Reference lis t Page 2Advant Energy Management Systems 2012Industrial
ITfor Power Management Syst ems
No: COUNTRY:Customer:
Project:
PrimaryEquipment:
Power Management Functions: Hardware: Year ofdelivery:
12. THAILAND
RRCRayong Refinery
20x 33 kV5x GEN
Monitoring and Control, Active and ReactivePower Control, Active- and Reactive PowerSharing, Volatge Control.
1x MP 260/11x AS 515-OS600 I/O
1995
13. THAILAND
Thai OilHCU-2
33 kV11 kV3.3 kV0.4 kV
Extension of Sriracha for the Hydro CrackerUnit 2 process.
2x AC 4501000 I/O
1995
14. BRAZIL
PetrobrasREPAR Refinery
Monitoring and Control, Active and ReactivePower Control, Generator/transformerControl, Power Sharing, Fast LoadShedding, re-acceleration, Event & Alarm
Handling, G2 expert system for operatorguidance.
12x MP 240/12x AS 520-OS1x AS 515-IMS
1995
15. THAILAND
Thai OilCO-GEN
33 kV11 kV0.4 kV
2x GEN
Extension of Sriracha for the Co-Generationprocess including two gasturbines withCommunication to MARK-V Controllers.
2x AC 4501000 I/O
1996
16. THAILAND
Thai Lube BaseLube Base Oil
33 kV11 kV0.4 kV
1x GEN
Monitoring and Control, Power Control,Power factor Control, transformer Control,Generator Control, metering, EventRecording, Alarm Handling and Recording,reports, Power Sharing, Fast and Back-upLoad Shedding.
3x MP 240/11x AS 520-OS2000 I/O
1996
17. INDIA
RelianceHazira Refinery
Monitoring and Control, Fast Load
Shedding, Power demand Control, Event &Alarm Handling.
2x AS 515-OS
20x MP 200/1
1996
18. BRAZIL
PetrobrasRLAM Refinery
Monitoring and Control, Active and ReactivePower Control, Generator/transformerControl, Power Sharing, Fast LoadShedding, thermal Load Shedding, re-acceleration, Event & Alarm Handling.
4x AC 45011x AC 4102x AS 520-OS
1996
19. BRAZIL
PetrobrasREDUC Refinery
Monitoring and Control, Active- andReactive-Power Control,Generator/transformer Control, PowerSharing, Fast Load Shedding, thermal LoadShedding, re-acceleration, Event & AlarmHandling.
24x AC 4002x AS 520-OS
1997
20. SYRIA
AFPCOMAR Refinery
Monitoring, Active-Power Control, frequencyControl, Generator Control, Power Sharing,spinning reserve evaluation, Fast LoadShedding, Event & Alarm Handling
7x AC 4502x AS 5203x AS 5154500 I/O
1997
21. THAILAND
Thai OilSPP, HDS
33 kV11 kV0.4 kV
2x GEN
Extension of Sriracha for Small Power Plantand Hydro De Sulphurization processincluding two gasturbines withCommunication to MARK-V Controllers.
4x AC 4501600 I/O
1997
22. OMAN
ShellLNG
Load Management System including Fast-and Back-up Load Shedding.
1x AC 4101x AS 520-OS500 I/O
1998
-
8/12/2019 Reference+PMS+2012 08
3/8
-
8/12/2019 Reference+PMS+2012 08
4/8
Reference lis t Page 4Advant Energy Management Systems 2012Industrial
ITfor Power Management Syst ems
No: COUNTRY:Customer:
Project:
PrimaryEquipment:
Power Management Functions: Hardware: Year ofdelivery:
31. NORWAYConocco PhilipsEkofiskOil & Gas Field
2004
32. NORWAYStatoilHammersfestLNG Complex
132 kV GIS11 kV6.6 kV690 V440 V5x GTG50 MW, 15kV,
50 Hz.
Monitoring, Active and Reactive PowerControl with grid and island operation,frequency Control, Generator Control,transformer Control, Power Sharing,spinning reserve evaluation, heavyconsumers, Fast Load Shedding, Event &Alarm Handling, Communication red
MODBUS with protection relays REF542+,MODBUS Communication with turbineGenerator packages
12x HMI Clients25x AC800M Red15x AC800M SingCommunication:- Profibus DP- MODBUS- LON OPC
2005
HammersfLNG.pdf
33. RUSSIAShellSakhalin IILNG Complex
Substations:1x 33 kV8x 6.6 kV5x GTG
Monitoringand Control, Fast Load Shedding,Active- & Reactive Power Control,Generator, Power Sharing, Event & AlarmHandling, Time Synchronisation,Communication with: protection relays,MARK-V, INSUM II MCCs, Siemens 60 Hzsystems.
