Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float...

34
Activity ID Activity Name Orig Dur Remaining Duration Start Finish Total Float Milestones Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction for Bid Package 1 - Milestone - CM Multiprime 0 0 07-Aug-18 1075 MSTONE-MISC-BP1-9040 Completion of Bid Package 1 - Milestone - CM Multiprime 0 0 23-Mar-20* -84 MSTONE-MISC-BP1-9070 Construction Duration of BP-01 - Milestone - CM Multiprime 710 710 07-Aug-18 16-Jul-20 -199 MSTONE-MISC-BP2-9020 Start of Construction for Bid Package 2 - Milestone - CM Multiprime 0 0 06-Nov-17 A MSTONE-MISC-BP2-9050 Completion of Bid Package 2 - Milestone - CM Multiprime 0 0 30-Jul-20* -211 MSTONE-MISC-BP2-9080 Construction Duration of BP-02 - Milestone - CM Multiprime 781 791 06-Nov-17 A 29-Jul-20 -211 MSTONE-MISC-BP3-9030 Start of Construction for Bid Package 3 - Milestone - CM Multiprime 0 0 06-Nov-17 A MSTONE-MISC-BP3-9060 Completion of Bid Package 3 - Milestone - CM Multiprime 0 0 30-Jul-20* -211 MSTONE-MISC-BP3-9090 Construction Duration of BP-03 - Milestone - CM Multiprime 815 791 06-Nov-17 A 29-Jul-20 -211 MSTONE-MISC-N/A-9000 Notice to Proceed - Bid Package 2 &3 - CM Multiprime 0 0 21-Jul-16 A MSTONE-MISC-N/A-9010 Notice to Proceed - Bid Package 1 - CM Multiprime 0 0 07-Aug-18 -203 MSTONE-MISC-N/A-9020 BP-02 and BP-03 Deferred Submittals (Includes Review by Design Team & OSHPD) 472 0 21-Jul-16 A 06-Nov-17 A MSTONE-MISC-N/A-9100 Overall Project Substantial Completion - Milestone - CM Multiprime 0 0 17-Jul-20* -199 MSTONE-MISC-N/A-9110 Overall Project Final Completion - Milestone - CM Multiprime 0 0 17-Jul-20* -198 Bidding & Award (O Bidding & Award (Originally 90 wd) 378 47 17-Mar-16 A 06-Aug-18 -141 BA02 Bid Phase 30 0 17-Mar-16 A 03-May-16 A BA03 Building Survey (BP02 & BP-03 Abov e Ceiling) 36 0 14-Oct-16 A 03-Feb-17 A BA04 UCDMC Funding Augmentation Dec ision (&PRIMEb Peer Review) 30 0 04-May-16 A 13-Oct-16 A BA05 Re-bid HAZMAT BP-01 (Bid Advertisement to Bid Opening) (OD 30d) 15 15 02-Jul-18 23-Jul-18 -141 BA06 BP-01 NOA and Contract Execution (Per FD&C , FS w/ Funding Augmentation) 10 10 24-Jul-18 06-Aug-18 -141 BA07 BP-02 & BP-03 NOA and Contr act Execution (NOA Issued to BP-02 & BP-03 on 24JUN16) 19 0 24-Jun-16 A 21-Jul-16 A BA08 Repackage HAZMAT Bid Package (BP-01) 20 0 07-Dec-16 A 30-Jan-17 A BA09 Estimate for HAZMAT BP-01 (LIONAKIS) 15 0 31-Jan-17 A 03-Mar-17 A BA10 Estimate for HAZMAT BP-01 (PRIMEb) 15 0 31-Jan-17 A 02-Mar-17 A BA11 Reconcile Estimate For HAZMAT BP-01 3 0 06-Mar-17 A 08-Mar-17 A BA12 Funding Augmentation for HAZMAT BP-01 (FD&C to Confirm duration) 40 7 09-Mar-17 A 08-Jun-18 -149 BA13 Finalize Bid Docs for HAZMAT BP-01 (Completion Pending FD&C Leadership Direction to Proceed w/ Schedule Mitigation) 12 12 31-May-18 15-Jun-18 -141 BA14 OSHPD CO for Rebid Scope & Bid Addenda Material Changes (O D 15d) 5 5 24-Jul-18 30-Jul-18 -136 M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S 2018 2019 2020 2021 Start of Construction for Bid Package 1 - Milestone - CM Multiprime Completion of Bid Package 1 - Milestone - CM Multiprim Construction Duration of BP-01 - Milestone ction for Bid Package 2 - Milestone - CM Multiprime Completion of Bid Package 2 - Milestone - Construction Duration of BP-02 - Mileston ction for Bid Package 3 - Milestone - CM Multiprime Completion of Bid Package 3 - Milestone - Construction Duration of BP-03 - Mileston Notice to Proceed - Bid Package 1 - CM Multiprime 3 Deferred Submittals (Includes Review by Design Team & OSHPD) Overall Project Substantial Completion - M Overall Project Final Completion - Mileston g) r R eview) Re-bid HAZMAT BP-01 (Bid Advertisement to Bid Opening) (OD 30d) BP-01 NOA and Contract Execution (Per FD&C , FS w/ Funding Augmentation) -02 & BP-03 on 24JUN16) Funding Augmentation for HAZMAT BP-01 (FD&C to Confirm duration) Finalize Bid Docs for HAZMAT BP-01 (Completion Pending FD&C Leadership Direction to Proceed w/ Schedule Mitigation) OSHPD CO for Rebid Scope & Bid Addenda Material Changes (O D 15d) 4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 1 of 34 Data Date: 31-May-18 Run Date: 07-Jun-18 Layout: UCDMC - All Activities, Grouped by Subph Filters: TASK filter: All Activities Remaining Work Actual Work Critical Remaining Work Milestone Critical Milestone Remaining Le... Actual Level o... KITCHELL UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised SCHEDULE DATED: 31-May-18 All Activities, Grouped by Subphase - For Distribution-

Transcript of Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float...

Page 1: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

MilestonesMilestones 1275 791 21-Jul-16 A 30-Jul-20 352

MSTONE-MISC-BP1-9010 Start of Construction for Bid Package 1 - Milestone - CM Multiprime 0 0 07-Aug-18 1075

MSTONE-MISC-BP1-9040 Completion of Bid Package 1 - Milestone - CM Multiprime 0 0 23-Mar-20* -84

MSTONE-MISC-BP1-9070 Construction Duration of BP-01 - Milestone - CM Multiprime 710 710 07-Aug-18 16-Jul-20 -199

MSTONE-MISC-BP2-9020 Start of Construction for Bid Package 2 - Milestone - CM Multiprime 0 0 06-Nov-17 A

MSTONE-MISC-BP2-9050 Completion of Bid Package 2 - Milestone - CM Multiprime 0 0 30-Jul-20* -211

MSTONE-MISC-BP2-9080 Construction Duration of BP-02 - Milestone - CM Multiprime 781 791 06-Nov-17 A 29-Jul-20 -211

MSTONE-MISC-BP3-9030 Start of Construction for Bid Package 3 - Milestone - CM Multiprime 0 0 06-Nov-17 A

MSTONE-MISC-BP3-9060 Completion of Bid Package 3 - Milestone - CM Multiprime 0 0 30-Jul-20* -211

MSTONE-MISC-BP3-9090 Construction Duration of BP-03 - Milestone - CM Multiprime 815 791 06-Nov-17 A 29-Jul-20 -211

MSTONE-MISC-N/A-9000 Notice to Proceed - Bid Package 2 &3 - CM Multiprime 0 0 21-Jul-16 A

MSTONE-MISC-N/A-9010 Notice to Proceed - Bid Package 1 - CM Multiprime 0 0 07-Aug-18 -203

MSTONE-MISC-N/A-9020 BP-02 and BP-03 Deferred Submittals (Includes Review by Design Team & OSHPD) 472 0 21-Jul-16 A 06-Nov-17 A

MSTONE-MISC-N/A-9100 Overall Project Substantial Completion - Milestone - CM Multiprime 0 0 17-Jul-20* -199

MSTONE-MISC-N/A-9110 Overall Project Final Completion - Milestone - CM Multiprime 0 0 17-Jul-20* -198

Bidding & Award (Originally 90 wd)Bidding & Award (Originally 90 wd) 378 47 17-Mar-16 A 06-Aug-18 -141

BA02 Bid Phase 30 0 17-Mar-16 A 03-May-16 A

BA03 Building Survey (BP02 & BP-03 Above Ceiling) 36 0 14-Oct-16 A 03-Feb-17 A

BA04 UCDMC Funding Augmentation Dec ision (&PRIMEb Peer Review) 30 0 04-May-16 A 13-Oct-16 A

BA05 Re-bid HAZMAT BP-01 (Bid Advertisement to Bid Opening) (OD 30d) 15 15 02-Jul-18 23-Jul-18 -141

BA06 BP-01 NOA and Contract Execution (Per FD&C , FS w/ Funding Augmentation) 10 10 24-Jul-18 06-Aug-18 -141

BA07 BP-02 & BP-03 NOA and Contract Execution (NOA Issued to BP-02 & BP-03 on 24JUN16) 19 0 24-Jun-16 A 21-Jul-16 A

BA08 Repackage HAZMAT Bid Package (BP-01) 20 0 07-Dec-16 A 30-Jan-17 A

BA09 Estimate for HAZMAT BP-01 (LIONAKIS) 15 0 31-Jan-17 A 03-Mar-17 A

BA10 Estimate for HAZMAT BP-01 (PRIMEb) 15 0 31-Jan-17 A 02-Mar-17 A

BA11 Reconcile Estimate For HAZMAT BP-01 3 0 06-Mar-17 A 08-Mar-17 A

BA12 Funding Augmentation for HAZMAT BP-01 (FD&C to Confirm duration) 40 7 09-Mar-17 A 08-Jun-18 -149

BA13 Finalize Bid Docs for HAZMAT BP-01 (Completion Pending FD&C Leadership Direction to Proceed w/ Schedule Mitigation)

12 12 31-May-18 15-Jun-18 -141

BA14 OSHPD CO for Rebid Scope & Bid Addenda Material Changes (OD 15d) 5 5 24-Jul-18 30-Jul-18 -136

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

Start of Construction for Bid Package 1 - Milestone - CM Multiprime

Completion of Bid Package 1 - Milestone - CM Multiprime

Construction Duration of BP-01 - Milestone - CM Multiprime

Start of Construction for Bid Package 2 - Milestone - CM Multiprime

Completion of Bid Package 2 - Milestone - CM Multiprime

Construction Duration of BP-02 - Milestone - CM Multiprime

Start of Construction for Bid Package 3 - Milestone - CM Multiprime

Completion of Bid Package 3 - Milestone - CM Multiprime

Construction Duration of BP-03 - Milestone - CM Multiprime

Notice to Proceed - Bid Package 1 - CM Multiprime

BP-02 and BP-03 Deferred Submittals (Includes Review by Design Team & OSHPD)

Overall Project Substantial Completion - Milestone - CM Multipr

Overall Project Final Completion - Milestone - CM Multiprime

Building Survey (BP02 & BP-03 Above Ceiling)

UCDMC Funding Augmentation Dec ision (&PRIMEb Peer Review)

Re-bid HAZMAT BP-01 (Bid Advertisement to Bid Opening) (OD 30d)

BP-01 NOA and Contract Execution (Per FD&C , FS w/ Funding Augmentation)

BP-02 & BP-03 NOA and Contract Execution (NOA Issued to BP-02 & BP-03 on 24JUN16)

Funding Augmentation for HAZMAT BP-01 (FD&C to Confirm duration)

Finalize Bid Docs for HAZMAT BP-01 (Completion Pending FD&C Leadership Direction to Proceed w/ Schedule Mitigation)

OSHPD CO for Rebid Scope & Bid Addenda Material Changes (OD 15d)

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 1 of 34

Data Date: 31-May-18

Run Date: 07-Jun-18

Layout: UCDMC - All Activities, Grouped by Subph

Filters: TASK filter: All Activities

Remaining Work

Actual Work

Critical Remaining Work

Milestone

Critical Milestone

Remaining Le...

Actual Level o... KITCHELL

UCDMC Seismic Upgrade Fire and Life / Safety Upgrade -

Increment 2 - Master Project Schedule Revised

SCHEDULE DATED: 31-May-18

All Activities, Grouped by Subphase

- For Distribution-

aparker
Snapshot
aparker
Text Box
594
aparker
Text Box
594
aparker
Snapshot
aparker
Snapshot
aparker
Snapshot
aparker
Snapshot
aparker
Snapshot
aparker
Snapshot
Page 2: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

BA15 Constructability Review (PRIMEb) 15 0 31-Jan-17 A 02-Mar-17 A

BA16 FD&C Re-Phasing Decision 12 0 08-Nov-16 A 23-Nov-16 A

BA17 Phasing Plan / Master Project Schedule (For Bid Docs) 30 0 02-Dec-16 A 26-Jul-17 A

BA18 Confirm Existing Ceiling Types 4 0 01-Dec-16 A 04-Dec-16 A

BA19 UCDMC Contracts Department Bid Docs 10 10 18-Jun-18 29-Jun-18 -141

PreconstructionPreconstruction 424 30 22-Jul-16 A 17-Sep-18 739

PRECON-MISC-BP1-1020 Preconstruction Coordination (Safety, ICRA Test, etc) - Preconstruction - Bid Pkg 1 Contr 3 3 07-Aug-18 09-Aug-18 1072

PRECON-MISC-BP1-1030 Prepare Existing Site Investigation - Procurement - Bid Pkg 1 Contr 5 5 07-Aug-18 11-Aug-18 -73

PRECON-MISC-BP1-1040 Prepare & Submit Cementitious Fireproofing - Procurement - Bid Pkg 1 Contr 14 14 07-Aug-18 20-Aug-18 -189

PRECON-MISC-BP1-1050 Review & Approve Cementitious Fireproofing - Procurement - UCDMC 14 14 21-Aug-18 03-Sep-18 -189

PRECON-MISC-BP1-1060 Prepare & Submit Firestopping - Procurement - Bid Pkg 1 Contr 14 14 07-Aug-18 20-Aug-18 -196

PRECON-MISC-BP1-1070 Review & Approve Fires topping - Procurement - UCDMC 14 14 21-Aug-18 03-Sep-18 -196

PRECON-MISC-BP1-1080 Procure/Fab/Deliver Firestopping - Procurement - Bid Pkg 1 Contr 7 7 04-Sep-18 10-Sep-18 -196

PRECON-MISC-BP1-1090 Prepare & Submit Access Doors , Caulking & Sealant - Procurement - Bid Pkg 1 Contr 14 14 07-Aug-18 20-Aug-18 -203

PRECON-MISC-BP1-1100 Review & Approve Access Doors, Caulking & Sealant - Procurement - UCDMC 14 14 21-Aug-18 03-Sep-18 -203

PRECON-MISC-BP1-1110 Procure/Fab/Deliver Ceiling Mtls, Caulking & Sealant - Procurement - Bid Pkg 1 Contr (ASSUMMES ACCEPTANCE OF ACT DETAIL)

14 14 04-Sep-18 17-Sep-18 -203

PRECON-MISC-BP1-1120 Prepare & Submit Metal Stud Framing - Procurement - Bid Pkg 1 Contr 14 14 07-Aug-18 20-Aug-18 -203

PRECON-MISC-BP1-1130 Review & Approve Metal Stud Framing - Procurement - UCDMC 14 14 21-Aug-18 03-Sep-18 -203

PRECON-MISC-BP1-1140 Procure/Fab/Deliver Metal Stud Framing - Procurement - Bid Pkg 1 Contr 14 14 04-Sep-18 17-Sep-18 -203

PRECON-MISC-BP1-1150 Prepare & Submit Gypsum Board - Procurement - Bid Pkg 1 Contr 14 14 07-Aug-18 20-Aug-18 -203

PRECON-MISC-BP1-1160 Review & Approve Gypsum Board - Procurement - UCDMC 14 14 21-Aug-18 03-Sep-18 -203

PRECON-MISC-BP1-1170 Procure/Fab/Deliver Gypsum Board - Procurement - Bid Pkg 1 Contr 14 14 04-Sep-18 17-Sep-18 -203

PRECON-MISC-BP1-1180 Prepare & Submit Paint - Procurement - Bid Pkg 1 Contr 14 14 07-Aug-18 20-Aug-18 -203

PRECON-MISC-BP1-1190 Review & Approve Paint - Procurement - UCDMC 14 14 21-Aug-18 03-Sep-18 -203

PRECON-MISC-BP1-1200 Procure/Fab/Deliver Paint - Procurement - Bid Pkg 1 Contr 14 14 04-Sep-18 17-Sep-18 -203

PRECON-MISC-BP1-1210 Prepare & Submit Backing - Procurement - Bid Pkg 1 Contr 14 14 07-Aug-18 20-Aug-18 -203

PRECON-MISC-BP1-1220 Review & Approve Metal Backing - Procurement - UCDMC 14 14 21-Aug-18 03-Sep-18 -203

PRECON-MISC-BP1-1230 Procure/Fab/Deliver Backing - Procurement - Bid Pkg 1 Contr 14 14 04-Sep-18 17-Sep-18 -203

PRECON-MISC-BP1-1240 Prepare & Submit HAZMAT Containment - Bid Pkg 1 Contr 14 14 07-Aug-18 20-Aug-18 -96

PRECON-MISC-BP1-1250 Review & Approve HAZMAT Containment - Procurement - UCDMC 14 14 21-Aug-18 03-Sep-18 -96

PRECON-MISC-BP1-1260 Procure/Fab/Deliver HAZMAT Containment Bid Pkg 1 Contr 14 14 04-Sep-18 17-Sep-18 -96

PRECON-MISC-BP2-1290 Prepare & Submit LV Conductors & Cables - Procurement - Bid Pkg 2 Contr 28 0 01-Jan-17 A 11-Jan-17 A

PRECON-MISC-BP2-1300 Review & Approve LV Conductors & Cables - Procurement - UCDMC 14 0 11-Jan-17 A 01-Mar-17 A

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

Phasing Plan / Master Project Schedule (For Bid Docs)

UCDMC Contracts Department Bid Docs

Preconstruction Coordination (Safety, ICRA Test, etc) - Preconstruction - Bid Pkg 1 Contr

Prepare Existing Site Investigation - Procurement - Bid Pkg 1 Contr

Prepare & Submit Cementitious Fireproofing - Procurement - Bid Pkg 1 Contr

Review & Approve Cementitious Fireproofing - Procurement - UCDMC

Prepare & Submit Firestopping - Procurement - Bid Pkg 1 Contr

Review & Approve Fires topping - Procurement - UCDMC

Procure/Fab/Deliver Firestopping - Procurement - Bid Pkg 1 Contr

Prepare & Submit Access Doors , Caulking & Sealant - Procurement - Bid Pkg 1 Contr

Review & Approve Access Doors, Caulking & Sealant - Procurement - UCDMC

Procure/Fab/Deliver Ceiling Mtls, Caulking & Sealant - Procurement - Bid Pkg 1 Contr (ASSUMMES ACCEPTANCE OF ACT DETAIL

Prepare & Submit Metal Stud Framing - Procurement - Bid Pkg 1 Contr

Review & Approve Metal Stud Framing - Procurement - UCDMC

Procure/Fab/Deliver Metal Stud Framing - Procurement - Bid Pkg 1 Contr

Prepare & Submit Gypsum Board - Procurement - Bid Pkg 1 Contr

Review & Approve Gypsum Board - Procurement - UCDMC

Procure/Fab/Deliver Gypsum Board - Procurement - Bid Pkg 1 Contr

Prepare & Submit Paint - Procurement - Bid Pkg 1 Contr

Review & Approve Paint - Procurement - UCDMC

Procure/Fab/Deliver Paint - Procurement - Bid Pkg 1 Contr

Prepare & Submit Backing - Procurement - Bid Pkg 1 Contr

Review & Approve Metal Backing - Procurement - UCDMC

Procure/Fab/Deliver Backing - Procurement - Bid Pkg 1 Contr

Prepare & Submit HAZMAT Containment - Bid Pkg 1 Contr

Review & Approve HAZMAT Containment - Procurement - UCDMC

Procure/Fab/Deliver HAZMAT Containment Bid Pkg 1 Contr

Prepare & Submit LV Conductors & Cables - Procurement - Bid Pkg 2 Contr

Review & Approve LV Conductors & Cables - Procurement - UCDMC

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 2 of 34

Page 3: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

PRECON-MISC-BP2-1310 Procure/Fab/Deliver LV Conductors & Cables - Procurement - Bid Pkg 2 Contr 7 0 02-Mar-17 A 06-Jul-17 A

PRECON-MISC-BP2-1320 Prepare & Submit Grounding - Procurement - Bid Pkg 2 Contr 28 0 01-Jan-17 A 11-Jan-17 A

PRECON-MISC-BP2-1330 Review & Approve Grounding - Procurement - UCDMC 14 0 11-Jan-17 A 01-Mar-17 A

PRECON-MISC-BP2-1340 Procure/Fab/Deliver Grounding - Procurement - Bid Pkg 2 Contr 7 0 17-May-17 A 06-Jul-17 A

PRECON-MISC-BP2-1350 Prepare & Submit Hangers & Supporters - Procurement - Bid Pkg 2 Contr 28 0 01-Jan-17 A 11-Jan-17 A

PRECON-MISC-BP2-1360 Review & Approve Hangers & Supporters - Procurement - UCDMC 14 0 11-Jan-17 A 01-Mar-17 A

PRECON-MISC-BP2-1370 Procure/Fab/Deliver Hangers & Supporters - Procurement - Bid Pkg 2 Contr 7 0 17-May-17 A 06-Jul-17 A

PRECON-MISC-BP2-1380 Prepare & Submit Raceway & Conduits - Procurement - Bid Pkg 2 Contr 28 0 01-Jan-17 A 11-Jan-17 A

PRECON-MISC-BP2-1390 Review & Approve Raceway & Conduits - Procurement - UCDMC 14 0 11-Jan-17 A 01-Mar-17 A

PRECON-MISC-BP2-1400 Procure/Fab/Deliver Raceway & Conduits - Procurement - Bid Pkg 2 Contr 7 0 17-May-17 A 06-Jul-17 A

PRECON-MISC-BP2-1410 Prepare & Submit Pullboxes & Junctions Boxes - Procurement - Bid Pkg 2 Contr 28 0 01-Jan-17 A 11-Jan-17 A

PRECON-MISC-BP2-1420 Review & Approve Pullboxes & Junctions Boxes - Procurement - UCDMC 14 0 11-Jan-17 A 01-Mar-17 A

PRECON-MISC-BP2-1430 Procure/Fab/Deliver Pullboxes & Junctions Boxes - Procurement - Bid Pkg 2 Contr 7 0 17-May-17 A 06-Jul-17 A

PRECON-MISC-BP2-1440 Prepare & Submit Shop Drwg Perm Fire Alarm Sys tem - Procurement - Bid Pkg 2 Contr (Due 12/16/2016 per contract)

28 0 22-Jul-16 A 11-Jan-17 A

PRECON-MISC-BP2-1450 Review & Approve Shop Drwg Perm Fire Alarm System - Procurement - UCDMC 28 0 11-Jan-17 A 01-Mar-17 A

PRECON-MISC-BP2-1460 Procure/Fab/Deliver Perm Fire Alarm System - Procurement - Bid Pkg 2 Contr 7 0 17-May-17 A 06-Jul-17 A

PRECON-MISC-BP2-1470 Prepare & Submit Temp Fire Alarm System - Procurement - Bid Pkg 2 Contr (Due 12/16/2016 per contract) 28 0 22-Jul-16 A 11-Jan-17 A

PRECON-MISC-BP2-1480 Review & Approve Fire Alarm System - Procurement - UCDMC 49 0 11-Jan-17 A 01-Mar-17 A

PRECON-MISC-BP2-1490 Procure/Fab/Deliver Fire Alarm System - Procurement - Bid Pkg 2 Contr 7 0 02-Mar-17 A 06-Jul-17 A

PRECON-MISC-BP2-1500 Revise and Resubmit Perm Fire Alarm System Drawings - Bid Pkg 2 (Due 3/8/2017 per Contract) 10 0 01-Mar-17 A 15-Mar-17 A

PRECON-MISC-BP2-1510 Review & Approve Resubmittal of Perm Fire Alarm System - UCDMC (Lionakis sent to UCDMC on 3/27/17) 14 0 15-Mar-17 A 17-May-17 A

PRECON-MISC-BP2-1520 Revise & Re-Submit Fire Alarm System - Procurement - UCDMC - Revision 2 13 0 02-Mar-17 A 15-Mar-17 A

PRECON-MISC-BP2-1530 Review & Approve Fire Alarm System - Procurement - UCDMC - Revision 2 62 0 16-Mar-17 A 17-May-17 A

PRECON-MISC-BP2-1540 Revise & Re-Submit Fire Alarm System - Procurement - UCDMC - Revision 3 (KCEM coord w/ Fire Marshal14 cal days)

56 0 18-May-17 A 13-Jul-17 A

PRECON-MISC-BP2-1550 Review & Approve Fire Alarm System - Procurement - UCDMC - Revision 3 62 0 14-Jul-17 A 24-Aug-17 A

PRECON-MISC-BP2-1560 Revise & Re-Submit Fire Alarm System - Procurement - UCDMC - Revision 4 3 0 25-Aug-17 A 08-Sep-17 A

PRECON-MISC-BP2-1570 Review & Approve Fire Alarm System - Procurement - UCDMC - Revision 4 (at OSHPD on 9/13) 15 0 11-Sep-17 A 06-Nov-17 A

PRECON-MISC-BP3-1500 Prepare & Submit Sleeves & Seals - Procurement - Bid Pkg 3 Contr 28 0 01-Oct-16 A 19-Oct-16 A

PRECON-MISC-BP3-1510 Review & Approve Sleeves & Seals - Procurement - UCDMC 14 0 19-Oct-16 A 18-Nov-16 A

PRECON-MISC-BP3-1520 Procure/Fab/Deliver Sleeves & Seals - Procurement - Bid Pkg 3 Contr 7 0 02-Mar-17 A 06-Jul-17 A

PRECON-MISC-BP3-1530 Prepare & Submit Escutcheons/Hangers/Supports - Procurement - Bid Pkg 3 Contr 28 0 01-Oct-16 A 19-Oct-16 A

PRECON-MISC-BP3-1540 Review & Approve Escutcheons/Hangers/Supports - Procurement - UCDMC 14 0 19-Oct-16 A 18-Nov-16 A

PRECON-MISC-BP3-1550 Procure/Fab/Deliver Escutcheons/Hangers/Supports - Procurement - Bid Pkg 3 Contr 14 0 06-Jul-17 A 20-Jul-17 A

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

Procure/Fab/Deliver LV Conductors & Cables - Procurement - Bid Pkg 2 Contr

Prepare & Submit Grounding - Procurement - Bid Pkg 2 Contr

Review & Approve Grounding - Procurement - UCDMC

Procure/Fab/Deliver Grounding - Procurement - Bid Pkg 2 Contr

Prepare & Submit Hangers & Supporters - Procurement - Bid Pkg 2 Contr

Review & Approve Hangers & Supporters - Procurement - UCDMC

Procure/Fab/Deliver Hangers & Supporters - Procurement - Bid Pkg 2 Contr

Prepare & Submit Raceway & Conduits - Procurement - Bid Pkg 2 Contr

Review & Approve Raceway & Conduits - Procurement - UCDMC

Procure/Fab/Deliver Raceway & Conduits - Procurement - Bid Pkg 2 Contr

Prepare & Submit Pullboxes & Junctions Boxes - Procurement - Bid Pkg 2 Contr

Review & Approve Pullboxes & Junctions Boxes - Procurement - UCDMC

Procure/Fab/Deliver Pullboxes & Junctions Boxes - Procurement - Bid Pkg 2 Contr

Prepare & Submit Shop Drwg Perm Fire Alarm Sys tem - Procurement - Bid Pkg 2 Contr (Due 12/16/2016 per contrac t)

Review & Approve Shop Drwg Perm Fire Alarm System - Procurement - UCDMC

Procure/Fab/Deliver Perm Fire Alarm System - Procurement - Bid Pkg 2 Contr

Prepare & Submit Temp Fire Alarm System - Procurement - Bid Pkg 2 Contr (Due 12/16/2016 per contract)

Review & Approve Fire Alarm System - Procurement - UCDMC

Procure/Fab/Deliver Fire Alarm System - Procurement - Bid Pkg 2 Contr

Revise and Resubmit Perm Fire Alarm System Drawings - Bid Pkg 2 (Due 3/8/2017 per Contract)

Review & Approve Resubmittal of Perm Fire Alarm System - UCDMC (Lionakis sent to UCDMC on 3/27/17)

Revise & Re-Submit Fire Alarm System - Procurement - UCDMC - Revision 2

Review & Approve Fire Alarm System - Procurement - UCDMC - Revision 2

Revise & Re-Submit Fire Alarm System - Procurement - UCDMC - Revision 3 (KCEM coord w/ Fire Marshal 14 cal days)

Review & Approve Fire Alarm System - Procurement - UCDMC - Revision 3

Revise & Re-Submit Fire Alarm System - Procurement - UCDMC - Revision 4

Review & Approve Fire Alarm System - Procurement - UCDMC - Revision 4 (at OSHPD on 9/13)

Prepare & Submit Sleeves & Seals - Procurement - Bid Pkg 3 Contr

Review & Approve Sleeves & Seals - Procurement - UCDMC

Procure/Fab/Deliver Sleeves & Seals - Procurement - Bid Pkg 3 Contr

Prepare & Submit Escutcheons/Hangers/Supports - Procurement - Bid Pkg 3 Contr

Review & Approve Escutcheons/Hangers/Supports - Procurement - UCDMC

Procure/Fab/Deliver Escutcheons/Hangers/Supports - Procurement - Bid Pkg 3 Contr

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 3 of 34

Page 4: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

PRECON-MISC-BP3-1560 Prepare & Submit Valves - Procurement - Bid Pkg 3 Contr 28 0 01-Oct-16 A 19-Oct-16 A

PRECON-MISC-BP3-1570 Review & Approve Valves - Procurement - UCDMC 14 0 19-Oct-16 A 18-Nov-16 A

PRECON-MISC-BP3-1580 Procure/Fab/Deliver Valves - Procurement - Bid Pkg 3 Contr 14 0 06-Jul-17 A 20-Jul-17 A

PRECON-MISC-BP3-1590 Prepare & Submit Shop Drwg Fire Sprinklers - Procurement - Bid Pkg 3 Contr 146 0 22-Jul-16 A 15-Dec-16 A

PRECON-MISC-BP3-1600 Review & Approve Submit Shop Drwg Sprinklers - Procurement - UCDMC (Due 1/16/17 per contract) 14 0 15-Dec-16 A 01-Feb-17 A

PRECON-MISC-BP3-1610 Procure/Fab/Deliver Sprinklers - Procurement - Bid Pkg 3 Contr 14 0 06-Jul-17 A 20-Jul-17 A

PRECON-MISC-BP3-1620 Prepare & Submit Piping & Misc Materials - Procurement - Bid Pkg 3 Contr 28 0 01-Oct-16 A 19-Oct-16 A

PRECON-MISC-BP3-1630 Review & Approve Piping & Misc Materials - Procurement - UCDMC 14 0 19-Oct-16 A 18-Nov-16 A

PRECON-MISC-BP3-1640 Procure/Fab/Deliver Piping & Misc Materials - Procurement - Bid Pkg 3 Contr 14 0 06-Jul-17 A 20-Jul-17 A

PRECON-MISC-BP3-1680 Revise and Resubmit Sprinkler Shop Drawings - Bid Pkg 3 (Due 2/8/2017 Per Contract) Revision 2 36 0 01-Feb-17 A 16-Mar-17 A

PRECON-MISC-BP3-1690 Review & Approve Resubmittal of Sprinkler Shop Drawings - UCDMC (Lionak is sent to UCDMC on 3/27/17)- Revision 2

14 0 22-Mar-17 A 08-May-17 A

PRECON-MISC-BP3-1700 Revise and Resubmit Sprinkler Shop Drawings - Bid Pkg 3 - Revision 3 36 0 09-May-17 A 07-Jun-17 A

PRECON-MISC-BP3-1710 Review & Approve Resubmittal of Sprinkler Shop Drawings - UCDMC - Revision 3 14 0 08-Jun-17 A 05-Jul-17 A

PRECON-MISC-BP3-1720 Revise and Resubmit Sprinkler Shop Drawings - Bid Pkg 3 - Revision 4 36 0 06-Jul-17 A 14-Jul-17 A

