• Important to engage all dredgers in discussion
• Most entrepreneurial business
• Multiple investments amounting to several $100’s of millions dollars even without a commitment.
Regionalization - A Dredger’s Perspective
Foundational Issues (why?)
• Schedule
– Typically time to permit
– Time to contract
• Costs
– Always a question
– Best attitude is what can I do to lower costs?
Regionalization A Dredgers Perspective
Has this been done before?
ABSOLUTELY!
Regionalization A Dredgers Perspective
Experience
- SANDAG (Non- Corps) - PKS (Non- Corps)
- West Coast Hopper - NC Beaches
Upcoming
- Delaware Beaches - SAD Hopper
- Houston - RSM
Regionalization A Dredgers Perspective
Promise - Efficient Execution
- Better management
- Regulatory motivation
- More streamlined schedule - Utilize dredges for their purpose not towing
- More bidders
- BETTER bids
Regionalization A Dredgers Perspective
Reality - Efficient Execution
- Better management - Transparency
- Regulatory - Transparency
- More bidders
- BETTER bids
Regionalization A Dredgers Perspective
The Big Nut – Mob & Demob –
Many moving parts – all expensive
Dredge
Support Equipment
Pipeline
Shore Equipment
Weather
Regionalization A Dredgers Perspective The Big Nut – Mob & Demob (Shared) SAFETY – EVERYONE INVOLVED Crews (Some cases over 100 persons mobilized) • Salaried • Shoreside • Waterside Organization • Mob & Demobs Inherently more dangers/risks • Hand over meeting • Task oriented briefings
Regionalization A Dredgers Perspective
The Big Nut – Mob & Demob (Shared)
Dredge & Support Equipment
- Prep for tow
- Tow
- Breakdown at Site
Regionalization A Dredgers Perspective
The Big Nut – Mob & Demob (Partially Shared)
Pipeline (Floating, Submerged, and Shore Line)
- Prep for tow
- Tow
- Truck to Site
Regionalization A Dredgers Perspective
The Big Nut – Mob & Demob (Partially Shared)
Shore Equipment (Dozers, Pipe Handlers, Fill Office, Light Plant)
- Load out
- Transport
- Unload
Regionalization A Dredgers Perspective The Big Nut – Mob & Demob (Shared) Summary of Equipment
- Waterside tow to Site - Dredge, Supply Barge, Anchor Barge, Derrick Barge, Float
Hose, Fuel Barge, Air Compressor Barge, Tending Tugs, Rafts of submerged pipeline (approx 5,000’)
- Shoreside (partially shared) - Shore pipeline say 10,000’ beach (42 Trucks) - Dozers & Loader (5-10 Trucks) - CRAB (2 Trucks) - Fill Offices, Light Plants, & Misc Support Equip (10-15
Trucks)
Regionalization A Dredgers Perspective
The Big Nut – Mob & Demob (Fixed Cost)
- Waterside Preparations
- Stage equipment in closest Inlet/Port
- Unraft, prepare, and lay submerged pipeline
- Prepare dredge for work
- Tow dredge to site
- Connect dredge to floating and submerged pipeline
- All very weather dependant
Regionalization A Dredgers Perspective
The Big Nut – Mob & Demob (Fixed Cost)
- Shoreside (partially shared)
- Land submerged Pipeline
- Setup Staging Area
- Lay initial pipeline
- Accept shipment of trucks
- Perform surveys
Regionalization A Dredgers Perspective
Experience
SANDAG (2x)
• 5 counties
• 7 beaches
• 1 owner
Regionalization A Dredgers Perspective
Experience
Pine Knoll Shoals (2x)
• 2 Towns
• 2 Beaches
• 1 Bid
• 2 Contracts
Regionalization A Dredgers Perspective
Experience
West Coast Hopper Contract
• 3 Districts
• 5 projects
• 1 contract
Regionalization A Dredgers Perspective
Experience
North Carolina Beaches (2x)
• 1 District
• 5 projects
• 1 contract
Regionalization A Dredgers Perspective
Proposed
Delaware Beaches – Sandy Work
• 1 District
• 3 projects
• 1 contract
Regionalization A Dredgers Perspective
Proposed
SAD Hopper Contract
•3 Districts
•5 projects
•1 contract
Regionalization A Dredgers Perspective
Proposed
Houston Cutter Suction Contract
• 1 Districts
• 5 projects
• 1 contract
Regionalization A Dredgers Perspective
Proposed
Regional Sediment Management
- Combining Authorities to do the right thing!
- Beneficial Use of Dredging Material
Regionalization A Dredgers Perspective
Cautions
- Include all projects at bid time, don’t piggyback - Have money and permits in place, options add risk - If non-Corps project, focus on boilerplate contract.
Needs to be adaptive for dredging - Engage dredgers early, industry days work
Draft Plans & Specifications
Regionalization A Dredgers Perspective
Cautions
- Be flexible on schedules, lots of scheduling issues for dredgers
- Fix dates and priorities if necessary, but understand cost impact.
- Start date unimportant, finish date is important don’t include unnecessary constraints
Regionalization A Dredgers Perspective
Cautions
- When owner is engaged, prices drop
- There is no way to increase work requirements and lower costs. Help yourself by being flexible where possible.
- Allow and encourage innovation
- Reduce Risk