2x HMI10x AC800M RedMODBUS to:- REF542+- MARK-V- INSUM II MCCs3000 I/O
2005
Sakhalin.p
34. QATARQatar Petroleum& Exxon MobilQatar Gas IILNG Complex
Substations:1x 66 kV3x 33 kV10x 6.6 kV7x GTG3x STG
Monitoring and Control, Fast LoadShedding, Active- & Reactive PowerControl, Generator, Power Sharing, Event &Alarm Handling, Time Synchronisation.
2x HMI4x AC800M Red.LONBUS to:- 400x REF542+MODBUS to:- DCS- MARK-VI- INSUM II MCCs
2006
35. BRAZILVittoriaFPSO
2006
36. MALYSIAPetronasMelaka
Cogeneration
Substations:1x 132 kV1x 33 kV
4x 6.6 kV4x GTG1x STG
Monitoring and Control, Active- & ReactivePower Control, Generator Control, PowerSharing, Network Synchronisation, Event &
Alarm Handling, energy reporting, TimeSynchronisation, Communication with:protection relays, MARK-VI, GE MCCs andDCS.
1x HMI1x AC800M Red.OPC to DCS
SherlockDist.Rec.MODBUS to:- 35x REF542+- 4x MARK-VI- GE MCCs
2007
37. BRUNEIShell BLNGLNG complex
Substations:1x 110 kV1x 33 kV3x 11 kV1x GTG4x STG
Monitoring and Control, Fast LoadShedding, Active- & Reactive PowerControl, Generator Control, Power Sharing,Network Synchronisation, Event & AlarmHandling, Time Synchronisation,Communication with: protection relays.
1x HMI3x AC800M Red.LONBUS to:- 30x REF542+
2007
-
8/12/2019 Reference+PMS+2012 08
5/8
Reference lis t Page 5Advant Energy Management Systems 2012Industrial
ITfor Power Management Syst ems
No: COUNTRY:Customer:
Project:
PrimaryEquipment:
Power Management Functions: Hardware: Year ofdelivery:
38. QATARQatar Petroleum& ConocoPhilips & ShellQatar Gas III & IVLNG Complex
Substations:1x 66 kV3x 33 kV10x 6.6 kV8x GTG3x STG
Monitoring and Control, Fast LoadShedding, Active- & Reactive PowerControl, Generator, Power Sharing, Event &Alarm Handling, Time Synchronisation.
2x HMI4x AC800M Red.LONBUS to:400x REF542+MODBUS to:- DCS- MARK-VI- INSUM II MCCs
2007
39. CHINAChina SouthernPower GridHuizhou Power
Plant
2007
40. NETHERLANDSShellShell Pernis
Substations:1x 66 kV3x 25 kV10x 6,6 kV9x GEN
Monitoring and Control, Fast LoadShedding, Active- & Reactive PowerControl, Generator Control, Power Sharing,Network Synchronisation, Event & AlarmHandling, Time Synchronisation,Communication with: protection relays.
4x HMI4x AC800M Red.9x Rem. S800I/OLONBUS to:- 55x REF542+SPABUS to:- 100x SPACOM
2008
41. NIGERIAShell NLNGBonny Six
Substations:1x 132 kV3x 33 kV8x GTG
Monitoring and Control, Event & AlarmHandling, Time Synchronisation,Communication with: protection relays,disturbance Recording.
1x HMI4x AC800M Red.MODBUS to:- 1x BrushLONBUS to:- 20x REF542+
2008
42. UKMontrosePlatform
4(5)x GTG Fast Load Shedding, OverLoad Shedding,Spinning reserve calculation and Eventlogging
1x HMI1x AC800M Red.
