RECUWATT Conference - Stephanie Thiel lecture

18
MechanicalBiological Treatment (MBT) and incineration in a waste management system: experience in Germany Dr.Ing. Stephanie Thiel Professor Dr. Dr. h. c. Karl J. ThoméKozmiensky vivis Consult GmbH Dorfstraße 51 D 16816 Nietwerder Tel.: +49 3391 4545 0 Fax: +49 3391 4545 10 EMail: [email protected] RECUWATT Conference – Recycling and Energy, 25 th March 2011 Outline 1. Introduction 2. Incineration of residual waste 2.1. Status quo in Germany 2.2. Technology of waste incineration 2.3. Problems and subjects of optimisation 3. Mechanicalbiological treatment of residual waste 3.1. Status quo in Germany 3.2. Technology of mechanical biological waste treatment 3.3. Technical, economic and ecological problems 3.4. Output streams and mass balances 4. Conclusions and Summary 2

description

SECTION V: COMPLEMENTARITY OF WASTE-TO-ENERGY IN A WASTE MANAGEMENT SYSTEM “TMB and incineration in a waste management system: experience in Germany” by Mr. Stephanie Thiel, VIVIS Consult, Germany

Transcript of RECUWATT Conference - Stephanie Thiel lecture

Page 1: RECUWATT Conference - Stephanie Thiel lecture

Mechanical‐Biological Treatment (MBT) and incineration in a waste management system: 

experience in Germany

Dr.‐Ing. Stephanie ThielProfessor Dr. Dr. h. c. Karl J. Thomé‐Kozmiensky

vivis Consult GmbHDorfstraße 51

D ‐ 16816 NietwerderTel.: +49 3391 4545 0Fax: +49 3391 4545 10

E‐Mail: [email protected]

RECUWATT Conference – Recycling and Energy, 25th March 2011

Outline1. Introduction

2. Incineration of residual waste2.1. Status quo in Germany

2.2. Technology of waste incineration2.3. Problems and subjects of optimisation

3. Mechanical‐biological treatment of residual waste3.1. Status quo in Germany

3.2. Technology of mechanical‐biological waste treatment3.3. Technical, economic and ecological problems 

3.4. Output streams and mass balances

4. Conclusions and Summary2

Page 2: RECUWATT Conference - Stephanie Thiel lecture

Waste Management System – simplified illustration for household and commercial waste –

3

Outline1. Introduction

2. Incineration of residual waste2.1. Status quo in Germany

2.2. Technology of waste incineration2.3. Problems and subjects of optimisation

3. Mechanical‐biological treatment of residual waste3.1. Status quo in Germany

3.2. Technology of mechanical‐biological waste treatment3.3. Technical, economic and ecological problems 

3.4. Output streams and mass balances

4. Conclusions and Summary4

Page 3: RECUWATT Conference - Stephanie Thiel lecture

Thermal treatment of mixed municipal waste in Germany 

Number of plants and their capacity• 67 Waste incineration plants• 1 Pyrolysis plant

Total68 plants

about 19 million t/a

5

Grate furnace with a post‐combustion chamber

6

Page 4: RECUWATT Conference - Stephanie Thiel lecture

Example of a waste incineration plant

7

Reduction in emissions of pollutants from WIPs

Basis of data: Federal Ministry for the Environment, Nature Conservation and Reactor Safety, 2008

8

Page 5: RECUWATT Conference - Stephanie Thiel lecture

Problems posed by the incineration of waste and subjects of optimisation

• corrosion in the steam generator

9

• fouling of the heating surfaces• reduction of nitrogen oxides – selective non catalytic reduction (SNCR)

• availability

• waste throughput

• energy efficiency• economic efficiency

Source: CheMin GmbH Source: Uhlig Rohrbogen GmbH Source: CheMin GmbH

Corrosion damage on a tube wall Weld‐cladding of a tube wall Superheater tubes with cladding

