RELIEF OPERATIONS

34
LIVABLE COMMUNITY FRAMEWORK: A TEMPLATE FOR SENDONG VICTIMS IN CITIES OF CAGAYAN DE ORO & ILIGAN URBAN TERRITORIES (A Conceptual Proposal)

description

LIVABLE COMMUNITY FRAMEWORK: A TEMPLATE FOR SENDONG VICTIMS IN CITIES OF CAGAYAN DE ORO & ILIGAN URBAN TERRITORIES ( A Conceptual Proposal ). RELIEF OPERATIONS. UNFPA-DOH-POGS RH MISSIONS. Macasandig Court-one of the biggest Evacuation Center. - PowerPoint PPT Presentation

Transcript of RELIEF OPERATIONS

Page 1: RELIEF OPERATIONS

LIVABLE COMMUNITY FRAMEWORK: A TEMPLATE

FOR SENDONG VICTIMS IN CITIES OF CAGAYAN DE ORO & ILIGAN URBAN TERRITORIES

(A Conceptual Proposal)

Page 2: RELIEF OPERATIONS

RELIEF OPERATIONSDATE PLACE NO. OF FAMIILIES

SERVEDDec. 18, 2011 Macasandig Covered

Court250

Dec. 20, 2012 Macasandig and Tibasak 500

Dec. 24, 2012 PuntodXavier HeightsPilgrim School

2,000 500 200

Dec. 28, 2012 Sto. Nino Church 150

Page 3: RELIEF OPERATIONS

UNFPA-DOH-POGS RH MISSIONSDATE PLACES RECIPIENTS PER SERVICE

Jan 5, 2012 City Central School PLW – 38DMPA – 21

Jan 10, 2012 West City Central School PLW – 35DMPA – 6

Jan. 14, 2012 Bulua Barangay Hall PLW – 46DMPA – 4

Jan 21, 2012 Macasandig Prenatal – 47VIA - 67

Jan 26, 2012 Calaanan Tent City

Page 4: RELIEF OPERATIONS

Macasandig Court-one of the biggest Evacuation Center

Page 5: RELIEF OPERATIONS
Page 6: RELIEF OPERATIONS

• POGS national president, Dr. Rey de los Reyes during the RH Mission at Macasandig covered court.

Page 7: RELIEF OPERATIONS

Tibasak area

• A view of the area with the river in site.

Page 8: RELIEF OPERATIONS

• The remains of a house. The tip of the mosque in the background was the only one seen during the flood.

Page 9: RELIEF OPERATIONS

There used to be around in these empty land. The other side of the river is another hardly hit area – Balulang.

Page 10: RELIEF OPERATIONS
Page 11: RELIEF OPERATIONS

Tent City in Calaanan – 1962 People with 493 families

Page 12: RELIEF OPERATIONS

PORTALETS

Page 13: RELIEF OPERATIONS

Unfpa volunteers

Page 14: RELIEF OPERATIONS

UNFPA’S country Rep

Page 15: RELIEF OPERATIONS

POGS-UNFPA

Page 16: RELIEF OPERATIONS

POGS MEMBERS

Page 17: RELIEF OPERATIONS

POGS MEMBERS

Page 18: RELIEF OPERATIONS

LIVABLE COMMUNITY FRAMEWORK: A TEMPLATE

FOR SENDONG VICTIMS IN CITIES OF CAGAYAN DE ORO & ILIGAN URBAN TERRITORIES

(A Conceptual Proposal)

Page 19: RELIEF OPERATIONS

Improved Environmental

Condition

Improved Environmental

Condition

Enhanced Social & Cultural for Peoples

Empowerment

Enhanced Social & Cultural for Peoples

Empowerment

Community-Led Economic Policy

& Increased Investment

Community-Led Economic Policy

& Increased Investment

Community-Led Governmental Policy & Legal Infrastructure

Community-Led Governmental Policy & Legal Infrastructure

People / Community-Led

Liveable Territory

A QUADRANT FOR LIVEABLE COMMUNITY FRAMEWORK

Page 20: RELIEF OPERATIONS

Livable Community Framework Replication to Sendong-Affected Communities in Northern Mindanao

Page 21: RELIEF OPERATIONS

SUBDIVISION PLAN

Page 22: RELIEF OPERATIONS

PERSPECTIVEDUPLEX HOUSING

Page 23: RELIEF OPERATIONS
Page 24: RELIEF OPERATIONS
Page 25: RELIEF OPERATIONS
Page 26: RELIEF OPERATIONS

Duplex Housing Construction

Page 27: RELIEF OPERATIONS

Full Utilization of San Carlos ICEB Enviro-blox

Page 28: RELIEF OPERATIONS

The Project is Assisting 300 Families or 1,800 Individuals

Page 29: RELIEF OPERATIONS

A community-led effort facilitated by ICEB-trained community workers.

Page 30: RELIEF OPERATIONS

A finished housing product where the land component is donated by private individuals.

Page 31: RELIEF OPERATIONS

Total savings generated ranges from 35-40% through earth-based construction technology.

Page 32: RELIEF OPERATIONS

A 50 square meter-duplex housing unit with a P220,000 total package cost or P110,000 per unit cost without the land component.

Page 33: RELIEF OPERATIONS

Proposal to POGS National and Regional Components:To build ten (10) in Cag ayan de Oro and ten (10) houses in Iligan City underThe names of POGS at P 110,000.00 per unit.Total Cost: P 2.4 Million.

Page 34: RELIEF OPERATIONS

THANK YOU!