Inter-regional Workshop on EE Investments Project Pipeline
Refurbishment of Home for the elderly and infirm persons in City of Petrinja, Croatia
Bangkok, 23rd April 2014
Inter-regional Workshop on EE Investments Project PipelineShort description
• Energy efficiency in public building• Energy audits (EA) made in 2008 and 2013 by Energy
Institute Hrvoje Požar (EIHP)• Heated area is 4,397.72 m2, 190 elderly people and 59
employees• Investments based on EA recommendations in new doors
and windows with LOW-E glass in 2009, lighting system in2009, radiator thermostats and automatic balancing valvesin 2012 and new building envelope in 2013
• Financing from county’s budget and grant fromEnvironmental protection and energy efficiency fund
• Monitoring and verification of savings done by EIHP• Next step - towards nearly zero energy status
Inter-regional Workshop on EE Investments Project Pipeline
EE in publicbuilding
Radiator thermostats
Lighting
Building envelope
19711981
Inter-regional Workshop on EE Investments Project PipelineBuilding envelope
Inter-regional Workshop on EE Investments Project Pipeline
Electricity - 15 minute analysis
Overall building Kitchen and other appliances
0,00
0,50
1,00
1,50
2,00
2,50
3,00
3,50
4,00
4,50
5,00
11:28:00 16:28:00 21:28:00 02:28:00 07:28:00 12:28:00 17:28:00 22:28:00 03:28:00 08:28:00 13:28:00 18:28:00 23:28:00 04:28:00 09:28:00
angaži
rana s
naga
[kW
]
0,00
0,10
0,20
0,30
0,40
0,50
0,60
0,70
0,80
0,90
1,00
Kotlovnica cos φ
Heating system
0,00
10,00
20,00
30,00
40,00
50,00
60,00
70,00
11:05:20 16:05:20 21:05:20 02:05:20 07:05:20
angaži
rana
snaga [
kW]
0,00
0,10
0,20
0,30
0,40
0,50
0,60
0,70
0,80
0,90
1,00
Razvod kod kuhinje cos φ
0,00
20,00
40,00
60,00
80,00
100,00
120,00
140,00
10:47:
11
15:47:
11
20:4
7:11
01:4
7:11
06:4
7:11
11:47:
11
16:4
7:11
21:4
7:11
02:4
7:11
07:47:
11
12:47:
11
17:4
7:11
22:4
7:11
03:4
7:11
08:47:
11
13:47:
11
18:4
7:11
23:4
7:11
04:47:
11
09:47:
11
angaži
rana
snaga [
kW]
0,00
0,10
0,20
0,30
0,40
0,50
0,60
0,70
0,80
0,90
1,00
Glavni razvodni cos φ
Inter-regional Workshop on EE Investments Project Pipeline
EA Measures in2008
Energy audit measures
Extra light fuel oil LPG Wood pellets Electricity WaterSavings IRR
consumption reduction consumption reduction
l l kg kg kWh m3 € annualRadiator thermostats 110,500 11,000 - - - - 7,451 1.2
Wastewater heat recovery in laundry 2,320 total - - - - 1,569 3.75
Solar collectors 18,300 10,300 - - - - 7,060 9.25Liquefied petroleum gas (LPG) 128,800 total 100,000 - - - 32,680 1
Extra light fuel oil to Wood Pellets 128,800 total - 280,000 - - 43,790 Np
Building envelope insulation and installation of new windows
110,500 80,000 - - - - 54,380 5.3
Building envelope insulation and installation of window facade
110,500 77,000 - - - - 52,290 7.2
Building envelope insulation and new windows installation + UNP
128,800 total 34,700 - - - 68,900 4.5
Building envelope insulation and installation of window facade + UNP
128,800 total 39,500 - - - 66,400 6
Building envelope insulation and new windows installation + radiator thermostats + solar collectors
128,800 96,000 - - - - 65,255 5.5
Building envelope insulation and installation of window facade+ radiator thermostats + solar collectors
128,800 92,700 - - - - 63,012 7.2
Incandescent light bulbs with compact fluorescent lights (CFL)
- - - - 9,600 - 915 4.2
Replacement of toilet cisterns - - - - - 1,500 2,876 1.3
Replacement of water taps - - - - - 700 1,569 3.5
Replacement of water taps with new sensor water taps
- - - - - 2,200 3,920 9
Installation of smartshower system - - - - - 1,500 2,615 2.5
Inter-regional Workshop on EE Investments Project Pipeline
EA Measures in2013
Energy audit measuresInvestment
[€]
Potential annual savingsIRR
[annual]
CO2
reduction [t/annualy]
Electricity [kWh]
Extra light fuel oil [l]
LPG [kg]
Water[m3]
Savings [€]
1. Implementation of Energy management 18,835 15,302 4,930 49 1,269 7,520 2.5 19.31
