2. Authorize staff to proceed with procurement and construction within the budget allowance.
Town Centre Park Lafarge Lake Washroom - Final Design and Budget Approval
Report Purpose:The purpose of this report is to seek Council approval of the final detailed design for the Town Centre Park Lafarge Lake Washroom and seek approval to proceed with the procurement process.
City ManagerGeneral Manager Civic Lands and FacilitiesGeneral Manager Parks, Recreation and Culture Services
1. Approve the final design for the Town Centre Park Lafarge Lake Washroom and;
Background:Town Centre Park is the urban jewel in the City’s park system and is wellloved by residents and visitors alike. On March 5, 2018, Council approved the Town Centre Park Master Plan (TCPMP) to outline a 20-year vision to guide the park’s ongoing development. Following adoption of the TCPMP,consistent with the plan’s implementation strategy, staff were directed to proceed with the implementation of a select list of priorities beginning with Festival Lawn and Washroom improvements. Lake Loop Improvements, and
Strategic Goal:This initiative aligns with the City’s corporate Strategic Goals of Healthy Community and Active Citizens and Sustainable Services, Environment andInfrastructure. The development of the Town Centre Park Phase OneImprovements is an “B” Priority in the 2020 Business Plan.
August 28, 2020Our File: 12-6100-20/64081/1
3812866.V1
Recommendations:That Council:
J
'f
File #: 12-6100-20/64081/1 Doc #: 3812866.V1
Below are some of the building’s key features which aim to provide the broadest public benefits and best value:
a new washroom at the southwest corner of Lafarge Lake attached to the Evergreen Cultural Centre (Attachment 1).
This new, simple washroom building is attached to the Evergreen Cultural Centre (ECC) and will have two universal stalls. The new washroom is intended to reflect the form and character of the new Festival Hub Washroom in order to maintain a consistent design aesthetic within the Park. The washroom will primarily service the users of the Park, but its location (Attachment 2 - Al.l Site Plan) will also make it reasonably accessible to the users of Lafarge-Lake Douglas SkyTrain station.
Following endorsement from Council on June 15, 2020 of the concept design. City staff commenced the design development process for this new facility.
This report provides Council with the final design and budget for the new washroom, which can proceed independently of other proposed lake loop improvements. It is anticipated that procurement will start mid-September2020, with construction beginning in October 2020 and completion in April/May 2021.
To expedite the process for this relatively straightforward project, staff has concurrently commenced the building permit process for the new washroom in advance of construction start in October 2020, should Council approve the recommendations in this report.
A few locations were reviewed to determine the most suitable location for this washroom while considering future development in the TCPMP, the availability and access to services (water, sanitary and hydro), building code constraints, accessibility to and from the main lake loop pathway, visibility. Crime Prevention Through Environmental Design, (CPTED) considerations, maintenance requirements, and cost.
Discussion:Staff has retained the same consultant team leading the Festival Hub,Servery and Washroom improvements to design this newest washroom inTown Centre Park. To date, significant efficiencies have been achievedthrough the planning and design phase as a result of knowledge gained during the implementation of the Festival Lawn improvements.
Page 2August 28, 2020
staff will minimize disruption to park users duringthe construction phase
File#: 12-6100-20/64081/1 Doc #: 3812866.V1
The City’s estimated annual operating cost for the washroom is $34,000 and, would be an operating tied to capital budget submission in the 2021 budget to cover the operational costs for a portion of 2021 upon the building being completed. The breakdown of the costs is listed below:
Facility Operations ConsiderationsAs part of the completion of the detailed design, staff has determined the estimated cost to maintain the washroom. This will help inform Council of the annual maintenance, component replacement and operational costs of this additional park asset on the City budget.
$26,000$ 8,000 $34,000
Evergreen Washroom Building Costs Operations and Maintenance_____Component Replacement
Construction ProcurementSubject to Council approval of this report, staff intends to proceed with a public Request for Proposals for construction services for the new washroom facility in mid-September 2020 followed by a construction start date of October 2020 and anticipated completion in April/May 2021.
• Two universal washrooms including mechanical service room;• Precast concrete structure with nail laminated timber (NLT) roof
to mimic the new Festival Hub Servery and Washroom building adjacent to TD Community Plaza;
• Cost saving achieved by connecting directly to the existing ECC plumbing and electrical systems;
• Externally accessible water fountain and bottle filler to service park users;
• Soffit lighting to enhance visibility, surveillance and safety; and •- Visible, simple, and clear washroom identifier signage.