PRECON-MISC-BP3-1730 Review & Approve Resubmittal of Sprinkler Shop Drawings - UCDMC - Revision 4 14 0 14-Jul-17 A 16-Aug-17 A

PRECON-MISC-N/A-1240 Prepare & Submit Construction Baseline Schedule - Procurement - CM Multiprime 15 0 26-Jul-17 A 28-Jul-17 A

PRECON-MISC-N/A-1250 Review & Approve Construc tion Baseline Schedule - Procurement - UCDMC 14 0 28-Jul-17 A 28-Jul-17 A

ConstructionConstruction 870 559 13-Mar-17 A 21-Jul-20 258

Pilot ProgramPilot Program 291 73 05-Apr-17 A 10-Sep-18 -67

Pilot Bidding & AwardPilot Bidding & Award 24 0 05-Apr-17 A 16-Jun-17 A

PRECON-MISC-PP-1200 Pilot Program - Direction from FD&C 14 0 05-Apr-17 A 03-May-17 A

PRECON-MISC-PP-1210 Pilot Program - Repackage Bid Docs 3 0 04-May-17 A 08-May-17 A

PRECON-MISC-PP-1220 Pilot Program - Finalize Bid Docs 10 0 09-May-17 A 10-May-17 A

PRECON-MISC-PP-1230 Pilot Program - Bid Phase (Advert through Bid Opening) 14 0 11-May-17 A 09-Jun-17 A

PRECON-MISC-PP-1240 Pilot Program - NOA and Contract Execution 14 0 12-Jun-17 A 16-Jun-17 A

PRECON-MISC-PP-1250 Pilot Program - Notice to Proceed (BP-03 field order-02) 0 0 16-Jun-17 A

Pilot PreconstructionPilot Preconstruction 73 0 16-Jun-17 A 12-Dec-17 A

PRECON-MISC-BP1-1000 Establish Laydown Yard - Preconstruction - Pilot Contr 5 0 26-Jun-17 A 07-Jul-17 A

PRECON-MISC-PP-1270 Prepare & Submit HAZMAT Containment - Pilot Contr 14 0 16-Jun-17 A 30-Jun-17 A

PRECON-MISC-PP-1280 Review & Approve HAZMAT Containment - Pilot Contr 14 0 03-Jul-17 A 10-Jul-17 A

PRECON-MISC-PP-1290 Procure/Fab/Deliver HAZMAT Containment - Pilot Contr 7 0 03-Aug-17 A 10-Aug-17 A

PRECON-MISC-PP-1300 Prep & Submit Misc Materials - Pilot Contr 14 0 16-Jun-17 A 30-Jun-17 A

PRECON-MISC-PP-1310 Review & Approve Misc Materials - Pilot Contr 14 0 30-Jun-17 A 10-Jul-17 A

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

Prepare & Submit Valves - Procurement - Bid Pkg 3 Contr

Procure/Fab/Deliver Valves - Procurement - Bid Pkg 3 Contr

Prepare & Submit Shop Drwg Fire Sprinklers - Procurement - Bid Pkg 3 Contr

Review & Approve Submit Shop Drwg Sprinklers - Procurement - UCDMC (Due 1/16/17 per contract)

Procure/Fab/Deliver Sprinklers - Procurement - Bid Pkg 3 Contr

Prepare & Submit Piping & Misc Materials - Procurement - Bid Pkg 3 Contr

Review & Approve Piping & Misc Materials - Procurement - UCDMC

Procure/Fab/Deliver Piping & Misc Materials - Procurement - Bid Pkg 3 Contr

Revise and Resubmit Sprinkler Shop Drawings - Bid Pkg 3 (Due 2/8/2017 Per Contract) Revision 2

Review & Approve Resubmittal of Sprinkler Shop Drawings - UCDMC (Lionak is sent to UCDMC on 3/27/17) - Revision 2

Revise and Resubmit Sprinkler Shop Drawings - Bid Pkg 3 - Revision 3

Review & Approve Resubmittal of Sprinkler Shop Drawings - UCDMC - Revision 3

Revise and Resubmit Sprinkler Shop Drawings - Bid Pkg 3 - Revision 4

Review & Approve Resubmittal of Sprinkler Shop Drawings - UCDMC - Revision 4

Prepare & Submit Construction Baseline Schedule - Procurement - CM Multiprime

Review & Approve Construc tion Baseline Schedule - Procurement - UCDMC

Pilot Program - Direction from FD&C

Pilot Program - Repackage Bid Docs

Pilot Program - Bid Phase (Advert through Bid Opening)

Pilot Program - NOA and Contract Execution

Pilot Program - Notice to Proceed (BP-03 field order-02)

Establish Laydown Yard - Preconstruction - Pilot Contr

Prepare & Submit HAZMAT Containment - Pilot Contr

Review & Approve HAZMAT Containment - Pilot Contr

Procure/Fab/Deliver HAZMAT Containment - Pilot Contr

Prep & Submit Misc Materials - Pilot Contr

Review & Approve Misc Materials - Pilot Contr

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 4 of 34

Page 5: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

PRECON-MISC-PP-1320 Procure & Deliver Misc Materials - Pilot Contr 14 0 03-Aug-17 A 10-Aug-17 A

PRECON-MISC-PP-1330 Revise & Re-Submit HAZMAT Containment - Pilot Contr - Revision 1 14 0 11-Jul-17 A 17-Jul-17 A

PRECON-MISC-PP-1340 Review & Approve HAZMAT Containment - Pilot Contr - Revision 1 14 0 18-Jul-17 A 31-Aug-17 A

PRECON-MISC-PP-1350 Revise & Re-Submit Misc Materials - Pilot Contr - Revision 1 14 0 11-Jul-17 A 17-Jul-17 A

PRECON-MISC-PP-1360 Review & Approve Misc Materials - Pilot Contr - Revision 1 14 0 18-Jul-17 A 31-Aug-17 A

PRECON-MISC-PP-1370 Procure & Deliver Long Lead Materials - Pilot Contr 42 0 03-Aug-17 A 12-Dec-17 A

Pilot ConstructionPilot Construction 206 73 10-Oct-17 A 10-Sep-18 -67

INSPCT-BP2-7200 BP-02 Fire Alarm Inspections & Verifications of 4th Floor 3 3 31-Aug-18 05-Sep-18 -65

INSPCT-BP3-7210 BP-03 Fire Sprinkler Inspections & Verifications of 4th Floor 3 3 31-Aug-18 05-Sep-18 -65

SP 1.10-9th-2175 Punchlist - 9th Flr Penthouse SP 1.10a 1 1 20-Jun-18 20-Jun-18 -149

SP 1.10-9th-2185 Punchlist Correction - 9th Flr Penthouse SP 1.10a 1 1 21-Jun-18 21-Jun-18 -149

SP 1.10-BP1-2165 Install Containment - 9th Flr Penthouse, SP 1.10a - Pilot Contr 1 0 16-Oct-17 A 16-Oct-17 A

SP 1.10-BP3-2170 Inspect & Verify Fire Alarm and Sprinkler - 9th Fl - Bid Pkg 2 & 3 2 2 14-Jun-18 15-Jun-18 -145

SP 1.10-BP3-2180 Material Staging - 9th Fl Penthouse, SP 1.10a - Bid Pkg 2 & 3 Contr 1 0 10-Oct-17 A 10-Oct-17 A

SP 1.10-BP3-2190 Layout - 9th Fl Penthouse, SP 1.10a - Bid Pkg 2 & 3 Contr 1 0 12-Oct-17 A 12-Oct-17 A

SP 1.10a-9h-BP1-2140 Intall Roof Protection - 9th Flr, SP 1.10a - Pilot Contr 2 0 16-Oct-17 A 16-Oct-17 A

SP 1.10a-9h-BP1-2150 Demo/Abate - 9th Flr Penthouse, SP 1.10a - (Work at Comm. Penthouse Pending RFI 011) 4 0 17-Oct-17 A 20-Oct-17 A

SP 1.10a-9th-BP1-209 Air Clearance Test - 9th Flr Penthouse, SP 1.10a - Pilot Contr 1 1 26-Jun-18 26-Jun-18 -149

SP 1.10a-9th-BP1-2090 Terminal Clean - 9th Flr Penthouse, SP 1.10a - Pilot Contr 3 3 22-Jun-18 26-Jun-18 -149

SP 1.10a-9th-BP1-2150 Remove Containment & Roof Protection - 9th Flr, SP 1.10a - Pilot Contr 2 0 17-Oct-17 A 20-Oct-17 A

SP 1.10a-9th-BP1-2160 Touch Ups and Repairs - 9th Flr Penthouse SP 1.10a - Pilot Contr 4 4 14-Jun-18 19-Jun-18 -149

SP 1.10a-9th-BP2-2100 Decomission & Install Fire Alarm - 9th Flr, SP 1.10a - Bid Pkg 2 Contr 6 6 31-May-18* 07-Jun-18 -149

SP 1.10a-9th-BP3-211 RFI 011 - Telecom Shack 16 0 26-Oct-17 A 16-Nov-17 A

SP 1.10a-9th-BP3-212 RFI 011 - Telecom Shack Demo Floor to Scan SOD and Install Fire Sprinker 4 4 08-Jun-18 13-Jun-18 -159

SP 1.10a-9th-BP3-2120 Install Fire Sprinkler - 9th Flr, SP 1.10a - Bid Pkg 3 Contr 6 0 23-Oct-17 A 26-Oct-17 A

SP 2.0-4th-Misc-2680 Vacate Patient Care Rooms - 4th Flr, SP 2.06 - UCDMC 2 0 17-May-18 A 18-May-18 A

SP 2.01-4th-2260 Punchlist (4th Floor Patient Rooms 4115, 4117, 4119, and HK Room 4120) 1 0 02-Jan-18 A 02-Jan-18 A

SP 2.01-4th-2270 Layout - 4th Floor, SP 2.01 - Bid Pkg 2 & 3 Contr 1 0 06-Dec-17 A 06-Dec-17 A

SP 2.01-4th-2280 Punchlist Correction (4th Floor Patient Rooms 4115, 4117, 4119, and HK Room 4120) 1 0 08-Jan-18 A 09-Jan-18 A

SP 2.01-4th-2290 Air Clearance Test - Pilot Contr 1 0 10-Jan-18 A 10-Jan-18 A

SP 2.01-4th-2300 Punchlist 1 0 29-Jan-18 A 29-Jan-18 A

SP 2.01-4th-2310 Punchlist Correction 1 0 30-Jan-18 A 31-Jan-18 A

SP 2.01-4th-2320 Air Clearance Test - Pilot Contr 1 0 31-Jan-18 A 31-Jan-18 A

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

Procure & Deliver Misc Materials - Pilot Contr

Revise & Re-Submit HAZMAT Containment - Pilot Contr - Revision 1

Review & Approve HAZMAT Containment - Pilot Contr - Revision 1

Revise & Re-Submit Misc Materials - Pilot Contr - Revision 1

Review & Approve Misc Materials - Pilot Contr - Revision 1

Procure & Deliver Long Lead Materials - Pilot Contr

BP-02 Fire Alarm Inspections & Verifications of 4th Floor

BP-03 Fire Sprinkler Inspections & Verifications of 4th Floor

Punchlist - 9th Flr Penthouse SP 1.10a

Punchlist Correction - 9th Flr Penthouse SP 1.10a

Install Containment - 9th Flr Penthouse, SP 1.10a - Pilot Contr

Inspect & Verify Fire Alarm and Sprinkler - 9th Fl - Bid Pkg 2 & 3

Material Staging - 9th Fl Penthouse, SP 1.10a - Bid Pkg 2 & 3 Contr

Layout - 9th Fl Penthouse, SP 1.10a - Bid Pkg 2 & 3 Contr

Intall Roof Protection - 9th Flr, SP 1.10a - Pilot Contr

Demo/Abate - 9th Flr Penthouse, SP 1.10a - (Work at Comm. Penthouse Pending RFI 011)

Air Clearance Test - 9th Flr Penthouse, SP 1.10a - Pilot Contr

Terminal Clean - 9th Flr Penthouse, SP 1.10a - Pilot Contr

Remove Containment & Roof Protection - 9th Flr, SP 1.10a - Pilot Contr

Touch Ups and Repairs - 9th Flr Penthouse SP 1.10a - Pilot Contr

Decomission & Install Fire Alarm - 9th Flr, SP 1.10a - Bid Pkg 2 Contr

RFI 011 - Telecom Shack

RFI 011 - Telecom Shack Demo Floor to Scan SOD and Install Fire Sprinker

Install Fire Sprinkler - 9th Flr, SP 1.10a - Bid Pkg 3 Contr

Vacate Patient Care Rooms - 4th Flr, SP 2.06 - UCDMC

Punchlist (4th Floor Patient Rooms 4115, 4117, 4119, and HK Room 4120)

Layout - 4th Floor, SP 2.01 - Bid Pkg 2 & 3 Contr

Punchlist Correction (4th Floor Patient Rooms 4115, 4117, 4119, and HK Room 4120)

Air Clearance Test - Pilot Contr

Punchlist

Punchlist Correction

Air Clearance Test - Pilot Contr

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 5 of 34

Page 6: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

SP 2.01-4th-BP1-2190 Terminal Clean - 4th Floor, SP 2.01 - Pilot Contr 3 0 08-Jan-18 A 09-Jan-18 A

SP 2.01-4th-BP1-2210 Demo/Abate & Install Ceiling Access Frame - 4th Floor, SP 2.01 - Pilot Contr 4 0 06-Dec-17 A 08-Dec-17 A

SP 2.01-4th-BP1-2215 Additional Fire Protection Patch 2 0 14-Dec-17 A 15-Dec-17 A

SP 2.01-4th-BP1-2217 ATI Access Hole Location and Ceiling Repairs 7 0 14-Dec-17 A 22-Dec-17 A

SP 2.01-4th-BP1-2220 Install Ceiling Access Panels & Touch Up/Repair - 4th Floor, SP 2.01 - Pilot Contr 3 0 19-Dec-17 A 22-Dec-17 A

SP 2.01-4th-BP1-2230 Install Cont./Access/Egress/Signage - 4th Floor, SP 2.01 - Pilot Contr 1 0 01-Dec-17 A 05-Dec-17 A

SP 2.01-4th-BP1-2240 Material Staging - 4th Floor, SP 2.01 - Bid Pkg 2 & 3 Contr 1 0 11-Dec-17 A 13-Dec-17 A

SP 2.01-4th-BP1-2250 Remove Cont./Access/Egress/Signage - 4th Floor, SP 2.01 -Pilot Contr 1 0 11-Jan-18 A 12-Jan-18 A

SP 2.01-4th-BP2-2200 Decomission & Install Fire Alarm - 4th Floor, SP 2.01 - Bid Pkg 2 Contr 6 0 11-Dec-17 A 18-Dec-17 A

SP 2.01-4th-BP3-2240 Install Fire Sprinkler - 4th Floor, SP 2.01 - Bid Pkg 3 Contr 6 0 11-Dec-17 A 13-Dec-17 A

SP 2.02-4th-2280 Layout - 4th Floor, SP 2.02 - Bid Pkg 2 &3 Contr 1 0 18-Jan-18 A 18-Jan-18 A

SP 2.02-4th-BP1-2260 Material Staging - 4th Flr, SP 2.02 - Bid Pkg 2 & 3 Contr 1 0 15-Jan-18 A 15-Jan-18 A

SP 2.02-4th-BP1-2270 Terminal Clean - 4th Flr, SP 2.02 - Pilot Contr 3 0 06-Feb-18 A 06-Feb-18 A

SP 2.02-4th-BP1-2290 Demo/Abate & Install Ceiling Access Frame - 4th Flr, SP 2.02 - Pilot Contr 4 0 19-Jan-18 A 22-Jan-18 A

SP 2.02-4th-BP1-2300 Install Ceiling Access Panels & Touch Up/Repair - 4th Flr, SP 2.02 - Pilot Contr 3 0 24-Jan-18 A 26-Jan-18 A

SP 2.02-4th-BP1-2310 Install Cont./Access/Egress/Signage - 4th Flr, SP 2.02 - Pilot Contr 1 0 15-Jan-18 A 17-Jan-18 A

SP 2.02-4th-BP1-2330 Remove Cont./Access/Egress/Signage - 4th Flr, SP 2.02 - Pilot Contr 1 0 05-Feb-18 A 05-Feb-18 A

SP 2.02-4th-BP2-2280 Decomission & Install Fire Alarm - 4th Flr, SP 2.02 - Bid Pkg 2 Contr (IES TO CONFIRM DATES) 6 0 05-Jan-18 A 05-Jan-18 A

SP 2.02-4th-BP3-2320 Install Fire Sprinkler - 4th Flr, SP 2.02 - Bid Pkg 3 Contr 6 0 23-Jan-18 A 25-Jan-18 A

SP 2.03-4th-2290 Layout - 4th Floor, SP 2.03 - Bid Pkg 2 &3 Contr 1 0 08-Feb-18 A 08-Feb-18 A

SP 2.03-4th-2330 Punchlist 1 0 27-Feb-18 A 27-Feb-18 A

SP 2.03-4th-2340 Punchlist Correction 1 0 27-Feb-18 A 27-Feb-18 A

SP 2.03-4th-2350 Air Clearance Test - Pilot Contr 1 0 28-Feb-18 A 28-Feb-18 A

SP 2.03-4th-BP1-2270 Material Staging - 4th Flr, SP 2.03 - Bid Pkg 2 & 3 Contr 1 0 06-Feb-18 A 06-Feb-18 A

SP 2.03-4th-BP1-2350 Terminal Clean - 4th Flr, SP 2.03 - Pilot Contr 3 0 27-Feb-18 A 27-Feb-18 A

SP 2.03-4th-BP1-2370 Demo/Abate & Install Ceiling Access Frame - 4th Flr, SP 2.03 - Pilot Contr 4 0 08-Feb-18 A 12-Feb-18 A

SP 2.03-4th-BP1-2380 Install Ceiling Access Panels & Touch Up/Repair - 4th Flr, SP 2.03 - Pilot Contr 3 0 20-Feb-18 A 26-Feb-18 A

SP 2.03-4th-BP1-2390 Install Cont./Access/Egress/Signage - 4th Flr, SP 2.03 - Pilot Contr 1 0 06-Feb-18 A 06-Feb-18 A

SP 2.03-4th-BP1-2410 Remove Cont./Access/Egress/Signage - 4th Flr, SP 2.03 - Pilot Contr 1 0 05-Mar-18 A 05-Mar-18 A

SP 2.03-4th-BP2-2360 Decomission & Install Fire Alarm - 4th Flr, SP 2.03 - Bid Pkg 2 Contr 6 0 13-Feb-18 A 21-Feb-18 A

SP 2.03-4th-BP3-2400 Install Fire Sprinkler - 4th Flr, SP 2.03 - Bid Pkg 3 Contr 6 0 13-Feb-18 A 13-Feb-18 A

SP 2.04-4th-2300 Layout - 4th Floor, SP 2.04 - Bid Pkg 2 &3 Contr 1 0 09-Mar-18 A 09-Mar-18 A

SP 2.04-4th-2360 Punchlist 1 0 06-Apr-18 A 06-Apr-18 A

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

Terminal Clean - 4th Floor, SP 2.01 - Pilot Contr

Demo/Abate & Install Ceiling Access Frame - 4th Floor, SP 2.01 - Pilot Contr

Additional Fire Protection Patch

ATI Access Hole Location and Ceiling Repairs

Install Ceiling Access Panels & Touch Up/Repair - 4th Floor, SP 2.01 - Pilot Contr

Install Cont./Access/Egress/Signage - 4th Floor, SP 2.01 - Pilot Contr

Material Staging - 4th Floor, SP 2.01 - Bid Pkg 2 & 3 Contr

Remove Cont./Access/Egress/Signage - 4th Floor, SP 2.01 -Pilot Contr

Decomission & Install Fire Alarm - 4th Floor, SP 2.01 - Bid Pkg 2 Contr

Install Fire Sprinkler - 4th Floor, SP 2.01 - Bid Pkg 3 Contr

Layout - 4th Floor, SP 2.02 - Bid Pkg 2 &3 Contr

Material Staging - 4th Flr, SP 2.02 - Bid Pkg 2 & 3 Contr

Terminal Clean - 4th Flr, SP 2.02 - Pilot Contr

Demo/Abate & Install Ceiling Access Frame - 4th Flr, SP 2.02 - Pilot Contr

Install Ceiling Access Panels & Touch Up/Repair - 4th Flr, SP 2.02 - Pilot Contr

Install Cont./Access/Egress/Signage - 4th Flr, SP 2.02 - Pilot Contr

Remove Cont./Access/Egress/Signage - 4th Flr, SP 2.02 - Pilot Contr

Decomission & Install Fire Alarm - 4th Flr, SP 2.02 - Bid Pkg 2 Contr (IES TO CONFIRM DATES)

Install Fire Sprinkler - 4th Flr, SP 2.02 - Bid Pkg 3 Contr

Layout - 4th Floor, SP 2.03 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test - Pilot Contr

Material Staging - 4th Flr, SP 2.03 - Bid Pkg 2 & 3 Contr

Terminal Clean - 4th Flr, SP 2.03 - Pilot Contr

Demo/Abate & Install Ceiling Access Frame - 4th Flr, SP 2.03 - Pilot Contr

Install Ceiling Access Panels & Touch Up/Repair - 4th Flr, SP 2.03 - Pilot Contr

Install Cont./Access/Egress/Signage - 4th Flr, SP 2.03 - Pilot Contr

Remove Cont./Access/Egress/Signage - 4th Flr, SP 2.03 - Pilot Contr

Decomission & Install Fire Alarm - 4th Flr, SP 2.03 - Bid Pkg 2 Contr

Install Fire Sprinkler - 4th Flr, SP 2.03 - Bid Pkg 3 Contr

Layout - 4th Floor, SP 2.04 - Bid Pkg 2 &3 Contr

Punchlist

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 6 of 34

Page 7: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

SP 2.04-4th-2370 Punchlist Correction 1 0 07-Apr-18 A 07-Apr-18 A

SP 2.04-4th-2380 Air Clearance Test - Pilot Contr 1 0 06-Apr-18 A 06-Apr-18 A

SP 2.04-4th-BP1-2430 Terminal Clean - 4th Flr, SP 2.04 - Pilot Contr 3 0 05-Apr-18 A 05-Apr-18 A

SP 2.04-4th-BP1-2450 Demo/Abate & Install Ceiling Access Frame - 4th Flr, SP 2.04 - Pilot Contr 4 0 08-Mar-18 A 13-Mar-18 A

SP 2.04-4th-BP1-2460 Install Ceiling Access Panels & Touch Up/Repair - 4th Flr, SP 2.04 - Pilot Contr 3 0 22-Mar-18 A 05-Apr-18 A

SP 2.04-4th-BP1-2470 Install Cont./Access/Egress/Signage - 4th Flr, SP 2.04 - Pilot Contr 1 0 06-Mar-18 A 06-Mar-18 A

SP 2.04-4th-BP1-2480 Material Staging - 4th Flr, SP 2.04 - Bid Pkg 2 & 3 Contr 1 0 06-Mar-18 A 06-Mar-18 A

SP 2.04-4th-BP1-2490 Remove Cont./Access/Egress/Signage - 4th Flr, SP 2.04 - Pilot Contr 1 0 11-Apr-18 A 11-Apr-18 A

SP 2.04-4th-BP2-2440 Decomission & Install Fire Alarm - 4th Flr, SP 2.04 - Bid Pkg 2 Contr 6 0 02-Mar-18 A 06-Mar-18 A

SP 2.04-4th-BP3-2480 Install Fire Sprinkler - 4th Flr, SP 2.04 - Bid Pkg 3 Contr 6 0 14-Mar-18 A 14-Mar-18 A

SP 2.05-4th-2310 Layout - 4th Floor, SP 2.05 - Bid Pkg 2 &3 Contr 1 0 16-Apr-18 A 16-Apr-18 A

SP 2.05-4th-2390 Punchlist 1 0 14-May-18 A 14-May-18 A

SP 2.05-4th-2400 Punchlist Correction 1 0 14-May-18 A 14-May-18 A

SP 2.05-4th-2410 Air Clearance Test - Pilot Contr 1 0 16-May-18 A 16-May-18 A

SP 2.05-4th-BP1-2490 Material Staging - 4th Flr, SP 2.05 - Bid Pkg 2 & 3 Contr 1 0 12-Apr-18 A 12-Apr-18 A

SP 2.05-4th-BP1-2510 Terminal Clean - 4th Flr, SP 2.05 - Pilot Contr 3 0 15-May-18 A 15-May-18 A

SP 2.05-4th-BP1-2540 Demo/Abate & Install Ceiling Access Frame - 4th Flr, SP 2.05 - Pilot Contr 4 0 16-Apr-18 A 17-Apr-18 A

SP 2.05-4th-BP1-2550 Install Ceiling Access Panels & Touch Up/Repair - 4th Flr, SP 2.05 - Pilot Contr 3 0 26-Apr-18 A 14-May-18 A

SP 2.05-4th-BP1-2560 Install Cont./Access/Egress/Signage - 4th Flr, SP 2.05 - Pilot Contr 1 0 12-Apr-18 A 12-Apr-18 A

SP 2.05-4th-BP1-2580 Remove Cont./Access/Egress/Signage - 4th Flr, SP 2.05 - Pilot Contr 1 0 21-May-18 A 21-May-18 A

SP 2.05-4th-BP2-2520 Decomission & Install Fire Alarm - 4th Flr, SP 2.05 - Bid Pkg 2 Contr 6 0 24-Apr-18 A 26-Apr-18 A

SP 2.05-4th-BP3-2570 Install Fire Sprinkler - 4th Flr, SP 2.05 - Bid Pkg 3 Contr 6 0 19-Apr-18 A 19-Apr-18 A

SP 2.06-4th-2320 Layout - 4th Floor, SP 2.06 - Bid Pkg 2 &3 Contr 1 0 23-May-18 A 23-May-18 A

SP 2.06-4th-2420 Punchlist 1 1 26-Jul-18 26-Jul-18 -65

SP 2.06-4th-2430 Punchlist Correction 1 1 27-Jul-18 27-Jul-18 -65

SP 2.06-4th-2480 Air Clearance Test - Pilot Contr 1 0 23-May-18 A 23-May-18 A

SP 2.06-4th-BP1-2500 Material Staging - 4th Flr, SP 2.06 - Bid Pkg 2 & 3 Contr 1 0 22-May-18 A 22-May-18 A

SP 2.06-4th-BP1-2630 Demo/Abate & Install Ceiling Access Frame - 4th Flr, SP 2.06 - Pilot Contr 4 4 24-May-18 A 05-Jun-18 -37

SP 2.06-4th-BP1-2640 Install Ceiling Access Panels & Touch Up/Repair - 4th Flr, SP 2.06 - Pilot Contr 3 3 14-Jun-18 18-Jun-18 -37

SP 2.06-4th-BP1-2650 Install Cont./Access/Egress/Signage - 4th Flr, SP 2.06 - Pilot Contr 1 0 22-May-18 A 22-May-18 A

SP 2.06-4th-BP1-2690 Terminal Clean - 4th Flr, SP 2.06 - Pilot Contr 3 3 30-Jul-18 01-Aug-18 -65

SP 2.06-4th-BP1-2730 Remove Cont./Access/Egress/Signage - 4th Flr, SP 2.06 - Pilot Contr 1 1 01-Aug-18 01-Aug-18 -65

SP 2.06-4th-BP2-2610 Decomission & Install Fire Alarm - 4th Flr, SP 2.06 - Bid Pkg 2 Contr 6 6 06-Jun-18 13-Jun-18 -37

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

Punchlist Correction

Air Clearance Test - Pilot Contr

Terminal Clean - 4th Flr, SP 2.04 - Pilot Contr

Demo/Abate & Install Ceiling Access Frame - 4th Flr, SP 2.04 - Pilot Contr

Install Ceiling Access Panels & Touch Up/Repair - 4th Flr, SP 2.04 - Pilot Contr

Install Cont./Access/Egress/Signage - 4th Flr, SP 2.04 - Pilot Contr

Material Staging - 4th Flr, SP 2.04 - Bid Pkg 2 & 3 Contr

Remove Cont./Access/Egress/Signage - 4th Flr, SP 2.04 - Pilot Contr

Decomission & Install Fire Alarm - 4th Flr, SP 2.04 - Bid Pkg 2 Contr

Install Fire Sprinkler - 4th Flr, SP 2.04 - Bid Pkg 3 Contr

Layout - 4th Floor, SP 2.05 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test - Pilot Contr

Material Staging - 4th Flr, SP 2.05 - Bid Pkg 2 & 3 Contr

Terminal Clean - 4th Flr, SP 2.05 - Pilot Contr

Demo/Abate & Install Ceiling Access Frame - 4th Flr, SP 2.05 - Pilot Contr

Install Ceiling Access Panels & Touch Up/Repair - 4th Flr, SP 2.05 - Pilot Contr

Install Cont./Access/Egress/Signage - 4th Flr, SP 2.05 - Pilot Contr

Remove Cont./Access/Egress/Signage - 4th Flr, SP 2.05 - Pilot Contr

Decomission & Install Fire Alarm - 4th Flr, SP 2.05 - Bid Pkg 2 Contr

Install Fire Sprinkler - 4th Flr, SP 2.05 - Bid Pkg 3 Contr

Layout - 4th Floor, SP 2.06 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test - Pilot Contr

Material Staging - 4th Flr, SP 2.06 - Bid Pkg 2 & 3 Contr

Demo/Abate & Install Ceiling Access Frame - 4th Flr, SP 2.06 - Pilot Contr

Install Ceiling Access Panels & Touch Up/Repair - 4th Flr, SP 2.06 - Pilot Contr

Install Cont./Access/Egress/Signage - 4th Flr, SP 2.06 - Pilot Contr

Terminal Clean - 4th Flr, SP 2.06 - Pilot Contr

Remove Cont./Access/Egress/Signage - 4th Flr, SP 2.06 - Pilot Contr

Decomission & Install Fire Alarm - 4th Flr, SP 2.06 - Bid Pkg 2 Contr

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 7 of 34

Page 8: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

SP 2.06-4th-BP3-2660 Install Fire Sprinkler - 4th Flr, SP 2.06 - Bid Pkg 3 Contr 6 10 29-May-18 A 13-Jun-18 -37

SP 2.07-4th-2320 Layout - 4th Floor, SP 2.07 - Bid Pkg 2 &3 Contr 1 1 07-Aug-18 07-Aug-18 -65

SP 2.07-4th-2420 Punchlist 1 1 23-Aug-18 23-Aug-18 -65

SP 2.07-4th-2430 Punchlist Correction 1 1 24-Aug-18 24-Aug-18 -65

SP 2.07-4th-2440 Air Clearance Test - Pilot Contr 1 1 29-Aug-18 29-Aug-18 -65

SP 2.07-4th-BP1-2500 Material Staging - 4th Flr, SP 2.07 - Bid Pkg 2 & 3 Contr 1 1 06-Aug-18 06-Aug-18 -60

SP 2.07-4th-BP1-2600 Terminal Clean - 4th Flr, SP 2.07 - Pilot Contr 3 3 27-Aug-18 29-Aug-18 -65

SP 2.07-4th-BP1-2630 Demo/Abate & Install Ceiling Access Frame - 4th Flr, SP 2.07 - Pilot Contr 4 4 08-Aug-18 13-Aug-18 -65

SP 2.07-4th-BP1-2640 Install Ceiling Access Panels & Touch Up/Repair - 4th Flr, SP 2.07 - Pilot Contr 3 3 22-Aug-18 24-Aug-18 -65

SP 2.07-4th-BP1-2650 Install Cont./Access/Egress/Signage - 4th Flr, SP 2.07 - Pilot Contr 1 1 06-Aug-18 06-Aug-18 -65

SP 2.07-4th-BP1-2670 Remove Cont./Access/Egress/Signage - 4th Flr, SP 2.07 - Pilot Contr 1 1 30-Aug-18 30-Aug-18 -65

SP 2.07-4th-BP2-2610 Decomission & Install Fire Alarm - 4th Flr, SP 2.07 - Bid Pkg 2 Contr 6 6 14-Aug-18 21-Aug-18 -65

SP 2.07-4th-BP3-2620 Demo FHC & Existing Sprinkler System - 4th Flr - Bid Pkg 3 Contr 3 3 06-Sep-18 10-Sep-18 -65

SP 2.07-4th-BP3-2660 Install Fire Sprinkler - 4th Flr, SP 2.07 - Bid Pkg 3 Contr 6 6 08-Aug-18 15-Aug-18 -61

