REGIONAL INTERCONNECTIONS
• Kenya’s geographical position makes it an ideal hub for regional power interconnections in the region
• GOK through KETRACO is therefore involved in all the regional initiatives and is currently undertaking the following:
• Eastern Africa Power Interconnector;
• Lessos-Tororo NELSAP Project; and
• Kenya-Tanzania
![Page 2: REGIONAL INTERCONNECTIONS - ICA - The · PDF file · 2013-03-19REGIONAL INTERCONNECTIONS ... 132 kV Jinja-Nairobi line ... PowerPoint Presentation](https://reader034.fdocuments.us/reader034/viewer/2022052319/5ab7ab4c7f8b9ac60e8bd96e/html5/thumbnails/2.jpg)
2
• The proposed 500 kV HVDC line with a power
transfer capacity of 2000MW will originate
from Wolayta-Sodo in Ethiopia and terminate
at Suswa in Kenya.
• The total length of the proposed transmission
line is approximately 1045 km, out of which
approximately 433 km will be in Ethiopia and
612 km in Kenya.
Eastern Africa Interconnector
![Page 3: REGIONAL INTERCONNECTIONS - ICA - The · PDF file · 2013-03-19REGIONAL INTERCONNECTIONS ... 132 kV Jinja-Nairobi line ... PowerPoint Presentation](https://reader034.fdocuments.us/reader034/viewer/2022052319/5ab7ab4c7f8b9ac60e8bd96e/html5/thumbnails/3.jpg)
3
Eastern Africa Interconnector
• The routing in Ethiopia is in a southerly
direction along Lakes Abaya and Chamo, via
Konso to the Ethiopia - Kenya border.
• It will cross the border approximately 90 km
West of Moyale town and traverse Marsabit,
Samburu, Isiolo, Laikipia, Nyandarua and
Nakuru Counties of Kenya.
![Page 4: REGIONAL INTERCONNECTIONS - ICA - The · PDF file · 2013-03-19REGIONAL INTERCONNECTIONS ... 132 kV Jinja-Nairobi line ... PowerPoint Presentation](https://reader034.fdocuments.us/reader034/viewer/2022052319/5ab7ab4c7f8b9ac60e8bd96e/html5/thumbnails/4.jpg)
4
Eastern Africa Interconnector
• Converter substations
• The Substations at both ends of the line will have:
– 2 x 1000 MW HVDC converters at Wolayta/Sodo and Suswa
– and
– 400/220 kV AC substations
![Page 5: REGIONAL INTERCONNECTIONS - ICA - The · PDF file · 2013-03-19REGIONAL INTERCONNECTIONS ... 132 kV Jinja-Nairobi line ... PowerPoint Presentation](https://reader034.fdocuments.us/reader034/viewer/2022052319/5ab7ab4c7f8b9ac60e8bd96e/html5/thumbnails/5.jpg)
5
Eastern Africa Interconnector
Project Status
• The project is currently at the stage of bid document preparation.
• Financing by World Bank, African Development Bank and the French Development Agency has been confirmed and construction is expected to start by 2013 and commissioning in 2016
• KPLC and EEPCO have a signed a power purchase agreement for an initial 400 MW which will be increased as demand grows.
![Page 6: REGIONAL INTERCONNECTIONS - ICA - The · PDF file · 2013-03-19REGIONAL INTERCONNECTIONS ... 132 kV Jinja-Nairobi line ... PowerPoint Presentation](https://reader034.fdocuments.us/reader034/viewer/2022052319/5ab7ab4c7f8b9ac60e8bd96e/html5/thumbnails/6.jpg)
6
LESSOS-TORORO: Project Scope
TORORO
LESSOS
127 km of 220 kV double circuit transmission line Additional transformers and reactors at Lessos
Line route along alignment of existing 132 kV Jinja-Nairobi line
MUSAGA
300 MW transfer capacity with existing 132 kV line
6
![Page 7: REGIONAL INTERCONNECTIONS - ICA - The · PDF file · 2013-03-19REGIONAL INTERCONNECTIONS ... 132 kV Jinja-Nairobi line ... PowerPoint Presentation](https://reader034.fdocuments.us/reader034/viewer/2022052319/5ab7ab4c7f8b9ac60e8bd96e/html5/thumbnails/7.jpg)
7
Lessos Substation
S/S Arrangement Scope
Works include:
• Extension of the existing 220 kV bus and addition of three more
• Two 90 MVA transformers
• Compensation reactors
7
![Page 8: REGIONAL INTERCONNECTIONS - ICA - The · PDF file · 2013-03-19REGIONAL INTERCONNECTIONS ... 132 kV Jinja-Nairobi line ... PowerPoint Presentation](https://reader034.fdocuments.us/reader034/viewer/2022052319/5ab7ab4c7f8b9ac60e8bd96e/html5/thumbnails/8.jpg)
8
LESSOS-TORORO: STATUS
• The project is fully funded by the African Development Bank.