Outline1. Introduction

2. Incineration of residual waste2.1. Status quo in Germany

2.2. Technology of waste incineration2.3. Problems and subjects of optimisation

3. Mechanical‐biological treatment of residual waste3.1. Status quo in Germany

3.2. Technology of mechanical‐biological waste treatment3.3. Technical, economic and ecological problems 

3.4. Output streams and mass balances

4. Conclusions and Summary10

Page 6: RECUWATT Conference - Stephanie Thiel lecture

Mechanical(‐biological) waste treatment plants 

in Germany

61 M(B)T plants

Plant throughputs:25,000 – 300,000 t/a

Total capacity:6.4 million t/a

11

12

Material Stream Separation

Page 7: RECUWATT Conference - Stephanie Thiel lecture

Mechanical Processingminimum basic equipment:

• comminution

• screening

• magnetic separation

further possible aggregates:

• air classification

• ballistic separation

• eddy current separation

• near‐infrared spectroscopy (NIR sorting)

• x‐ray sensors

• colour sensors in the range of visible light

• hard material separation

• long parts separation

• manual sorting

• thermal drying

• pelletization

Process flowsheet of the BMA Dresden

13

Biological Treatment

• intensive and secondary rotting

• biological drying

• fermentation– and secondary rotting– and aeration of the digestate

• percolation process

14

Page 8: RECUWATT Conference - Stephanie Thiel lecture

Flue Gas Purification• dust filter

• biofilter

• acid scrubber• Regenerative Thermal Oxidation (RTO)

left: 

acid scrubber

right: 

RTO

15

Problems posed by the mechanical‐biological treatment of waste I

Mechanical processing

• High level of wear, tear and energy requirement with processing and conveying aggregates, e.g. comminution, pelletization

• Blockages and contamination, e.g. during screening and ballistic separation

• increased time and effort for cleaning, maintenance and repairs,thereby reduction of time availability and throughput

• Personnel requirement often significantly underestimated

16

Page 9: RECUWATT Conference - Stephanie Thiel lecture

Problems posed by the mechanical‐biological treatment of waste II

Fermentation

• At 5 plants operating with wet fermentation and aeration of the digestate insludge activation tanks, partly serious operational errors occurred during thecommissioning, including deflagration/fire and bursting of a fermentation reactor

• strongly fluctuatingproduction of biogasdue to discontinuoussubstrate‐entry 

• waste water: possibility of high amount, complex and very costlytreatment is necessary

Typical production of gas  in the MBT Hannover plant – smoothed waveform

Source: Vielhaber, B.; Nülle, C. (2008), revised.

17

Problems posed by the mechanical‐biological treatment of waste III

Flue Gas Purification – Regenerative Thermal Oxidation (RTO)• blocking of the ceramic honeycomb structure through siloxanes in the flue gas  • dimensioning frequently too small and lacking redundancy • corrosion in the casing of the RTO and the gas pipes• energy requirement frequently underestimated

Landfill fraction• The landfill fractions from MBT have a higher organic proportion, and therefore 

a higher biological activity than ash/slag from waste incineration plantsMethane emissions (climate‐damaging) increased mobilisation of pollutants such as heavy metals

• It was not possible to comply with the assignment criteria specified for the landfilling of ash/slag from waste incineration plants

less strict criteria were defined for landfilling of secondary waste from MBT

Corrosion • e.g. buildings, ventilation system of the rotting system, RTO

18

Page 10: RECUWATT Conference - Stephanie Thiel lecture

CostsThe waste disposal costs with MBT plants are similar to those with waste incineration plants

They comprise the costs for• construction and operation of the MBT plant• combustion of solid recovered fuel (SRF) and further

combustible fractions for waste incineration plants (WIP)• landfilling of the landfill fractions

• transports

Waste disposal costs for municipal solid waste in Germany: approximately 100 Euro per ton

19

20

Reality:

