REDD+ Guiana Plateau project First Steering Committee Meeting Paramaribo, 6 August 2013 Rene...

15
REDD+ Guiana Plateau project First Steering Committee Meeting Paramaribo, 6 August 2013 Rene Somopawiro SBB, Suriname

Transcript of REDD+ Guiana Plateau project First Steering Committee Meeting Paramaribo, 6 August 2013 Rene...

Page 1: REDD+ Guiana Plateau project First Steering Committee Meeting Paramaribo, 6 August 2013 Rene Somopawiro SBB, Suriname.

REDD+ Guiana Plateau projectFirst Steering Committee Meeting

Paramaribo, 6 August 2013

Rene Somopawiro

SBB, Suriname

Page 2: REDD+ Guiana Plateau project First Steering Committee Meeting Paramaribo, 6 August 2013 Rene Somopawiro SBB, Suriname.

Outlook

1. General information

2. Policy, Laws, Strategies and Institutions

3. REDD+ Readiness Proposal (RPP)

4. REDD+ Guiana Plateau Project Activities

5. Expectations

Page 3: REDD+ Guiana Plateau project First Steering Committee Meeting Paramaribo, 6 August 2013 Rene Somopawiro SBB, Suriname.

•Land area:16.3 million ha

• Forest Cover: 14.8 million ha , 90% of land area •Production forest 4.5 million ha

-Timber cutting license : 2.1 million ha• Protected area 2.1 million ha

• Timber production ; 436,000 m3/year (2012)

• Contribution forestry (Logging and timber processing) to the GDP < 2%

• Deforestation rate o.o2%/annually approx 3,000 ha/year• Population 536,000 , Growth 1.2 %/year• Forest Carbon stock quick analysis: 189.2 tons of

carbon/hectare +/- 14.2 ; NET SINK country

General information

Page 4: REDD+ Guiana Plateau project First Steering Committee Meeting Paramaribo, 6 August 2013 Rene Somopawiro SBB, Suriname.

• Constitution of 1987• Development Plan 2012-2016• National Forest Policy (2003)• Strategic Action Plan for the Forestry Sector 2009-2013• Climate Action Plan, National Biodiversity Strategy 2005• Forest Management Act 1992, replace Timber Act 1947• Nature Conservation and Game Act 1957• Mining Decree 1982

•REDD+ Readiness Proposal (RPP) 2013

Policy, Laws and Strategies

Page 5: REDD+ Guiana Plateau project First Steering Committee Meeting Paramaribo, 6 August 2013 Rene Somopawiro SBB, Suriname.

Policy, Laws and strategies (2)

Suriname is at an early stage of a forest transition curve, which points at the risk that greenhouse gas emissions from deforestation and forest degradation could increase over time.

REDD+ implementation in Suriname will aim at conserving existing carbon stocks and avoiding new emissions fromdeforestation and forest degradation and promote Sustainable Forest Management rather than decreasing existing emission levels.

Suriname, as a HFLD country, will focus in the to-be formulated REDD+ Strategy on limiting the growth in the forest-transition curve and associated emissions, without limiting economic and social development.

•REDD+Readiness Proposal (RPP) 2013

Page 6: REDD+ Guiana Plateau project First Steering Committee Meeting Paramaribo, 6 August 2013 Rene Somopawiro SBB, Suriname.

Institutions • Cabinet of the President , CCDU

• Ministry of Physical Planning Land and Forest Management (RGB)

• Stichting voor Bosbeheer en Bostoezicht (SBB) Technical work arm to promote SFM (MRV, RL)

• Minister of Labour, Technological Development and

Environment (ATM)

• Minister of Natural Resources (NH)

• Minister of Agriculture, Husbandry and Fishery (LVV)

• Minister of Public Works (OW)

• Ministry of Regional Development (RO)

• National Institute for Environment and Development in

Suriname (NIMOS)

• NGO, CSO , Indigenous and Maroon people

• Private Sector

• Training and Research Institutions (ADEKUS, CELOS)

Page 7: REDD+ Guiana Plateau project First Steering Committee Meeting Paramaribo, 6 August 2013 Rene Somopawiro SBB, Suriname.