• Construction is scheduled to start in late 2012 and commissioning in late 2014.
![Page 9: REGIONAL INTERCONNECTIONS - ICA - The · PDF file · 2013-03-19REGIONAL INTERCONNECTIONS ... 132 kV Jinja-Nairobi line ... PowerPoint Presentation](https://reader034.fdocuments.us/reader034/viewer/2022052319/5ab7ab4c7f8b9ac60e8bd96e/html5/thumbnails/9.jpg)
9
Olkaria-Lessos-Kisumu
A 300 km double circuit 220 kV line from Olkaria-Lessos-Kisumu will integrate this project into the Kenya Grid. New 220 kV lines from Olkaria to Nairobi
KISUMU
LANET
LESSOS
9
![Page 10: REGIONAL INTERCONNECTIONS - ICA - The · PDF file · 2013-03-19REGIONAL INTERCONNECTIONS ... 132 kV Jinja-Nairobi line ... PowerPoint Presentation](https://reader034.fdocuments.us/reader034/viewer/2022052319/5ab7ab4c7f8b9ac60e8bd96e/html5/thumbnails/10.jpg)
10
Olkaria - Lessos - Kisumu
STATUS:
• The project is fully funded through JICA
• Construction is expected to start in late 2012 and commissioning in 2015
10
![Page 11: REGIONAL INTERCONNECTIONS - ICA - The · PDF file · 2013-03-19REGIONAL INTERCONNECTIONS ... 132 kV Jinja-Nairobi line ... PowerPoint Presentation](https://reader034.fdocuments.us/reader034/viewer/2022052319/5ab7ab4c7f8b9ac60e8bd96e/html5/thumbnails/11.jpg)
11
Nairobi Ring
![Page 12: REGIONAL INTERCONNECTIONS - ICA - The · PDF file · 2013-03-19REGIONAL INTERCONNECTIONS ... 132 kV Jinja-Nairobi line ... PowerPoint Presentation](https://reader034.fdocuments.us/reader034/viewer/2022052319/5ab7ab4c7f8b9ac60e8bd96e/html5/thumbnails/12.jpg)
12
Scope: 100km, 400kV, Double Circuit Transmission
Line; Suswa – Isinya, & Substations.
The Nairobi Ring will connect the proposed substations
of Suswa and Isinya to form an outer 400 kV system
around the Nairobi metropolis
It will also integrate the regional interconnections into
the national grid.
Nairobi Ring
![Page 13: REGIONAL INTERCONNECTIONS - ICA - The · PDF file · 2013-03-19REGIONAL INTERCONNECTIONS ... 132 kV Jinja-Nairobi line ... PowerPoint Presentation](https://reader034.fdocuments.us/reader034/viewer/2022052319/5ab7ab4c7f8b9ac60e8bd96e/html5/thumbnails/13.jpg)
13
Nairobi Ring
• It will take in supplies from the geothermal fields, wind power from Lake Turkana and power from Ethiopia at Suswa.
• At Isinya, it will connect to the Mombasa 400 kV line and Kenya Tanzania interconnection.
• Bid documents for the first phase of the project are being processed and construction will start shortly.
![Page 14: REGIONAL INTERCONNECTIONS - ICA - The · PDF file · 2013-03-19REGIONAL INTERCONNECTIONS ... 132 kV Jinja-Nairobi line ... PowerPoint Presentation](https://reader034.fdocuments.us/reader034/viewer/2022052319/5ab7ab4c7f8b9ac60e8bd96e/html5/thumbnails/14.jpg)
14
Zambia – Tanzania - Kenya Interconnector
Kenya - Tanzania
• The Kenya Tanzania power interconnection will link
the Isinya subsation to the Tanzanian power system at
Arusha through a 400 kV line that will continue to
Singida in central Tanzania, firmly connecting the
Kenya and Tanzania systems.