False reasoning:

in every MBT plantsolid recovered fuelis produced

intermediatestorage

solid recovered fuelpower stations

Page 11: RECUWATT Conference - Stephanie Thiel lecture

21

Comparison of the systems of MBT and WIP

22

Mass balance of M(B)T plants throughout Germany 

estimation, 11/2007

Page 12: RECUWATT Conference - Stephanie Thiel lecture

Outline1. Introduction

2. Incineration of residual waste2.1. Status quo in Germany

2.2. Technology of waste incineration2.3. Problems and subjects of optimisation

3. Mechanical‐biological treatment of residual waste3.1. Status quo in Germany

3.2. Technology of mechanical‐biological waste treatment3.3. Technical, economic and ecological problems 

3.4. Output streams and mass balances

4. Conclusions and Summary23

Conclusions and Summary – Incineration 

• the most developed residual waste treatment process 

• ideal combination of waste treatment and energy supply (electricity, process heat, district heating and/or remote cooling)

• combined heat and power generation is pre‐condition for highenergy efficiency

• pollutant sink for harmful substances in waste

• emissions of pollutants: dramatic fall in comparison with the period prior to 1990 – clear undercut of the limit values on annual average

• problem of corrosion – solutions for reduction are disposable

• availability, energy efficiency and economic efficiency are further optimised in several plants

24

Page 13: RECUWATT Conference - Stephanie Thiel lecture

Conclusions and Summary – Mechanical‐biological treatment

•MBTs are complex waste treatment plants with a wide rangingvariety of technical configurations

• various technical, economic and ecological problems,partly solved and partly still subject of optimisation

•MBT cannot replace waste incineration – MBT is only a pre‐treatment of waste prior to its incineration

• incineration is simply delayed – more complex system with more material streams and treatment steps

• altogether in Germany almost 60 wt % of the waste input of MBTs finally are incinerated

• in Germany waste disposal costs with MBTs and WIPs are similar

25

Reserve‐Folien

26

Page 14: RECUWATT Conference - Stephanie Thiel lecture

ENERGY CONVERSION THROUGH WASTE INCINERATION IN GERMANY

Evaluation of 64 of 68 plants for the thermal treatment of municipal waste 

44 plants:  both electrical power as well as heat (as district heat or steam)  Combined heat and power

9 plants: electrical power only9 plants: Provision of steam to an external user (full)

(generally to a power station or a combined heat and power plant)2 plants: district heat only

CONTRIBUTION OF WASTE INCINERATION TO THE SUPPLY OF ENERGY

19 million t of waste are incinerated in Germany:

~ 5 million MWh electricity

~ 15 million MWh district heat

Energy efficiency

28

Measures to increase energy efficiency – examples

• combined heat and power generation

• heat utilisation as process heat, district heating, remote cooling(examples: Wien, Kassel)

• reduction of the flue gas temperature• reduction of the flue gas volume

• elevation of the live steam temperature and pressure

• reheating• preheating of secondary air• preheating of condensate

Page 15: RECUWATT Conference - Stephanie Thiel lecture

29

Attainable net efficiency (depending on the individual basic conditions):

• pure electricity generation: up to > 30 %• concurrent generation of electricity anddistrict heating/process heat: overall efficiency: 70‐80 %

• pure generation of process heat: up to > 90 % Political definition

gross energy efficiency assessed by the R1 formula 

– range of german WIPs

Technical/scientific definitionnet energy efficiency

Energy efficiency

30

Mechanical‐Biological Stabilization

Page 16: RECUWATT Conference - Stephanie Thiel lecture

31

Mechanical‐Physical Stabilization

32

Mechanical(‐Biological) Pre‐Treatment prior to Incineration

Page 17: RECUWATT Conference - Stephanie Thiel lecture

33

34

Processes for the purification of waste water (simplified)

Source: Schalk, P. (2003)

Page 18: RECUWATT Conference - Stephanie Thiel lecture

In case of a planned opening of the plants that are currently under construction

– Projects are not considered–

End of 2011 presumably:

36 plants

4.81 million t/a

35

36

Mass balances of exemplary M(B)T plantswith production of high‐quality SRF