2. Water consumption tariff check-up - - - - - 7,135 Immediately -
3. Building envelope insulation -comprehensive
67,380 - 40,052 - - 29,330 2.3 106.9
3.A Facade insulation 40,810 - 16,276 - - 11,169 3.7 43.3
3.B Rooftop insulation 20,080 - 23,524 - - 16,145 1.2 6.2
3.c Installation of new windows 6,500 - 73 - - 49,950 130.1 0.2
4. Solar collectors 65,100 - 11,656 - - 8,532 7.6 30.3
5. Extra light fuel oil to Wood Pellets 86,275 - 98,590 - - 38,663 2.2 256.3
6. Overall building envelope insulation combined with fuel change
153,655 -
74,492Wood pellets71,909
- - 42,310 3.6 256.3
7. Integretation of electricity meters - - - - - 27 Immediately -
8. Overall lighting system revitalization 4,037 5,534 - - - 680 5.9 2.08
8.a Lighting system revitalization – Fluorescent lighting
2,660 1,984 - - - 261 10.2 0.75
8.b Lighting system revitalization – Incandescent lighting
1,377 3,551 - - - 419 3.3 1.33
9. Overall lighting system reconstruction 84,275 15,436 - - - 1,614 52.2 12.35
10. Overall revitalization of laudry room appliances 32,418 39,480 - - 876 6,088 5.3 15.16
10.a Revitalization of laudry room – washing machines
17,385 11,100 - - 876 3,011 5.8 4.49
10.b Revitalization of laudry room – dryer 7,843 20,580 - - - 2,214 3.5 7.74
10.c Revitalization of laudry room – iron 7,190 7,800 - - - 863 8.3 2.93
11. Installation of PV system 36,080 24,000 - - - 5,448 6.6 9.02
Inter-regional Workshop on EE Investments Project PipelineConsumption
-
50.000
100.000
150.000
200.000
250.000
-
2.000
4.000
6.000
8.000
10.000
12.000
14.000
16.000
18.000
EUR
Extr
a lig
ht
fue
l oil,
kW
h
Extra light fuel oil 2008
Extra light fuel oil 2013
EUR 2008
EUR 2013
-
5.000
10.000
15.000
20.000
25.000
30.000
35.000
-
500
1.000
1.500
2.000
2.500
3.000
3.500
4.000
4.500
EUR
Ele
ctri
city
, kW
h
Electricity 2008
Electricity 2013
EUR 2008
EUR 2013
-
200
400
600
800
1.000
1.200
1.400
1.600
1.800
-
500
1.000
1.500
2.000
2.500
3.000
3.500
EUR
Wat
er,
m3
Water 2008
Water 2013
EUR 2008
EUR 2013
Inter-regional Workshop on EE Investments Project Pipeline
Monitoring and verification
new windowsand doors
Inter-regional Workshop on EE Investments Project Pipeline
Monitoring and verification
new radiatorthermostats + automatic balancingvalves for heatingsystem
Inter-regional Workshop on EE Investments Project Pipeline
Energy and resources saved: extra light fuel oil savings
561,957.69 kWh/annually (35,127.35 EUR/annually)
extra light fuel oil (calculated for building envelope that is currently being refurbished) savings
166.687,38 kWh/annually (13,105.87 EUR/annually)
electricity savings
4,020.00 kWh/annually (343.30 EUR/annually)
Greenhouse gas emissions reduction: summarized savings of CO2 emissions
190,345.58 kg/annually
Savings
Inter-regional Workshop on EE Investments Project PipelineFinancing
Type EUR % of TotalInterest rate
%
Owner’s Equity Cash
windows and doors 70,328.72 EUR
lighting 3,181.30 EUR
radiator thermostats 3,205.41 EUR
Building envelope (old building) 48,243.59 EUR
Building envelope (new building) 59,443.79 EUR
SUM = 184,402.81 EUR
windows and doors 65%
lighting 100%
radiator thermostats 29%
Building envelope (old building) 100%
Building envelope (new building) 100%
SUM = 80%
0
Other Equity - - - -Bank Loans - - - -Other Loans - - - -
Grant from Croatian Environmental protection and energy efficiency Fund
Cash
windows and doors 37,381.95 EUR
lighting 0.00 EUR
radiator thermostats 7,781.47 EUR
Building envelope (old building) 0.00 EUR
Building envelope (new building) 0.00 EUR
SUM = 45,163.42 EUR
windows and doors 35%
lighting 0%
radiator thermostats 71%
Building envelope (old building) 0%
Building envelope (new building) 0%
SUM = 20%
0
Inter-regional Workshop on EE Investments Project PipelineNext step
AppliancesHeating and HWP
Energy management Renewables
Inter-regional Workshop on EE Investments Project Pipeline
THANK YOU!
Matija Vajdić, MSc.E.E.
Energy Institute Hrvoje Požar
Savska cesta 163, Zagreb, Croatia
T: + 385 1 6326 273
www.eihp.hr