The new washroom facility will also include lighting on the perimeter of the building for safety and wayfinding. Additional lighting will be added along the pathways from the Lakeside Loop Trail and from Guildford Way as part of the Lakeside Loop Trail Improvements that will come forward to Council in the fall. Floorplans and renderings are included in Attachment 1.
Page 3August 28, 2020
TOTAL;Costs do not include an estimated cost of $8K for asset replacement contribution.
r
A-
s
i
File#: 12-6100-20/64081/1 Doc #: 3812866.V1
Financial Implications:A “Class A” cost estimate has been completed by a qualified quantity surveyor in conjunction with the Carscadden Stokes McDonald Architects team of consultants.
This report was prepared by Scott Groves; Director Strategic & Capital Projects, and reviewed by Lanny Englund, Manager Park Planning and Forestry,Pinky De La Cruz, Manager City Assets, Andre Isakov, Park Planning & Design Manager, Kathleen Vincent, Manager Corporate Communications, and Gorana Cabral, Manager Financial Planning & Budgets.
and work with Evergreen Cultural Centre (ECC) staff to minimize any potential impacts to their operations. As a proactive measure, staff has appointed a liaison to provide ECC staff with regular updates throughout the duration of the project.
The projected construction cost of the new washroom facility is within the allocated budget that has been approved by Council for the Lake Loop Improvements per the TCPMP.
Attachments:1. TCPMP Excerpt ECC Washroom (CEDMS #381572?)2. Town Centre Park Lafarge Lake Washroom - Site Plan, Floor Plan &
Renderings (CEDMS #3808472)
Conclusion:The development of the Town Centre Park Phase One Improvements is a “B” Priority in the 2020 Business Plan. The detailed design of the Town Centre Park Lafarge Lake Washroom has been completed, and a Class A cost estimate received arid reviewed by the consultants, professional project managerand staff. It is projected that the project as designed can bedelivered within the approved budget. Staff requests approval from Council to proceed with the procurement and construction within the approved budget as detailed in this report.
Page 4August 28, 2020
ATTACHMENT #1
Fig.56 Evergreen Cultural Centre in Coquitlam
Fig.57 Evergreen Cultural Centre in Coquitlam
Detailed Design Directions I 29
• To provide access to washrooms and drinking water
Character and Scale:• Character, size and scale: Retain and
match existing building design
Intent:• To provide access to an existing
facility that supports daily park users in the Green Commons
v'
Elements:
2.1.1.5 RESTROOM ACCESS AT EVERGREEN CULTURAL CENTREA feasibility study is to be conducted to determine if external access to the restrooms in the Evergreen Cultural Centre is possible.
Wayfinding: Clear signage for the restroom location
Sufficient lighting at and around the facility integrated with the structure where possible
Water fountain/bottle refill
Bike racks
Recommendations:• Provide sufficient lighting in the
surrounding area
• Provide a universally accessible path to the facility
• Provide drinking fountains and bottle fillers
• Use of feature colour and character for all facilities to strengthen the sense of identity
4.2.2.1 PRELIMINARY OPINION OF PROJECT COST
PRIORITY: SHORTTERM (2018-2022)Land Use
Zone Item # Action Guideline
SOI N/A SOS $600,000,00Section 3.4.1 $1,000,000.00
A
UwnS02 10000 S04 Section 3.3.1
TOTAL COST OF ZONE A PROJECTS
B S03 Park Core: Play Area 14800 SO2, S03 $1,000,000.00Section 3.3.2 $2,500,000.00
S04 Park Core: Water Play SOI, S031900
SOS 110800 S07 $400,000.00 $500,000.00
S06 New Connection 3100 S06 $800,000.00 $1,500,000.00
C S07 On Water 1400 $500,000.00 $800,000.00
S08 Garden Walk 6700 506 Section 3.4.10 $700,000.00 $1,000,000.00
S09 Creat^cces^^restmon^ v̂ei^ree^CulturaKent̂ N/A
SIO Town Centre Park Strategy N/A Section 3.4.3 $75,000.00 $100,000.00
Sll Town Centre Park Strategy N/A Section 3.4.4 $25,000.00 $50,000.00
512 Town Centre Park Strategy N/A $25,000.00Section 3.4.7 $50,000.00
S13 Town Centre Park Strategy N/A Section 3.4.13 N/A N/A
S14 Town Centre Park Strategy N/A Srction 3.4.2 N/A N/A
SIS Town Centre Park Strategy N/A N/A N/A
516 Town Centre Park Strategy N/A N/A N/A
517 Town Centre Park Strategy N/A
TOTAL COST OF SHORT TERM PRIORITY PROJECTS
$6,625,000.00 $12,500,000.00
44 I Coquitlam Town Centre Park
Facility
Water Area
Understory
Facility
Enhance the health and quality of the forested areas including the understory surrounding the lake.
