Regional Master Plan Kick-off
Campus Presentation
January 31, 2007
![Page 2: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/2.jpg)
Mission
North Shore Community College is a source of hope and opportunity and a regional leader for social and economic change.
Blending tradition and innovation, liberal arts and career preparation, intellectual development and cultural and personal growth, we foster a diverse and caring community of learners where all are welcome and each is challenged.
We offer lifelong education responsive to changing community needs, a global economy, evolving technology and the shifting roles faced by individuals and institutions.
Our greatest contribution to the commonwealth is the success and achievement of our students.
![Page 3: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/3.jpg)
Vision
North Shore Community College will be a catalyst for personal, community and regional change through education, training and civic engagement.
The College will serve as a beacon of hope and opportunity for an increasingly diverse student body and be a respected, full partner with other public and private organizations seeking better lives for North Shore residents and a vibrant future for the region.
![Page 4: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/4.jpg)
![Page 5: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/5.jpg)
![Page 6: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/6.jpg)
Campus Profile
4 campus locations (Danvers, Hathorne/Aggie, Lynn, Cummings Center/Beverly)
– 4000+ FTE (approx. 6900+ credit headcount)– 2500+ non-credit headcount– 80+ prog. of study
• Career,Liberal Arts,Transfer• Technical Training
– 130 Full-time faculty – Approx. 400 adjuncts
![Page 7: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/7.jpg)
![Page 8: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/8.jpg)
Danvers Campus
ACRES – 65.85• Landscaped – 7.77
• Roads & Parking – 13.40
• Wet Lands – 44.68
ParkingTotal Parking Spaces - 1054
![Page 9: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/9.jpg)
Danvers Campus
Frederick E. Berry Building (2003)
Health Professions & Science Building (1994)
Friends Building (1993)
Service Buildings
![Page 10: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/10.jpg)
Danvers – Berry Building
![Page 11: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/11.jpg)
Danvers Campus
FREDERICK E. BERRY BUILDING• Built 2003
• 106,000 Square Feet• GP and Specialized Classrooms
• Library
• Cafeteria
• Office Space
![Page 12: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/12.jpg)
Health Professions & Science
![Page 13: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/13.jpg)
Danvers Campus
HEALTH PROFESSIONS & SCIENCE BUILDING• Built 1985
• Purchased 1990 - Renovated 1994
• 84,000 Square Feet• GP & Specialized Classrooms
• Labs
• IT Infrastructure
• Offices
• Bookstore
• Shipping & Receiving
![Page 14: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/14.jpg)
Friends Building
![Page 15: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/15.jpg)
Danvers Campus
FRIENDS BUILDING• Built 1993
• 2,400 Square Feet• Facilities Management Offices
![Page 16: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/16.jpg)
Danvers Campus
Service Buildings• Maintenance Garage – 1,800 SF
• Maintenance Shop – 900 SF
• Maintenance Shed – 975 SF
![Page 17: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/17.jpg)
Danvers Campus
![Page 18: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/18.jpg)
Essex Aggie Campus
Acquired Postsecondary Programs 1999 Maude Hall Berry Hall Agricultural Engineering Building Small Animal Building Greenhouse
![Page 19: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/19.jpg)
Maude Hall
![Page 20: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/20.jpg)
Maude Hall
Built 1920 – Annex 1971 21,467 Square Feet
• Specialized Spaces• LPN
• Surgical Technology
• Veterinary Technology
• Cosmetology Space
• GP Classroom
• Offices
![Page 21: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/21.jpg)
Berry Hall
![Page 22: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/22.jpg)
Berry Hall
Built 1968 35,096 Square Feet GP Classrooms Specialized Space
• Culinary Arts /Food Science
• Horticulture/Floriculture
Offices
![Page 23: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/23.jpg)
Agricultural Engineering Building
![Page 24: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/24.jpg)
Ag Engineering Building
Built 1969 3,560 Square Feet
• Specialized Space• Environmental Technology
![Page 25: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/25.jpg)
Small Animal Building
![Page 26: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/26.jpg)
Small Animal Building
Converted to Current Use 1976 2,400 Square Feet
• Specialized Space• Veterinary Technology & Animal Care
![Page 27: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/27.jpg)
Greenhouse
![Page 28: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/28.jpg)
Greenhouse
Built 1969 1,824 Square Feet
![Page 29: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/29.jpg)
Essex Aggie Campus
![Page 30: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/30.jpg)
Lynn Campus
ACRES – 15• Landscaped - 10.3
• Roads & Parking - 4.7
Parking• Total Parking Spaces - 466
![Page 31: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/31.jpg)
Lynn Campus
McGee Building (1983) Modular Classroom Building (2003)
MBTA Building (Lease through 2010)
![Page 32: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/32.jpg)
Lynn Campus – McGee Building
