Beam for SeaQuest/E-906
Michael Geelhoed
G2 to NM1 BermpipeRed: Berm Pipe Yellow: G2 Vac pump St.Blue: G2 EnclosureGreen: Bermpipe Flange
Vacuum Issue
Feb 1st March 1st April 1st May 1st June 1st
Michael Geelhoed 2/20/12
Bermpipe Solution
Sleeve the Bermpipe
G2 Enclosure NM1 Enclosure
Michael Geelhoed 2/20/12
G2 to NM1 Bermpipe
Michael Geelhoed 2/20/12
Bermpipe monitoring port – N01 upstream
G2 to NM1 Bermpipe
Michael Geelhoed 2/20/12
Bermpipe grout
Grout in the Bermpipe
G2 Enclosure NM1 Enclosure
G2 to NM1 Bermpipe
G2 to NM1 Bermpipe
Michael Geelhoed 2/20/12
Grout removal in Bermpipe
G2 to NM1 Bermpipe
Michael Geelhoed 2/20/12
Grout Removal techniques
Getting beam through the Bermpipe
G2 Enclosure NM1 Enclosure
G2 to NM1 Bermpipe
G2 to NM1 Bermpipe
Michael Geelhoed 2/20/12
• Helium filled Berm pipe is the plan • Upon testing leak rate at positive pressure there was no leak.• Tried pumping down with pumps and bad “O” rings = 1.3 Torr• Pump down with good “O” rings < 1 Torr• Helium filled Berm pipe is now the back-up plan• Current plan is to run with < 1 Torr vac berm pipe
Two options for the Bermpipe medium
Paperwork
Michael Geelhoed 2/20/12
• Shielding Assessment in the hands of the SA Committee • Will take until Tuesday 2/21/12 to review SA• SAD has gone through the SAD Committee• Once both documents are approved & signed• AD Division Head approves & signs• ES&H Division Head approves & signs• DOE local office approves & signs
My understanding of the process*
Finishing touches
Michael Geelhoed 2/20/12
• ESS Interlock testing of entire NM beamline enclosures (complete)• Interlock testing of Radiation monitors (complete)• Operating/Safety/ Warning limits calculated• AD Division Department Heads approvals & signatures• AD RSO approval & signature• AD Division Head approval & signature