2008
43. QATARMaersk OilBlock 16 FieldDevelopmentProj. (2 offshoreplatforms (BG &BE)
Substations:1x 11 kV2x 3 kV4(5)x GTG
PMS Load Sharing and Load Shedding,Synchronisation, Event & Alarm Handling,Time Synchronisation from SCADA,Communication (MODBUS) with SCADAsystem
1x HMI2x AC800M RedMODBUS to:- 2x SCADA
2009
44. Qatar Petroleum
Halul Island
Substations:
1x 33 kV1x 22 kV17x LV15x RMU11x GTG
Presently In design stage
PMS Generator Control, Load Sharing andLoad Shedding.Synchronisation.Event and Alarm HandlingTime Synchronisation from PMS
5x 800xA
12x AC800M Red
2009
45. MALAYSIASHELLGumusutoffshore
Substations:1x11kV15x LV3x GTG
Presently In design stageControl and Monitoring if circuit breakersIEC61850 Interface with MV IEDsRemote parameters setting and disturbancerecorders files download.Load Shedding.
Event and Alarm HandlingTime Synchronisation from PMS
5x 800xA12x AC800M RedIEC61850 com to- 20x IED
2009
-
8/12/2019 Reference+PMS+2012 08
6/8
Reference lis t Page 6Advant Energy Management Systems 2012Industrial
ITfor Power Management Syst ems
No: COUNTRY:Customer:
Project:
PrimaryEquipment:
Power Management Functions: Hardware: Year ofdelivery:
46. Pluto LNG Substations:1x 33 kV8x 6,6 kV3x MV VSD3x GTG
Presently In design stagePMS Generator Control, Load Sharing andLoad Shedding.Synchronisation.Event and Alarm HandlingTime Synchronisation from PMSPower Quality MonitoringNOX avoidance
2x 800xA12x AC800M Red
2009
47. QATARShell Pearl GTL
Substations:1x 132 kV4x 33 kV4x 11 kV
17x 6,6 kV4x STG8x GTGCogen6x MV VSD
PMS Generator Control, Load Sharing andLoad Shedding.Synchronisation.Event and Alarm Handling
Time Synchronisation from PMSPower Quality MonitoringComplete electrical package
3x 800xA25x AC800M RedIEC61850 com to>500x IED
2009
48. SPAINRepsol C10CartagenaRefinery
Substations:1x 132 kV3x 33 kV10x 11kV2x STG2x GTGCogen
Generator Control, Load Sharing and LoadShedding.Event and Alarm HandlingTime Synchronisation
3x 800xA13x AC800M Red
2009
49. NORWAYPeregrinoFPSO
Substations:2x 13.8 kV2x 4 kV12x LV3x STG
Part of an integrated DCS + Safety + PMSSystems inc complete electrical package.
5x 800xA6x AC800M Red
2009
50. NORWAYBergersenFPSO
Substations:2x 13,8 kV2x 4 kV12x LV3x STG
Part of an integrated DCS + Safety + PMSSystems inc complete electrical package.
4x 800xA6x AC800M Red
2009
51. THAILANDPTTMap Ta Phut
C&S-GSP#3
11 kV0,4 kV
Monitoring and Control, Automatic TransferSwitching, Communication with protectiondevices
1x 800xA1x AC800M Red
2009
52. THAILANDPTTMap Ta PhutPMS-ESP/GSP#6
33 kV11 kV0,4 kV
PMS Generator Control, load Sharing, LoadShedding, Power restoration,Synchronisation, Event & Alarm Handling
1x 800xA6x AC800M Red
2009
53. THAILANDPTTMap Ta PhutC&S-ESP/GSP#6
33 kV11 kV0,4 kV
Monitoring and Control, automatic transferswitching, Communication with protectiondevices. Integrated with PMS project.
8x AC800M Red 2009
54. NORWAY
StatoilHydroGullfaks A & C
36 kV
13,8 kV6 kV
Improvement project. Replacement of PC
hardware by AC800M
1x AC800M Red 2009
-
8/12/2019 Reference+PMS+2012 08
7/8
Reference lis t Page 7Advant Energy Management Systems 2012Industrial
ITfor Power Management Syst ems
No: COUNTRY:Customer:
Project:
PrimaryEquipment:
Power Management Functions: Hardware: Year ofdelivery:
55. GREECEHELPEERUP
Substations:2x 20 kV1x 11 kV7x 6,6 kV2 x STG24x LV MCC's
Monitoring and Control, Fast LoadShedding, Active- & Reactive PowerControl, Generator Control, Power Sharing,Network Synchronisation, reaccelerationEvent & Alarm Handling, TimeSynchronisation, Communication with:protection relays.