SP 2.074th-Misc-2680 Vacate Patient Care Rooms - 4th Flr, SP 2.07 - UCDMC 2 2 02-Aug-18 03-Aug-18 -65

SP2.01-4th-Misc-2260 Vacate Patient Care Rooms - 4th Floor, SP 2.01 - UCDMC 4 0 27-Nov-17 A 30-Nov-17 A

SP2.02-4th-Misc-2340 Vacate Patient Care Rooms - 4th Flr, SP 2.02 - UCDMC 2 0 13-Jan-18 A 15-Jan-18 A

SP2.03-4th-Misc-2420 Vacate Patient Care Rooms - 4th Flr, SP 2.03 - UCDMC 5 0 01-Feb-18 A 26-Feb-18 A

SP2.04-4th-Misc-2500 Vacate Patient Care Rooms - 4th Flr, SP 2.04 - UCDMC 2 0 01-Mar-18 A 02-Mar-18 A

SP2.05-4th-Misc-2590 Vacate Patient Care Rooms - 4th Flr, SP 2.05 - UCDMC 2 0 06-Apr-18 A 07-Apr-18 A

Fire RisersFire Risers 356 45 13-Mar-17 A 01-Aug-18 772

Ground Flr, Stair 1, SP 1.01Ground Flr, Stair 1, SP 1.01 90 2 19-Dec-17 A 01-Jun-18 795

SP 1.01-Gnd Flr-2010 Install Fire Alarm - Ground Flr, Stair 1, SP 1.01 - Bid Pkg 2 Contr (CHECK DATE) 1 1 31-May-18* 31-May-18 -11

SP 1.01-Gnd Flr-2020 UCDMC Inspect Riser - Ground Flr, Stair 1, SP 1.01 - Bid Pkg 2 & 3 Contr 1 0 26-Dec-17 A 26-Dec-17 A

SP 1.01-Gnd Flr-2030 UCDMC Inspect Alarm - Ground Flr, Stair 1, SP 1.01 - Bid Pkg 2 & 3 Contr (CHECK DATE) 1 1 01-Jun-18 01-Jun-18 -4

SP 1.01-Gnd Flr-BP3-2000 Install Fire Riser - Ground Flr, Stair 1, SP 1.01 - Bid Pkg 3 Contr 3 0 19-Dec-17 A 21-Dec-17 A

1st Flr, Stair 1, SP 1.021st Flr, Stair 1, SP 1.02 129 38 30-Oct-17 A 23-Jul-18 779

SP 1.02-2nd Flr-2050 Install Fire Alarm - 1st Flr, Stair 1, SP 1.03 - Bid Pkg 2 Contr (RFI 012) 1 1 20-Jul-18 20-Jul-18 -45

SP 1.02-2nd Flr-2060 UCDMC Inspect Riser - 1st Flr, Stair 1, SP 1.03 - Bid Pkg 2 & 3 Contr 1 0 26-Dec-17 A 24-Jan-18 A

SP 1.02-2nd Flr-2070 UCDMC Inspect Alarm - 1st Flr, Stair 1, SP 1.03 - Bid Pkg 2 & 3 Contr 1 1 23-Jul-18 23-Jul-18 -39

SP 1.02-2nd-BP3-2020 Install Fire Riser - 1st Flr, Stair 1, SP 1.03 - Bid Pkg 3 Contr (RFI 012) 1 0 19-Dec-17 A 21-Dec-17 A

SP 1.02-2nd-BP3-2030 RFI 012 Revise Standpipe Location 1 0 30-Oct-17 A 02-Nov-17 A

SP 1.02-2nd-BP3-2040 RFI 012 ARCH-OSHPD Review and Resolution 1 6 03-Nov-17 A 07-Jun-18 -47

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

Install Fire Sprinkler - 4th Flr, SP 2.06 - Bid Pkg 3 Contr

Layout - 4th Floor, SP 2.07 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test - Pilot Contr

Material Staging - 4th Flr, SP 2.07 - Bid Pkg 2 & 3 Contr

Terminal Clean - 4th Flr, SP 2.07 - Pilot Contr

Demo/Abate & Install Ceiling Access Frame - 4th Flr, SP 2.07 - Pilot Contr

Install Ceiling Access Panels & Touch Up/Repair - 4th Flr, SP 2.07 - Pilot Contr

Install Cont./Access/Egress/Signage - 4th Flr, SP 2.07 - Pilot Contr

Remove Cont./Access/Egress/Signage - 4th Flr, SP 2.07 - Pilot Contr

Decomission & Install Fire Alarm - 4th Flr, SP 2.07 - Bid Pkg 2 Contr

Demo FHC & Existing Sprinkler System - 4th Flr - Bid Pkg 3 Contr

Install Fire Sprinkler - 4th Flr, SP 2.07 - Bid Pkg 3 Contr

Vacate Patient Care Rooms - 4th Flr, SP 2.07 - UCDMC

Vacate Patient Care Rooms - 4th Floor, SP 2.01 - UCDMC

Vacate Patient Care Rooms - 4th Flr, SP 2.02 - UCDMC

Vacate Patient Care Rooms - 4th Flr, SP 2.03 - UCDMC

Vacate Patient Care Rooms - 4th Flr, SP 2.04 - UCDMC

Vacate Patient Care Rooms - 4th Flr, SP 2.05 - UCDMC

Install Fire Alarm - Ground Flr, Stair 1, SP 1.01 - Bid Pkg 2 Contr (CHECK DATE)

UCDMC Inspect Riser - Ground Flr, Stair 1, SP 1.01 - Bid Pkg 2 & 3 Contr

UCDMC Inspect Alarm - Ground Flr, Stair 1, SP 1.01 - Bid Pkg 2 & 3 Contr (CHECK DATE)

Install Fire Riser - Ground Flr, Stair 1, SP 1.01 - Bid Pkg 3 Contr

Install Fire Alarm - 1st Flr, Stair 1, SP 1.03 - Bid Pkg 2 Contr (RFI 012)

UCDMC Inspect Riser - 1st Flr, Stair 1, SP 1.03 - Bid Pkg 2 & 3 Contr

UCDMC Inspect Alarm - 1st Flr, Stair 1, SP 1.03 - Bid Pkg 2 & 3 Contr

Install Fire Riser - 1st Flr, Stair 1, SP 1.03 - Bid Pkg 3 Contr (RFI 012)

RFI 012 Revise Standpipe Location

RFI 012 ARCH-OSHPD Review and Resolution

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 8 of 34

Page 9: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

SP 1.02-2nd-BP3-2050 RFI 012 Access/Egress Coord and ILSM 30 30 08-Jun-18 19-Jul-18 -47

SP 1.02-2nd-BP3-2055 RFI 019 2-Hr Rated Ceiling Temporary Patch 30 30 08-Jun-18 19-Jul-18 -47

SP 1.02-2nd-BP3-2070 RFI 012 Layout 1 1 20-Jul-18 20-Jul-18 -47

2nd Flr, Stair 1, SP 1.032nd Flr, Stair 1, SP 1.03 170 2 13-Nov-17 A 24-Jul-18 -40

SP 1.03-2nd Flr-2030 Install Fire Alarm - 2nd Flr, Stair 1, SP 1.03 - Bid Pkg 2 Contr & ATI Install Ceiling Panel 1 1 23-Jul-18 23-Jul-18 -45

SP 1.03-2nd Flr-2040 UCDMC Inspect Riser - 2nd Flr, Stair 1, SP 1.03 - Bid Pkg 2 & 3 Contr 1 0 16-Nov-17 A 16-Nov-17 A

SP 1.03-2nd Flr-2050 UCDMC Inspect Alarm - 2nd Flr, Stair 1, SP 1.03 - Bid Pkg 2 & 3 Contr 1 1 24-Jul-18 24-Jul-18 -40

SP 1.03-2nd-BP3-2010 Install Fire Riser - 2nd Flr, Stair 1, SP 1.03 - Bid Pkg 3 Contr 3 0 13-Nov-17 A 15-Nov-17 A

3rd Flr, Stair 1, SP 1.043rd Flr, Stair 1, SP 1.04 171 2 07-Nov-17 A 25-Jul-18 758

SP 1.04-3rd Flr-2050 Install Fire Alarm - 3rd Flr, Stair 1, SP 1.04 - Bid Pkg 2 Contr 1 1 24-Jul-18 24-Jul-18 -45

SP 1.04-3rd Flr-2060 UCDMC Inspect Riser - 3rd Flr, Stair 1, SP 1.04 - Bid Pkg 2 1 0 21-Nov-17 A 21-Nov-17 A

SP 1.04-3rd Flr-2070 UCDMC Inspect Alarm - 3rd Flr, Stair 1, SP 1.04 - Bid Pkg 2 1 1 25-Jul-18 25-Jul-18 -41

SP 1.04-3rd-BP3-2030 Install Fire Riser - 3rd Flr, Stair 1, SP 1.04 - Bid Pkg 3 Contr (Driven by ex. ceiling repairs) 3 0 07-Nov-17 A 20-Nov-17 A

4th Flr, Stair 1, SP 1.054th Flr, Stair 1, SP 1.05 128 2 27-Nov-17 A 26-Jul-18 -42

SP 1.05-4th Flr-2070 Install Fire Alarm - 4th Flr, Stair 1, SP 1.05 - Bid Pkg 2 Contr & ATI Install 1 1 25-Jul-18 25-Jul-18 -45

SP 1.05-4th Flr-2080 UCDMC Inspect Riser - 4th Flr, Stair 1, SP 1.05 - Bid Pkg 2 & 3 Contr 1 0 04-Dec-17 A 04-Dec-17 A

SP 1.05-4th Flr-2090 UCDMC Inspect Alarm - 4th Flr, Stair 1, SP 1.05 - Bid Pkg 2 & 3 Contr 1 1 26-Jul-18 26-Jul-18 -42

SP 1.05-4th-BP3-2040 Install Fire Riser - 4th Flr, Stair 1, SP 1.05 & ATI Install Containment 3 0 27-Nov-17 A 29-Nov-17 A

5th Flr, Stair 1, SP 1.065th Flr, Stair 1, SP 1.06 121 2 04-Dec-17 A 27-Jul-18 219

SP 1.06-5th Flr-2090 Install Fire Alarm - 5th Flr, Stair 1, SP 1.06 - Bid Pkg 3 Contr 1 1 26-Jul-18 26-Jul-18 -45

SP 1.06-5th Flr-2100 UCDMC Inspect Riser - 5th Flr, Stair 1, SP 1.06 - Bid Pkg 2 & 3 Contr 1 0 07-Dec-17 A 07-Dec-17 A

SP 1.06-5th Flr-2110 UCDMC Inspect Alarm - 5th Flr, Stair 1, SP 1.06 - Bid Pkg 2 & 3 Contr 1 1 27-Jul-18 27-Jul-18 -43

SP 1.06-5th-BP3-2050 Install Fire Riser - 5th Flr, Stair 1, SP 1.06 & ATI Install Containment 3 0 04-Dec-17 A 06-Dec-17 A

6th Flr, Stair 1, SP 1.076th Flr, Stair 1, SP 1.07 122 2 15-Dec-17 A 30-Jul-18 89

SP 1.07-6th Flr-2110 Install Fire Alarm - 6th Flr, Stair 1, SP 1.07 - Bid Pkg 2 Contr 1 1 27-Jul-18 27-Jul-18 -45

SP 1.07-6th Flr-2120 UCDMC Inspect Riser - 6th Flr, Stair 1, SP 1.07 - Bid Pkg 2 & 3 Contr 1 0 21-Dec-17 A 21-Dec-17 A

SP 1.07-6th Flr-2130 UCDMC Inspect Alarm - 6th Flr, Stair 1, SP 1.07 - Bid Pkg 2 & 3 Contr 1 1 30-Jul-18 30-Jul-18 -44

SP 1.07-6th-BP3-2070 Install Fire Riser - 6th Flr, Stair 1, SP 1.07 & ATI Install Containment 3 0 15-Dec-17 A 19-Dec-17 A

7th Flr, Stair 1, SP 1.087th Flr, Stair 1, SP 1.08 135 2 18-Dec-17 A 31-Jul-18 -45

SP 1.08-7th-BP3-2080 Install Fire Riser - 7th Flr, Stair 1, SP 1.08 - Bid Pkg 3 Contr 3 0 18-Dec-17 A 21-Dec-17 A

SP 1.08-7th-BP3-2130 Install Fire Alarm - 7th Flr, Stair 1, SP 1.08 - Bid Pkg 2 Contr 1 1 30-Jul-18 30-Jul-18 -45

SP 1.08-7th-BP3-2140 UCDMC Inspect Riser - 7th Flr, Stair 1, SP 1.08 - Bid Pkg 2 & 3 Contr 1 0 22-Dec-17 A 22-Dec-17 A

SP 1.08-7th-BP3-2150 UCDMC Inspect Alarm - 7th Flr, Stair 1, SP 1.08 - Bid Pkg 2 & 3 Contr 1 1 31-Jul-18 31-Jul-18 -45

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

RFI 012 Access/Egress Coord and ILSM

RFI 019 2-Hr Rated Ceiling Temporary Patch

RFI 012 Layout

Install Fire Alarm - 2nd Flr, Stair 1, SP 1.03 - Bid Pkg 2 Contr & ATI Install Ceiling Panel

UCDMC Inspect Riser - 2nd Flr, Stair 1, SP 1.03 - Bid Pkg 2 & 3 Contr

UCDMC Inspect Alarm - 2nd Flr, Stair 1, SP 1.03 - Bid Pkg 2 & 3 Contr

Install Fire Riser - 2nd Flr, Stair 1, SP 1.03 - Bid Pkg 3 Contr

Install Fire Alarm - 3rd Flr, Stair 1, SP 1.04 - Bid Pkg 2 Contr

UCDMC Inspect Riser - 3rd Flr, Stair 1, SP 1.04 - Bid Pkg 2

UCDMC Inspect Alarm - 3rd Flr, Stair 1, SP 1.04 - Bid Pkg 2

Install Fire Riser - 3rd Flr, Stair 1, SP 1.04 - Bid Pkg 3 Contr (Driven by ex. ceiling repairs)

Install Fire Alarm - 4th Flr, Stair 1, SP 1.05 - Bid Pkg 2 Contr & ATI Install

UCDMC Inspect Riser - 4th Flr, Stair 1, SP 1.05 - Bid Pkg 2 & 3 Contr

UCDMC Inspect Alarm - 4th Flr, Stair 1, SP 1.05 - Bid Pkg 2 & 3 Contr

Install Fire Riser - 4th Flr, Stair 1, SP 1.05 & ATI Install Containment

Install Fire Alarm - 5th Flr, Stair 1, SP 1.06 - Bid Pkg 3 Contr

UCDMC Inspect Riser - 5th Flr, Stair 1, SP 1.06 - Bid Pkg 2 & 3 Contr

UCDMC Inspect Alarm - 5th Flr, Stair 1, SP 1.06 - Bid Pkg 2 & 3 Contr

Install Fire Riser - 5th Flr, Stair 1, SP 1.06 & ATI Install Containment

Install Fire Alarm - 6th Flr, Stair 1, SP 1.07 - Bid Pkg 2 Contr

UCDMC Inspect Riser - 6th Flr, Stair 1, SP 1.07 - Bid Pkg 2 & 3 Contr

UCDMC Inspect Alarm - 6th Flr, Stair 1, SP 1.07 - Bid Pkg 2 & 3 Contr

Install Fire Riser - 6th Flr, Stair 1, SP 1.07 & ATI Install Containment

Install Fire Riser - 7th Flr, Stair 1, SP 1.08 - Bid Pkg 3 Contr

Install Fire Alarm - 7th Flr, Stair 1, SP 1.08 - Bid Pkg 2 Contr

UCDMC Inspect Riser - 7th Flr, Stair 1, SP 1.08 - Bid Pkg 2 & 3 Contr

UCDMC Inspect Alarm - 7th Flr, Stair 1, SP 1.08 - Bid Pkg 2 & 3 Contr

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 9 of 34

Page 10: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

SP 1.08-7th-BP3-2160 PP Fireproof Patching - Added Scope 2 0 22-Dec-17 A 26-Dec-17 A

8th Fl Stair 1 & 9th Fl, SP 1.10a8th Fl Stair 1 & 9th Fl, SP 1.10a 124 1 26-Dec-17 A 01-Aug-18 753

SP 1.10-BP3-2160 UCDMC Inspect Riser - 8th Fl Riser, Stair 1, SP 1.10a - Bid Pkg 2 & 3 Contr 1 0 08-Jan-18 A 08-Jan-18 A

SP 1.10-BP3-2200 UCDMC Alarm Inspec tions Complete - Stair 1, All Floors 1 1 01-Aug-18 01-Aug-18 -45

SP 1.10-BP3-2210 UCDMC Riser Inspection Complete - Stair 1, All Floors 1 0 28-Dec-17 A 28-Dec-17 A

SP 1.10a-BP3-2130 Install Fire Riser - 8th Flr, Stair 1, SP 1.10a - Bid Pkg 3 Contr 3 0 26-Dec-17 A 02-Jan-18 A

4th Flr, Stair 1, SP 1.10b4th Flr, Stair 1, SP 1.10b 233 0 13-Mar-17 A 28-Dec-17 A

SP1.10b-4th-BP2-2160 Install Temp Fire Alarm - 4th Floor, SP 1.10b - Bid Pkg 2 (IES Connect and Pre-Test) 3 0 13-Mar-17 A 15-Mar-17 A

SP1.10b-4th-BP2-2165 IES Connected SWIFT FA System to Notifier 1 0 04-Dec-17 A 20-Dec-17 A

SP1.10b-4th-BP2-2167 Fire Marshall Const. Advisory Report - Temp FA System 1 0 21-Dec-17 A 21-Dec-17 A

SP1.10b-4th-BP2-2169 IES Revise Installation of Temp FA System (per Fire Marshall Report) 1 0 21-Dec-17 A 27-Dec-17 A

SP1.10b-4th-BP2-2170 Inspect & Verify Temp Fire Alarm - 4th Floor, SP 1.10b - Bid Pkg 2 Contr 1 0 28-Dec-17 A 28-Dec-17 A

Patient Care RoomsPatient Care Rooms 459 459 31-May-18 A 31-Mar-20 338

8th Flr, SP 2.07b8th Flr, SP 2.07b 3 45 31-May-18 A 02-Aug-18 -45

SP 2.07b-8th-BP2-2760 Inspect & Verify Temp Fire Alarm - 8th Flr, SP 2.07b - Bid Pkg 2 Contr 1 1 02-Aug-18 02-Aug-18 -45

SP 2.07b-8th-Misc-2770 Install Temp Fire Alarm - 8th Flr, SP 2.07b - Bid Pkg 2 3 10 31-May-18 A 13-Jun-18 -12

8th Flr, SP 3.018th Flr, SP 3.01 73 73 14-Jun-18 26-Sep-18 -66

SP 3.01-8th-2340 Layout - 8th Floor, SP 3.01 - Bid Pkg 2 &3 Contr 1 1 14-Aug-18 14-Aug-18 -51

SP 3.01-8th-2540 Punchlist 1 1 18-Sep-18 19-Sep-18 -66

SP 3.01-8th-2550 Punchlist Correction 1 1 19-Sep-18 20-Sep-18 -66

SP 3.01-8th-2560 Air Clearance Test 1 1 24-Sep-18 25-Sep-18 -66

SP 3.01-8th-BP1-2520 Material Staging - 8th Flr, SP 3.01 - Bid Pkg 2 & 3 Contr 1 1 13-Aug-18 13-Aug-18 -46

SP 3.01-8th-BP1-2780 Terminal Clean - 8th Flr, SP 3.01 - Bid Pkg 1 Contr 3 3 20-Sep-18 25-Sep-18 -66

SP 3.01-8th-BP1-2800 Demo/Abate & Install Ceiling Access Frame - 8th Flr, SP 3.01 - Bid Pkg 1 Contr 4 4 15-Aug-18 20-Aug-18 -51

SP 3.01-8th-BP1-2810 Install Ceiling Access Panels & Touch Up/Repair - 8th Flr, SP 3.01 - Bid Pkg 1 Contr 3 3 17-Sep-18 20-Sep-18 -66

SP 3.01-8th-BP1-2820 Install Cont./Access/Egress/Signage - 8th Flr, SP 3.01 - Bid Pkg 1 Contr 1 1 13-Aug-18 13-Aug-18 -51

SP 3.01-8th-BP1-2840 Remove Cont./Access/Egress/Signage - 8th Flr, SP 3.01 - Bid Pkg 1 Contr 1 1 25-Sep-18 26-Sep-18 -66

SP 3.01-8th-BP2-2790 Decomission & Install Fire Alarm - 8th Flr, SP 3.01 - Bid Pkg 2 Contr 6 6 21-Aug-18 28-Aug-18 -51

SP 3.01-8th-BP3-2830 Install Fire Sprinkler - 8th Flr, SP 3.01 - Bid Pkg 3 Contr 6 6 11-Sep-18 18-Sep-18 -65

SP 3.01-8th-Misc-2850 Vacate Patient Care Rooms - 8th Flr, SP 3.01 - UCDMC 2 2 14-Jun-18 15-Jun-18 -12

8th Flr, SP 3.028th Flr, SP 3.02 19 19 25-Sep-18 22-Oct-18 -66

SP 3.02-8th-2350 Layout - 8th Floor, SP 3.02 - Bid Pkg 2 &3 Contr 1 1 28-Sep-18 01-Oct-18 -66

SP 3.02-8th-2570 Punchlist 1 1 12-Oct-18 15-Oct-18 -66

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

PP Fireproof Patching - Added Scope

UCDMC Inspect Riser - 8th Fl Riser, Stair 1, SP 1.10a - Bid Pkg 2 & 3 Contr

UCDMC Alarm Inspec tions Complete - Stair 1, All Floors

UCDMC Riser Inspection Complete - Stair 1, All Floors

Install Fire Riser - 8th Flr, Stair 1, SP 1.10a - Bid Pkg 3 Contr

Install Temp Fire Alarm - 4th Floor, SP 1.10b - Bid Pkg 2 (IES Connect and Pre-Test)

IES Connected SWIFT FA System to Notifier

Fire Marshall Const. Advisory Report - Temp FA System

IES Revise Installation of Temp FA System (per Fire Marshall Report)

Inspect & Verify Temp Fire Alarm - 4th Floor, SP 1.10b - Bid Pkg 2 Contr

Inspect & Verify Temp Fire Alarm - 8th Flr, SP 2.07b - Bid Pkg 2 Contr

Install Temp Fire Alarm - 8th Flr, SP 2.07b - Bid Pkg 2

Layout - 8th Floor, SP 3.01 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Material Staging - 8th Flr, SP 3.01 - Bid Pkg 2 & 3 Contr

Terminal Clean - 8th Flr, SP 3.01 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - 8th Flr, SP 3.01 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - 8th Flr, SP 3.01 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - 8th Flr, SP 3.01 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - 8th Flr, SP 3.01 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - 8th Flr, SP 3.01 - Bid Pkg 2 Contr

Install Fire Sprinkler - 8th Flr, SP 3.01 - Bid Pkg 3 Contr

Vacate Patient Care Rooms - 8th Flr, SP 3.01 - UCDMC

Layout - 8th Floor, SP 3.02 - Bid Pkg 2 &3 Contr

Punchlist

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 10 of 34

Page 11: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

SP 3.02-8th-2580 Punchlist Correction 1 1 15-Oct-18 16-Oct-18 -66

SP 3.02-8th-2590 Air Clearance Test 1 1 18-Oct-18 19-Oct-18 -66

SP 3.02-8th-BP1-2530 Material Staging - 8th Flr, SP 3.02 - Bid Pkg 2 & 3 Contr 1 1 27-Sep-18 28-Sep-18 -61

SP 3.02-8th-BP1-2860 Terminal Clean - 8th Flr, SP 3.02 - Bid Pkg 1 Contr 3 3 16-Oct-18 19-Oct-18 -66

SP 3.02-8th-BP1-2880 Demo/Abate & Install Ceiling Access Frame - 8th Flr, SP 3.02 - Bid Pkg 1 Contr 4 4 01-Oct-18 05-Oct-18 -66

SP 3.02-8th-BP1-2890 Install Ceiling Access Panels & Touch Up/Repair - 8th Flr, SP 3.02 - Bid Pkg 1 Contr 3 3 11-Oct-18 16-Oct-18 -66

SP 3.02-8th-BP1-2900 Install Cont./Access/Egress/Signage - 8th Flr, SP 3.02 - Bid Pkg 1 Contr 1 1 27-Sep-18 28-Sep-18 -66

SP 3.02-8th-BP1-2920 Remove Cont./Access/Egress/Signage - 8th Flr, SP 3.02 - Bid Pkg 1 Contr 1 1 19-Oct-18 22-Oct-18 -66

SP 3.02-8th-BP2-2870 Decomission & Install Fire Alarm - 8th Flr, SP 3.02 - Bid Pkg 2 Contr 6 6 05-Oct-18 15-Oct-18 -66

SP 3.02-8th-BP3-2910 Install Fire Sprinkler - 8th Flr, SP 3.02 - Bid Pkg 3 Contr 6 6 05-Oct-18 15-Oct-18 -66

SP 3.02-8th-Misc-2930 Vacate Patient Care Rooms - 8th Flr, SP 3.02 - UCDMC 2 2 25-Sep-18 27-Sep-18 -66

8th Flr, SP 3.038th Flr, SP 3.03 19 19 19-Oct-18 16-Nov-18 -66

SP 3.03-8th-2360 Layout - 8th Floor, SP 3.03 - Bid Pkg 2 &3 Contr 1 1 24-Oct-18 25-Oct-18 -66

SP 3.03-8th-2600 Punchlist 1 1 07-Nov-18 08-Nov-18 -66

SP 3.03-8th-2610 Punchlist Correction 1 1 08-Nov-18 09-Nov-18 -66

SP 3.03-8th-2620 Air Clearance Test 1 1 14-Nov-18 15-Nov-18 -66

SP 3.03-8th-BP1-2540 Material Staging - 8th Flr, SP 3.03 - Bid Pkg 2 & 3 Contr 1 1 23-Oct-18 24-Oct-18 -61

SP 3.03-8th-BP1-2940 Terminal Clean - 8th Flr, SP 3.03 - Bid Pkg 1 Contr 3 3 09-Nov-18 15-Nov-18 -66

SP 3.03-8th-BP1-2960 Demo/Abate & Install Ceiling Access Frame - 8th Flr, SP 3.03 - Bid Pkg 1 Contr 4 4 25-Oct-18 31-Oct-18 -66

SP 3.03-8th-BP1-2970 Install Ceiling Access Panels & Touch Up/Repair - 8th Flr, SP 3.03 - Bid Pkg 1 Contr 3 3 06-Nov-18 09-Nov-18 -66

SP 3.03-8th-BP1-2980 Install Cont./Access/Egress/Signage - 8th Flr, SP 3.03 - Bid Pkg 1 Contr 1 1 23-Oct-18 24-Oct-18 -66

SP 3.03-8th-BP1-3000 Remove Cont./Access/Egress/Signage - 8th Flr, SP 3.03 - Bid Pkg 1 Contr 1 1 15-Nov-18 16-Nov-18 -66

SP 3.03-8th-BP2-2950 Decomission & Install Fire Alarm - 8th Flr, SP 3.03 - Bid Pkg 2 Contr 6 6 31-Oct-18 08-Nov-18 -66

SP 3.03-8th-BP3-2990 Install Fire Sprinkler - 8th Flr, SP 3.03 - Bid Pkg 3 Contr 6 6 31-Oct-18 08-Nov-18 -66

SP 3.03-8th-Misc-3010 Vacate Patient Care Rooms - 8th Flr, SP 3.03 - UCDMC 2 2 19-Oct-18 23-Oct-18 -66

8th Flr, SP 3.048th Flr, SP 3.04 19 19 15-Nov-18 14-Dec-18 -66

SP 3.04-8th-2370 Layout - 8th Floor, SP 3.04 - Bid Pkg 2 &3 Contr 1 1 20-Nov-18 21-Nov-18 -66

SP 3.04-8th-2630 Punchlist 1 1 06-Dec-18 07-Dec-18 -66

SP 3.04-8th-2640 Punchlist Correction 1 1 07-Dec-18 10-Dec-18 -66

SP 3.04-8th-2650 Air Clearance Test 1 1 12-Dec-18 13-Dec-18 -66

SP 3.04-8th-BP1-3010 Material Staging - 8th Flr, SP 3.04 - Bid Pkg 2 & 3 Contr 1 1 19-Nov-18 20-Nov-18 -61

SP 3.04-8th-BP1-3020 Terminal Clean - 8th Flr, SP 3.04 - Bid Pkg 1 Contr 3 3 10-Dec-18 13-Dec-18 -66

SP 3.04-8th-BP1-3040 Demo/Abate & Install Ceiling Access Frame - 8th Flr, SP 3.04 - Bid Pkg 1 Contr 4 4 21-Nov-18 29-Nov-18 -66

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

Punchlist Correction

Air Clearance Test

Material Staging - 8th Flr, SP 3.02 - Bid Pkg 2 & 3 Contr

Terminal Clean - 8th Flr, SP 3.02 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - 8th Flr, SP 3.02 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - 8th Flr, SP 3.02 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - 8th Flr, SP 3.02 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - 8th Flr, SP 3.02 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - 8th Flr, SP 3.02 - Bid Pkg 2 Contr

Install Fire Sprinkler - 8th Flr, SP 3.02 - Bid Pkg 3 Contr

Vacate Patient Care Rooms - 8th Flr, SP 3.02 - UCDMC

Layout - 8th Floor, SP 3.03 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Material Staging - 8th Flr, SP 3.03 - Bid Pkg 2 & 3 Contr

Terminal Clean - 8th Flr, SP 3.03 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - 8th Flr, SP 3.03 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - 8th Flr, SP 3.03 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - 8th Flr, SP 3.03 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - 8th Flr, SP 3.03 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - 8th Flr, SP 3.03 - Bid Pkg 2 Contr

Install Fire Sprinkler - 8th Flr, SP 3.03 - Bid Pkg 3 Contr

Vacate Patient Care Rooms - 8th Flr, SP 3.03 - UCDMC

Layout - 8th Floor, SP 3.04 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Material Staging - 8th Flr, SP 3.04 - Bid Pkg 2 & 3 Contr

Terminal Clean - 8th Flr, SP 3.04 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - 8th Flr, SP 3.04 - Bid Pkg 1 Contr

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 11 of 34

Page 12: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

SP 3.04-8th-BP1-3050 Install Ceiling Access Panels & Touch Up/Repair - 8th Flr, SP 3.04 - Bid Pkg 1 Contr 3 3 05-Dec-18 10-Dec-18 -66

SP 3.04-8th-BP1-3060 Install Cont./Access/Egress/Signage - 8th Flr, SP 3.04 - Bid Pkg 1 Contr 1 1 19-Nov-18 20-Nov-18 -66

SP 3.04-8th-BP1-3080 Remove Cont./Access/Egress/Signage - 8th Flr, SP 3.04 - Bid Pkg 1 Contr 1 1 13-Dec-18 14-Dec-18 -66

SP 3.04-8th-BP2-3030 Decomission & Install Fire Alarm - 8th Flr, SP 3.04 - Bid Pkg 2 Contr 6 6 29-Nov-18 07-Dec-18 -66

SP 3.04-8th-BP3-3070 Install Fire Sprinkler - 8th Flr, SP 3.04 - Bid Pkg 3 Contr 6 6 29-Nov-18 07-Dec-18 -66

SP 3.04-8th-Misc-3090 Vacate Patient Care Rooms - 8th Flr, SP 3.04 - UCDMC 2 2 15-Nov-18 19-Nov-18 -66

8th Flr, SP 3.058th Flr, SP 3.05 65 65 13-Dec-18 22-Mar-19 -63

SP 3.05-8th-2380 Layout - 8th Floor, SP 3.05 - Bid Pkg 2 &3 Contr 1 1 18-Dec-18 19-Dec-18 -66

SP 3.05-8th-2660 Punchlist 1 1 09-Jan-19 10-Jan-19 -66

SP 3.05-8th-2670 Punchlist Correction 1 1 10-Jan-19 11-Jan-19 -66

SP 3.05-8th-2680 Air Clearance Test 1 1 15-Jan-19 16-Jan-19 -66

SP 3.05-8th-BP1-3090 Material Staging - 8th Flr, SP 3.05 - Bid Pkg 2 & 3 Contr 1 1 17-Dec-18 18-Dec-18 -61