Section 3.3.1Section 3.4.2
Notes:Adjustments for construction cost escalation and inflation are not included.
Section 3.3.1Section 3.4.8Section 3.4.9
Section 3.3.1Section 3.4.6
Related Projects for Consideration
Town Centre ParkGreen Commons: Evergreen Cultural Centre
Green Commons:North and South Lake Margins___________Green Commons:North and South Lake Margins___________Green Commons: North and South Lake Margins
Green Commons: Festival > ,• .Lawn »*2,.
Provide more open space and amenities for Informal recreation and picnicking.__________________________Weather Protection: Use durable, well-designed materials and appropriate landscaping to make the site more comfortable for users and increase the longevity of site elements over time.
Section 3.4.12________________ Section 3.4.13TOTAL COST OF ALL STRATEGIES
Section 3.4.12Section 3.3.1Section 3.4.1Section 3.4.13
Add restroom and storage facility at future Festival Hub. Festival Lawn: Expand Festival Lawn westward into existing BMX park to provide additional open space available to a variety of park programs and activities. Improve areas to provide support for large festival events such as Canada Day celebration.
Expand, update and improve children's play area to include unique play elements accessible to children of all ages and abilities. Remove two existing volleyball courts and retain four Sand Volleyball Courts._______________Upgrade and expand Water Play to be dynamic and appealing for a wide range of age groups and abilities.
Wayfinding: Develop a site-wide signage and visual identity strategy to emphasize its unique character and importance._____________________________________Lighting: Develop a site-wide lighting strategy for the Park to address the multiple lighting needs.________________Operational review of parking lots and encourage multiple programming opportunities.________________________Furnishings and Elements: Develop a site-wide furnishing be developed to address the multiple needs. Emphasize park system of looped park paths through consistent pathway surface treatments, colours, nodes and wayfinding signage.____________________________Material Quality: Introduce unique and cohesive identifying colours and material palette for the park, to be used to create a sense of place through repeated use on park elements,
$3,000,000.00
$5,500,000.00
$1,300,000.00
$2,300,000.00
$1,200,000.00
$2,200,000.00
$1,000,000.00
$1,600,000.00
$300,000 00
$2,700,000.00$700,000.00
$4,500,000.00
Improve pathway loop around Lafarge Lake including a new connection through the north lake area. Introduce "on the water" areas such as decks and wharfs for better access to the water as well as a dedicated locatlon(s) for fishing.___________________________ __Garden Walk: Design a significant horticultural feature that extends from the Inspiration Garden, and weaves through the park and ends at Pinetree Way and Trevor Wingrove Way.
Location/Category_______Green Commons: Festival Hub
Section^A^_
TOTAL COST OF ZONE C PROJECTS
Probable Cost Range Low High
Section 3.3.2
TOTAL COST OF ZONE B PROJECTS
_________N/A$125,000.00
_________N/A$200,000.00
Approximate [Area (m^)
'■'as-
-3
COQUITLAM INNOVATION CENTRE
LEGEND
EVERGREEN CULTURAL CENTRE
► WC ACCESS
VIEW TO WC
NEW WASHROOM BUILDING
EvtrgraM WMhmom
SHE PLAN
M OS
2008 RB 2000
SUltOFoROWAVPROPERTY UNE
cA1.1
ATTACHMENT»2
DENSITY OF PEDESTRIANTRAFFIC
I
nOSnmtrwWiyCoqulllwn
foArr" ** mmoxi aw > j*
b. ar <«»<
APPROXIMATE'SCTENT OF TREE CANOP*
1
r
CarscMdw StflkM Mct>onaUAi-dtfhKXsin&
Vafxouwr. BC V6* IW
>
o X3 m z H S
DOSTING KIOSK
- ■ -
TO LAFARGE LAKE
EXISTING PATH
6.IM (2O’-O“)
ROOF OVERHANG
CONCRETE APRON
2
'4*wrTeDr«CAM.i
TO GUILDFORD WAY■LTWLET
JEvergreen WMhroomEFLOORPLAN
M 68
SOOS
o 7T(7 <7/ Is 1/ oA2.1<
IM
5?