![Page 33: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/33.jpg)
Lynn Campus
Thomas W. McGee Building• Built 1983 (Opened Fall 1985)
• 160,000 Square Feet• GP Classrooms
• Labs
• Offices
• Library
• Gym
• Cafeteria
![Page 34: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/34.jpg)
Lynn – Mod Building
![Page 35: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/35.jpg)
Lynn Campus
MODULAR CLASSROOM BUILDING• Built 2003
• 3,000 Square Feet• GP Classrooms (4)
![Page 36: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/36.jpg)
Lynn Campus
Service Buildings• Maintenance Garage – 1,350 SF
• Maintenance Shed – 200 SF
![Page 37: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/37.jpg)
Lynn – MBTA Building
![Page 38: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/38.jpg)
Lynn Campus
MBTA BUILDING Leased Space – 16,500 SF
• GP Classrooms
• Offices
• Police
• Storage
![Page 39: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/39.jpg)
Lynn Campus
![Page 40: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/40.jpg)
Beverly
![Page 41: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/41.jpg)
Beverly Campus
CUMMINGS CENTER (Lease through 2009)
Institute for Corporate Training and Technology
Leased Space – 14,052 SF• GP Classrooms
• Specialized Classrooms
• Office Space
![Page 42: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/42.jpg)
Recent Renovations/Adaptations
Lynn Open Computer Lab Enrollment Center – Lynn Lynn Gym Lighting and Sound Maude Hall – LPN and Surg Tech area Lynn Bookstore Honors Program Lounge
![Page 43: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/43.jpg)
Lynn – Open Computer Lab
![Page 44: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/44.jpg)
Lynn – Enrollment Center
![Page 45: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/45.jpg)
Lynn Gym
![Page 46: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/46.jpg)
Recently Completed & On-going Projects
Danvers Consolidation Plan Study Lynn Energy Performance Project Lynn 65kw Passive Solar Project H P & S Roof Project – 6/07 McGee Roof Project – 7/07 McGee Chiller #1 Replacement – 6/06
![Page 47: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/47.jpg)
Physical Planning Concerns
Danvers• Campus Access (Roads)
• Parking
Lynn• Parking
Green Building & Sustainability Goals
![Page 48: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/48.jpg)
Physical Planning Concerns
Flexible Learning Spaces Meeting/Community Spaces Performance Space Fitness areas Specialized labs Student Union/Commons Student Learning/Study Area
![Page 49: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/49.jpg)
Status of Technology Infrastructure
Increasingly Complex Network & Services• 70+ servers support academic & administration
• 1400 desktops & laptops
• Secure wireless at all campus locations
• 10MB Internet connection
• 20+ internal T1s for voice & data
• Robust integrated online services
• Multi-campus adds to overhead / complexity
![Page 50: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/50.jpg)
Technology Infrastructure – Future Considerations Flexible Learning Spaces
• Smarter classrooms Increasing Bandwidth Requirements
• Possible building to building wireless solutions• Multiple ISP and entry points
Redundancy and Disaster Recovery Diverse Security Measures
• Biometrics?, Card based access to buildings? Computing Capacity @ Danvers / Lynn Data Centers
• Move towards virtual servers • Smaller rack mounted devices
Digital Imaging
![Page 51: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/51.jpg)
Strategic Academic Directions –Overview Curricula for the 21st Century Workforce and Economic Development Demographic Growth areas (immigrant populations) Faculty offices, conference, resource spaces Space to accommodate flexible learning options Advising and Career planning Community based programs (Project YES, Youth
Program, Gang Prevention, Basic Adult Education)
![Page 52: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/52.jpg)
Strategic Academic Directions Danvers Consolidation Study Lynn Academic Building expansion Health and life sciences expansion in Lynn (Dental
Hygienist Program, CNA, LPN, Sterile Processing etc.)
Workforce Development and Corporate training – entrepreneurial center
Emerging technologies including green industries
![Page 53: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/53.jpg)
Strategic Academic Directions Continued
TV/Media production program ESL, Business Administration, Early Childhood
Education Breaking Through initiative (CDA) Liberal Arts/Honors Other
![Page 54: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/54.jpg)
Issues and Concerns Gym study/Performance Space - Lynn Recreational and Fitness Athletic Fields - Lynn Parking/transportation/shuttle Community Needs Assessment/Image Enrollment/student financial services/student
support/advising/tutoring spaces Outreach programs (connections with
Elementary, Middle Schools, High Schools)
![Page 55: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/55.jpg)
Issues and Concerns Continued ADA issues Green/Sustainability plans Status of technology/infrastructure Flexible and shared spaces Storage and Archive space EdLink Access Road – Danvers/Aggie NEASC Accreditation (2009) and Strategic
Plan 2009-2013
![Page 56: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/56.jpg)
Essex Aggie Campus
![Page 57: Regional Master Plan Kick-off Campus Presentation January 31, 2007](https://reader036.fdocuments.us/reader036/viewer/2022062301/56814a4a550346895db76735/html5/thumbnails/57.jpg)
Status of Danvers Consolidation Study – Rosalyn Elder DCAM