SP 3.05-8th-BP1-3100 Terminal Clean - 8th Flr, SP 3.05 - Bid Pkg 1 Contr 3 3 11-Jan-19 16-Jan-19 -66

SP 3.05-8th-BP1-3130 Demo/Abate & Install Ceiling Access Frame - 8th Flr, SP 3.05 - Bid Pkg 1 Contr 4 4 19-Dec-18 27-Dec-18 -66

SP 3.05-8th-BP1-3140 Install Ceiling Access Panels & Touch Up/Repair - 8th Flr, SP 3.05 - Bid Pkg 1 Contr 3 3 08-Jan-19 11-Jan-19 -66

SP 3.05-8th-BP1-3150 Install Cont./Access/Egress/Signage - 8th Flr, SP 3.05 - Bid Pkg 1 Contr 1 1 17-Dec-18 18-Dec-18 -66

SP 3.05-8th-BP1-3170 Remove Cont./Access/Egress/Signage - 8th Flr, SP 3.05 - Bid Pkg 1 Contr 1 1 16-Jan-19 17-Jan-19 -66

SP 3.05-8th-BP2-3110 Decomission & Install Fire Alarm - 8th Flr, SP 3.05 - Bid Pkg 2 Contr 6 6 27-Dec-18 08-Jan-19 -64

SP 3.05-8th-BP3-3120 Demo FHC & Existing Sprinkler System - 8th Flr - Bid Pkg 3 Contr 3 3 19-Mar-19 22-Mar-19 -63

SP 3.05-8th-BP3-3160 Install Fire Sprinkler - 8th Flr, SP 3.05 - Bid Pkg 3 Contr 6 6 27-Dec-18 08-Jan-19 -66

SP 3.05-8th-Misc-3180 Vacate Patient Care Rooms - 8th Flr, SP 3.05 - UCDMC 2 2 13-Dec-18 17-Dec-18 -66

8th Flr, SP 3.068th Flr, SP 3.06 20 20 16-Jan-19 14-Feb-19 -66

SP 3.06-8th-2390 Layout - 8th Floor, SP 3.06 - Bid Pkg 2 &3 Contr 1 1 18-Jan-19 22-Jan-19 -66

SP 3.06-8th-2690 Punchlist 1 1 06-Feb-19 07-Feb-19 -66

SP 3.06-8th-2700 Punchlist Correction 1 1 07-Feb-19 08-Feb-19 -66

SP 3.06-8th-2710 Air Clearance Test 1 1 12-Feb-19 13-Feb-19 -66

SP 3.06-8th-BP1-3180 Material Staging - 8th Flr, SP 3.06 - Bid Pkg 2 & 3 Contr 1 1 17-Jan-19 18-Jan-19 -61

SP 3.06-8th-BP1-3190 Terminal Clean - 8th Flr, SP 3.06 - Bid Pkg 1 Contr 3 3 08-Feb-19 13-Feb-19 -66

SP 3.06-8th-BP1-3220 Demo/Abate & Install Ceiling Access Frame - 8th Flr, SP 3.06 - Bid Pkg 1 Contr 4 4 22-Jan-19 28-Jan-19 -66

SP 3.06-8th-BP1-3230 Install Ceiling Access Panels & Touch Up/Repair - 8th Flr, SP 3.06 - Bid Pkg 1 Contr 3 3 05-Feb-19 08-Feb-19 -66

SP 3.06-8th-BP1-3240 Install Cont./Access/Egress/Signage - 8th Flr, SP 3.06 - Bid Pkg 1 Contr 1 1 17-Jan-19 18-Jan-19 -66

SP 3.06-8th-BP1-3260 Remove Cont./Access/Egress/Signage - 8th Flr, SP 3.06 - Bid Pkg 1 Contr 1 1 13-Feb-19 14-Feb-19 -66

SP 3.06-8th-BP2-3200 Decomission & Install Fire Alarm - 8th Flr, SP 3.06 - Bid Pkg 2 Contr 6 6 28-Jan-19 05-Feb-19 -64

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

Install Ceiling Access Panels & Touch Up/Repair - 8th Flr, SP 3.04 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - 8th Flr, SP 3.04 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - 8th Flr, SP 3.04 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - 8th Flr, SP 3.04 - Bid Pkg 2 Contr

Install Fire Sprinkler - 8th Flr, SP 3.04 - Bid Pkg 3 Contr

Vacate Patient Care Rooms - 8th Flr, SP 3.04 - UCDMC

Layout - 8th Floor, SP 3.05 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Material Staging - 8th Flr, SP 3.05 - Bid Pkg 2 & 3 Contr

Terminal Clean - 8th Flr, SP 3.05 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - 8th Flr, SP 3.05 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - 8th Flr, SP 3.05 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - 8th Flr, SP 3.05 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - 8th Flr, SP 3.05 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - 8th Flr, SP 3.05 - Bid Pkg 2 Contr

Demo FHC & Existing Sprinkler System - 8th Flr - Bid Pkg 3 Contr

Install Fire Sprinkler - 8th Flr, SP 3.05 - Bid Pkg 3 Contr

Vacate Patient Care Rooms - 8th Flr, SP 3.05 - UCDMC

Layout - 8th Floor, SP 3.06 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Material Staging - 8th Flr, SP 3.06 - Bid Pkg 2 & 3 Contr

Terminal Clean - 8th Flr, SP 3.06 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - 8th Flr, SP 3.06 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - 8th Flr, SP 3.06 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - 8th Flr, SP 3.06 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - 8th Flr, SP 3.06 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - 8th Flr, SP 3.06 - Bid Pkg 2 Contr

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 12 of 34

Page 13: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

SP 3.06-8th-BP3-3250 Install Fire Sprinkler - 8th Flr, SP 3.06 - Bid Pkg 3 Contr 6 6 28-Jan-19 05-Feb-19 -66

SP 3.06-8th-Misc-3270 Vacate Patient Care Rooms - 8th Flr, SP 3.06 - UCDMC 2 2 16-Jan-19 18-Jan-19 -66

8th Flr, SP 3.078th Flr, SP 3.07 198 198 31-May-18 19-Mar-19 -63

INSPCT-BP2-7210 BP-02 Fire Alarm Inspections & Verifications of 8th Floor 3 3 14-Mar-19 19-Mar-19 -63

INSPCT-BP3-7220 BP-03 Fire Sprinkler Inspections & Verifications of 8th Floor 3 3 31-May-18 04-Jun-18 132

SP 3.07-8th-2400 Layout - 8th Floor, SP 3.07 - Bid Pkg 2 &3 Contr 1 1 15-Feb-19 19-Feb-19 -66

SP 3.07-8th-2720 Punchlist 1 1 06-Mar-19 07-Mar-19 -66

SP 3.07-8th-2730 Punchlist Correction 1 1 07-Mar-19 08-Mar-19 -66

SP 3.07-8th-2740 Air Clearance Test 1 1 12-Mar-19 13-Mar-19 -66

SP 3.07-8th-BP1-3270 Material Staging - 8th Flr, SP 3.07 - Bid Pkg 2 & 3 Contr 1 1 14-Feb-19 15-Feb-19 -61

SP 3.07-8th-BP1-3280 Terminal Clean - 8th Flr, SP 3.07 - Bid Pkg 1 Contr 3 3 08-Mar-19 13-Mar-19 -66

SP 3.07-8th-BP1-3310 Demo/Abate & Install Ceiling Access Frame - 8th Flr, SP 3.07 - Bid Pkg 1 Contr 4 4 19-Feb-19 25-Feb-19 -66

SP 3.07-8th-BP1-3320 Install Ceiling Access Panels & Touch Up/Repair - 8th Flr, SP 3.07 - Bid Pkg 1 Contr 3 3 05-Mar-19 08-Mar-19 -66

SP 3.07-8th-BP1-3330 Install Cont./Access/Egress/Signage - 8th Flr, SP 3.07 - Bid Pkg 1 Contr 1 1 14-Feb-19 15-Feb-19 -66

SP 3.07-8th-BP1-3350 Remove Cont./Access/Egress/Signage - 8th Flr, SP 3.07 - Bid Pkg 1 Contr 1 1 13-Mar-19 14-Mar-19 -66

SP 3.07-8th-BP2-3290 Decomission & Install Fire Alarm - 8th Flr, SP 3.07 - Bid Pkg 2 Contr 6 6 25-Feb-19 05-Mar-19 -64

SP 3.07-8th-BP3-3340 Install Fire Sprinkler - 8th Flr, SP 3.07 - Bid Pkg 3 Contr 6 6 25-Feb-19 05-Mar-19 -66

SP 3.07-8th-Misc-3360 Vacate Patient Care Rooms - 8th Flr, SP 3.07 - UCDMC 2 2 13-Feb-19 15-Feb-19 -66

6th Flr, SP 3.08b6th Flr, SP 3.08b 3 3 13-Mar-19 18-Mar-19 -65

SP 3.08b-6th-BP2-3430 Inspect & Verify Temp Fire Alarm - 6th Flr, SP 3.08b - Bid Pkg 2 Contr 1 1 14-Mar-19 15-Mar-19 -64

SP 3.08b-6th-Misc-3440 Install Temp Fire Alarm - 6th Flr, SP 3.08b - Bid Pkg 2 3 3 13-Mar-19 18-Mar-19 -66

6th Flr, SP 4.016th Flr, SP 4.01 19 19 18-Mar-19 12-Apr-19 -66

SP 4.01-6th-2420 Layout - 6th Floor, SP 4.01 - Bid Pkg 2 &3 Contr 1 1 20-Mar-19 21-Mar-19 -66

SP 4.01-6th-2750 Punchlist 1 1 04-Apr-19 05-Apr-19 -66

SP 4.01-6th-2760 Punchlist Correction 1 1 05-Apr-19 08-Apr-19 -66

SP 4.01-6th-2770 Air Clearance Test 1 1 10-Apr-19 11-Apr-19 -66

SP 4.01-6th-BP1-3370 Material Staging - 6th Flr, SP 4.01 - Bid Pkg 2 & 3 Contr 1 1 19-Mar-19 20-Mar-19 -61

SP 4.01-6th-BP1-3450 Terminal Clean - 6th Flr, SP 4.01 - Bid Pkg 1 Contr 3 3 08-Apr-19 11-Apr-19 -66

SP 4.01-6th-BP1-3470 Demo/Abate & Install Ceiling Access Frame - 6th Flr, SP 4.01 - Bid Pkg 1 Contr 4 4 21-Mar-19 27-Mar-19 -66

SP 4.01-6th-BP1-3480 Install Ceiling Access Panels & Touch Up/Repair - 6th Flr, SP 4.01 - Bid Pkg 1 Contr 3 3 02-Apr-19 05-Apr-19 -66

SP 4.01-6th-BP1-3490 Install Cont./Access/Egress/Signage - 6th Flr, SP 4.01 - Bid Pkg 1 Contr 1 1 19-Mar-19 20-Mar-19 -66

SP 4.01-6th-BP1-3510 Remove Cont./Access/Egress/Signage - 6th Flr, SP 4.01 - Bid Pkg 1 Contr 1 1 11-Apr-19 12-Apr-19 -66

SP 4.01-6th-BP2-3460 Decomission & Install Fire Alarm - 6th Flr, SP 4.01 - Bid Pkg 2 Contr 6 6 27-Mar-19 04-Apr-19 -66

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

Install Fire Sprinkler - 8th Flr, SP 3.06 - Bid Pkg 3 Contr

Vacate Patient Care Rooms - 8th Flr, SP 3.06 - UCDMC

BP-02 Fire Alarm Inspections & Verifications of 8th Floor

BP-03 Fire Sprinkler Inspections & Verifications of 8th Floor

Layout - 8th Floor, SP 3.07 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Material Staging - 8th Flr, SP 3.07 - Bid Pkg 2 & 3 Contr

Terminal Clean - 8th Flr, SP 3.07 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - 8th Flr, SP 3.07 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - 8th Flr, SP 3.07 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - 8th Flr, SP 3.07 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - 8th Flr, SP 3.07 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - 8th Flr, SP 3.07 - Bid Pkg 2 Contr

Install Fire Sprinkler - 8th Flr, SP 3.07 - Bid Pkg 3 Contr

Vacate Patient Care Rooms - 8th Flr, SP 3.07 - UCDMC

Inspect & Verify Temp Fire Alarm - 6th Flr, SP 3.08b - Bid Pkg 2 Contr

Install Temp Fire Alarm - 6th Flr, SP 3.08b - Bid Pkg 2

Layout - 6th Floor, SP 4.01 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Material Staging - 6th Flr, SP 4.01 - Bid Pkg 2 & 3 Contr

Terminal Clean - 6th Flr, SP 4.01 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - 6th Flr, SP 4.01 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - 6th Flr, SP 4.01 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - 6th Flr, SP 4.01 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - 6th Flr, SP 4.01 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - 6th Flr, SP 4.01 - Bid Pkg 2 Contr

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 13 of 34

Page 14: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

SP 4.01-6th-BP3-3500 Install Fire Sprinkler - 6th Flr, SP 4.01 - Bid Pkg 3 Contr 6 6 27-Mar-19 04-Apr-19 -66

SP 4.01-6th-Misc-3520 Vacate Patient Care Rooms - 6th Flr, SP 4.01 - UCDMC 2 2 18-Mar-19 20-Mar-19 -66

6th Flr, SP 4.026th Flr, SP 4.02 18 18 11-Apr-19 07-May-19 -66

SP 4.02-6th-2430 Layout - 6th Floor, SP 4.02 - Bid Pkg 2 &3 Contr 1 1 15-Apr-19 16-Apr-19 -66

SP 4.02-6th-2780 Punchlist 1 1 29-Apr-19 30-Apr-19 -66

SP 4.02-6th-2790 Punchlist Correction 1 1 30-Apr-19 01-May-19 -66

SP 4.02-6th-2800 Air Clearance Test 1 1 03-May-19 06-May-19 -66

SP 4.02-6th-BP1-3520 Material Staging - 6th Flr, SP 4.02 - Bid Pkg 2 & 3 Contr 1 1 12-Apr-19 15-Apr-19 -61

SP 4.02-6th-BP1-3530 Terminal Clean - 6th Flr, SP 4.02 - Bid Pkg 1 Contr 3 3 01-May-19 06-May-19 -66

SP 4.02-6th-BP1-3550 Demo/Abate & Install Ceiling Access Frame - 6th Flr, SP 4.02 - Bid Pkg 1 Contr 4 4 16-Apr-19 22-Apr-19 -66

SP 4.02-6th-BP1-3560 Install Ceiling Access Panels & Touch Up/Repair - 6th Flr, SP 4.02 - Bid Pkg 1 Contr 3 3 26-Apr-19 01-May-19 -66

SP 4.02-6th-BP1-3570 Install Cont./Access/Egress/Signage - 6th Flr, SP 4.02 - Bid Pkg 1 Contr 1 1 12-Apr-19 15-Apr-19 -66

SP 4.02-6th-BP1-3590 Remove Cont./Access/Egress/Signage - 6th Flr, SP 4.02 - Bid Pkg 1 Contr 1 1 06-May-19 07-May-19 -66

SP 4.02-6th-BP2-3540 Decomission & Install Fire Alarm - 6th Flr, SP 4.02 - Bid Pkg 2 Contr 6 6 22-Apr-19 30-Apr-19 -66

SP 4.02-6th-BP3-3580 Install Fire Sprinkler - 6th Flr, SP 4.02 - Bid Pkg 3 Contr 6 6 22-Apr-19 30-Apr-19 -66

SP 4.02-6th-Misc-3600 Vacate Patient Care Rooms - 6th Flr, SP 4.02 - UCDMC 2 2 11-Apr-19 15-Apr-19 -66

6th Flr, SP 4.036th Flr, SP 4.03 18 18 06-May-19 31-May-19 -66

SP 4.03-6th-2440 Layout - 6th Floor, SP 4.03 - Bid Pkg 2 &3 Contr 1 1 08-May-19 09-May-19 -66

SP 4.03-6th-2810 Punchlist 1 1 22-May-19 23-May-19 -66

SP 4.03-6th-2820 Punchlist Correction 1 1 23-May-19 24-May-19 -66

SP 4.03-6th-2830 Air Clearance Test 1 1 29-May-19 30-May-19 -66

SP 4.03-6th-BP1-3600 Material Staging - 6th Flr, SP 4.03 - Bid Pkg 2 & 3 Contr 1 1 07-May-19 08-May-19 -61

SP 4.03-6th-BP1-3610 Terminal Clean - 6th Flr, SP 4.03 - Bid Pkg 1 Contr 3 3 24-May-19 30-May-19 -66

SP 4.03-6th-BP1-3630 Demo/Abate & Install Ceiling Access Frame - 6th Flr, SP 4.03 - Bid Pkg 1 Contr 4 4 09-May-19 15-May-19 -66

SP 4.03-6th-BP1-3640 Install Ceiling Access Panels & Touch Up/Repair - 6th Flr, SP 4.03 - Bid Pkg 1 Contr 3 3 21-May-19 24-May-19 -66

SP 4.03-6th-BP1-3650 Install Cont./Access/Egress/Signage - 6th Flr, SP 4.03 - Bid Pkg 1 Contr 1 1 07-May-19 08-May-19 -66

SP 4.03-6th-BP1-3670 Remove Cont./Access/Egress/Signage - 6th Flr, SP 4.03 - Bid Pkg 1 Contr 1 1 30-May-19 31-May-19 -66

SP 4.03-6th-BP2-3620 Decomission & Install Fire Alarm - 6th Flr, SP 4.03 - Bid Pkg 2 Contr 6 6 15-May-19 23-May-19 -66

SP 4.03-6th-BP3-3660 Install Fire Sprinkler - 6th Flr, SP 4.03 - Bid Pkg 3 Contr 6 6 15-May-19 23-May-19 -66

SP 4.03-6th-Misc-3680 Vacate Patient Care Rooms - 6th Flr, SP 4.03 - UCDMC 2 2 06-May-19 08-May-19 -66

6th Flr, SP 4.046th Flr, SP 4.04 81 81 30-May-19 24-Sep-19 -63

SP 4.04-6th-2450 Layout - 6th Floor, SP 4.04 - Bid Pkg 2 &3 Contr 1 1 03-Jun-19 04-Jun-19 -66

SP 4.04-6th-2840 Punchlist 1 1 19-Jun-19 20-Jun-19 -66

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

Install Fire Sprinkler - 6th Flr, SP 4.01 - Bid Pkg 3 Contr

Vacate Patient Care Rooms - 6th Flr, SP 4.01 - UCDMC

Layout - 6th Floor, SP 4.02 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Material Staging - 6th Flr, SP 4.02 - Bid Pkg 2 & 3 Contr

Terminal Clean - 6th Flr, SP 4.02 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - 6th Flr, SP 4.02 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - 6th Flr, SP 4.02 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - 6th Flr, SP 4.02 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - 6th Flr, SP 4.02 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - 6th Flr, SP 4.02 - Bid Pkg 2 Contr

Install Fire Sprinkler - 6th Flr, SP 4.02 - Bid Pkg 3 Contr

Vacate Patient Care Rooms - 6th Flr, SP 4.02 - UCDMC

Layout - 6th Floor, SP 4.03 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Material Staging - 6th Flr, SP 4.03 - Bid Pkg 2 & 3 Contr

Terminal Clean - 6th Flr, SP 4.03 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - 6th Flr, SP 4.03 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - 6th Flr, SP 4.03 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - 6th Flr, SP 4.03 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - 6th Flr, SP 4.03 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - 6th Flr, SP 4.03 - Bid Pkg 2 Contr

Install Fire Sprinkler - 6th Flr, SP 4.03 - Bid Pkg 3 Contr

Vacate Patient Care Rooms - 6th Flr, SP 4.03 - UCDMC

Layout - 6th Floor, SP 4.04 - Bid Pkg 2 &3 Contr

Punchlist

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 14 of 34

Page 15: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

SP 4.04-6th-2850 Punchlist Correction 1 1 20-Jun-19 21-Jun-19 -66

SP 4.04-6th-2860 Air Clearance Test 1 1 25-Jun-19 26-Jun-19 -66

SP 4.04-6th-BP1-3680 Material Staging - 6th Flr, SP 4.04 - Bid Pkg 2 & 3 Contr 1 1 31-May-19 03-Jun-19 -61

SP 4.04-6th-BP1-3690 Terminal Clean- 6th Flr, SP 4.04 - Bid Pkg 1 Contr 3 3 21-Jun-19 26-Jun-19 -66

SP 4.04-6th-BP1-3720 Demo/Abate & Install Ceiling Access Frame - 6th Flr, SP 4.04 - Bid Pkg 1 Contr 4 4 04-Jun-19 10-Jun-19 -66

SP 4.04-6th-BP1-3730 Install Ceiling Access Panels & Touch Up/Repair - 6th Flr, SP 4.04 - Bid Pkg 1 Contr 3 3 18-Jun-19 21-Jun-19 -66

SP 4.04-6th-BP1-3740 Install Cont./Access/Egress/Signage - 6th Flr, SP 4.04 - Bid Pkg 1 Contr 1 1 31-May-19 03-Jun-19 -66

SP 4.04-6th-BP1-3760 Remove Cont./Access/Egress/Signage - 6th Flr, SP 4.04 - Bid Pkg 1 Contr 1 1 26-Jun-19 27-Jun-19 -66

SP 4.04-6th-BP2-3700 Decomission & Install Fire Alarm - 6th Flr, SP 4.04 - Bid Pkg 2 Contr 6 6 10-Jun-19 18-Jun-19 -64

SP 4.04-6th-BP3-3710 Demo FHC & Existing Sprinkler System - 6th Flr - Bid Pkg 3 Contr 3 3 19-Sep-19 24-Sep-19 -63

SP 4.04-6th-BP3-3750 Install Fire Sprinkler - 6th Flr, SP 4.04 - Bid Pkg 3 Contr 6 6 10-Jun-19 18-Jun-19 -66

SP 4.04-6th-Misc-3770 Vacate Patient Care Rooms - 6th Flr, SP 4.04 - UCDMC 2 2 30-May-19 03-Jun-19 -66

6th Flr, SP 4.056th Flr, SP 4.05 20 20 26-Jun-19 25-Jul-19 -66

SP 4.05-6th-2460 Layout - 6th Floor, SP 4.05 - Bid Pkg 2 &3 Contr 1 1 28-Jun-19 01-Jul-19 -66

SP 4.05-6th-2870 Punchlist 1 1 17-Jul-19 18-Jul-19 -66

SP 4.05-6th-2880 Punchlist Correction 1 1 18-Jul-19 19-Jul-19 -66

SP 4.05-6th-2890 Air Clearance Test 1 1 23-Jul-19 24-Jul-19 -66

SP 4.05-6th-BP1-3770 Material Staging - 6th Flr, SP 4.05 - Bid Pkg 2 & 3 Contr 1 1 27-Jun-19 28-Jun-19 -61

SP 4.05-6th-BP1-3780 Terminal Clean - 6th Flr, SP 4.05 - Bid Pkg 1 Contr 3 3 19-Jul-19 24-Jul-19 -66

SP 4.05-6th-BP1-3810 Demo/Abate & Install Ceiling Access Frame - 6th Flr, SP 4.05 - Bid Pkg 1 Contr 4 4 01-Jul-19 08-Jul-19 -66

SP 4.05-6th-BP1-3820 Install Ceiling Access Panels & Touch Up/Repair - 6th Flr, SP 4.05 - Bid Pkg 1 Contr 3 3 16-Jul-19 19-Jul-19 -66

SP 4.05-6th-BP1-3830 Install Cont./Access/Egress/Signage - 6th Flr, SP 4.05 - Bid Pkg 1 Contr 1 1 27-Jun-19 28-Jun-19 -66

SP 4.05-6th-BP1-3850 Remove Cont./Access/Egress/Signage - 6th Flr, SP 4.05 - Bid Pkg 1 Contr 1 1 24-Jul-19 25-Jul-19 -66

SP 4.05-6th-BP2-3790 Decomission & Install Fire Alarm - 6th Flr, SP 4.05 - Bid Pkg 2 Contr 6 6 08-Jul-19 16-Jul-19 -64

SP 4.05-6th-BP3-3840 Install Fire Sprinkler - 6th Flr, SP 4.05 - Bid Pkg 3 Contr 6 6 08-Jul-19 16-Jul-19 -66

SP 4.05-6th-Misc-3860 Vacate Patient Care Rooms - 6th Flr, SP 4.05 - UCDMC 2 2 26-Jun-19 28-Jun-19 -66

6th Flr, SP 4.066th Flr, SP 4.06 20 20 24-Jul-19 21-Aug-19 -66

SP 4.06-6th-2470 Layout - 6th Floor, SP 4.06 - Bid Pkg 2 &3 Contr 1 1 26-Jul-19 29-Jul-19 -66

SP 4.06-6th-2900 Punchlist 1 1 13-Aug-19 14-Aug-19 -66

SP 4.06-6th-2910 Punchlist Correction 1 1 14-Aug-19 15-Aug-19 -66

SP 4.06-6th-2920 Air Clearance Test 1 1 19-Aug-19 20-Aug-19 -66

SP 4.06-6th-BP1-3860 Material Staging - 6th Flr, SP 4.06 - Bid Pkg 2 & 3 Contr 1 1 25-Jul-19 26-Jul-19 -61

SP 4.06-6th-BP1-3870 Terminal Clean - 6th Flr, SP 4.06 - Bid Pkg 1 Contr 3 3 15-Aug-19 20-Aug-19 -66

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

Punchlist Correction

Air Clearance Test

Material Staging - 6th Flr, SP 4.04 - Bid Pkg 2 & 3 Contr

Terminal Clean- 6th Flr, SP 4.04 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - 6th Flr, SP 4.04 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - 6th Flr, SP 4.04 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - 6th Flr, SP 4.04 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - 6th Flr, SP 4.04 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - 6th Flr, SP 4.04 - Bid Pkg 2 Contr

Demo FHC & Existing Sprinkler System - 6th Flr - Bid Pkg 3 Contr

Install Fire Sprinkler - 6th Flr, SP 4.04 - Bid Pkg 3 Contr

Vacate Patient Care Rooms - 6th Flr, SP 4.04 - UCDMC

Layout - 6th Floor, SP 4.05 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Material Staging - 6th Flr, SP 4.05 - Bid Pkg 2 & 3 Contr

Terminal Clean - 6th Flr, SP 4.05 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - 6th Flr, SP 4.05 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - 6th Flr, SP 4.05 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - 6th Flr, SP 4.05 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - 6th Flr, SP 4.05 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - 6th Flr, SP 4.05 - Bid Pkg 2 Contr

Install Fire Sprinkler - 6th Flr, SP 4.05 - Bid Pkg 3 Contr

Vacate Patient Care Rooms - 6th Flr, SP 4.05 - UCDMC

Layout - 6th Floor, SP 4.06 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Material Staging - 6th Flr, SP 4.06 - Bid Pkg 2 & 3 Contr

Terminal Clean - 6th Flr, SP 4.06 - Bid Pkg 1 Contr

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 15 of 34

Page 16: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

SP 4.06-6th-BP1-3900 Demo/Abate & Install Ceiling Access Frame - 6th Flr, SP 4.06 - Bid Pkg 1 Contr 4 4 29-Jul-19 02-Aug-19 -66

SP 4.06-6th-BP1-3910 Install Ceiling Access Panels & Touch Up/Repair - 6th Flr, SP 4.06 - Bid Pkg 1 Contr 3 3 12-Aug-19 15-Aug-19 -66

SP 4.06-6th-BP1-3920 Install Cont./Access/Egress/Signage - 6th Flr, SP 4.06 - Bid Pkg 1 Contr 1 1 25-Jul-19 26-Jul-19 -66

SP 4.06-6th-BP1-3940 Remove Cont./Access/Egress/Signage - 6th Flr, SP 4.06 - Bid Pkg 1 Contr 1 1 20-Aug-19 21-Aug-19 -66

SP 4.06-6th-BP2-3880 Decomission & Install Fire Alarm - 6th Flr, SP 4.06 - Bid Pkg 2 Contr 6 6 02-Aug-19 12-Aug-19 -64

SP 4.06-6th-BP3-3930 Install Fire Sprinkler - 6th Flr, SP 4.06 - Bid Pkg 3 Contr 6 6 02-Aug-19 12-Aug-19 -66

SP 4.06-6th-Misc-3950 Vacate Patient Care Rooms - 6th Flr, SP 4.06 - UCDMC 2 2 24-Jul-19 26-Jul-19 -66

6th Flr, SP 4.07a6th Flr, SP 4.07a 21 21 20-Aug-19 19-Sep-19 -63

INSPCT-BP2-7220 BP-02 Fire Alarm Inspections & Verifications of 6th Floor 3 3 16-Sep-19 19-Sep-19 -63

INSPCT-BP3-7230 BP-03 Fire Sprinkler Inspections & Verifications of 6th Floor 3 3 16-Sep-19 19-Sep-19 -63

SP 4.07-6th-2480 Layout - 6th Floor, SP 4.07 - Bid Pkg 2 &3 Contr 1 1 22-Aug-19 23-Aug-19 -66

SP 4.07-6th-BP1-3950 Material Staging - 6th Flr, SP 4.07a - Bid Pkg 2 & 3 Contr 1 1 21-Aug-19 22-Aug-19 -61

SP 4.07a-6th-2930 Punchlist 1 1 06-Sep-19 09-Sep-19 -66

SP 4.07a-6th-2940 Punchlist Correction 1 1 09-Sep-19 10-Sep-19 -66

SP 4.07a-6th-2950 Air Clearance Test 1 1 12-Sep-19 13-Sep-19 -66

SP 4.07a-6th-BP1-3960 Terminal Clean - 6th Flr, SP 4.07a - Bid Pkg 1 Contr 3 3 10-Sep-19 13-Sep-19 -66

SP 4.07a-6th-BP1-3980 Demo/Abate & Install Ceiling Access Frame - 6th Flr, SP 4.07a - Bid Pkg 1 Contr 4 4 23-Aug-19 29-Aug-19 -66

SP 4.07a-6th-BP1-3990 Install Ceiling Access Panels & Touch Up/Repair - 6th Flr, SP 4.07a - Bid Pkg 1 Contr 3 3 05-Sep-19 10-Sep-19 -66

SP 4.07a-6th-BP1-4000 Install Cont./Access/Egress/Signage - 6th Flr, SP 4.07a - Bid Pkg 1 Contr 1 1 21-Aug-19 22-Aug-19 -66

SP 4.07a-6th-BP2-3970 Decomission & Install Fire Alarm - 6th Flr, SP 4.07a - Bid Pkg 2 Contr 6 6 29-Aug-19 09-Sep-19 -66

SP 4.07a-6th-BP3-4010 Install Fire Sprinkler - 6th Flr, SP 4.07a - Bid Pkg 3 Contr 6 6 29-Aug-19 09-Sep-19 -66

SP4.07a-6th-BP1-2890 Vacate Patient Care Rooms - 6th Flr, SP 4.07a - Bid Pkg 1 Contr 2 2 20-Aug-19 22-Aug-19 -66

SP4.07a-6th-BP1-3965 Remove Cont./Access/Egress/Signage - 6th Flr, SP 4.07a - Bid Pkg 1 Contr 1 1 13-Sep-19 16-Sep-19 -66

5th Flr, SP 4.07b5th Flr, SP 4.07b 3 3 13-Sep-19 18-Sep-19 -65

SP 4.07b-5th-BP2-4020 Inspect & Verify Temp Fire Alarm - 5th Flr, SP 4.07b - Bid Pkg 2 Contr 1 1 16-Sep-19 17-Sep-19 -64

SP 4.07b-5th-Misc-4030 Install Temp Fire Alarm - 5th Flr, SP 4.07b - Bid Pkg 2 3 3 13-Sep-19 18-Sep-19 -66

5th Flr, SP 5.015th Flr, SP 5.01 18 18 18-Sep-19 15-Oct-19 -66

SP 5.01-5th-2490 Layout - 5th Floor, SP 5.01 - Bid Pkg 2 &3 Contr 1 1 20-Sep-19 23-Sep-19 -66

SP 5.01-5th-2990 Punchlist 1 1 04-Oct-19 07-Oct-19 -66

SP 5.01-5th-3000 Punchlist Correction 1 1 07-Oct-19 08-Oct-19 -66

SP 5.01-5th-3010 Air Clearance Test 1 1 10-Oct-19 11-Oct-19 -66

SP 5.01-5th-BP1-3960 Material Staging - 5th Flr, SP 5.01 - Bid Pkg 2 & 3 Contr 1 1 19-Sep-19 20-Sep-19 -61