Project activity 1: Inventory of the resources (1)

•Forest Carbon Assessment Monitoring Project 2010

•Pilot National Forest Inventory 2012 to date

Page 8: REDD+ Guiana Plateau project First Steering Committee Meeting Paramaribo, 6 August 2013 Rene Somopawiro SBB, Suriname.

Activity 1 (2) Monitoring logging activities

Monitoring logging activities• Log tracking system• GIS system • Field control and Data gathering activities •Personnel capacity building

Page 9: REDD+ Guiana Plateau project First Steering Committee Meeting Paramaribo, 6 August 2013 Rene Somopawiro SBB, Suriname.

Activity 1(3)Monitoring Forest Cover Change

ACTO Regional project: Monitoring deforestation, Logging, Land use changes in the Pan Amazonian Forest

• Capacity building in Remote Sensing• Establishment of a special Remote Sensing Unit within SBB (observation room)• Forest cover map 2000 and 2009 indicating deforestation• Continue delivering data on deforestation and in the later stage on forest degradation, logging and land use change• Monitoring logging activities using GIS, Log tracking system and field control

Page 10: REDD+ Guiana Plateau project First Steering Committee Meeting Paramaribo, 6 August 2013 Rene Somopawiro SBB, Suriname.

ACTIVITY 2: Quantify and localize the factors of deforestation

and forest degradation

Deforestation rate : < 0.02%/yr

• Mining

• Agriculture

• Shifting cultivation

• Road building /infrastructure

• Logging (degradation)

RPP quick preliminary analysis (RPP)

In-depth analysis of the drivers is necessary

Page 11: REDD+ Guiana Plateau project First Steering Committee Meeting Paramaribo, 6 August 2013 Rene Somopawiro SBB, Suriname.

ACTIVITY 3: Modelling to aid decision-making in future development

Development Plan for Suriname in Transition 2012-2016

• Need of scientifically valuation of forests and protected areas in Suriname

• REDD+ is a mechanism that could be used for creating economic benefits

• Climate Compatible Development Strategy that aims to minimize the impacts of climate change while maximizing human development opportunities for resilience.

Page 12: REDD+ Guiana Plateau project First Steering Committee Meeting Paramaribo, 6 August 2013 Rene Somopawiro SBB, Suriname.

ACTIVITY 3: Modelling to aid decision-making in future development

RPP• Establishing a national forest reference level (RL), and this process will result in data being acquired to model development scenarios with and without REDD+.

• Future development trends are an important element of the modelling, and the business-as-usual (BAU) scenario in Suriname expects a significant rise in emissions from deforestation and forest degradation

• A number of scenarios have been developed for Suriname KfW/RGB/CI

• Through dialogues with stakeholders as part of the R-PP process, 13 strategy option scenarios were identified for REDD+ in Suriname. These 13 options will be assessed and the most promising ones will become part of the national REDD+ Strategy.

Capacity Building : Training in Modelling “ Spatial Planning Group”

Page 13: REDD+ Guiana Plateau project First Steering Committee Meeting Paramaribo, 6 August 2013 Rene Somopawiro SBB, Suriname.

Ongoing projects/activities

• Capacity building (NIMOS) for implementation of the RPP

• Enhancing Awareness on REDD+, including HFLD REDD+ conference in November 2013

• Fundraising for the implementation of the RPP

• Continuation of the ACTO project

• Continuation of Pilot National Forest Inventory

• Consolidate and increase forest monitoring and promotion of SFM

• Implementation of the RPP

Implementation of the REDD+ Guiana Plateau Project

Page 14: REDD+ Guiana Plateau project First Steering Committee Meeting Paramaribo, 6 August 2013 Rene Somopawiro SBB, Suriname.

Expectations

• Platform to exchange knowledge, skills and information from the region regarding REDD+

• A regional approach to contribute in combatting Climate change, implementation of mitigation and adaptation actions, regional REDD+ strategy

• Contribution in the Implementation of the RPP

• Contribution in the formulation of a National Climate Change Compatible Strategy

• Contribute in capacity building and awareness raising

Page 15: REDD+ Guiana Plateau project First Steering Committee Meeting Paramaribo, 6 August 2013 Rene Somopawiro SBB, Suriname.