Releasable Mooring System Design - Drillsafe

16
1 Delivering high quality personnel, service, and equipment - all incident free Releasable Mooring System Design

Transcript of Releasable Mooring System Design - Drillsafe

Page 1: Releasable Mooring System Design - Drillsafe

1Delivering high quality personnel, service, and equipment - all incident free

Releasable Mooring System Design

Page 2: Releasable Mooring System Design - Drillsafe

2THE OFFSHORE MOORING AND SUBSEA COMPANY

Problem + Solution

Not to drill during the cyclone season

Find a way to enable MODU to quickly depart field while still

maintaining mooring capability

Page 3: Releasable Mooring System Design - Drillsafe

3THE OFFSHORE MOORING AND SUBSEA COMPANY

Regulatory Feasibility

Offshore Petroleum and Greenhouse Gas Storage Act

2006 (OPGGSA)

Navigation Act 2012

Management of Safety on Offshore Facilities

Regulations 1996 (MOSOF)

Page 4: Releasable Mooring System Design - Drillsafe

4

THE OFFSHORE MOORING AND SUBSEA COMPANY

Qualification of Technology

Technical Documentation

Design Documentation

Construction

Operational History

Proof Testing

Case Studies

FMEA

BowTie analysis for MAE

Control Functions

Page 5: Releasable Mooring System Design - Drillsafe

5

THE OFFSHORE MOORING AND SUBSEA COMPANY

RARPlus

Highest number of alternate release options

Highest ultimate load and proof load rating

No reliance on ROV for alternate release

Highest degree of acoustic transducer protection and redundancy.

Highest proven operational performance record

Rig immediately ready for transit

Page 6: Releasable Mooring System Design - Drillsafe

6

RAR Plus Release Options

Acoustic Release Backup - Rig Fairlead Backup - AHTS

Page 7: Releasable Mooring System Design - Drillsafe

7

Proof Load and MBL

Page 8: Releasable Mooring System Design - Drillsafe

8

Nested for Transit

THE OFFSHORE MOORING AND SUBSEA COMPANY

Eliminates need for AHTS

Minimize personnel exposure

Eliminate AHTS weather downtime

Maximize time savings

Rig immediately ready for transit

Page 9: Releasable Mooring System Design - Drillsafe

9THE OFFSHORE MOORING AND SUBSEA COMPANY

Basis of Design

MODU Mooring in Australian Tropical Waters Guideline

Page 10: Releasable Mooring System Design - Drillsafe

10THE OFFSHORE MOORING AND SUBSEA COMPANY

Departure Study

Page 11: Releasable Mooring System Design - Drillsafe

11THE OFFSHORE MOORING AND SUBSEA COMPANY

Cyclone Response on Paper

• T-time calculation for current operations• Operations to be completed for rig avoidance readiness• Weather Forecast • Proposed MODU avoidance path/location• Non-essential personnel mobilisation• Vessel mobilisation post release

Page 12: Releasable Mooring System Design - Drillsafe

12THE OFFSHORE MOORING AND SUBSEA COMPANY

RARPlus Training

Title Holder MODU Operator AHV Crew

Page 13: Releasable Mooring System Design - Drillsafe

13THE OFFSHORE MOORING AND SUBSEA COMPANY

Equipment

• (Set) Anchor, Chain and Wire per leg

• (Set) 1 RAR Plus per leg

• (Set) 1 Trigger Sleeve per leg

• (4) Spare RAR’s and (4) spare end cap

• (2) Hydraulic Service Unit (HSU)

• (2) Command Units and (2) 1120 Transducers w/ deployment reels

• (1) RAR Test/Diagnostic Unit per AHTS

• (1) Spare mooring leg

Page 14: Releasable Mooring System Design - Drillsafe

14THE OFFSHORE MOORING AND SUBSEA COMPANY

Offshore Operations

Page 15: Releasable Mooring System Design - Drillsafe

15

Release Video

Page 16: Releasable Mooring System Design - Drillsafe

16

Q & A