SP 5.01-5th-BP1-4040 Terminal Clean - 5th Flr, SP 5.01 - Bid Pkg 1 Contr 3 3 08-Oct-19 11-Oct-19 -66

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

Demo/Abate & Install Ceiling Access Frame - 6th Flr, SP 4.06 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - 6th Flr, SP 4.06 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - 6th Flr, SP 4.06 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - 6th Flr, SP 4.06 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - 6th Flr, SP 4.06 - Bid Pkg 2 Contr

Install Fire Sprinkler - 6th Flr, SP 4.06 - Bid Pkg 3 Contr

Vacate Patient Care Rooms - 6th Flr, SP 4.06 - UCDMC

BP-02 Fire Alarm Inspections & Verifications of 6th Floor

BP-03 Fire Sprinkler Inspections & Verifications of 6th Floor

Layout - 6th Floor, SP 4.07 - Bid Pkg 2 &3 Contr

Material Staging - 6th Flr, SP 4.07a - Bid Pkg 2 & 3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Terminal Clean - 6th Flr, SP 4.07a - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - 6th Flr, SP 4.07a - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - 6th Flr, SP 4.07a - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - 6th Flr, SP 4.07a - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - 6th Flr, SP 4.07a - Bid Pkg 2 Contr

Install Fire Sprinkler - 6th Flr, SP 4.07a - Bid Pkg 3 Contr

Vacate Patient Care Rooms - 6th Flr, SP 4.07a - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - 6th Flr, SP 4.07a - Bid Pkg 1 Contr

Inspect & Verify Temp Fire Alarm - 5th Flr, SP 4.07b - Bid Pkg 2 Contr

Install Temp Fire Alarm - 5th Flr, SP 4.07b - Bid Pkg 2

Layout - 5th Floor, SP 5.01 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Material Staging - 5th Flr, SP 5.01 - Bid Pkg 2 & 3 Contr

Terminal Clean - 5th Flr, SP 5.01 - Bid Pkg 1 Contr

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 16 of 34

Page 17: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

SP 5.01-5th-BP1-4060 Demo/Abate & Install Ceiling Access Frame - 5th Flr, SP 5.01 - Bid Pkg 1 Contr 4 4 23-Sep-19 27-Sep-19 -66

SP 5.01-5th-BP1-4070 Install Ceiling Access Panels & Touch Up/Repair - 5th Flr, SP 5.01 - Bid Pkg 1 Contr 3 3 03-Oct-19 08-Oct-19 -66

SP 5.01-5th-BP1-4080 Install Cont./Access/Egress/Signage - 5th Flr, SP 5.01 - Bid Pkg 1 Contr 1 1 19-Sep-19 20-Sep-19 -66

SP 5.01-5th-BP1-4100 Remove Cont./Access/Egress/Signage - 5th Flr, SP 5.01 - Bid Pkg 1 Contr 1 1 11-Oct-19 15-Oct-19 -66

SP 5.01-5th-BP2-4050 Decomission & Install Fire Alarm - 5th Flr, SP 5.01 - Bid Pkg 2 Contr 6 6 27-Sep-19 07-Oct-19 -66

SP 5.01-5th-BP3-4090 Install Fire Sprinkler - 5th Flr, SP 5.01 - Bid Pkg 3 Contr 6 6 27-Sep-19 07-Oct-19 -66

SP 5.01-5th-Misc-4110 Vacate Patient Care Rooms - 5th Flr, SP 5.01 - UCDMC 2 2 18-Sep-19 20-Sep-19 -66

5th Flr, SP 5.025th Flr, SP 5.02 18 18 15-Oct-19 08-Nov-19 -66

SP 5.02-5th-2500 Layout - 5th Floor, SP 5.02 - Bid Pkg 2 &3 Contr 1 1 17-Oct-19 18-Oct-19 -66

SP 5.02-5th-3020 Punchlist 1 1 31-Oct-19 01-Nov-19 -66

SP 5.02-5th-3030 Punchlist Correction 1 1 01-Nov-19 04-Nov-19 -66

SP 5.02-5th-3040 Air Clearance Test 1 1 06-Nov-19 07-Nov-19 -66

SP 5.02-5th-BP1-4110 Material Staging - 5th Flr, SP 5.02 - Bid Pkg 2 & 3 Contr 1 1 16-Oct-19 17-Oct-19 -61

SP 5.02-5th-BP1-4120 Terminal Clean - 5th Flr, SP 5.02 - Bid Pkg 1 Contr 3 3 04-Nov-19 07-Nov-19 -66

SP 5.02-5th-BP1-4140 Demo/Abate & Install Ceiling Access Frame - 5th Flr, SP 5.02 - Bid Pkg 1 Contr 4 4 18-Oct-19 24-Oct-19 -66

SP 5.02-5th-BP1-4150 Install Ceiling Access Panels & Touch Up/Repair - 5th Flr, SP 5.02 - Bid Pkg 1 Contr 3 3 30-Oct-19 04-Nov-19 -66

SP 5.02-5th-BP1-4160 Install Cont./Access/Egress/Signage - 5th Flr, SP 5.02 - Bid Pkg 1 Contr 1 1 16-Oct-19 17-Oct-19 -66

SP 5.02-5th-BP1-4180 Remove Cont./Access/Egress/Signage - 5th Flr, SP 5.02 - Bid Pkg 1 Contr 1 1 07-Nov-19 08-Nov-19 -66

SP 5.02-5th-BP2-4130 Decomission & Install Fire Alarm - 5th Flr, SP 5.02 - Bid Pkg 2 Contr 6 6 24-Oct-19 01-Nov-19 -66

SP 5.02-5th-BP3-4170 Install Fire Sprinkler - 5th Flr, SP 5.02 - Bid Pkg 3 Contr 6 6 24-Oct-19 01-Nov-19 -66

SP 5.02-5th-Misc-4190 Vacate Patient Care Rooms - 5th Flr, SP 5.02 - UCDMC 2 2 15-Oct-19 17-Oct-19 -66

5th Flr, SP 5.035th Flr, SP 5.03 18 18 07-Nov-19 05-Dec-19 -66

SP 5.03-5th-2510 Layout - 5th Floor, SP 5.03 - Bid Pkg 2 &3 Contr 1 1 12-Nov-19 13-Nov-19 -66

SP 5.03-5th-3050 Punchlist 1 1 26-Nov-19 27-Nov-19 -66

SP 5.03-5th-3060 Punchlist Correction 1 1 27-Nov-19 29-Nov-19 -66

SP 5.03-5th-3070 Air Clearance Test 1 1 03-Dec-19 04-Dec-19 -66

SP 5.03-5th-BP1-4190 Material Staging - 5th Flr, SP 5.03 - Bid Pkg 2 & 3 Contr 1 1 08-Nov-19 12-Nov-19 -61

SP 5.03-5th-BP1-4200 Terminal Clean - 5th Flr, SP 5.03 - Bid Pkg 1 Contr 3 3 29-Nov-19 04-Dec-19 -66

SP 5.03-5th-BP1-4220 Demo/Abate & Install Ceiling Access Frame - 5th Flr, SP 5.03 - Bid Pkg 1 Contr 4 4 13-Nov-19 19-Nov-19 -66

SP 5.03-5th-BP1-4230 Install Ceiling Access Panels & Touch Up/Repair - 5th Flr, SP 5.03 - Bid Pkg 1 Contr 3 3 25-Nov-19 29-Nov-19 -66

SP 5.03-5th-BP1-4240 Install Cont./Access/Egress/Signage - 5th Flr, SP 5.03 - Bid Pkg 1 Contr 1 1 08-Nov-19 12-Nov-19 -66

SP 5.03-5th-BP1-4260 Remove Cont./Access/Egress/Signage - 5th Flr, SP 5.03 - Bid Pkg 1 Contr 1 1 04-Dec-19 05-Dec-19 -66

SP 5.03-5th-BP2-4210 Decomission & Install Fire Alarm - 5th Flr, SP 5.03 - Bid Pkg 2 Contr 6 6 19-Nov-19 27-Nov-19 -66

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

Demo/Abate & Install Ceiling Access Frame - 5th Flr, SP 5.01 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - 5th Flr, SP 5.01 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - 5th Flr, SP 5.01 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - 5th Flr, SP 5.01 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - 5th Flr, SP 5.01 - Bid Pkg 2 Contr

Install Fire Sprinkler - 5th Flr, SP 5.01 - Bid Pkg 3 Contr

Vacate Patient Care Rooms - 5th Flr, SP 5.01 - UCDMC

Layout - 5th Floor, SP 5.02 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Material Staging - 5th Flr, SP 5.02 - Bid Pkg 2 & 3 Contr

Terminal Clean - 5th Flr, SP 5.02 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - 5th Flr, SP 5.02 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - 5th Flr, SP 5.02 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - 5th Flr, SP 5.02 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - 5th Flr, SP 5.02 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - 5th Flr, SP 5.02 - Bid Pkg 2 Contr

Install Fire Sprinkler - 5th Flr, SP 5.02 - Bid Pkg 3 Contr

Vacate Patient Care Rooms - 5th Flr, SP 5.02 - UCDMC

Layout - 5th Floor, SP 5.03 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Material Staging - 5th Flr, SP 5.03 - Bid Pkg 2 & 3 Contr

Terminal Clean - 5th Flr, SP 5.03 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - 5th Flr, SP 5.03 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - 5th Flr, SP 5.03 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - 5th Flr, SP 5.03 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - 5th Flr, SP 5.03 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - 5th Flr, SP 5.03 - Bid Pkg 2 Contr

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 17 of 34

Page 18: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

SP 5.03-5th-BP3-4250 Install Fire Sprinkler - 5th Flr, SP 5.03 - Bid Pkg 3 Contr 6 6 19-Nov-19 27-Nov-19 -66

SP 5.03-5th-Misc-4270 Vacate Patient Care Rooms - 5th Flr, SP 5.03 - UCDMC 2 2 07-Nov-19 12-Nov-19 -66

5th Flr, SP 5.045th Flr, SP 5.04 18 18 04-Dec-19 31-Dec-19 -66

SP 5.04-5th-2520 Layout - 5th Floor, SP 5.04 - Bid Pkg 2 &3 Contr 1 1 06-Dec-19 09-Dec-19 -66

SP 5.04-5th-3080 Punchlist 1 1 20-Dec-19 23-Dec-19 -66

SP 5.04-5th-3090 Punchlist Correction 1 1 23-Dec-19 24-Dec-19 -66

SP 5.04-5th-3100 Air Clearance Test 1 1 27-Dec-19 30-Dec-19 -66

SP 5.04-5th-BP1-4270 Material Staging - 5th Flr, SP 5.04 - Bid Pkg 2 & 3 Contr 1 1 05-Dec-19 06-Dec-19 -61

SP 5.04-5th-BP1-4280 Terminal Clean - 5th Flr, SP 5.04 - Bid Pkg 1 Contr 3 3 24-Dec-19 30-Dec-19 -66

SP 5.04-5th-BP1-4300 Demo/Abate & Install Ceiling Access Frame - 5th Flr, SP 5.04 - Bid Pkg 1 Contr 4 4 09-Dec-19 13-Dec-19 -66

SP 5.04-5th-BP1-4310 Install Ceiling Access Panels & Touch Up/Repair - 5th Flr, SP 5.04 - Bid Pkg 1 Contr 3 3 19-Dec-19 24-Dec-19 -66

SP 5.04-5th-BP1-4320 Install Cont./Access/Egress/Signage - 5th Flr, SP 5.04 - Bid Pkg 1 Contr 1 1 05-Dec-19 06-Dec-19 -66

SP 5.04-5th-BP1-4340 Remove Cont./Access/Egress/Signage - 5th Flr, SP 5.04 - Bid Pkg 1 Contr 1 1 30-Dec-19 31-Dec-19 -66

SP 5.04-5th-BP2-4290 Decomission & Install Fire Alarm - 5th Flr, SP 5.04 - Bid Pkg 2 Contr 6 6 13-Dec-19 23-Dec-19 -66

SP 5.04-5th-BP3-4330 Install Fire Sprinkler - 5th Flr, SP 5.04 - Bid Pkg 3 Contr 6 6 13-Dec-19 23-Dec-19 -66

SP 5.04-5th-Misc-4350 Vacate Patient Care Rooms - 5th Flr, SP 5.04 - UCDMC 2 2 04-Dec-19 06-Dec-19 -66

5th Flr, SP 5.055th Flr, SP 5.05 64 64 30-Dec-19 31-Mar-20 338

SP 5.05-5th-2530 Layout - 5th Floor, SP 5.05 - Bid Pkg 2 &3 Contr 1 1 02-Jan-20 03-Jan-20 -66

SP 5.05-5th-3110 Punchlist 1 1 21-Jan-20 22-Jan-20 -66

SP 5.05-5th-3120 Punchlist Correction 1 1 22-Jan-20 23-Jan-20 -66

SP 5.05-5th-3130 Air Clearance Test 1 1 27-Jan-20 28-Jan-20 -66

SP 5.05-5th-BP1-4350 Material Staging - 5th Flr, SP 5.05 - Bid Pkg 2 & 3 Contr 1 1 31-Dec-19 02-Jan-20 -61

SP 5.05-5th-BP1-4360 Terminal Clean - 5th Flr, SP 5.05 - Bid Pkg 1 Contr 3 3 23-Jan-20 28-Jan-20 -66

SP 5.05-5th-BP1-4390 Demo/Abate & Install Ceiling Access Frame - 5th Flr, SP 5.05 - Bid Pkg 1 Contr 4 4 03-Jan-20 09-Jan-20 -66

SP 5.05-5th-BP1-4400 Install Ceiling Access Panels & Touch Up/Repair - 5th Flr, SP 5.05 - Bid Pkg 1 Contr 3 3 17-Jan-20 23-Jan-20 -66

SP 5.05-5th-BP1-4410 Install Cont./Access/Egress/Signage - 5th Flr, SP 5.05 - Bid Pkg 1 Contr 1 1 31-Dec-19 02-Jan-20 -66

SP 5.05-5th-BP1-4430 Remove Cont./Access/Egress/Signage - 5th Flr, SP 5.05 - Bid Pkg 1 Contr 1 1 28-Jan-20 29-Jan-20 -66

SP 5.05-5th-BP2-4370 Decomission & Install Fire Alarm - 5th Flr, SP 5.05 - Bid Pkg 2 Contr 6 6 09-Jan-20 17-Jan-20 -64

SP 5.05-5th-BP3-4380 Demo FHC & Existing Sprinkler System - 5th Flr - Bid Pkg 3 Contr 3 3 26-Mar-20 31-Mar-20 338

SP 5.05-5th-BP3-4420 Install Fire Sprinkler - 5th Flr, SP 5.05 - Bid Pkg 3 Contr 6 6 09-Jan-20 17-Jan-20 -66

SP 5.05-5th-Misc-4440 Vacate Patient Care Rooms - 5th Flr, SP 5.05 - UCDMC 2 2 30-Dec-19 02-Jan-20 -66

5th Flr, SP 5.065th Flr, SP 5.06 20 20 28-Jan-20 25-Feb-20 -66

SP 5.06-5th-2540 Layout - 5th Floor, SP 5.06 - Bid Pkg 2 &3 Contr 1 1 30-Jan-20 31-Jan-20 -66

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

Install Fire Sprinkler - 5th Flr, SP 5.03 - Bid Pkg 3 Contr

Vacate Patient Care Rooms - 5th Flr, SP 5.03 - UCDMC

Layout - 5th Floor, SP 5.04 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Material Staging - 5th Flr, SP 5.04 - Bid Pkg 2 & 3 Contr

Terminal Clean - 5th Flr, SP 5.04 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - 5th Flr, SP 5.04 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - 5th Flr, SP 5.04 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - 5th Flr, SP 5.04 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - 5th Flr, SP 5.04 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - 5th Flr, SP 5.04 - Bid Pkg 2 Contr

Install Fire Sprinkler - 5th Flr, SP 5.04 - Bid Pkg 3 Contr

Vacate Patient Care Rooms - 5th Flr, SP 5.04 - UCDMC

Layout - 5th Floor, SP 5.05 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Material Staging - 5th Flr, SP 5.05 - Bid Pkg 2 & 3 Contr

Terminal Clean - 5th Flr, SP 5.05 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - 5th Flr, SP 5.05 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - 5th Flr, SP 5.05 - Bid Pkg 1 Co

Install Cont./Access/Egress/Signage - 5th Flr, SP 5.05 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - 5th Flr, SP 5.05 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - 5th Flr, SP 5.05 - Bid Pkg 2 Contr

Demo FHC & Existing Sprinkler System - 5th Flr - Bid Pkg 3 Contr

Install Fire Sprinkler - 5th Flr, SP 5.05 - Bid Pkg 3 Contr

Vacate Patient Care Rooms - 5th Flr, SP 5.05 - UCDMC

Layout - 5th Floor, SP 5.06 - Bid Pkg 2 &3 Contr

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 18 of 34

Page 19: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

SP 5.06-5th-3140 Punchlist 1 1 17-Feb-20 18-Feb-20 -66

SP 5.06-5th-3150 Punchlist Correction 1 1 18-Feb-20 19-Feb-20 -66

SP 5.06-5th-3160 Air Clearance Test 1 1 21-Feb-20 24-Feb-20 -66

SP 5.06-5th-BP1-4440 Material Staging - 5th Flr, SP 5.06 - Bid Pkg 2 & 3 Contr 1 1 29-Jan-20 30-Jan-20 -61

SP 5.06-5th-BP1-4450 Terminal Clean - 5th Flr, SP 5.06 - Bid Pkg 1 Contr 3 3 19-Feb-20 24-Feb-20 -66

SP 5.06-5th-BP1-4480 Demo/Abate & Install Ceiling Access Frame - 5th Flr, SP 5.06 - Bid Pkg 1 Contr 4 4 31-Jan-20 06-Feb-20 -66

SP 5.06-5th-BP1-4490 Install Ceiling Access Panels & Touch Up/Repair - 5th Flr, SP 5.06 - Bid Pkg 1 Contr 3 3 14-Feb-20 19-Feb-20 -66

SP 5.06-5th-BP1-4500 Install Cont./Access/Egress/Signage - 5th Flr, SP 5.06 - Bid Pkg 1 Contr 1 1 29-Jan-20 30-Jan-20 -66

SP 5.06-5th-BP1-4520 Remove Cont./Access/Egress/Signage - 5th Flr, SP 5.06 - Bid Pkg 1 Contr 1 1 24-Feb-20 25-Feb-20 -66

SP 5.06-5th-BP2-4460 Decomission & Install Fire Alarm - 5th Flr, SP 5.06 - Bid Pkg 2 Contr 6 6 06-Feb-20 14-Feb-20 -64

SP 5.06-5th-BP3-4510 Install Fire Sprinkler - 5th Flr, SP 5.06 - Bid Pkg 3 Contr 6 6 06-Feb-20 14-Feb-20 -66

SP 5.06-5th-Misc-4530 Vacate Patient Care Rooms - 5th Flr, SP 5.06 - UCDMC 2 2 28-Jan-20 30-Jan-20 -66

5th Flr, SP 5.075th Flr, SP 5.07 23 23 24-Feb-20 26-Mar-20 -66

INSPCT-BP2-7230 BP-02 Fire Alarm Inspections & Verifications of 5th Floor 3 3 23-Mar-20 26-Mar-20 -66

INSPCT-BP3-7240 BP-03 Fire Sprinkler Inspections & Verifications of 5th Floor 3 3 23-Mar-20 26-Mar-20 -66

SP 5.07-5th-2550 Layout - 5th Floor, SP 5.07 - Bid Pkg 2 &3 Contr 1 1 26-Feb-20 27-Feb-20 -66

SP 5.07-5th-3170 Punchlist 1 1 13-Mar-20 16-Mar-20 -66

SP 5.07-5th-3180 Punchlist Correction 1 1 16-Mar-20 17-Mar-20 -66

SP 5.07-5th-3190 Air Clearance Test 1 1 19-Mar-20 20-Mar-20 -66

SP 5.07-5th-BP1-2900 Vacate Patient Care Rooms - 5th Flr, SP 5.07 - Bid Pkg 1 Contr 2 2 24-Feb-20 26-Feb-20 -66

SP 5.07-5th-BP1-4530 Material Staging - 5th Flr, SP 5.07 - Bid Pkg 2 & 3 Contr 1 1 25-Feb-20 26-Feb-20 -61

SP 5.07-5th-BP1-4540 Terminal Clean - 5th Flr, SP 5.07 - Bid Pkg 1 Contr 3 3 17-Mar-20 20-Mar-20 -66

SP 5.07-5th-BP1-4570 Demo/Abate & Install Ceiling Access Frame - 5th Flr, SP 5.07 - Bid Pkg 1 Contr 4 4 27-Feb-20 04-Mar-20 -66

SP 5.07-5th-BP1-4580 Install Ceiling Access Panels & Touch Up/Repair - 5th Flr, SP 5.07 - Bid Pkg 1 Contr 3 3 12-Mar-20 17-Mar-20 -66

SP 5.07-5th-BP1-4590 Install Cont./Access/Egress/Signage - 5th Flr, SP 5.07 - Bid Pkg 1 Contr 1 1 25-Feb-20 26-Feb-20 -66

SP 5.07-5th-BP1-4610 Remove Cont./Access/Egress/Signage - 5th Flr, SP 5.07 - Bid Pkg 1 Contr 1 1 20-Mar-20 23-Mar-20 -66

SP 5.07-5th-BP2-4550 Decomission & Install Fire Alarm - 5th Flr, SP 5.07 - Bid Pkg 2 Contr 6 6 04-Mar-20 12-Mar-20 -64

SP 5.07-5th-BP3-4600 Install Fire Sprinkler - 5th Flr, SP 5.07 - Bid Pkg 3 Contr 6 6 04-Mar-20 12-Mar-20 -66

Fallback ZoneFallback Zone 650 559 26-Oct-17 A 21-Jul-20 -148

Ground Flr, ZN A.01Ground Flr, ZN A.01 131 40 26-Oct-17 A 25-Jul-18 -158

ZN A.01-Gnd Flr -2560 Layout - Ground Floor, ZN A.01 - Bid Pkg 2 &3 Contr 1 1 03-Jul-18 03-Jul-18 -149

ZN A.01-Gnd Flr -3200 Punchlist 1 1 18-Jul-18 18-Jul-18 -149

ZN A.01-Gnd Flr -3210 Punchlist Correction 1 1 19-Jul-18 19-Jul-18 -149

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

Punchlist

Punchlist Correction

Air Clearance Test

Material Staging - 5th Flr, SP 5.06 - Bid Pkg 2 & 3 Contr

Terminal Clean - 5th Flr, SP 5.06 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - 5th Flr, SP 5.06 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - 5th Flr, SP 5.06 - Bid Pkg 1

Install Cont./Access/Egress/Signage - 5th Flr, SP 5.06 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - 5th Flr, SP 5.06 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - 5th Flr, SP 5.06 - Bid Pkg 2 Contr

Install Fire Sprinkler - 5th Flr, SP 5.06 - Bid Pkg 3 Contr

Vacate Patient Care Rooms - 5th Flr, SP 5.06 - UCDMC

BP-02 Fire Alarm Inspections & Verifications of 5th Floor

BP-03 Fire Sprinkler Inspections & Verifications of 5th Floor

Layout - 5th Floor, SP 5.07 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Vacate Patient Care Rooms - 5th Flr, SP 5.07 - Bid Pkg 1 Contr

Material Staging - 5th Flr, SP 5.07 - Bid Pkg 2 & 3 Contr

Terminal Clean - 5th Flr, SP 5.07 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - 5th Flr, SP 5.07 - Bid Pkg 1 Con

Install Ceiling Access Panels & Touch Up/Repair - 5th Flr, SP 5.07 - Bid Pkg

Install Cont./Access/Egress/Signage - 5th Flr, SP 5.07 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - 5th Flr, SP 5.07 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - 5th Flr, SP 5.07 - Bid Pkg 2 Contr

Install Fire Sprinkler - 5th Flr, SP 5.07 - Bid Pkg 3 Contr

Layout - Ground Floor, ZN A.01 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 19 of 34

Page 20: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

ZN A.01-Gnd Flr -3220 Air Clearance Test 1 1 24-Jul-18 24-Jul-18 -149

ZN A.01-Gnd Flr -4671 RFI 010 - Add FS Valves (3 SOVs) 1 0 26-Oct-17 A 03-Nov-17 A

ZN A.01-Gnd Flr -4672 RFI 010 - COR for FS Valves 1 0 06-Nov-17 A 28-Nov-17 A

ZN A.01-Gnd Flr -4673 RFI 010 - FO for FS Valves (and Shutdown Coord) 1 23 29-Nov-17 A 02-Jul-18 -151

ZN A.01-Gnd Flr -4674 RFI 010 - Install FS Valves 2 2 03-Jul-18 04-Jul-18 -151

ZN A.01-Gnd Flr -4675 RFI 010 - Inspect FS Valves (SOVs) and RFI 015 Inspect Fire Sprinkler 2 2 05-Jul-18 06-Jul-18 -151

ZN A.01-Gnd Flr -4676 RFI 015 - (E) Concrete Beam Conflict w/FS Pipe 1 0 03-Jan-18 A 03-Jan-18 A

ZN A.01-Gnd Flr -4677 RFI 015 - Install Fire Sprinkler 1 0 04-Jan-18 A 04-Jan-18 A

ZN A.01-Gnd Flr -4700 Material Staging - Ground Flr, ZN A.01 - Bid Pkg 2 & 3 Contr 1 1 02-Jul-18 02-Jul-18 -144

ZN A.01-Gnd Flr -BP1-4630 Terminal Clean - Ground Flr, ZN A.01 - Bid Pkg 1 Contr 3 3 20-Jul-18 24-Jul-18 -149

ZN A.01-Gnd Flr -BP1-4650 Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.01 - Bid Pkg 1 Contr 4 4 05-Jul-18 10-Jul-18 -149

ZN A.01-Gnd Flr -BP1-4660 Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.01 - Bid Pkg 1 Contr 3 3 17-Jul-18 19-Jul-18 -149

ZN A.01-Gnd Flr -BP1-4670 Install Cont./Access/Egress/Signage - Ground Flr, ZN A.01 - Bid Pkg 1 Contr 1 1 02-Jul-18 02-Jul-18 -149

ZN A.01-Gnd Flr -BP1-4690 Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.01 - Bid Pkg 1 Contr 1 1 25-Jul-18 25-Jul-18 -149

ZN A.01-Gnd Flr -BP1-4700 Vacate Rooms - Ground Flr, ZN A.01 - Bid Pkg 1 Contr 2 2 27-Jun-18 28-Jun-18 -149

ZN A.01-Gnd Flr -BP2-4640 Decomission & Install Fire Alarm - Ground Flr, ZN A.01 - Bid Pkg 2 Contr 6 6 11-Jul-18 18-Jul-18 -149

ZN A.01-Gnd Flr -BP3-4680 Install Fire Sprinkler - Ground Flr, ZN A.01 - Bid Pkg 3 Contr 6 6 11-Jul-18 18-Jul-18 -149

Ground Flr, ZN A.02Ground Flr, ZN A.02 18 18 25-Jul-18 17-Aug-18 -149

ZN A.02-Gnd Flr -2570 Layout - Ground Floor, ZN A.02 - Bid Pkg 2 &3 Contr 1 1 27-Jul-18 27-Jul-18 -149

ZN A.02-Gnd Flr -3230 Punchlist 1 1 10-Aug-18 10-Aug-18 -149

ZN A.02-Gnd Flr -3240 Punchlist Correction 1 1 13-Aug-18 13-Aug-18 -149

ZN A.02-Gnd Flr -3250 Air Clearance Test 1 1 16-Aug-18 16-Aug-18 -149

ZN A.02-Gnd Flr -4790 Material Staging - Ground Flr, ZN A.02 - Bid Pkg 2 & 3 Contr 1 1 26-Jul-18 26-Jul-18 -144

ZN A.02-Gnd Flr -BP1-4710 Terminal Clean- Ground Flr, ZN A.02 - Bid Pkg 1 Contr 3 3 14-Aug-18 16-Aug-18 -149

ZN A.02-Gnd Flr -BP1-4730 Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.02 - Bid Pkg 1 Contr 4 4 30-Jul-18 02-Aug-18 -149

ZN A.02-Gnd Flr -BP1-4740 Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.02 - Bid Pkg 1 Contr 3 3 09-Aug-18 13-Aug-18 -149

ZN A.02-Gnd Flr -BP1-4750 Install Cont./Access/Egress/Signage - Ground Flr, ZN A.02 - Bid Pkg 1 Contr 1 1 26-Jul-18 26-Jul-18 -149

ZN A.02-Gnd Flr -BP1-4770 Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.02 - Bid Pkg 1 Contr 1 1 17-Aug-18 17-Aug-18 -149

ZN A.02-Gnd Flr -BP1-4780 Vacate Rooms - Ground Flr, ZN A.02 - Bid Pkg 1 Contr 2 2 25-Jul-18 26-Jul-18 -149

ZN A.02-Gnd Flr -BP2-4720 Decomission & Install Fire Alarm - Ground Flr, ZN A.02 - Bid Pkg 2 Contr 6 6 03-Aug-18 10-Aug-18 -149

ZN A.02-Gnd Flr -BP3-4760 Install Fire Sprinkler - Ground Flr, ZN A.02 - Bid Pkg 3 Contr 6 6 03-Aug-18 10-Aug-18 -149

Ground Flr, ZN A.03Ground Flr, ZN A.03 18 18 17-Aug-18 12-Sep-18 -149

ZN A.03-Gnd Flr -2580 Layout - Ground Floor, ZN A.03 - Bid Pkg 2 &3 Contr 1 1 21-Aug-18 21-Aug-18 -149

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

Air Clearance Test

RFI 010 - Add FS Valves (3 SOVs)

RFI 010 - COR for FS Valves

RFI 010 - FO for FS Valves (and Shutdown Coord)

RFI 010 - Install FS Valves

RFI 010 - Inspect FS Valves (SOVs) and RFI 015 Inspect Fire Sprinkler

RFI 015 - (E) Concrete Beam Conflict w/FS Pipe

RFI 015 - Install Fire Sprinkler

Material Staging - Ground Flr, ZN A.01 - Bid Pkg 2 & 3 Contr

Terminal Clean - Ground Flr, ZN A.01 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.01 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.01 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - Ground Flr, ZN A.01 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.01 - Bid Pkg 1 Contr

Vacate Rooms - Ground Flr, ZN A.01 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - Ground F lr, ZN A.01 - Bid Pkg 2 Contr

Install Fire Sprinkler - Ground Flr, ZN A.01 - Bid Pkg 3 Contr

Layout - Ground Floor, ZN A.02 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Material Staging - Ground Flr, ZN A.02 - Bid Pkg 2 & 3 Contr

Terminal Clean- Ground Flr, ZN A.02 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.02 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.02 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - Ground Flr, ZN A.02 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.02 - Bid Pkg 1 Contr

Vacate Rooms - Ground Flr, ZN A.02 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - Ground F lr, ZN A.02 - Bid Pkg 2 Contr

Install Fire Sprinkler - Ground Flr, ZN A.02 - Bid Pkg 3 Contr

Layout - Ground Floor, ZN A.03 - Bid Pkg 2 &3 Contr

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 20 of 34

aparker
Text Box
Ground Floor work and First Floor work are concurrent with Patient Care 5th, 6th, & 8th Floors.
Page 21: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

ZN A.03-Gnd Flr -3260 Punchlist 1 1 05-Sep-18 05-Sep-18 -149

ZN A.03-Gnd Flr -3270 Punchlist Correction 1 1 06-Sep-18 06-Sep-18 -149

ZN A.03-Gnd Flr -3280 Air Clearance Test 1 1 11-Sep-18 11-Sep-18 -149

ZN A.03-Gnd Flr -4800 Material Staging - Ground Flr, ZN A.03 - Bid Pkg 2 & 3 Contr 1 1 20-Aug-18 20-Aug-18 -144

ZN A.03-Gnd Flr -BP1-4790 Terminal Clean - Ground Flr, ZN A.03 - Bid Pkg 1 Contr 3 3 07-Sep-18 11-Sep-18 -149

ZN A.03-Gnd Flr -BP1-4810 Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.03 - Bid Pkg 1 Contr 4 4 22-Aug-18 27-Aug-18 -149

ZN A.03-Gnd Flr -BP1-4820 Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.03 - Bid Pkg 1 Contr 3 3 04-Sep-18 06-Sep-18 -149

ZN A.03-Gnd Flr -BP1-4830 Install Cont./Access/Egress/Signage - Ground Flr, ZN A.03 - Bid Pkg 1 Contr 1 1 20-Aug-18 20-Aug-18 -149