4x HMI16x AC800M RedIEC61850 com to- 500 IED
2010
56. United ArabEmiratesGASCOHabshan 5
13 Substationscomprisingswitchboards:1x132 kV4x 33 kV
11x 11 kV9x 3,3 kV35x LV MCCs9 x GEN
Monitoring and Control, Fast LoadShedding, Active- & Reactive PowerControl, Generator Control, Power Sharing,Network Synchronisation,, Event & AlarmHandling, Time Synchronisation, IEC61850
Communication with: protection relays.
14x HMI15x AC800M RedIEC61850 com to- 1800 IED
2011
57. United ArabEmiratesGASCORuwais Train 4
Substationscomprisingswitchboards:1x132 kV1x 33 kV4x 11kV6x 3,3kV25x LV MCC
Monitoring and Control, Event & AlarmHandling, Time Synchronisation, IEC61850Communication with: protection relays.
9x HMI13x AC800M RedIEC61850 com to- 300x IED
2011
58. RussiaExxonMobilSakahlin 1extension
Substations:1x 20 kV5x 6,6 kV2x GEN
Monitoring and Control, Fast LoadShedding, Active- & Reactive PowerControl, Generator Control, Power Sharing,Network Synchronisation, reaccelerationEvent & Alarm Handling, TimeSynchronisation, Communication with:protection relays.
5x HMI12x AC800M RedIEC61850 com to- 400x IED
2011
59. RussiaExxonMobilArktun Dagi
Substations:1x 20 kV5x 6,6 kV2x GEN
Monitoring and Control, Fast LoadShedding, Active- & Reactive PowerControl, Generator Control, Power Sharing,Network Synchronisation, reaccelerationEvent & Alarm Handling, TimeSynchronisation, Communication with:
protection relays.
5x HMI12x AC800M RedIEC61850 com to- 400x IED
2011
60. ArgentinaExxonMobilCampanaRefinery
Substations:1x 20 kV5x 6,6 kV2x GEN
Monitoring and Control, Fast LoadShedding, Active- & Reactive PowerControl, Generator Control, Power Sharing,Network Synchronisation, reaccelerationEvent & Alarm Handling, TimeSynchronisation, Communication with:protection relays.
5x HMI12x AC800M RedIEC61850 com to- 400x IED
2011
61. QatarExxonMobil &RasGasBarzanGas Process
Substations:1x 132 kV15x 6,6 kV2x GEN
Monitoring and Control, Reactive PowerControl, Generator Control, Power Sharing,Event & Alarm Handling, TimeSynchronisation, Communication with ABBRelion & Siemens Siprotec protection
relays.
3x HMI18x AC800M RedIEC61850 com to- 400x IED
2012
-
8/12/2019 Reference+PMS+2012 08
8/8
Reference lis t Page 8Advant Energy Management Systems 2012Industrial
ITfor Power Management Syst ems
No: COUNTRY:Customer:
Project:
PrimaryEquipment:
Power Management Functions: Hardware: Year ofdelivery:
62. Saudi ArabiaSADAFPetrochemical
Substations:1x 230 kV21x 13,8 kV3x GEN9x Capacitorbanks
Monitoring and Control, Reactive PowerControl, Generator Control, Event & AlarmHandling, Time Synchronisation,Communication with ABB Relion & SiemensSiprotec protection relays.
3x HMI18x AC800M RedIEC61850 com to- 400x IED
2012
63. USADow CorningURSAlabama Plant
Substations:1x 13,8 kV1x 4,16 kV5x 480 V
Monitoring and Control, Event & AlarmHandling, Time Synchronisation,Communication with legacy protection units,Power Quality & Energy DemandMonitoring.
1x HMI2x AC800M RedMODBUS com to- 135x IED / PowerMeters
2012
64. USA
ConfidentialURSTennessee
26x 34.5 kV
4x 4,16 kV
Monitoring and Control, Load Shedding (via
GOOSE), Event & Alarm Handling, TimeSynchronisation, Reverse Protectionblocking (via GOOSE), Communication withprotection units
1x HMI
2x AC800M RedIEC61850 com to- 84x IED / PowerMeters
2012