WALL-MOUNTED CHANGE TABLE
0.6M(2-0^
0.6M (2-03
MOPSINK (MECHANICAL ROOM)
TOEVERGREEN CULTURAL CENTRE
S
I
1205 Pinetree WayCoquHIm
III
MECH.ROOMEp3
TOILET ROOMEK]
eM 6531S30 »ello«<<ar«CKht*(Lc«LKancaddanArtn
DRINKING FOUNTAIN W/ BOTTLE nilER
\ '
Can
I
3JM (Iff-O IM t.1M (atf-cT)t
36 SOO EG L Jn
EXISTING MASONRY VMLl- MBMED ROOF RECESSED UNEM UGHT
ncusr CONCROE
cvwEsroirr «wow
HEWr DiriY UETN. DOOR
* 35 500 EG
Cerecadden
+ZLZ7T TZZZX z J T7T^5Evargreen Washroom
SECTIONS
<!> 32 500 EG
85
MJ6 20202003
1:25
SECTION SECTIONSCALE 1:25 SCALE 125
A3.1
.4•1
(2>
TOUT ROOM fon
TOUT ROOMroTi
(3>
I5
I-------GROUND MUdCEWTO EX5TMG BUUMO APPROX. + 35 ODD
TOUT ROOM
1205 PlnatTMCoquMm
5c.
s
OffUMlan StohM axcOoMUArtMncBl71SeKtH«»'«»SO V«vu»rMr. K V&A 1R
/\//
7
1 3 »W63S -noT J
wtff wrt tniot
ELEVATION
ELEVATIONSCALE 125 SCALE 1.25
MMTmNRCetMCt.
Ceracadden
J 1205 Pinetm WayCoqufllamLA
CONCKTC. FMNTCD-
Evergreen WaehroomCONOCIE. nWflED-
TfflCN. ELEVATIONS
AJ es
SOOSNie SOSO
Ids
ELEVATION
A4.1SCAl£1;25
■
J
OI
IT
t
/ 1a
iS'
(3>
(2>
CONOCIE MMED
COIOC1E MMED
PREnCHEO MCTM. nectt
MOM. nwc PMffED
FUL HOCHT ASmeiL PAIRED
PRETNSHED Mn< PASO
COPCHETE PMNTED
LMMATED IBflCR STAMED —
(i>
hdoAu'VMdtft «* »C«na(WinAie>earuAddvtxa
'i
Os
JS
HEWr DUTY HOUOV. ICIN. DOOR PMNTED
Cancaddcf, StOkM McDonald AKNtMts Inc.
EMt «'»•(VanaxMf. K V6A TU
ir. BC V8A IRS
Evergreen Wathroom
RENDERS
os
2005 AM 2020
tJS
A10.1
J
120SPhMtn*W«yCequlten
r
(•TtcAtMensttfkM McDonald ArcMnaa Inc. "'SfanHMi-tiaw.'^ncowmr. BC V8A1R3
604 «33 'tao ^'eVoAca'Kaddcnxa(‘OnodMnAKh ^^nuManca
ig^saesggasi!Rca^OS?«
(arvM4«p MokM
•1
Caracadden
Evergreen Waehroom
RENDERS
M OS
2009 MJe 2020
1:29
A10.2
-’1
<'v.
'V
i ■ 1
1120SPImtrMW«yCoqulton
dw<3) 'ssn
MancxMvnArth<«rtu4el«n.c«
K. ■
, ' IM A -
-
Evergreen Wwhmom
RENDERS
05
200 MM 2020
1:20
- 1
Al 0.3
1205PlMtrMW«yCoquilian
«<M«39 'no
9Unc»iM«nArtf«e«nud4an<a
C«rs(M««n McDonald Af cMaen Inc71S Cm Hau •<% S(*e»( Vw.ouv9f. BC V&K 1R3
•et5?w
Car,
Evergreen Washroom
RENDERS
M GS
2009 MA 2020
1:25
'*?
Al 0.4
1205PlmtrMW«yCoquitlam
Mohn AfchMocca tne.
■5£«« v.,<v-.ou«K ec V6A IW