ZN A.03-Gnd Flr -BP1-4850 Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.03 - Bid Pkg 1 Contr 1 1 12-Sep-18 12-Sep-18 -149

ZN A.03-Gnd Flr -BP1-4860 Vacate Rooms - Ground Flr, ZN A.03 - Bid Pkg 1 Contr 2 2 17-Aug-18 20-Aug-18 -149

ZN A.03-Gnd Flr -BP2-4800 Decomission & Install Fire Alarm - Ground Flr, ZN A.03 - Bid Pkg 2 Contr 6 6 28-Aug-18 05-Sep-18 -149

ZN A.03-Gnd Flr -BP3-4840 Install Fire Sprinkler - Ground Flr, ZN A.03 - Bid Pkg 3 Contr 6 6 28-Aug-18 05-Sep-18 -149

Ground Flr, ZN A.04Ground Flr, ZN A.04 19 19 12-Sep-18 08-Oct-18 -149

ZN A.04-Gnd Flr -2590 Layout - Ground Floor, ZN A.04 - Bid Pkg 2 &3 Contr 1 1 17-Sep-18 17-Sep-18 -149

ZN A.04-Gnd Flr -3290 Punchlist 1 1 01-Oct-18 01-Oct-18 -149

ZN A.04-Gnd Flr -3300 Punchlist Correction 1 1 02-Oct-18 02-Oct-18 -149

ZN A.04-Gnd Flr -3310 Air Clearance Test 1 1 05-Oct-18 05-Oct-18 -149

ZN A.04-Gnd Flr -4810 Material Staging - Ground Flr, ZN A.04 - Bid Pkg 2 & 3 Contr 1 1 14-Sep-18 14-Sep-18 -144

ZN A.04-Gnd Flr -BP1-4870 Terminal Clean - Ground Flr, ZN A.04 - Bid Pkg 1 Contr 3 3 03-Oct-18 05-Oct-18 -149

ZN A.04-Gnd Flr -BP1-4890 Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.04 - Bid Pkg 1 Contr 4 4 18-Sep-18 21-Sep-18 -149

ZN A.04-Gnd Flr -BP1-4900 Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.04 - Bid Pkg 1 Contr 3 3 28-Sep-18 02-Oct-18 -149

ZN A.04-Gnd Flr -BP1-4910 Install Cont./Access/Egress/Signage - Ground Flr, ZN A.04 - Bid Pkg 1 Contr 1 1 14-Sep-18 14-Sep-18 -149

ZN A.04-Gnd Flr -BP1-4930 Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.04 - Bid Pkg 1 Contr 1 1 08-Oct-18 08-Oct-18 -149

ZN A.04-Gnd Flr -BP1-4940 Vacate Rooms - Ground Flr, ZN A.04 - Bid Pkg 1 Contr 2 2 12-Sep-18 13-Sep-18 -149

ZN A.04-Gnd Flr -BP2-4880 Decomission & Install Fire Alarm - Ground Flr, ZN A.04 - Bid Pkg 2 Contr 6 6 24-Sep-18 01-Oct-18 -149

ZN A.04-Gnd Flr -BP3-4920 Install Fire Sprinkler - Ground Flr, ZN A.04 - Bid Pkg 3 Contr 6 6 24-Sep-18 01-Oct-18 -149

Ground Flr, ZN A.05Ground Flr, ZN A.05 18 18 08-Oct-18 31-Oct-18 -149

ZN A.05-Gnd Flr -2600 Layout - Ground Floor, ZN A.05 - Bid Pkg 2 &3 Contr 1 1 10-Oct-18 10-Oct-18 -149

ZN A.05-Gnd Flr -3320 Punchlist 1 1 24-Oct-18 24-Oct-18 -149

ZN A.05-Gnd Flr -3330 Punchlist Correction 1 1 25-Oct-18 25-Oct-18 -149

ZN A.05-Gnd Flr -3340 Air Clearance Test 1 1 30-Oct-18 30-Oct-18 -149

ZN A.05-Gnd Flr -4820 Material Staging - Ground Flr, ZN A.05 - Bid Pkg 2 & 3 Contr 1 1 09-Oct-18 09-Oct-18 -144

ZN A.05-Gnd Flr -BP1-4950 Terminal Clean - Ground Flr, ZN A.05 - Bid Pkg 1 Contr 3 3 26-Oct-18 30-Oct-18 -149

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

Punchlist

Punchlist Correction

Air Clearance Test

Material Staging - Ground Flr, ZN A.03 - Bid Pkg 2 & 3 Contr

Terminal Clean - Ground Flr, ZN A.03 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.03 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.03 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - Ground Flr, ZN A.03 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.03 - Bid Pkg 1 Contr

Vacate Rooms - Ground Flr, ZN A.03 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - Ground F lr, ZN A.03 - Bid Pkg 2 Contr

Install Fire Sprinkler - Ground Flr, ZN A.03 - Bid Pkg 3 Contr

Layout - Ground Floor, ZN A.04 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Material Staging - Ground Flr, ZN A.04 - Bid Pkg 2 & 3 Contr

Terminal Clean - Ground Flr, ZN A.04 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.04 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.04 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - Ground Flr, ZN A.04 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.04 - Bid Pkg 1 Contr

Vacate Rooms - Ground Flr, ZN A.04 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - Ground F lr, ZN A.04 - Bid Pkg 2 Contr

Install Fire Sprinkler - Ground Flr, ZN A.04 - Bid Pkg 3 Contr

Layout - Ground Floor, ZN A.05 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Material Staging - Ground Flr, ZN A.05 - Bid Pkg 2 & 3 Contr

Terminal Clean - Ground Flr, ZN A.05 - Bid Pkg 1 Contr

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 21 of 34

aparker
Text Box
Ground Floor and First Floor work are concurrent with Patient Care 5th, 6th, & 8th Floors.
Page 22: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

ZN A.05-Gnd Flr -BP1-4970 Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.05 - Bid Pkg 1 Contr 4 4 11-Oct-18 16-Oct-18 -149

ZN A.05-Gnd Flr -BP1-4980 Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.05 - Bid Pkg 1 Contr 3 3 23-Oct-18 25-Oct-18 -149

ZN A.05-Gnd Flr -BP1-4990 Install Cont./Access/Egress/Signage - Ground Flr, ZN A.05 - Bid Pkg 1 Contr 1 1 09-Oct-18 09-Oct-18 -149

ZN A.05-Gnd Flr -BP1-5010 Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.05 - Bid Pkg 1 Contr 1 1 31-Oct-18 31-Oct-18 -149

ZN A.05-Gnd Flr -BP1-5020 Vacate Rooms - Ground Flr, ZN A.05 - Bid Pkg 1 Contr 2 2 08-Oct-18 09-Oct-18 -149

ZN A.05-Gnd Flr -BP2-4960 Decomission & Install Fire Alarm - Ground Flr, ZN A.05 - Bid Pkg 2 Contr 6 6 17-Oct-18 24-Oct-18 -149

ZN A.05-Gnd Flr -BP3-5000 Install Fire Sprinkler - Ground Flr, ZN A.05 - Bid Pkg 3 Contr 6 6 17-Oct-18 24-Oct-18 -149

Ground Flr, ZN A.06Ground Flr, ZN A.06 18 18 31-Oct-18 28-Nov-18 -149

ZN A.06-Gnd Flr -2610 Layout - Ground Floor, ZN A.06 - Bid Pkg 2 &3 Contr 1 1 02-Nov-18 02-Nov-18 -149

ZN A.06-Gnd Flr -3350 Punchlist 1 1 19-Nov-18 19-Nov-18 -149

ZN A.06-Gnd Flr -3360 Punchlist Correction 1 1 20-Nov-18 20-Nov-18 -149

ZN A.06-Gnd Flr -3370 Air Clearance Test 1 1 27-Nov-18 27-Nov-18 -149

ZN A.06-Gnd Flr -4830 Material Staging - Ground Flr, ZN A.06 - Bid Pkg 2 & 3 Contr 1 1 01-Nov-18 01-Nov-18 -144

ZN A.06-Gnd Flr -BP1-5030 Terminal Clean - Ground Flr, ZN A.06 - Bid Pkg 1 Contr 3 3 21-Nov-18 27-Nov-18 -149

ZN A.06-Gnd Flr -BP1-5050 Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.06 - Bid Pkg 1 Contr 4 4 05-Nov-18 08-Nov-18 -149

ZN A.06-Gnd Flr -BP1-5060 Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.06 - Bid Pkg 1 Contr 3 3 16-Nov-18 20-Nov-18 -149

ZN A.06-Gnd Flr -BP1-5070 Install Cont./Access/Egress/Signage - Ground Flr, ZN A.06 - Bid Pkg 1 Contr 1 1 01-Nov-18 01-Nov-18 -149

ZN A.06-Gnd Flr -BP1-5090 Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.06 - Bid Pkg 1 Contr 1 1 28-Nov-18 28-Nov-18 -149

ZN A.06-Gnd Flr -BP1-5100 Vacate Rooms - Ground Flr, ZN A.06 - Bid Pkg 1 Contr 2 2 31-Oct-18 01-Nov-18 -149

ZN A.06-Gnd Flr -BP2-5040 Decomission & Install Fire Alarm - Ground Flr, ZN A.06 - Bid Pkg 2 Contr 6 6 09-Nov-18 19-Nov-18 -149

ZN A.06-Gnd Flr -BP3-5080 Install Fire Sprinkler - Ground Flr, ZN A.06 - Bid Pkg 3 Contr 6 6 09-Nov-18 19-Nov-18 -149

Ground Flr, ZN A.07Ground Flr, ZN A.07 18 18 28-Nov-18 21-Dec-18 -149

ZN A.07-Gnd Flr -2620 Layout - Ground Floor, ZN A.07 - Bid Pkg 2 &3 Contr 1 1 30-Nov-18 30-Nov-18 -149

ZN A.07-Gnd Flr -3380 Punchlist 1 1 14-Dec-18 14-Dec-18 -149

ZN A.07-Gnd Flr -3390 Punchlist Correction 1 1 17-Dec-18 17-Dec-18 -149

ZN A.07-Gnd Flr -3400 Air Clearance Test 1 1 20-Dec-18 20-Dec-18 -149

ZN A.07-Gnd Flr -4830 Material Staging - Ground Flr, ZN A.07 - Bid Pkg 2 & 3 Contr 1 1 29-Nov-18 29-Nov-18 -144

ZN A.07-Gnd Flr -BP1-5110 Terminal Clean - Ground Flr, ZN A.07 - Bid Pkg 1 Contr 3 3 18-Dec-18 20-Dec-18 -149

ZN A.07-Gnd Flr -BP1-5130 Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.07 - Bid Pkg 1 Contr 4 4 03-Dec-18 06-Dec-18 -149

ZN A.07-Gnd Flr -BP1-5140 Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.07 - Bid Pkg 1 Contr 3 3 13-Dec-18 17-Dec-18 -149

ZN A.07-Gnd Flr -BP1-5150 Install Cont./Access/Egress/Signage - Ground Flr, ZN A.07 - Bid Pkg 1 Contr 1 1 29-Nov-18 29-Nov-18 -149

ZN A.07-Gnd Flr -BP1-5170 Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.07 - Bid Pkg 1 Contr 1 1 21-Dec-18 21-Dec-18 -149

ZN A.07-Gnd Flr -BP1-5180 Vacate Rooms - Ground Flr, ZN A.07 - Bid Pkg 1 Contr 2 2 28-Nov-18 29-Nov-18 -149

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.05 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.05 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - Ground Flr, ZN A.05 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.05 - Bid Pkg 1 Contr

Vacate Rooms - Ground Flr, ZN A.05 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - Ground Flr, ZN A.05 - Bid Pkg 2 Contr

Install Fire Sprinkler - Ground Flr, ZN A.05 - Bid Pkg 3 Contr

Layout - Ground Floor, ZN A.06 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Material Staging - Ground Flr, ZN A.06 - Bid Pkg 2 & 3 Contr

Terminal Clean - Ground Flr, ZN A.06 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.06 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.06 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - Ground Flr, ZN A.06 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.06 - Bid Pkg 1 Contr

Vacate Rooms - Ground Flr, ZN A.06 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - Ground Flr, ZN A.06 - Bid Pkg 2 Contr

Install Fire Sprinkler - Ground Flr, ZN A.06 - Bid Pkg 3 Contr

Layout - Ground Floor, ZN A.07 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Material Staging - Ground Flr, ZN A.07 - Bid Pkg 2 & 3 Contr

Terminal Clean - Ground Flr, ZN A.07 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.07 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.07 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - Ground Flr, ZN A.07 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.07 - Bid Pkg 1 Contr

Vacate Rooms - Ground Flr, ZN A.07 - Bid Pkg 1 Contr

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 22 of 34

aparker
Text Box
Ground Floor and First Floor work are concurrent with Patient Care 5th, 6th, & 8th Floors.
Page 23: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

ZN A.07-Gnd Flr -BP2-5120 Decomission & Install Fire Alarm - Ground Flr, ZN A.07 - Bid Pkg 2 Contr 6 6 07-Dec-18 14-Dec-18 -149

ZN A.07-Gnd Flr -BP3-5160 Install Fire Sprinkler - Ground Flr, ZN A.07 - Bid Pkg 3 Contr 6 6 07-Dec-18 14-Dec-18 -149

Ground Flr, ZN A.08Ground Flr, ZN A.08 18 18 26-Dec-18 23-Jan-19 -149

ZN A.08-Gnd Flr -2630 Layout - Ground Floor, ZN A.08 - Bid Pkg 2 &3 Contr 1 1 28-Dec-18 28-Dec-18 -149

ZN A.08-Gnd Flr -3410 Punchlist 1 1 15-Jan-19 15-Jan-19 -149

ZN A.08-Gnd Flr -3420 Punchlist Correction 1 1 16-Jan-19 16-Jan-19 -149

ZN A.08-Gnd Flr -3430 Air Clearance Test 1 1 22-Jan-19 22-Jan-19 -149

ZN A.08-Gnd Flr -4840 Material Staging - Ground Flr, ZN A.08 - Bid Pkg 2 & 3 Contr 1 1 27-Dec-18 27-Dec-18 -144

ZN A.08-Gnd Flr -BP1-5190 Terminal Clean - Ground Flr, ZN A.08 - Bid Pkg 1 Contr 3 3 17-Jan-19 22-Jan-19 -149

ZN A.08-Gnd Flr -BP1-5210 Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.08 - Bid Pkg 1 Contr 4 4 02-Jan-19 07-Jan-19 -149

ZN A.08-Gnd Flr -BP1-5220 Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.08 - Bid Pkg 1 Contr 3 3 14-Jan-19 16-Jan-19 -149

ZN A.08-Gnd Flr -BP1-5230 Install Cont./Access/Egress/Signage - Ground Flr, ZN A.08 - Bid Pkg 1 Contr 1 1 27-Dec-18 27-Dec-18 -149

ZN A.08-Gnd Flr -BP1-5250 Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.08 - Bid Pkg 1 Contr 1 1 23-Jan-19 23-Jan-19 -149

ZN A.08-Gnd Flr -BP1-5260 Vacate Rooms - Ground Flr, ZN A.08 - Bid Pkg 1 Contr 2 2 26-Dec-18 27-Dec-18 -149

ZN A.08-Gnd Flr -BP2-5200 Decomission & Install Fire Alarm - Ground Flr, ZN A.08 - Bid Pkg 2 Contr 6 6 08-Jan-19 15-Jan-19 -149

ZN A.08-Gnd Flr -BP3-5240 Install Fire Sprinkler - Ground Flr, ZN A.08 - Bid Pkg 3 Contr 6 6 08-Jan-19 15-Jan-19 -149

Ground Flr, ZN A.09Ground Flr, ZN A.09 18 18 24-Jan-19 19-Feb-19 -149

ZN A.09-Gnd Flr -2640 Layout - Ground Floor, ZN A.09 - Bid Pkg 2 &3 Contr 1 1 28-Jan-19 28-Jan-19 -149

ZN A.09-Gnd Flr -3440 Punchlist 1 1 11-Feb-19 11-Feb-19 -149

ZN A.09-Gnd Flr -3450 Punchlist Correction 1 1 12-Feb-19 12-Feb-19 -149

ZN A.09-Gnd Flr -3460 Air Clearance Test 1 1 15-Feb-19 15-Feb-19 -149

ZN A.09-Gnd Flr -4850 Material Staging - Ground Flr, ZN A.09 - Bid Pkg 2 & 3 Contr 1 1 25-Jan-19 25-Jan-19 -144

ZN A.09-Gnd Flr -BP1-5270 Terminal Clean - Ground Flr, ZN A.09 - Bid Pkg 1 Contr 3 3 13-Feb-19 15-Feb-19 -149

ZN A.09-Gnd Flr -BP1-5290 Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.09 - Bid Pkg 1 Contr 4 4 29-Jan-19 01-Feb-19 -149

ZN A.09-Gnd Flr -BP1-5300 Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.09 - Bid Pkg 1 Contr 3 3 08-Feb-19 12-Feb-19 -149

ZN A.09-Gnd Flr -BP1-5310 Install Cont./Access/Egress/Signage - Ground Flr, ZN A.09 - Bid Pkg 1 Contr 1 1 25-Jan-19 25-Jan-19 -149

ZN A.09-Gnd Flr -BP1-5330 Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.09 - Bid Pkg 1 Contr 1 1 19-Feb-19 19-Feb-19 -149

ZN A.09-Gnd Flr -BP1-5340 Vacate Rooms - Ground Flr, ZN A.09 - Bid Pkg 1 Contr 2 2 24-Jan-19 25-Jan-19 -149

ZN A.09-Gnd Flr -BP2-5280 Decomission & Install Fire Alarm - Ground Flr, ZN A.09 - Bid Pkg 2 Contr 6 6 04-Feb-19 11-Feb-19 -149

ZN A.09-Gnd Flr -BP3-5320 Install Fire Sprinkler - Ground Flr, ZN A.09 - Bid Pkg 3 Contr 6 6 04-Feb-19 11-Feb-19 -149

Ground Flr, ZN A.10Ground Flr, ZN A.10 18 18 19-Feb-19 14-Mar-19 -149

ZN A.10-Gnd Flr -2650 Layout - Ground Floor, ZN A.10 - Bid Pkg 2 &3 Contr 1 1 21-Feb-19 21-Feb-19 -149

ZN A.10-Gnd Flr -3470 Punchlist 1 1 07-Mar-19 07-Mar-19 -149

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

Decomission & Install Fire Alarm - Ground F lr, ZN A.07 - Bid Pkg 2 Contr

Install Fire Sprinkler - Ground Flr, ZN A.07 - Bid Pkg 3 Contr

Layout - Ground Floor, ZN A.08 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Material Staging - Ground Flr, ZN A.08 - Bid Pkg 2 & 3 Contr

Terminal Clean - Ground Flr, ZN A.08 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.08 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.08 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - Ground Flr, ZN A.08 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.08 - Bid Pkg 1 Contr

Vacate Rooms - Ground Flr, ZN A.08 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - Ground F lr, ZN A.08 - Bid Pkg 2 Contr

Install Fire Sprinkler - Ground Flr, ZN A.08 - Bid Pkg 3 Contr

Layout - Ground Floor, ZN A.09 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Material Staging - Ground Flr, ZN A.09 - Bid Pkg 2 & 3 Contr

Terminal Clean - Ground Flr, ZN A.09 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.09 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.09 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - Ground Flr, ZN A.09 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.09 - Bid Pkg 1 Contr

Vacate Rooms - Ground Flr, ZN A.09 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - Ground F lr, ZN A.09 - Bid Pkg 2 Contr

Install Fire Sprinkler - Ground Flr, ZN A.09 - Bid Pkg 3 Contr

Layout - Ground Floor, ZN A.10 - Bid Pkg 2 &3 Contr

Punchlist

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 23 of 34

aparker
Text Box
Ground Floor and First Floor work are concurrent with Patient Care 5th, 6th, & 8th Floors.
Page 24: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

ZN A.10-Gnd Flr -3480 Punchlist Correction 1 1 08-Mar-19 08-Mar-19 -149

ZN A.10-Gnd Flr -3490 Air Clearance Test 1 1 13-Mar-19 13-Mar-19 -149

ZN A.10-Gnd Flr -4860 Material Staging - Ground Flr, ZN A.10 - Bid Pkg 2 & 3 Contr 1 1 20-Feb-19 20-Feb-19 -144

ZN A.10-Gnd Flr -BP1-5350 Terminal Clean - Ground Flr, ZN A.10 - Bid Pkg 1 Contr 3 3 11-Mar-19 13-Mar-19 -149

ZN A.10-Gnd Flr -BP1-5370 Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.10 - Bid Pkg 1 Contr 4 4 22-Feb-19 27-Feb-19 -149

ZN A.10-Gnd Flr -BP1-5380 Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.10 - Bid Pkg 1 Contr 3 3 06-Mar-19 08-Mar-19 -149

ZN A.10-Gnd Flr -BP1-5390 Install Cont./Access/Egress/Signage - Ground Flr, ZN A.10 - Bid Pkg 1 Contr 1 1 20-Feb-19 20-Feb-19 -149

ZN A.10-Gnd Flr -BP1-5410 Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.10 - Bid Pkg 1 Contr 1 1 14-Mar-19 14-Mar-19 -149

ZN A.10-Gnd Flr -BP1-5420 Vacate Rooms - Ground Flr, ZN A.10 - Bid Pkg 1 Contr 2 2 19-Feb-19 20-Feb-19 -149

ZN A.10-Gnd Flr -BP2-5360 Decomission & Install Fire Alarm - Ground Flr, ZN A.10 - Bid Pkg 2 Contr 6 6 28-Feb-19 07-Mar-19 -149

ZN A.10-Gnd Flr -BP3-5400 Install Fire Sprinkler - Ground Flr, ZN A.10 - Bid Pkg 3 Contr 6 6 28-Feb-19 07-Mar-19 -149

Ground Flr, ZN A.11Ground Flr, ZN A.11 18 18 14-Mar-19 08-Apr-19 -149

ZN A.11-Gnd Flr-2660 Layout - Ground Floor, ZN A.11 - Bid Pkg 2 &3 Contr 1 1 18-Mar-19 18-Mar-19 -149

ZN A.11-Gnd Flr-3500 Punchlist 1 1 01-Apr-19 01-Apr-19 -149

ZN A.11-Gnd Flr-3510 Punchlist Correction 1 1 02-Apr-19 02-Apr-19 -149

ZN A.11-Gnd Flr-3520 Air Clearance Test 1 1 05-Apr-19 05-Apr-19 -149

ZN A.11-Gnd Flr-4870 Material Staging - Ground Flr, ZN A.11 - Bid Pkg 2 & 3 Contr 1 1 15-Mar-19 15-Mar-19 -144

ZN A.11-Gnd Flr-BP1-5430 Terminal Clean - Ground Flr, ZN A.11 - Bid Pkg 1 Contr 3 3 03-Apr-19 05-Apr-19 -149

ZN A.11-Gnd Flr-BP1-5450 Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.11 - Bid Pkg 1 Contr 4 4 19-Mar-19 22-Mar-19 -149

ZN A.11-Gnd Flr-BP1-5460 Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.11 - Bid Pkg 1 Contr 3 3 29-Mar-19 02-Apr-19 -149

ZN A.11-Gnd Flr-BP1-5470 Install Cont./Access/Egress/Signage - Ground Flr, ZN A.11 - Bid Pkg 1 Contr 1 1 15-Mar-19 15-Mar-19 -149

ZN A.11-Gnd Flr-BP1-5490 Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.11 - Bid Pkg 1 Contr 1 1 08-Apr-19 08-Apr-19 -149

ZN A.11-Gnd Flr-BP1-5500 Vacate Rooms - Ground Flr, ZN A.11 - Bid Pkg 1 Contr 2 2 14-Mar-19 15-Mar-19 -149

ZN A.11-Gnd Flr-BP2-5440 Decomission & Install Fire Alarm - Ground Flr, ZN A.11 - Bid Pkg 2 Contr 6 6 25-Mar-19 01-Apr-19 -149

ZN A.11-Gnd Flr-BP3-5480 Install Fire Sprinkler - Ground Flr, ZN A.11 - Bid Pkg 3 Contr 6 6 25-Mar-19 01-Apr-19 -149

Ground Flr, ZN A.12Ground Flr, ZN A.12 17 17 08-Apr-19 30-Apr-19 -149

ZN A.12-Gnd Flr -2670 Layout - Ground Floor, ZN A.12 - Bid Pkg 2 &3 Contr 1 1 10-Apr-19 10-Apr-19 -149

ZN A.12-Gnd Flr -3530 Punchlist 1 1 24-Apr-19 24-Apr-19 -149

ZN A.12-Gnd Flr -3540 Punchlist Correction 1 1 25-Apr-19 25-Apr-19 -149

ZN A.12-Gnd Flr -3550 Air Clearance Test 1 1 29-Apr-19 29-Apr-19 -149

ZN A.12-Gnd Flr -4880 Material Staging - Ground Flr, ZN A.12 - Bid Pkg 2 & 3 Contr 1 1 09-Apr-19 09-Apr-19 -144

ZN A.12-Gnd Flr -BP1-5510 Terminal Clean - Ground Flr, ZN A.12 - Bid Pkg 1 Contr 3 3 26-Apr-19 30-Apr-19 -149

ZN A.12-Gnd Flr -BP1-5530 Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.12 - Bid Pkg 1 Contr 4 4 11-Apr-19 16-Apr-19 -149

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

Punchlist Correction

Air Clearance Test

Material Staging - Ground Flr, ZN A.10 - Bid Pkg 2 & 3 Contr

Terminal Clean - Ground Flr, ZN A.10 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.10 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.10 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - Ground Flr, ZN A.10 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.10 - Bid Pkg 1 Contr

Vacate Rooms - Ground Flr, ZN A.10 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - Ground Flr, ZN A.10 - Bid Pkg 2 Contr

Install Fire Sprinkler - Ground Flr, ZN A.10 - Bid Pkg 3 Contr

Layout - Ground Floor, ZN A.11 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Material Staging - Ground Flr, ZN A.11 - Bid Pkg 2 & 3 Contr

Terminal Clean - Ground Flr, ZN A.11 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.11 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.11 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - Ground Flr, ZN A.11 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.11 - Bid Pkg 1 Contr

Vacate Rooms - Ground Flr, ZN A.11 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - Ground Flr, ZN A.11 - Bid Pkg 2 Contr

Install Fire Sprinkler - Ground Flr, ZN A.11 - Bid Pkg 3 Contr

Layout - Ground Floor, ZN A.12 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Material Staging - Ground Flr, ZN A.12 - Bid Pkg 2 & 3 Contr

Terminal Clean - Ground Flr, ZN A.12 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.12 - Bid Pkg 1 Contr

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 24 of 34

aparker
Text Box
Ground Floor and First Floor work are concurrent with Patient Care 5th, 6th, & 8th Floors.
Page 25: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

ZN A.12-Gnd Flr -BP1-5540 Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.12 - Bid Pkg 1 Contr 3 3 23-Apr-19 25-Apr-19 -149

ZN A.12-Gnd Flr -BP1-5550 Install Cont./Access/Egress/Signage - Ground Flr, ZN A.12 - Bid Pkg 1 Contr 1 1 09-Apr-19 09-Apr-19 -149

ZN A.12-Gnd Flr -BP1-5570 Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.12 - Bid Pkg 1 Contr 1 1 30-Apr-19 30-Apr-19 -149

ZN A.12-Gnd Flr -BP1-5580 Vacate Rooms - Ground Flr, ZN A.12 - Bid Pkg 1 Contr 2 2 08-Apr-19 09-Apr-19 -149

ZN A.12-Gnd Flr -BP2-5520 Decomission & Install Fire Alarm - Ground Flr, ZN A.12 - Bid Pkg 2 Contr 6 6 17-Apr-19 24-Apr-19 -149

ZN A.12-Gnd Flr -BP3-5560 Install Fire Sprinkler - Ground Flr, ZN A.12 - Bid Pkg 3 Contr 6 6 17-Apr-19 24-Apr-19 -149

Ground Flr, ZN A.13Ground Flr, ZN A.13 18 18 30-Apr-19 23-May-19 -149

ZN A.13-Gnd Flr -2680 Layout - Ground Floor, ZN A.13 - Bid Pkg 2 &3 Contr 1 1 02-May-19 02-May-19 -149

ZN A.13-Gnd Flr -3560 Punchlist 1 1 16-May-19 16-May-19 -149

ZN A.13-Gnd Flr -3570 Punchlist Correction 1 1 17-May-19 17-May-19 -149

ZN A.13-Gnd Flr -3580 Air Clearance Test 1 1 22-May-19 22-May-19 -149

ZN A.13-Gnd Flr -4890 Material Staging - Ground Flr, ZN A.13 - Bid Pkg 2 & 3 Contr 1 1 01-May-19 01-May-19 -144

ZN A.13-Gnd Flr -BP1-5590 Terminal Clean - Ground Flr, ZN A.13 - Bid Pkg 1 Contr 3 3 20-May-19 22-May-19 -149

ZN A.13-Gnd Flr -BP1-5610 Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.13 - Bid Pkg 1 Contr 4 4 03-May-19 08-May-19 -149

ZN A.13-Gnd Flr -BP1-5620 Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.13 - Bid Pkg 1 Contr 3 3 15-May-19 17-May-19 -149

ZN A.13-Gnd Flr -BP1-5630 Install Cont./Access/Egress/Signage - Ground Flr, ZN A.13 - Bid Pkg 1 Contr 1 1 01-May-19 01-May-19 -149

ZN A.13-Gnd Flr -BP1-5650 Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.13 - Bid Pkg 1 Contr 1 1 23-May-19 23-May-19 -149

ZN A.13-Gnd Flr -BP1-5660 Vacate Rooms - Ground Flr, ZN A.13 - Bid Pkg 1 Contr 2 2 30-Apr-19 01-May-19 -149

ZN A.13-Gnd Flr -BP2-5600 Decomission & Install Fire Alarm - Ground Flr, ZN A.13 - Bid Pkg 2 Contr 6 6 09-May-19 16-May-19 -149

ZN A.13-Gnd Flr -BP3-5640 Install Fire Sprinkler - Ground Flr, ZN A.13 - Bid Pkg 3 Contr 6 6 09-May-19 16-May-19 -149

Ground Flr, ZN A.14Ground Flr, ZN A.14 18 18 23-May-19 18-Jun-19 -149

ZN A.14-Gnd Flr -2690 Layout - Ground Floor, ZN A.14 - Bid Pkg 2 &3 Contr 1 1 28-May-19 28-May-19 -149

ZN A.14-Gnd Flr -3590 Punchlist 1 1 11-Jun-19 11-Jun-19 -149

ZN A.14-Gnd Flr -3600 Punchlist Correction 1 1 12-Jun-19 12-Jun-19 -149

ZN A.14-Gnd Flr -3610 Air Clearance Test 1 1 17-Jun-19 17-Jun-19 -149

ZN A.14-Gnd Flr -4900 Material Staging - Ground Flr, ZN A.14 - Bid Pkg 2 & 3 Contr 1 1 24-May-19 24-May-19 -144

ZN A.14-Gnd Flr -BP1-5670 Terminal Clean - Ground Flr, ZN A.14 - Bid Pkg 1 Contr 3 3 13-Jun-19 17-Jun-19 -149

ZN A.14-Gnd Flr -BP1-5690 Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.14 - Bid Pkg 1 Contr 4 4 29-May-19 03-Jun-19 -149

ZN A.14-Gnd Flr -BP1-5700 Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.14 - Bid Pkg 1 Contr 3 3 10-Jun-19 12-Jun-19 -149

ZN A.14-Gnd Flr -BP1-5710 Install Cont./Access/Egress/Signage - Ground Flr, ZN A.14 - Bid Pkg 1 Contr 1 1 24-May-19 24-May-19 -149

ZN A.14-Gnd Flr -BP1-5730 Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.14 - Bid Pkg 1 Contr 1 1 18-Jun-19 18-Jun-19 -149

ZN A.14-Gnd Flr -BP1-5740 Vacate Rooms - Ground Flr, ZN A.14 - Bid Pkg 1 Contr 2 2 23-May-19 24-May-19 -149

ZN A.14-Gnd Flr -BP2-5680 Decomission & Install Fire Alarm - Ground Flr, ZN A.14 - Bid Pkg 2 Contr 6 6 04-Jun-19 11-Jun-19 -149

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.12 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - Ground Flr, ZN A.12 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.12 - Bid Pkg 1 Contr

Vacate Rooms - Ground Flr, ZN A.12 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - Ground F lr, ZN A.12 - Bid Pkg 2 Contr

