Page 1: Reference projects · 2020. 7. 28. · LIDL Projekt title Automation Technology. S 06 Location Oberkochen Number of skilled workers 5 Activities Electrical installations, cable management,

ReferenceprojectsELECTRICS / INDUSTRY

Success through quality.

www.subauftrag.com

Page 2: Reference projects · 2020. 7. 28. · LIDL Projekt title Automation Technology. S 06 Location Oberkochen Number of skilled workers 5 Activities Electrical installations, cable management,

S 02subauftrag.com

Content

Amazon

VW

LIDL

ZEISS

Kuka Robotics

ALDI

IKEA

ATOTECH

03

04

05

06

07

08

09

10

Page 3: Reference projects · 2020. 7. 28. · LIDL Projekt title Automation Technology. S 06 Location Oberkochen Number of skilled workers 5 Activities Electrical installations, cable management,

S 03

LocationDortmund

Number of skilled workers70

Activities Conveying technology, electrics, ventilation

The online giant Amazon opened Europe's most modern logistics centre in Dortmund. Over 1,600 new jobs were created on an area of around 50,000 m2 . Under great time pressure and not the slightest margin for error, more than 400 skilled workers were often at work - including subcontractors. Our subpartners were involved in several areas at once, starting with conveyor technology, electrical installations and ventilation installations.

subauftrag.com

R E F E R E N C E

AmazonProject titleAmazon Logistic Centre Germany

Page 4: Reference projects · 2020. 7. 28. · LIDL Projekt title Automation Technology. S 06 Location Oberkochen Number of skilled workers 5 Activities Electrical installations, cable management,

S 04

LocationZwickau

Number of skilled workers5

TActivities Electrical installations and assemblies

At Volkswagen Sachsen GmbH in Zwickau, West Saxony, a total of 5 electricians from our sub-partner were on duty. The project lasted for 3 weeks and the subcontractors' tasks included the installation of a cable duct as well as the pulling and connecting of the cables according to the circuit diagrams and instructions of the senior fitter. In addition, an existing control cabinet was moved.

subauftrag.com

R E F E R E N C E

VWProjekt titleVolkswagen Sachsen GmbH

Page 5: Reference projects · 2020. 7. 28. · LIDL Projekt title Automation Technology. S 06 Location Oberkochen Number of skilled workers 5 Activities Electrical installations, cable management,

S 05

LocationWest Virginia & North Carolina, USA

Number of skilled workers70

Activities Welding work for conveyor systems

For the project "automation technology" our subcontractors were used for the discounter and food retailer Lidl. At the West Virginia and North Carolina locations, a total of 70 men worked on conveyor systems, primarily welding work was carried out.

subauftrag.com

R E F E R E N C E

LIDLProjekt titleAutomation Technology

Page 6: Reference projects · 2020. 7. 28. · LIDL Projekt title Automation Technology. S 06 Location Oberkochen Number of skilled workers 5 Activities Electrical installations, cable management,

S 06

Location Oberkochen

Number of skilled workers5

Activities Electrical installations, cable management, luminaire mounting, MSR cabling, data technology

During the construction of the new workshop for the ZEISS company in Oberkochen, a team of 5 of our electrical specialists was responsible for general electrical installations as well as for cable pulling, luminaire installation, MSR cabling and data technology.

subauftrag.com

R E F E R E N C E

ZEISSProjekt titleWerkshalle Zeiss Oberkochen

Page 7: Reference projects · 2020. 7. 28. · LIDL Projekt title Automation Technology. S 06 Location Oberkochen Number of skilled workers 5 Activities Electrical installations, cable management,

S 07

Location Tuscaloosa, USA

Number of skilled workers87

Activities Electrical work, mechanical work, engineering, plant installation

For Mercedes-Benz, a total of 52 industrial robots were installed for production work in Tuscaloosa, a city in the US state of Alabama. In addition, the associated assembly lines and transfer racks were installed. The project lasted 18 months.

subauftrag.com

R E F E R E N C E

Kuka RoboticsProejct titleMercedes

Page 8: Reference projects · 2020. 7. 28. · LIDL Projekt title Automation Technology. S 06 Location Oberkochen Number of skilled workers 5 Activities Electrical installations, cable management,

S 08

LocationAltenstadt

Number of skilled workers5

Activities Assembly and disassembly of LED strip lights

In the logistics centre south of the food discounter ALDI a team of 4 of our electrical subcontractors was employed. At the site in Altenstadt they worked on the assembly and disassembly of LED light bands.

subauftrag.com

R E F E R E N C E

ALDI Project titleAldi

Page 9: Reference projects · 2020. 7. 28. · LIDL Projekt title Automation Technology. S 06 Location Oberkochen Number of skilled workers 5 Activities Electrical installations, cable management,

S 09

Location Cologne; Osnabrück

Number of skilled workers12

Activities Electrical installations; replacement of lighting

For the Swedish furniture giant IKEA, a total of 12 of our electrical specialists were on duty at the locations in Cologne and Osnabrück. The scope of work included replacing the lighting in the self-service halls.

subauftrag.com

R E F E R E N C E

IKEA Project titleIKEA

Page 10: Reference projects · 2020. 7. 28. · LIDL Projekt title Automation Technology. S 06 Location Oberkochen Number of skilled workers 5 Activities Electrical installations, cable management,

S 010

LocationMexico City, Mexico

Number of skilled workers12

Activities Electrical installations

Atotech is one of the world's leading suppliers of chemicals and equipment for the PCB, chip carrier and semiconductor industries. In this project our subcontractors were responsible for the complete installation, including welding and pipe fittings of the chemical plant.

subauftrag.com

R E F E R E N C E

ATOTECHProject titleAtotech

Page 11: Reference projects · 2020. 7. 28. · LIDL Projekt title Automation Technology. S 06 Location Oberkochen Number of skilled workers 5 Activities Electrical installations, cable management,

ContactSubauftrag.comT: +43 (0) 1336 0151-191 [email protected] www.subauftrag.com