• Another line will continue south from Singida to
Zambia, thus linking East Africa with the South
African Power Pool.
![Page 15: REGIONAL INTERCONNECTIONS - ICA - The · PDF file · 2013-03-19REGIONAL INTERCONNECTIONS ... 132 kV Jinja-Nairobi line ... PowerPoint Presentation](https://reader034.fdocuments.us/reader034/viewer/2022052319/5ab7ab4c7f8b9ac60e8bd96e/html5/thumbnails/15.jpg)
15
Mombasa – Nairobi
Mariakani Military base
Major re-routing to avoid Five Ranchers
Underground cable near JKIA
Line crosses Tsavo National Park
![Page 16: REGIONAL INTERCONNECTIONS - ICA - The · PDF file · 2013-03-19REGIONAL INTERCONNECTIONS ... 132 kV Jinja-Nairobi line ... PowerPoint Presentation](https://reader034.fdocuments.us/reader034/viewer/2022052319/5ab7ab4c7f8b9ac60e8bd96e/html5/thumbnails/16.jpg)
16
Mombasa – Nairobi
Scope: 475km, 2400kV Double Circuit Transmission
Line & Substation works at Rabai and Embakasi .
Purpose: To increase power transfer capacity between
the Coast and Nairobi
Financier: ADB, AFD, EIB and GoK
Commencement: 2010 and Completion: 2012
The project is under construction
![Page 17: REGIONAL INTERCONNECTIONS - ICA - The · PDF file · 2013-03-19REGIONAL INTERCONNECTIONS ... 132 kV Jinja-Nairobi line ... PowerPoint Presentation](https://reader034.fdocuments.us/reader034/viewer/2022052319/5ab7ab4c7f8b9ac60e8bd96e/html5/thumbnails/17.jpg)
17
Loiyangalani - Suswa
![Page 18: REGIONAL INTERCONNECTIONS - ICA - The · PDF file · 2013-03-19REGIONAL INTERCONNECTIONS ... 132 kV Jinja-Nairobi line ... PowerPoint Presentation](https://reader034.fdocuments.us/reader034/viewer/2022052319/5ab7ab4c7f8b9ac60e8bd96e/html5/thumbnails/18.jpg)
18
Scope: 430km, 400kV, Double Circuit Transmission Line
& Substations.
Purpose: To evacuate power from the proposed wind
power plant in Lake Turkana region
Financier: Spanish and Kenya Governments.
Commencement: Estimated June 2011 and Completion:
May 2013
Loiyangalani - Suswa
![Page 19: REGIONAL INTERCONNECTIONS - ICA - The · PDF file · 2013-03-19REGIONAL INTERCONNECTIONS ... 132 kV Jinja-Nairobi line ... PowerPoint Presentation](https://reader034.fdocuments.us/reader034/viewer/2022052319/5ab7ab4c7f8b9ac60e8bd96e/html5/thumbnails/19.jpg)
19
Arabuko Sokoke Forest Reserve
Rabai-Malindi-Garsen- Lamu
Witu Forest
Mariakani Military base
37km of marshy area requiring piling
![Page 20: REGIONAL INTERCONNECTIONS - ICA - The · PDF file · 2013-03-19REGIONAL INTERCONNECTIONS ... 132 kV Jinja-Nairobi line ... PowerPoint Presentation](https://reader034.fdocuments.us/reader034/viewer/2022052319/5ab7ab4c7f8b9ac60e8bd96e/html5/thumbnails/20.jpg)
20
Rabai-Malindi-Garsen- Lamu
Scope: 320km, 220kV Single Circuit Transmission Line &
2 No. 23 MVA sub-stations
Purpose: To connect Lamu Port to the National Grid and
strengthen supply to North Coast
Commencement: 2010 and Completion: 2012
The project is under construction
![Page 21: REGIONAL INTERCONNECTIONS - ICA - The · PDF file · 2013-03-19REGIONAL INTERCONNECTIONS ... 132 kV Jinja-Nairobi line ... PowerPoint Presentation](https://reader034.fdocuments.us/reader034/viewer/2022052319/5ab7ab4c7f8b9ac60e8bd96e/html5/thumbnails/21.jpg)
21
Thank You