Install Fire Sprinkler - Ground Flr, ZN A.12 - Bid Pkg 3 Contr

Layout - Ground Floor, ZN A.13 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Material Staging - Ground Flr, ZN A.13 - Bid Pkg 2 & 3 Contr

Terminal Clean - Ground Flr, ZN A.13 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.13 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.13 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - Ground Flr, ZN A.13 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.13 - Bid Pkg 1 Contr

Vacate Rooms - Ground Flr, ZN A.13 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - Ground F lr, ZN A.13 - Bid Pkg 2 Contr

Install Fire Sprinkler - Ground Flr, ZN A.13 - Bid Pkg 3 Contr

Layout - Ground Floor, ZN A.14 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Material Staging - Ground Flr, ZN A.14 - Bid Pkg 2 & 3 Contr

Terminal Clean - Ground Flr, ZN A.14 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.14 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.14 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - Ground Flr, ZN A.14 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.14 - Bid Pkg 1 Contr

Vacate Rooms - Ground Flr, ZN A.14 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - Ground F lr, ZN A.14 - Bid Pkg 2 Contr

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 25 of 34

aparker
Text Box
Ground Floor and First Floor work are concurrent with Patient Care 5th, 6th, & 8th Floors.
Page 26: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

ZN A.14-Gnd Flr -BP3-5720 Install Fire Sprinkler - Ground Flr, ZN A.14 - Bid Pkg 3 Contr 6 6 04-Jun-19 11-Jun-19 -149

Ground Flr, ZN A.15Ground Flr, ZN A.15 18 18 18-Jun-19 12-Jul-19 -149

ZN A.15-Gnd Flr -2700 Layout - Ground Floor, ZN A.15 - Bid Pkg 2 &3 Contr 1 1 20-Jun-19 20-Jun-19 -149

ZN A.15-Gnd Flr -3620 Punchlist 1 1 05-Jul-19 05-Jul-19 -149

ZN A.15-Gnd Flr -3630 Punchlist Correction 1 1 08-Jul-19 08-Jul-19 -149

ZN A.15-Gnd Flr -3640 Air Clearance Test 1 1 11-Jul-19 11-Jul-19 -149

ZN A.15-Gnd Flr -4900 Material Staging - Ground Flr, ZN A.15 - Bid Pkg 2 & 3 Contr 1 1 19-Jun-19 19-Jun-19 -144

ZN A.15-Gnd Flr -BP1-5750 Terminal Clean - Ground Flr, ZN A.15 - Bid Pkg 1 Contr 3 3 09-Jul-19 11-Jul-19 -149

ZN A.15-Gnd Flr -BP1-5770 Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.15 - Bid Pkg 1 Contr 4 4 21-Jun-19 26-Jun-19 -149

ZN A.15-Gnd Flr -BP1-5780 Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.15 - Bid Pkg 1 Contr 3 3 03-Jul-19 08-Jul-19 -149

ZN A.15-Gnd Flr -BP1-5790 Install Cont./Access/Egress/Signage - Ground Flr, ZN A.15 - Bid Pkg 1 Contr 1 1 19-Jun-19 19-Jun-19 -149

ZN A.15-Gnd Flr -BP1-5810 Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.15 - Bid Pkg 1 Contr 1 1 12-Jul-19 12-Jul-19 -149

ZN A.15-Gnd Flr -BP1-5820 Vacate Rooms - Ground Flr, ZN A.15 - Bid Pkg 1 Contr 2 2 18-Jun-19 19-Jun-19 -149

ZN A.15-Gnd Flr -BP2-5760 Decomission & Install Fire Alarm - Ground Flr, ZN A.15 - Bid Pkg 2 Contr 6 6 27-Jun-19 05-Jul-19 -149

ZN A.15-Gnd Flr -BP3-5800 Install Fire Sprinkler - Ground Flr, ZN A.15 - Bid Pkg 3 Contr 6 6 27-Jun-19 05-Jul-19 -149

Ground Flr, ZN A.16Ground Flr, ZN A.16 18 18 12-Jul-19 06-Aug-19 -149

ZN A.16-Gnd Flr -2710 Layout - Ground Floor, ZN A.16 - Bid Pkg 2 &3 Contr 1 1 16-Jul-19 16-Jul-19 -149

ZN A.16-Gnd Flr -3650 Punchlist 1 1 30-Jul-19 30-Jul-19 -149

ZN A.16-Gnd Flr -3660 Punchlist Correction 1 1 31-Jul-19 31-Jul-19 -149

ZN A.16-Gnd Flr -3670 Air Clearance Test 1 1 05-Aug-19 05-Aug-19 -149

ZN A.16-Gnd Flr -4910 Material Staging - Ground Flr, ZN A.16 - Bid Pkg 2 & 3 Contr 1 1 15-Jul-19 15-Jul-19 -144

ZN A.16-Gnd Flr -BP1-5830 Terminal Clean - Ground Flr, ZN A.16 - Bid Pkg 1 Contr 3 3 01-Aug-19 05-Aug-19 -149

ZN A.16-Gnd Flr -BP1-5850 Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.16 - Bid Pkg 1 Contr 4 4 17-Jul-19 22-Jul-19 -149

ZN A.16-Gnd Flr -BP1-5860 Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.16 - Bid Pkg 1 Contr 3 3 29-Jul-19 31-Jul-19 -149

ZN A.16-Gnd Flr -BP1-5870 Install Cont./Access/Egress/Signage - Ground Flr, ZN A.16 - Bid Pkg 1 Contr 1 1 15-Jul-19 15-Jul-19 -149

ZN A.16-Gnd Flr -BP1-5890 Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.16 - Bid Pkg 1 Contr 1 1 06-Aug-19 06-Aug-19 -149

ZN A.16-Gnd Flr -BP1-5900 Vacate Rooms - Ground Flr, ZN A.16 - Bid Pkg 1 Contr 2 2 12-Jul-19 15-Jul-19 -149

ZN A.16-Gnd Flr -BP2-5840 Decomission & Install Fire Alarm - Ground Flr, ZN A.16 - Bid Pkg 2 Contr 6 6 23-Jul-19 30-Jul-19 -149

ZN A.16-Gnd Flr -BP3-5880 Install Fire Sprinkler - Ground Flr, ZN A.16 - Bid Pkg 3 Contr 6 6 23-Jul-19 30-Jul-19 -149

Ground Flr, ZN A.17Ground Flr, ZN A.17 21 21 06-Aug-19 04-Sep-19 74

INSPCT-BP2-7240 BP-02 Fire Alarm Inspections & Verifications of Ground Floor 3 3 30-Aug-19 04-Sep-19 74

INSPCT-BP3-7250 BP-03 Fire Sprinkler Inspections & Verifications of Ground Floor 3 3 30-Aug-19 04-Sep-19 74

ZN A.17-Gnd Flr -2720 Layout - Ground Floor, ZN A.17 - Bid Pkg 2 &3 Contr 1 1 08-Aug-19 08-Aug-19 -149

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

Install Fire Sprinkler - Ground Flr, ZN A.14 - Bid Pkg 3 Contr

Layout - Ground Floor, ZN A.15 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Material Staging - Ground Flr, ZN A.15 - Bid Pkg 2 & 3 Contr

Terminal Clean - Ground Flr, ZN A.15 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.15 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.15 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - Ground Flr, ZN A.15 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.15 - Bid Pkg 1 Contr

Vacate Rooms - Ground Flr, ZN A.15 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - Ground Flr, ZN A.15 - Bid Pkg 2 Contr

Install Fire Sprinkler - Ground Flr, ZN A.15 - Bid Pkg 3 Contr

Layout - Ground Floor, ZN A.16 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Material Staging - Ground Flr, ZN A.16 - Bid Pkg 2 & 3 Contr

Terminal Clean - Ground Flr, ZN A.16 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.16 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.16 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - Ground Flr, ZN A.16 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.16 - Bid Pkg 1 Contr

Vacate Rooms - Ground Flr, ZN A.16 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - Ground Flr, ZN A.16 - Bid Pkg 2 Contr

Install Fire Sprinkler - Ground Flr, ZN A.16 - Bid Pkg 3 Contr

BP-02 Fire Alarm Inspections & Verifications of Ground Floor

BP-03 Fire Sprinkler Inspections & Verifications of Ground Floor

Layout - Ground Floor, ZN A.17 - Bid Pkg 2 &3 Contr

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 26 of 34

aparker
Text Box
Ground Floor and First Floor work are concurrent with Patient Care 5th, 6th, & 8th Floors.
Page 27: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

ZN A.17-Gnd Flr -3680 Punchlist 1 1 22-Aug-19 22-Aug-19 -149

ZN A.17-Gnd Flr -3690 Punchlist Correction 1 1 23-Aug-19 23-Aug-19 -149

ZN A.17-Gnd Flr -3700 Air Clearance Test 1 1 28-Aug-19 28-Aug-19 -149

ZN A.17-Gnd Flr -4920 Material Staging - Ground Flr, ZN A.17 - Bid Pkg 2 & 3 Contr 1 1 07-Aug-19 07-Aug-19 -144

ZN A.17-Gnd Flr -BP1-5910 Terminal Clean - Ground Flr, ZN A.17 - Bid Pkg 1 Contr 3 3 26-Aug-19 28-Aug-19 -149

ZN A.17-Gnd Flr -BP1-5930 Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.17 - Bid Pkg 1 Contr 4 4 09-Aug-19 14-Aug-19 -149

ZN A.17-Gnd Flr -BP1-5940 Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.17 - Bid Pkg 1 Contr 3 3 21-Aug-19 23-Aug-19 -149

ZN A.17-Gnd Flr -BP1-5950 Install Cont./Access/Egress/Signage - Ground Flr, ZN A.17 - Bid Pkg 1 Contr 1 1 07-Aug-19 07-Aug-19 -149

ZN A.17-Gnd Flr -BP1-5970 Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.17 - Bid Pkg 1 Contr 1 1 29-Aug-19 29-Aug-19 -149

ZN A.17-Gnd Flr -BP1-5980 Vacate Rooms - Ground Flr, ZN A.17 - Bid Pkg 1 Contr 2 2 06-Aug-19 07-Aug-19 -149

ZN A.17-Gnd Flr -BP2-5920 Decomission & Install Fire Alarm - Ground Flr, ZN A.17 - Bid Pkg 2 Contr 6 6 15-Aug-19 22-Aug-19 -149

ZN A.17-Gnd Flr -BP3-5960 Install Fire Sprinkler - Ground Flr, ZN A.17 - Bid Pkg 3 Contr 6 6 15-Aug-19 22-Aug-19 -149

First Flr, ZN B.01First Flr, ZN B.01 18 18 29-Aug-19 24-Sep-19 -149

ZN A.18-Gnd Flr -2730 Layout - Ground Floor, ZN A.18 - Bid Pkg 2 &3 Contr 1 1 03-Sep-19 03-Sep-19 -149

ZN B.01-1st-3710 Punchlist 1 1 17-Sep-19 17-Sep-19 -149

ZN B.01-1st-3720 Punchlist Correction 1 1 18-Sep-19 18-Sep-19 -149

ZN B.01-1st-3730 Air Clearance Test 1 1 23-Sep-19 23-Sep-19 -149

ZN B.01-1st-BP1-4930 Material Staging - 1st Flr, ZN B.01 - Bid Pkg 2 & 3 Contr 1 1 30-Aug-19 30-Aug-19 -144

ZN B.01-1st-BP1-5990 Terminal Clean - 1st Flr, ZN B.01 - Bid Pkg 1 Contr 3 3 19-Sep-19 23-Sep-19 -149

ZN B.01-1st-BP1-6010 Demo/Abate & Install Ceiling Access Frame - 1st Flr, ZN B.01 - Bid Pkg 1 Contr 4 4 04-Sep-19 09-Sep-19 -149

ZN B.01-1st-BP1-6020 Install Ceiling Access Panels & Touch Up/Repair - 1st Flr, ZN B.01 - Bid Pkg 1 Contr 3 3 16-Sep-19 18-Sep-19 -149

ZN B.01-1st-BP1-6030 Install Cont./Access/Egress/Signage - 1st Flr, ZN B.01 - Bid Pkg 1 Contr 1 1 30-Aug-19 30-Aug-19 -149

ZN B.01-1st-BP1-6050 Remove Cont./Access/Egress/Signage - 1st Flr, ZN B.01 - Bid Pkg 1 Contr 1 1 24-Sep-19 24-Sep-19 -149

ZN B.01-1st-BP1-6060 Vacate Rooms - 1st Flr, ZN B.01 - Bid Pkg 1 Contr 2 2 29-Aug-19 30-Aug-19 -149

ZN B.01-1st-BP2-6000 Decomission & Install Fire Alarm - 1st Flr, ZN B.01 - Bid Pkg 2 Contr 6 6 10-Sep-19 17-Sep-19 -149

ZN B.01-1st-BP3-6040 Install Fire Sprinkler - 1st Flr, ZN B.01 - Bid Pkg 3 Contr 6 6 10-Sep-19 17-Sep-19 -149

First Flr, ZN B.02First Flr, ZN B.02 18 18 24-Sep-19 18-Oct-19 -149

ZN B.02-1st-3740 Punchlist 1 1 10-Oct-19 10-Oct-19 -149

ZN B.02-1st-3750 Punchlist Correction 1 1 11-Oct-19 11-Oct-19 -149

ZN B.02-1st-3760 Air Clearance Test 1 1 17-Oct-19 17-Oct-19 -149

ZN B.02-1st-BP1-2740 Layout - 1st Flr, ZN B.02 - Bid Pkg 2 &3 Contr 1 1 26-Sep-19 26-Sep-19 -149

ZN B.02-1st-BP1-6050 Material Staging - 1st Flr, ZN B.02 - Bid Pkg 2 & 3 Contr 1 1 25-Sep-19 25-Sep-19 -144

ZN B.02-1st-BP1-6070 Terminal Clean - 1st Flr, ZN B.02 - Bid Pkg 1 Contr 3 3 15-Oct-19 17-Oct-19 -149

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

Punchlist

Punchlist Correction

Air Clearance Test

Material Staging - Ground Flr, ZN A.17 - Bid Pkg 2 & 3 Contr

Terminal Clean - Ground Flr, ZN A.17 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - Ground Flr, ZN A.17 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - Ground Flr, ZN A.17 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - Ground Flr, ZN A.17 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - Ground Flr, ZN A.17 - Bid Pkg 1 Contr

Vacate Rooms - Ground Flr, ZN A.17 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - Ground F lr, ZN A.17 - Bid Pkg 2 Contr

Install Fire Sprinkler - Ground Flr, ZN A.17 - Bid Pkg 3 Contr

Layout - Ground Floor, ZN A.18 - Bid Pkg 2 &3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Material Staging - 1st Flr, ZN B.01 - Bid Pkg 2 & 3 Contr

Terminal Clean - 1st Flr, ZN B.01 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - 1st Flr, ZN B.01 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - 1st Flr, ZN B.01 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - 1st Flr, ZN B.01 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - 1st Flr, ZN B.01 - Bid Pkg 1 Contr

Vacate Rooms - 1st Flr, ZN B.01 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - 1st Flr, ZN B.01 - Bid Pkg 2 Contr

Install Fire Sprinkler - 1st Flr, ZN B.01 - Bid Pkg 3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Layout - 1st Flr, ZN B.02 - Bid Pkg 2 &3 Contr

Material Staging - 1st Flr, ZN B.02 - Bid Pkg 2 & 3 Contr

Terminal Clean - 1st Flr, ZN B.02 - Bid Pkg 1 Contr

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 27 of 34

aparker
Text Box
Ground Floor and First Floor work are concurrent with Patient Care 5th, 6th, & 8th Floors.
Page 28: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

ZN B.02-1st-BP1-6090 Demo/Abate & Install Ceiling Access Frame - 1st Flr, ZN B.02 - Bid Pkg 1 Contr 4 4 27-Sep-19 02-Oct-19 -149

ZN B.02-1st-BP1-6100 Install Ceiling Access Panels & Touch Up/Repair - 1st Flr, ZN B.02 - Bid Pkg 1 Contr 3 3 09-Oct-19 11-Oct-19 -149

ZN B.02-1st-BP1-6110 Install Cont./Access/Egress/Signage - 1st Flr, ZN B.02 - Bid Pkg 1 Contr 1 1 25-Sep-19 25-Sep-19 -149

ZN B.02-1st-BP1-6130 Remove Cont./Access/Egress/Signage - 1st Flr, ZN B.02 - Bid Pkg 1 Contr 1 1 18-Oct-19 18-Oct-19 -149

ZN B.02-1st-BP1-6140 Vacate Rooms - 1st Flr, ZN B.02 - Bid Pkg 1 Contr 2 2 24-Sep-19 25-Sep-19 -149

ZN B.02-1st-BP2-6080 Decomission & Install Fire Alarm - 1st Flr, ZN B.02 - Bid Pkg 2 Contr 6 6 03-Oct-19 10-Oct-19 -149

ZN B.02-1st-BP3-6120 Install Fire Sprinkler - 1st Flr, ZN B.02 - Bid Pkg 3 Contr 6 6 03-Oct-19 10-Oct-19 -149

First Flr, ZN B.03First Flr, ZN B.03 23 23 18-Oct-19 20-Nov-19 -149

ZN B.03-1st-3770 Punchlist 1 1 07-Nov-19 07-Nov-19 -149

ZN B.03-1st-3780 Punchlist Correction 1 1 08-Nov-19 08-Nov-19 -149

ZN B.03-1st-3790 Air Clearance Test 1 1 14-Nov-19 14-Nov-19 -149

ZN B.03-1st-BP1-2750 Layout - 1st Flr, ZN B.03 - Bid Pkg 2 &3 Contr 1 1 22-Oct-19 22-Oct-19 -149

ZN B.03-1st-BP1-6150 Terminal Clean - 1st Flr, ZN B.03 - Bid Pkg 1 Contr 3 3 12-Nov-19 14-Nov-19 -149

ZN B.03-1st-BP1-6170 Demo/Abate & Install Ceiling Access Frame - 1st Flr, ZN B.03 - Bid Pkg 1 Contr 6 6 23-Oct-19 30-Oct-19 -149

ZN B.03-1st-BP1-6180 Install Ceiling Access Panels & Touch Up/Repair - 1st Flr, ZN B.03 - Bid Pkg 1 Contr 10 10 06-Nov-19 20-Nov-19 -149

ZN B.03-1st-BP1-6190 Install Cont./Access/Egress/Signage - 1st Flr, ZN B.03 - Bid Pkg 1 Contr 1 1 21-Oct-19 21-Oct-19 -149

ZN B.03-1st-BP1-6210 Remove Cont./Access/Egress/Signage - 1st Flr, ZN B.03 - Bid Pkg 1 Contr 1 1 15-Nov-19 15-Nov-19 -149

ZN B.03-1st-BP1-6220 Vacate Rooms - 1st Flr, ZN B.03 - Bid Pkg 1 Contr 2 2 18-Oct-19 21-Oct-19 -149

ZN B.03-1st-BP1-6230 Material Staging - 1st Flr, ZN B.03 - Bid Pkg 2 & 3 Contr 1 1 21-Oct-19 21-Oct-19 -142

ZN B.03-1st-BP2-6160 Decomission & Install Fire Alarm - 1st Flr, ZN B.03 - Bid Pkg 2 Contr 6 6 31-Oct-19 07-Nov-19 -149

ZN B.03-1st-BP3-6200 Install Fire Sprinkler - 1st Flr, ZN B.03 - Bid Pkg 3 Contr 6 6 31-Oct-19 07-Nov-19 -149

First Flr, ZN B.04First Flr, ZN B.04 18 18 15-Nov-19 11-Dec-19 -149

ZN B.04-1st-3800 Punchlist 1 1 04-Dec-19 04-Dec-19 -149

ZN B.04-1st-3810 Punchlist Correction 1 1 05-Dec-19 05-Dec-19 -149

ZN B.04-1st-3820 Air Clearance Test 1 1 10-Dec-19 10-Dec-19 -149

ZN B.04-1st-BP1-2760 Layout - 1st Flr, ZN B.04 - Bid Pkg 2 &3 Contr 1 1 19-Nov-19 19-Nov-19 -149

ZN B.04-1st-BP1-6210 Material Staging - 1st Flr, ZN B.04 - Bid Pkg 2 & 3 Contr 1 1 18-Nov-19 18-Nov-19 -144

ZN B.04-1st-BP1-6230 Terminal Clean - 1st Flr, ZN B.04 - Bid Pkg 1 Contr 3 3 06-Dec-19 10-Dec-19 -149

ZN B.04-1st-BP1-6250 Demo/Abate & Install Ceiling Access Frame - 1st Flr, ZN B.04 - Bid Pkg 1 Contr 4 4 20-Nov-19 25-Nov-19 -149

ZN B.04-1st-BP1-6260 Install Ceiling Access Panels & Touch Up/Repair - 1st Flr, ZN B.04 - Bid Pkg 1 Contr 3 3 03-Dec-19 05-Dec-19 -149

ZN B.04-1st-BP1-6270 Install Cont./Access/Egress/Signage - 1st Flr, ZN B.04 - Bid Pkg 1 Contr 1 1 18-Nov-19 18-Nov-19 -149

ZN B.04-1st-BP1-6290 Remove Cont./Access/Egress/Signage - 1st Flr, ZN B.04 - Bid Pkg 1 Contr 1 1 11-Dec-19 11-Dec-19 -149

ZN B.04-1st-BP1-6300 Vacate Rooms - 1st Flr, ZN B.04 - Bid Pkg 1 Contr 2 2 15-Nov-19 18-Nov-19 -149

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

Demo/Abate & Install Ceiling Access Frame - 1st Flr, ZN B.02 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - 1st Flr, ZN B.02 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - 1st Flr, ZN B.02 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - 1st Flr, ZN B.02 - Bid Pkg 1 Contr

Vacate Rooms - 1st Flr, ZN B.02 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - 1st Flr, ZN B.02 - Bid Pkg 2 Contr

Install Fire Sprinkler - 1st Flr, ZN B.02 - Bid Pkg 3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Layout - 1st Flr, ZN B.03 - Bid Pkg 2 &3 Contr

Terminal Clean - 1st Flr, ZN B.03 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - 1st Flr, ZN B.03 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - 1st Flr, ZN B.03 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - 1st Flr, ZN B.03 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - 1st Flr, ZN B.03 - Bid Pkg 1 Contr

Vacate Rooms - 1st Flr, ZN B.03 - Bid Pkg 1 Contr

Material Staging - 1st Flr, ZN B.03 - Bid Pkg 2 & 3 Contr

Decomission & Install Fire Alarm - 1st Flr, ZN B.03 - Bid Pkg 2 Contr

Install Fire Sprinkler - 1st Flr, ZN B.03 - Bid Pkg 3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Layout - 1st Flr, ZN B.04 - Bid Pkg 2 &3 Contr

Material Staging - 1st Flr, ZN B.04 - Bid Pkg 2 & 3 Contr

Terminal Clean - 1st Flr, ZN B.04 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - 1st Flr, ZN B.04 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - 1st Flr, ZN B.04 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - 1st Flr, ZN B.04 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - 1st Flr, ZN B.04 - Bid Pkg 1 Contr

Vacate Rooms - 1st Flr, ZN B.04 - Bid Pkg 1 Contr

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 28 of 34

aparker
Text Box
Ground Floor and First Floor work are concurrent with Patient Care 5th, 6th, & 8th Floors.
Page 29: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

ZN B.04-1st-BP2-6240 Decomission & Install Fire Alarm - 1st Flr, ZN B.04 - Bid Pkg 2 Contr 6 6 26-Nov-19 04-Dec-19 -149

ZN B.04-1st-BP3-6280 Install Fire Sprinkler - 1st Flr, ZN B.04 - Bid Pkg 3 Contr 6 6 26-Nov-19 04-Dec-19 -149

First Flr, ZN B.05First Flr, ZN B.05 23 23 11-Dec-19 14-Jan-20 -149

ZN B.05-1st-3830 Punchlist 1 1 02-Jan-20 02-Jan-20 -149

ZN B.05-1st-3840 Punchlist Correction 1 1 03-Jan-20 03-Jan-20 -149

ZN B.05-1st-3850 Air Clearance Test 1 1 08-Jan-20 08-Jan-20 -149

ZN B.05-1st-BP1-2770 Layout - 1st Flr, ZN B.05 - Bid Pkg 2 &3 Contr 1 1 13-Dec-19 13-Dec-19 -149

ZN B.05-1st-BP1-6310 Terminal Clean - 1st Flr, ZN B.05 - Bid Pkg 1 Contr 3 3 06-Jan-20 08-Jan-20 -149

ZN B.05-1st-BP1-6330 Demo/Abate & Install Ceiling Access Frame - 1st Flr, ZN B.05 - Bid Pkg 1 Contr 6 6 16-Dec-19 23-Dec-19 -149

ZN B.05-1st-BP1-6340 Install Ceiling Access Panels & Touch Up/Repair - 1st Flr, ZN B.05 - Bid Pkg 1 Contr 10 10 31-Dec-19 14-Jan-20 -149

ZN B.05-1st-BP1-6350 Install Cont./Access/Egress/Signage - 1st Flr, ZN B.05 - Bid Pkg 1 Contr 1 1 12-Dec-19 12-Dec-19 -149

ZN B.05-1st-BP1-6370 Remove Cont./Access/Egress/Signage - 1st Flr, ZN B.05 - Bid Pkg 1 Contr 1 1 09-Jan-20 09-Jan-20 -149

ZN B.05-1st-BP1-6380 Vacate Rooms - 1st Flr, ZN B.05 - Bid Pkg 1 Contr 2 2 11-Dec-19 12-Dec-19 -149

ZN B.05-1st-BP1-6390 Material Staging - 1st Flr, ZN B.05 - Bid Pkg 2 & 3 Contr 1 1 12-Dec-19 12-Dec-19 -142

ZN B.05-1st-BP2-6320 Decomission & Install Fire Alarm - 1st Flr, ZN B.05 - Bid Pkg 2 Contr 6 6 24-Dec-19 02-Jan-20 -149

ZN B.05-1st-BP3-6360 Install Fire Sprinkler - 1st Flr, ZN B.05 - Bid Pkg 3 Contr 6 6 24-Dec-19 02-Jan-20 -149

First Flr, ZN B.06First Flr, ZN B.06 18 18 29-Jun-18 25-Jul-18 -65

ZN B.06-1st-3860 Punchlist 1 1 18-Jul-18 18-Jul-18 -65

ZN B.06-1st-3870 Punchlist Correction 1 1 19-Jul-18 19-Jul-18 -65

ZN B.06-1st-3880 Air Clearance Test 1 1 24-Jul-18 24-Jul-18 -65

ZN B.06-1st-BP1-2780 Layout - 1st Flr, ZN B.06 - Bid Pkg 2 &3 Contr 1 1 03-Jul-18 03-Jul-18 -65

ZN B.06-1st-BP1-6390 Terminal Clean - 1st Flr, ZN B.06 - Bid Pkg 1 Contr 3 3 20-Jul-18 24-Jul-18 -65

ZN B.06-1st-BP1-6410 Demo/Abate & Install Ceiling Access Frame - 1st Flr, ZN B.06 - Bid Pkg 1 Contr 4 4 05-Jul-18 10-Jul-18 -65

ZN B.06-1st-BP1-6420 Install Ceiling Access Panels & Touch Up/Repair - 1st Flr, ZN B.06 - Bid Pkg 1 Contr 3 3 17-Jul-18 19-Jul-18 -65

ZN B.06-1st-BP1-6430 Install Cont./Access/Egress/Signage - 1st Flr, ZN B.06 - Bid Pkg 1 Contr 1 1 02-Jul-18 02-Jul-18 -65

ZN B.06-1st-BP1-6450 Remove Cont./Access/Egress/Signage - 1st Flr, ZN B.06 - Bid Pkg 1 Contr 1 1 25-Jul-18 25-Jul-18 -65

ZN B.06-1st-BP1-6460 Vacate Rooms - 1st Flr, ZN B.06 - Bid Pkg 1 Contr 2 2 29-Jun-18 02-Jul-18 -65

ZN B.06-1st-BP1-6470 Material Staging - 1st Flr, ZN B.06 - Bid Pkg 2 & 3 Contr 1 1 02-Jul-18 02-Jul-18 -60

ZN B.06-1st-BP2-6400 Decomission & Install Fire Alarm - 1st Flr, ZN B.06 - Bid Pkg 2 Contr 6 6 11-Jul-18 18-Jul-18 -65

ZN B.06-1st-BP3-6440 Install Fire Sprinkler - 1st Flr, ZN B.06 - Bid Pkg 3 Contr 6 6 11-Jul-18 18-Jul-18 -65

First Flr, ZN B.07First Flr, ZN B.07 18 18 29-Jun-18 25-Jul-18 -65

ZN B.07-1st-3890 Punchlist 1 1 18-Jul-18 18-Jul-18 -65

ZN B.07-1st-3900 Punchlist Correction 1 1 19-Jul-18 19-Jul-18 -65

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

Decomission & Install Fire Alarm - 1st Flr, ZN B.04 - Bid Pkg 2 Contr

Install Fire Sprinkler - 1st Flr, ZN B.04 - Bid Pkg 3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Layout - 1st Flr, ZN B.05 - Bid Pkg 2 &3 Contr

Terminal Clean - 1st Flr, ZN B.05 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - 1st Flr, ZN B.05 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - 1st Flr, ZN B.05 - Bid Pkg 1 Con

Install Cont./Access/Egress/Signage - 1st Flr, ZN B.05 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - 1st Flr, ZN B.05 - Bid Pkg 1 Contr

Vacate Rooms - 1st Flr, ZN B.05 - Bid Pkg 1 Contr

Material Staging - 1st Flr, ZN B.05 - Bid Pkg 2 & 3 Contr

Decomission & Install Fire Alarm - 1st Flr, ZN B.05 - Bid Pkg 2 Contr

Install Fire Sprinkler - 1st Flr, ZN B.05 - Bid Pkg 3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Layout - 1st Flr, ZN B.06 - Bid Pkg 2 &3 Contr

Terminal Clean - 1st Flr, ZN B.06 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - 1st Flr, ZN B.06 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - 1st Flr, ZN B.06 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - 1st Flr, ZN B.06 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - 1st Flr, ZN B.06 - Bid Pkg 1 Contr

Vacate Rooms - 1st Flr, ZN B.06 - Bid Pkg 1 Contr

Material Staging - 1st Flr, ZN B.06 - Bid Pkg 2 & 3 Contr

Decomission & Install Fire Alarm - 1st Flr, ZN B.06 - Bid Pkg 2 Contr

Install Fire Sprinkler - 1st Flr, ZN B.06 - Bid Pkg 3 Contr

Punchlist

Punchlist Correction

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 29 of 34

aparker
Text Box
Ground Floor and First Floor work are concurrent with Patient Care 5th, 6th, & 8th Floors.
Page 30: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

ZN B.07-1st-3910 Air Clearance Test 1 1 24-Jul-18 24-Jul-18 -65

ZN B.07-1st-BP1-2790 Layout - 1st Flr, ZN B.07 - Bid Pkg 2 &3 Contr 1 1 03-Jul-18 03-Jul-18 -65

ZN B.07-1st-BP1-6470 Terminal Clean - 1st Flr, ZN B.07 - Bid Pkg 1 Contr 3 3 20-Jul-18 24-Jul-18 -65

ZN B.07-1st-BP1-6490 Demo/Abate & Install Ceiling Access Frame - 1st Flr, ZN B.07 - Bid Pkg 1 Contr 4 4 05-Jul-18 10-Jul-18 -65

ZN B.07-1st-BP1-6500 Install Ceiling Access Panels & Touch Up/Repair - 1st Flr, ZN B.07 - Bid Pkg 1 Contr 3 3 17-Jul-18 19-Jul-18 -65

ZN B.07-1st-BP1-6510 Install Cont./Access/Egress/Signage - 1st Flr, ZN B.07 - Bid Pkg 1 Contr 1 1 02-Jul-18 02-Jul-18 -65

ZN B.07-1st-BP1-6530 Remove Cont./Access/Egress/Signage - 1st Flr, ZN B.07 - Bid Pkg 1 Contr 1 1 25-Jul-18 25-Jul-18 -65

ZN B.07-1st-BP1-6540 Vacate Rooms - 1st Flr, ZN B.07 - Bid Pkg 1 Contr 2 2 29-Jun-18 02-Jul-18 -65

ZN B.07-1st-BP1-6550 Material Staging - 1st Flr, ZN B.07 - Bid Pkg 2 & 3 Contr 1 1 02-Jul-18 02-Jul-18 -60

ZN B.07-1st-BP2-6480 Decomission & Install Fire Alarm - 1st Flr, ZN B.07 - Bid Pkg 2 Contr 6 6 11-Jul-18 18-Jul-18 -65

ZN B.07-1st-BP3-6520 Install Fire Sprinkler - 1st Flr, ZN B.07 - Bid Pkg 3 Contr 6 6 11-Jul-18 18-Jul-18 -65

First Flr, ZN B.08First Flr, ZN B.08 36 36 12-Dec-19 04-Feb-20 -149

ZN B.08-1st-3920 Punchlist 1 1 28-Jan-20 28-Jan-20 -149

ZN B.08-1st-3930 Punchlist Correction 1 1 29-Jan-20 29-Jan-20 -149

ZN B.08-1st-3940 Air Clearance Test 1 1 03-Feb-20 03-Feb-20 -149

ZN B.08-1st-BP1-2800 Layout - 1st Flr, ZN B.08 - Bid Pkg 2 &3 Contr 1 1 13-Jan-20 13-Jan-20 -149

ZN B.08-1st-BP1-6530 Material Staging - 1st Flr, ZN B.08 - Bid Pkg 2 & 3 Contr 1 1 13-Jan-20 13-Jan-20 -145

ZN B.08-1st-BP1-6550 Terminal Clean - 1st Flr, ZN B.08 - Bid Pkg 1 Contr 3 3 30-Jan-20 03-Feb-20 -149

ZN B.08-1st-BP1-6570 Demo/Abate & Install Ceiling Access Frame - 1st Flr, ZN B.08 - Bid Pkg 1 Contr 4 4 14-Jan-20 17-Jan-20 -149

ZN B.08-1st-BP1-6580 Install Ceiling Access Panels & Touch Up/Repair - 1st Flr, ZN B.08 - Bid Pkg 1 Contr 3 3 27-Jan-20 29-Jan-20 -149

ZN B.08-1st-BP1-6590 Install Cont./Access/Egress/Signage - 1st Flr, ZN B.08 - Bid Pkg 1 Contr 1 1 10-Jan-20 10-Jan-20 -149

ZN B.08-1st-BP1-6610 Remove Cont./Access/Egress/Signage - 1st Flr, ZN B.08 - Bid Pkg 1 Contr 1 1 04-Feb-20 04-Feb-20 -149

ZN B.08-1st-BP1-6620 Vacate Rooms - 1st Flr, ZN B.08 - Bid Pkg 1 Contr 2 2 12-Dec-19 13-Dec-19 -131

ZN B.08-1st-BP2-6560 Decomission & Install Fire Alarm - 1st Flr, ZN B.08 - Bid Pkg 2 Contr 6 6 21-Jan-20 28-Jan-20 -149

ZN B.08-1st-BP3-6600 Install Fire Sprinkler - 1st Flr, ZN B.08 - Bid Pkg 3 Contr 6 6 21-Jan-20 28-Jan-20 -149

First Flr, ZN B.09First Flr, ZN B.09 18 18 04-Feb-20 27-Feb-20 -149

ZN B.09-1st-3950 Punchlist 1 1 20-Feb-20 20-Feb-20 -149

ZN B.09-1st-3960 Punchlist Correction 1 1 21-Feb-20 21-Feb-20 -149

ZN B.09-1st-3970 Air Clearance Test 1 1 26-Feb-20 26-Feb-20 -149

ZN B.09-1st-BP1-2810 Layout - 1st Flr, ZN B.09 - Bid Pkg 2 &3 Contr 1 1 06-Feb-20 06-Feb-20 -149

ZN B.09-1st-BP1-6620 Material Staging - 1st Flr, ZN B.09 - Bid Pkg 2 & 3 Contr 1 1 05-Feb-20 05-Feb-20 -144

ZN B.09-1st-BP1-6630 Terminal Clean - 1st Flr, ZN B.09 - Bid Pkg 1 Contr 3 3 24-Feb-20 26-Feb-20 -149

ZN B.09-1st-BP1-6650 Demo/Abate & Install Ceiling Access Frame - 1st Flr, ZN B.09 - Bid Pkg 1 Contr 4 4 07-Feb-20 12-Feb-20 -149

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

Air Clearance Test

Layout - 1st Flr, ZN B.07 - Bid Pkg 2 &3 Contr

Terminal Clean - 1st Flr, ZN B.07 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - 1st Flr, ZN B.07 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - 1st Flr, ZN B.07 - Bid Pkg 1 Contr

Install Cont./Access/Egress/Signage - 1st Flr, ZN B.07 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - 1st Flr, ZN B.07 - Bid Pkg 1 Contr

Vacate Rooms - 1st Flr, ZN B.07 - Bid Pkg 1 Contr

Material Staging - 1st Flr, ZN B.07 - Bid Pkg 2 & 3 Contr

Decomission & Install Fire Alarm - 1st Flr, ZN B.07 - Bid Pkg 2 Contr

Install Fire Sprinkler - 1st Flr, ZN B.07 - Bid Pkg 3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Layout - 1st Flr, ZN B.08 - Bid Pkg 2 &3 Contr

Material Staging - 1st Flr, ZN B.08 - Bid Pkg 2 & 3 Contr

Terminal Clean - 1st Flr, ZN B.08 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - 1st Flr, ZN B.08 - Bid Pkg 1 Contr

Install Ceiling Access Panels & Touch Up/Repair - 1st Flr, ZN B.08 - Bid Pkg 1 C

Install Cont./Access/Egress/Signage - 1st Flr, ZN B.08 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - 1st Flr, ZN B.08 - Bid Pkg 1 Contr

Vacate Rooms - 1st Flr, ZN B.08 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - 1st Flr, ZN B.08 - Bid Pkg 2 Contr

Install Fire Sprinkler - 1st Flr, ZN B.08 - Bid Pkg 3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Layout - 1st Flr, ZN B.09 - Bid Pkg 2 &3 Contr

Material Staging - 1st Flr, ZN B.09 - Bid Pkg 2 & 3 Contr

Terminal Clean - 1st Flr, ZN B.09 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - 1st Flr, ZN B.09 - Bid Pkg 1 Cont

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 30 of 34

aparker
Text Box
Ground Floor and First Floor work are concurrent with Patient Care 5th, 6th, & 8th Floors.
Page 31: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

ZN B.09-1st-BP1-6660 Install Ceiling Access Panels & Touch Up/Repair - 1st Flr, ZN B.09 - Bid Pkg 1 Contr 3 3 19-Feb-20 21-Feb-20 -149

ZN B.09-1st-BP1-6670 Install Cont./Access/Egress/Signage - 1st Flr, ZN B.09 - Bid Pkg 1 Contr 1 1 05-Feb-20 05-Feb-20 -149

ZN B.09-1st-BP1-6690 Remove Cont./Access/Egress/Signage - 1st Flr, ZN B.09 - Bid Pkg 1 Contr 1 1 27-Feb-20 27-Feb-20 -149

ZN B.09-1st-BP1-6700 Vacate Rooms - 1st Flr, ZN B.09 - Bid Pkg 1 Contr 2 2 04-Feb-20 05-Feb-20 -149

ZN B.09-1st-BP2-6640 Decomission & Install Fire Alarm - 1st Flr, ZN B.09 - Bid Pkg 2 Contr 6 6 13-Feb-20 20-Feb-20 -149

ZN B.09-1st-BP3-6680 Install Fire Sprinkler - 1st Flr, ZN B.09 - Bid Pkg 3 Contr 6 6 13-Feb-20 20-Feb-20 -149

First Flr, ZN B.10First Flr, ZN B.10 18 18 27-Feb-20 23-Mar-20 -149

ZN B.10-1st-3980 Punchlist 1 1 16-Mar-20 16-Mar-20 -149

ZN B.10-1st-3990 Punchlist Correction 1 1 17-Mar-20 17-Mar-20 -149

ZN B.10-1st-4000 Air Clearance Test 1 1 20-Mar-20 20-Mar-20 -149

ZN B.10-1st-BP1-2820 Layout - 1st Flr, ZN B.10 - Bid Pkg 2 &3 Contr 1 1 02-Mar-20 02-Mar-20 -149

ZN B.10-1st-BP1-6710 Terminal Clean - 1st Flr, ZN B.10 - Bid Pkg 1 Contr 3 3 18-Mar-20 20-Mar-20 -149

ZN B.10-1st-BP1-6730 Demo/Abate & Install Ceiling Access Frame - 1st Flr, ZN B.10 - Bid Pkg 1 Contr 4 4 03-Mar-20 06-Mar-20 -149

ZN B.10-1st-BP1-6740 Install Ceiling Access Panels & Touch Up/Repair - 1st Flr, ZN B.10 - Bid Pkg 1 Contr 3 3 13-Mar-20 17-Mar-20 -149

ZN B.10-1st-BP1-6750 Install Cont./Access/Egress/Signage - 1st Flr, ZN B.10 - Bid Pkg 1 Contr 1 1 28-Feb-20 28-Feb-20 -149

ZN B.10-1st-BP1-6770 Remove Cont./Access/Egress/Signage - 1st Flr, ZN B.10 - Bid Pkg 1 Contr 1 1 23-Mar-20 23-Mar-20 -149

ZN B.10-1st-BP1-6780 Vacate Rooms - 1st Flr, ZN B.10 - Bid Pkg 1 Contr 2 2 27-Feb-20 28-Feb-20 -149

ZN B.10-1st-BP1-6790 Material Staging - 1st Flr, ZN B.10 - Bid Pkg 2 & 3 Contr 1 1 28-Feb-20 28-Feb-20 -144

ZN B.10-1st-BP2-6720 Decomission & Install Fire Alarm - 1st Flr, ZN B.10 - Bid Pkg 2 Contr 6 6 09-Mar-20 16-Mar-20 -149

ZN B.10-1st-BP3-6760 Install Fire Sprinkler - 1st Flr, ZN B.10 - Bid Pkg 3 Contr 6 6 09-Mar-20 16-Mar-20 -149

First Flr, ZN B.11First Flr, ZN B.11 18 18 23-Mar-20 15-Apr-20 -149

ZN B.11-1st-4010 Punchlist 1 1 08-Apr-20 08-Apr-20 -149

ZN B.11-1st-4020 Punchlist Correction 1 1 09-Apr-20 09-Apr-20 -149

ZN B.11-1st-4030 Air Clearance Test 1 1 14-Apr-20 14-Apr-20 -149

ZN B.11-1st-BP1-2830 Layout - 1st Flr, ZN B.11 - Bid Pkg 2 &3 Contr 1 1 25-Mar-20 25-Mar-20 -149

ZN B.11-1st-BP1-6790 Terminal Clean - 1st Flr, ZN B.11 - Bid Pkg 1 Contr 3 3 10-Apr-20 14-Apr-20 -149

ZN B.11-1st-BP1-6810 Demo/Abate & Install Ceiling Access Frame - 1st Flr, ZN B.11 - Bid Pkg 1 Contr 4 4 26-Mar-20 31-Mar-20 -149

ZN B.11-1st-BP1-6820 Install Ceiling Access Panels & Touch Up/Repair - 1st Flr, ZN B.11 - Bid Pkg 1 Contr 3 3 07-Apr-20 09-Apr-20 -149

ZN B.11-1st-BP1-6830 Install Cont./Access/Egress/Signage - 1st Flr, ZN B.11 - Bid Pkg 1 Contr 1 1 24-Mar-20 24-Mar-20 -149

ZN B.11-1st-BP1-6850 Remove Cont./Access/Egress/Signage - 1st Flr, ZN B.11 - Bid Pkg 1 Contr 1 1 15-Apr-20 15-Apr-20 -149

ZN B.11-1st-BP1-6860 Vacate Rooms - 1st Flr, ZN B.11 - Bid Pkg 1 Contr 2 2 23-Mar-20 24-Mar-20 -149

ZN B.11-1st-BP1-6870 Material Staging - 1st Flr, ZN B.11 - Bid Pkg 2 & 3 Contr 1 1 24-Mar-20 24-Mar-20 -144

ZN B.11-1st-BP2-6800 Decomission & Install Fire Alarm - 1st Flr, ZN B.11 - Bid Pkg 2 Contr 6 6 01-Apr-20 08-Apr-20 -149

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

Install Ceiling Access Panels & Touch Up/Repair - 1st Flr, ZN B.09 - Bid Pkg 1

Install Cont./Access/Egress/Signage - 1st Flr, ZN B.09 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - 1st Flr, ZN B.09 - Bid Pkg 1 Contr

Vacate Rooms - 1st Flr, ZN B.09 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - 1st Flr, ZN B.09 - Bid Pkg 2 Contr

Install Fire Sprinkler - 1st Flr, ZN B.09 - Bid Pkg 3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Layout - 1st Flr, ZN B.10 - Bid Pkg 2 &3 Contr

Terminal Clean - 1st Flr, ZN B.10 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - 1st Flr, ZN B.10 - Bid Pkg 1 Co

Install Ceiling Access Panels & Touch Up/Repair - 1st Flr, ZN B.10 - Bid Pkg

Install Cont./Access/Egress/Signage - 1st Flr, ZN B.10 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - 1st Flr, ZN B.10 - Bid Pkg 1 Contr

Vacate Rooms - 1st Flr, ZN B.10 - Bid Pkg 1 Contr

Material Staging - 1st Flr, ZN B.10 - Bid Pkg 2 & 3 Contr

Decomission & Install Fire Alarm - 1st Flr, ZN B.10 - Bid Pkg 2 Contr

Install Fire Sprinkler - 1st Flr, ZN B.10 - Bid Pkg 3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Layout - 1st Flr, ZN B.11 - Bid Pkg 2 &3 Contr

Terminal Clean - 1st Flr, ZN B.11 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - 1st Flr, ZN B.11 - Bid Pkg 1

Install Ceiling Access Panels & Touch Up/Repair - 1st Flr, ZN B.11 - Bid P

Install Cont./Access/Egress/Signage - 1st Flr, ZN B.11 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - 1st Flr, ZN B.11 - Bid Pkg 1 Co

Vacate Rooms - 1st Flr, ZN B.11 - Bid Pkg 1 Contr

Material Staging - 1st Flr, ZN B.11 - Bid Pkg 2 & 3 Contr

Decomission & Install Fire Alarm - 1st Flr, ZN B.11 - Bid Pkg 2 Contr

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 31 of 34

aparker
Text Box
Ground Floor and First Floor work are concurrent with Patient Care 5th, 6th, & 8th Floors.
Page 32: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

ZN B.11-1st-BP3-6840 Install Fire Sprinkler - 1st Flr, ZN B.11 - Bid Pkg 3 Contr 6 6 01-Apr-20 08-Apr-20 -149

First Flr, ZN B.12First Flr, ZN B.12 18 18 15-Apr-20 08-May-20 -149

ZN B.12-1st-4040 Punchlist 1 1 01-May-20 01-May-20 -149

ZN B.12-1st-4050 Punchlist Correction 1 1 04-May-20 04-May-20 -149

ZN B.12-1st-4060 Air Clearance Test 1 1 07-May-20 07-May-20 -149

ZN B.12-1st-BP1-2840 Layout - 1st Flr, ZN B.12 - Bid Pkg 2 &3 Contr 1 1 17-Apr-20 17-Apr-20 -149

ZN B.12-1st-BP1-6860 Material Staging - 1st Flr, ZN B.12 - Bid Pkg 2 & 3 Contr 1 1 16-Apr-20 16-Apr-20 -144

ZN B.12-1st-BP1-6870 Terminal Clean - 1st Flr, ZN B.12 - Bid Pkg 1 Contr 3 3 05-May-20 07-May-20 -149

ZN B.12-1st-BP1-6890 Demo/Abate & Install Ceiling Access Frame - 1st Flr, ZN B.12 - Bid Pkg 1 Contr 4 4 20-Apr-20 23-Apr-20 -149

ZN B.12-1st-BP1-6900 Install Ceiling Access Panels & Touch Up/Repair - 1st Flr, ZN B.12 - Bid Pkg 1 Contr 3 3 30-Apr-20 04-May-20 -149

ZN B.12-1st-BP1-6910 Install Cont./Access/Egress/Signage - 1st Flr, ZN B.12 - Bid Pkg 1 Contr 1 1 16-Apr-20 16-Apr-20 -149

ZN B.12-1st-BP1-6930 Remove Cont./Access/Egress/Signage - 1st Flr, ZN B.12 - Bid Pkg 1 Contr 1 1 08-May-20 08-May-20 -149

ZN B.12-1st-BP1-6940 Vacate Rooms - 1st Flr, ZN B.12 - Bid Pkg 1 Contr 2 2 15-Apr-20 16-Apr-20 -149

ZN B.12-1st-BP2-6880 Decomission & Install Fire Alarm - 1st Flr, ZN B.12 - Bid Pkg 2 Contr 6 6 24-Apr-20 01-May-20 -149

ZN B.12-1st-BP3-6920 Install Fire Sprinkler - 1st Flr, ZN B.12 - Bid Pkg 3 Contr 6 6 24-Apr-20 01-May-20 -149

First Flr, ZN B.13First Flr, ZN B.13 18 18 08-May-20 02-Jun-20 -149

ZN B.13-1st-4070 Punchlist 1 1 26-May-20 26-May-20 -149

ZN B.13-1st-4080 Punchlist Correction 1 1 27-May-20 27-May-20 -149

ZN B.13-1st-4090 Air Clearance Test 1 1 01-Jun-20 01-Jun-20 -149

ZN B.13-1st-BP1-2850 Layout - 1st Flr, ZN B.13 - Bid Pkg 2 &3 Contr 1 1 12-May-20 12-May-20 -149

ZN B.13-1st-BP1-6920 Material Staging - 1st Flr, ZN B.13 - Bid Pkg 2 & 3 Contr 1 1 11-May-20 11-May-20 -144

ZN B.13-1st-BP1-6950 Terminal Clean - 1st Flr, ZN B.13 - Bid Pkg 1 Contr 3 3 28-May-20 01-Jun-20 -149

ZN B.13-1st-BP1-6970 Demo/Abate & Install Ceiling Access Frame - 1st Flr, ZN B.13 - Bid Pkg 1 Contr 4 4 13-May-20 18-May-20 -149

ZN B.13-1st-BP1-6980 Install Ceiling Access Panels & Touch Up/Repair - 1st Flr, ZN B.13 - Bid Pkg 1 Contr 3 3 25-May-20 27-May-20 -149

ZN B.13-1st-BP1-6990 Install Cont./Access/Egress/Signage - 1st Flr, ZN B.13 - Bid Pkg 1 Contr 1 1 11-May-20 11-May-20 -149

ZN B.13-1st-BP1-7010 Remove Cont./Access/Egress/Signage - 1st Flr, ZN B.13 - Bid Pkg 1 Contr 1 1 02-Jun-20 02-Jun-20 -149

ZN B.13-1st-BP1-7020 Vacate Rooms - 1st Flr, ZN B.13 - Bid Pkg 1 Contr 2 2 08-May-20 11-May-20 -149

ZN B.13-1st-BP2-6960 Decomission & Install Fire Alarm - 1st Flr, ZN B.13 - Bid Pkg 2 Contr 6 6 19-May-20 26-May-20 -149

ZN B.13-1st-BP3-7000 Install Fire Sprinkler - 1st Flr, ZN B.13 - Bid Pkg 3 Contr 6 6 19-May-20 26-May-20 -149

First Flr, ZN B.14First Flr, ZN B.14 18 18 02-Jun-20 25-Jun-20 -149

ZN B.14-1st-4100 Punchlist 1 1 18-Jun-20 18-Jun-20 -149

ZN B.14-1st-4110 Punchlist Correction 1 1 19-Jun-20 19-Jun-20 -149

ZN B.14-1st-4120 Air Clearance Test 1 1 24-Jun-20 24-Jun-20 -149

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

Install Fire Sprinkler - 1st Flr, ZN B.11 - Bid Pkg 3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Layout - 1st Flr, ZN B.12 - Bid Pkg 2 &3 Contr

Material Staging - 1st Flr, ZN B.12 - Bid Pkg 2 & 3 Contr

Terminal Clean - 1st Flr, ZN B.12 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - 1st Flr, ZN B.12 - Bid Pkg

Install Ceiling Access Panels & Touch Up/Repair - 1st Flr, ZN B.12 - Bi

Install Cont./Access/Egress/Signage - 1st Flr, ZN B.12 - Bid Pkg 1 Contr

Remove Cont./Access/Egress/Signage - 1st Flr, ZN B.12 - Bid Pkg 1 C

Vacate Rooms - 1st Flr, ZN B.12 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - 1st Flr, ZN B.12 - Bid Pkg 2 Contr

Install Fire Sprinkler - 1st Flr, ZN B.12 - Bid Pkg 3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

Layout - 1st Flr, ZN B.13 - Bid Pkg 2 &3 Contr

Material Staging - 1st Flr, ZN B.13 - Bid Pkg 2 & 3 Contr

Terminal Clean - 1st Flr, ZN B.13 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - 1st Flr, ZN B.13 - Bid P

Install Ceiling Access Panels & Touch Up/Repair - 1st Flr, ZN B.13 -

Install Cont./Access/Egress/Signage - 1st Flr, ZN B.13 - Bid Pkg 1 Co

Remove Cont./Access/Egress/Signage - 1st Flr, ZN B.13 - Bid Pkg

Vacate Rooms - 1st Flr, ZN B.13 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - 1st Flr, ZN B.13 - Bid Pkg 2 Contr

Install Fire Sprinkler - 1st Flr, ZN B.13 - Bid Pkg 3 Contr

Punchlist

Punchlist Correction

Air Clearance Test

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 32 of 34

aparker
Text Box
Ground Floor and First Floor work are concurrent with Patient Care 5th, 6th, & 8th Floors.
Page 33: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

ZN B.14-1st-BP1-2860 Layout - 1st Flr, ZN B.14 - Bid Pkg 2 &3 Contr 1 1 04-Jun-20 04-Jun-20 -149

ZN B.14-1st-BP1-7020 Material Staging - 1st Flr, ZN B.14 - Bid Pkg 2 & 3 Contr 1 1 03-Jun-20 03-Jun-20 -144

ZN B.14-1st-BP1-7030 Terminal Clean - 1st Flr, ZN B.14 - Bid Pkg 1 Contr 3 3 22-Jun-20 24-Jun-20 -149

ZN B.14-1st-BP1-7050 Demo/Abate & Install Ceiling Access Frame - 1st Flr, ZN B.14 - Bid Pkg 1 Contr 4 4 05-Jun-20 10-Jun-20 -149

ZN B.14-1st-BP1-7060 Install Ceiling Access Panels & Touch Up/Repair - 1st Flr, ZN B.14 - Bid Pkg 1 Contr 3 3 17-Jun-20 19-Jun-20 -149

ZN B.14-1st-BP1-7070 Install Cont./Access/Egress/Signage - 1st Flr, ZN B.14 - Bid Pkg 1 Contr 1 1 03-Jun-20 03-Jun-20 -149

ZN B.14-1st-BP1-7090 Remove Cont./Access/Egress/Signage - 1st Flr, ZN B.14 - Bid Pkg 1 Contr 1 1 25-Jun-20 25-Jun-20 -149

ZN B.14-1st-BP1-7100 Vacate Rooms - 1st Flr, ZN B.14 - Bid Pkg 1 Contr 2 2 02-Jun-20 03-Jun-20 -149

ZN B.14-1st-BP2-7040 Decomission & Install Fire Alarm - 1st Flr, ZN B.14 - Bid Pkg 2 Contr 6 6 11-Jun-20 18-Jun-20 -149

ZN B.14-1st-BP3-7080 Install Fire Sprinkler - 1st Flr, ZN B.14 - Bid Pkg 3 Contr 6 6 11-Jun-20 18-Jun-20 -149

First Flr, ZN B.15First Flr, ZN B.15 19 19 25-Jun-20 21-Jul-20 -146

INSPCT-BP2-7250 BP-02 Fire Alarm Inspections & Verifications of 1st Floor 3 3 17-Jul-20 21-Jul-20 -149

INSPCT-BP3-7260 BP-03 Fire Sprinkler Inspections & Verifications of 1st Floor 3 3 17-Jul-20 21-Jul-20 -146

ZN B.15-1st-4130 Punchlist 1 1 09-Jul-20 09-Jul-20 -149

ZN B.15-1st-4140 Punchlist Correction 1 1 10-Jul-20 10-Jul-20 -149

ZN B.15-1st-4150 Air Clearance Test 1 1 15-Jul-20 15-Jul-20 -149

ZN B.15-1st-BP1-2870 Layout - 1st Flr, ZN B.15 - Bid Pkg 2 &3 Contr 1 1 29-Jun-20 29-Jun-20 -149

ZN B.15-1st-BP1-2880 Vacate Rooms - 1st Flr, ZN B.15 - Bid Pkg 1 Contr 2 2 25-Jun-20 26-Jun-20 -149

ZN B.15-1st-BP1-7110 Terminal Clean - 1st Flr, ZN B.15 - Bid Pkg 1 Contr 3 3 13-Jul-20 15-Jul-20 -149

ZN B.15-1st-BP1-7130 Demo/Abate & Install Ceiling Access Frame - 1st Flr, ZN B.15 - Bid Pkg 1 Contr 4 4 30-Jun-20 03-Jul-20 -149

ZN B.15-1st-BP1-7140 Install Ceiling Access Panels & Touch Up/Repair - 1st Flr, ZN B.15 - Bid Pkg 1 Contr 3 3 08-Jul-20 10-Jul-20 -149

ZN B.15-1st-BP1-7150 Install Cont./Access/Egress/Signage - 1st Flr, ZN B.15 - Bid Pkg 1 Contr 1 1 26-Jun-20 26-Jun-20 -149

ZN B.15-1st-BP1-7170 Remove Cont./Access/Egress/Signage - 1st Flr, ZN B.15 - Bid Pkg 1 Contr 1 1 16-Jul-20 16-Jul-20 -149

ZN B.15-1st-BP1-7180 Material Staging - 1st Flr, ZN B.15 - Bid Pkg 2 & 3 Contr 1 1 26-Jun-20 26-Jun-20 -144

ZN B.15-1st-BP2-7120 Decomission & Install Fire Alarm - 1st Flr, ZN B.15 - Bid Pkg 2 Contr 6 6 06-Jul-20 13-Jul-20 -149

ZN B.15-1st-BP3-7160 Install Fire Sprinkler - 1st Flr, ZN B.15 - Bid Pkg 3 Contr 6 6 06-Jul-20 13-Jul-20 -149

Final Inspection & VerificationFinal Inspection & Verification 6 6 22-Jul-20 29-Jul-20 -151

COUT-MISC-N/A-9180 Pre-Test Fire Alarm & Sprinklers - Bid Pkgs 2 & 3 5 5 22-Jul-20 26-Jul-20 -213

INSPCT-BP2-7190 BP-02 Fire Alarm Final Inspec tions & Verifications 3 3 27-Jul-20 29-Jul-20 -149

INSPCT-BP3-7200 BP-03 Fire Sprinkler Final Inspections & Verificat ions 3 3 27-Jul-20 29-Jul-20 -149

Project CloseoutProject Closeout 506 506 27-Feb-20 16-Jul-21 0

COUT-MISC-N/A-9120 Prepare & Submit O & M Manuals - Project Closeout - CM Multiprime 21 21 27-Feb-20 18-Mar-20 -92

COUT-MISC-N/A-9130 Review & Approve O & M Manuals - Project Closeout - UCDMC 14 14 19-Mar-20 01-Apr-20 -92

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

Layout - 1st Flr, ZN B.14 - Bid Pkg 2 &3 Contr

Material Staging - 1st Flr, ZN B.14 - Bid Pkg 2 & 3 Contr

Terminal Clean - 1st Flr, ZN B.14 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - 1st Flr, ZN B.14 - Bid

Install Ceiling Access Panels & Touch Up/Repair - 1st Flr, ZN B.14

Install Cont./Access/Egress/Signage - 1st Flr, ZN B.14 - Bid Pkg 1 C

Remove Cont./Access/Egress/Signage - 1st Flr, ZN B.14 - Bid Pk

Vacate Rooms - 1st Flr, ZN B.14 - Bid Pkg 1 Contr

Decomission & Install Fire Alarm - 1st Flr, ZN B.14 - Bid Pkg 2 Co

Install Fire Sprinkler - 1st Flr, ZN B.14 - Bid Pkg 3 Contr

BP-02 Fire Alarm Inspections & Verifications of 1st Floor

BP-03 Fire Sprinkler Inspections & Verifications of 1st Floor

Punchlist

Punchlist Correction

Air Clearance Test

Layout - 1st Flr, ZN B.15 - Bid Pkg 2 &3 Contr

Vacate Rooms - 1st Flr, ZN B.15 - Bid Pkg 1 Contr

Terminal Clean - 1st Flr, ZN B.15 - Bid Pkg 1 Contr

Demo/Abate & Install Ceiling Access Frame - 1st Flr, ZN B.15 - B

Install Ceiling Access Panels & Touch Up/Repair - 1st Flr, ZN B

Install Cont./Access/Egress/Signage - 1st Flr, ZN B.15 - Bid Pkg

Remove Cont./Access/Egress/Signage - 1st Flr, ZN B.15 - Bid

Material Staging - 1st Flr, ZN B.15 - Bid Pkg 2 & 3 Contr

Decomission & Install Fire Alarm - 1st Flr, ZN B.15 - Bid Pkg 2 C

Install Fire Sprinkler - 1st Flr, ZN B.15 - Bid Pkg 3 Contr

Pre-Test Fire Alarm & Sprinklers - Bid Pkgs 2 & 3

BP-02 Fire Alarm Final Inspec tions & Verifications

BP-03 Fire Sprinkler Final Inspections & Verificat ions

Prepare & Submit O & M Manuals - Project Closeout - CM Multiprime

Review & Approve O & M Manuals - Project Closeout - UCDMC

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 33 of 34

aparker
Snapshot
aparker
Snapshot
aparker
Snapshot
aparker
Text Box
aparker
Text Box
aparker
Text Box
27-Feb-20
aparker
Text Box
aparker
Text Box
Ground Floor and First Floor work are concurrent with Patient Care 5th, 6th, & 8th Floors.
Page 34: Remaining Start Finish Total Float Duration M J J A S O N ... · Start Finish Total Float Milestones 1275 791 21-Jul-16 A 30-Jul-20 352 MSTONE-MISC-BP1-9010 Start of Construction

Activity ID Activity Name OrigDur

RemainingDuration

Start Finish Total Float

COUT-MISC-N/A-9140 Prepare & Submit As-builts - Project Closeout - CM Multiprime 21 21 27-Feb-20 18-Mar-20 -92

COUT-MISC-N/A-9150 Review & Approve As-builts - Project Closeout - UCDMC 14 14 19-Mar-20 01-Apr-20 -92

MSTONE-MISC-N/A-9120 Start Warranty Phase 0 0 17-Jul-20 0

MSTONE-MISC-N/A-9130 Warranty Phase 365 365 17-Jul-20 16-Jul-21 0

MSTONE-MISC-N/A-9140 1 Year Warranty Expiration 0 0 16-Jul-21 0

MSTONE-MISC-N/A-9150 11 Month Warranty Walk - (All Trade Contractors) 0 0 16-May-21 61

No UCDMC INC 2 Subphase No UCDMC INC 2 Subphase 10 0 05-Oct-17 A 06-Nov-17 A

PRECON-MISC-BP2-1575 Revise & Re-Submit Fire Alarm System - Procurement - UCDMC - Revision 5 5 0 05-Oct-17 A 25-Oct-17 A

PRECON-MISC-BP2-1580 Review & Approve Fire Alarm System - Procurement - UCDMC - Revision 5 (at OSHPD on 10/25) 10 0 25-Oct-17 A 06-Nov-17 A

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S

2018 2019 2020 2021

Prepare & Submit As-builts - Project Closeout - CM Multiprime

Review & Approve As-builts - Project Closeout - UCDMC

Start Warranty Phase

Warranty Phase

1 Year Warranty Expiratio

11 Month Warranty Walk - (All T

Revise & Re-Submit Fire Alarm System - Procurement - UCDMC - Revision 5

Review & Approve Fire Alarm System - Procurement - UCDMC - Revision 5 (at OSHPD on 10/25)

4990 201805 UCDMC Seismic Upgrade Fire and Life / Safety Upgrade - Increment 2 - Master Project Schedule Revised page 34 of 34

aparker
Snapshot
aparker
Snapshot
aparker
Snapshot
aparker
Text Box
23-Mar-21
aparker
Text Box
23-Mar-21
aparker
Text Box
23-Feb-21