19
Description of document: Logs of Congressional Correspondence to the Nuclear Regulatory Commission (NRC), 2011-2012 Request date: 2013 Released date: 07-June-2013 Posted date: 08-December-2014 Records enclosed: 2011 & 2012 Electronic Document Agency Tracking System, (EDATS) Quick Search log of Congressional Correspondence during the years 2011 & 2012 2013 Executive Director for Operations Tracking System (ETS) log of Congressional Correspondence during 2012 Source of document: US Nuclear Regulatory Commission Mail Stop T-5 F09 Washington, DC 20555-0001 Fax: 301-415-5130 E-mail: [email protected] The governmentattic.org web site (“the site”) is noncommercial and free to the public. The site and materials made available on the site, such as this file, are for reference only. The governmentattic.org web site and its principals have made every effort to make this information as complete and as accurate as possible, however, there may be mistakes and omissions, both typographical and in content. The governmentattic.org web site and its principals shall have neither liability nor responsibility to any person or entity with respect to any loss or damage caused, or alleged to have been caused, directly or indirectly, by the information provided on the governmentattic.org web site or in this file. The public records published on the site were obtained from government agencies using proper legal channels. Each document is identified as to the source. Any concerns about the contents of the site should be directed to the agency originating the document in question. GovernmentAttic.org is not responsible for the contents of documents published on the website.

Transcript of RECORDS BEING RELEASED IN THEIR ENTIRETY€¦ · Senator Robert Menendez : Letter : TASK CLOSEr :...

Page 1: RECORDS BEING RELEASED IN THEIR ENTIRETY€¦ · Senator Robert Menendez : Letter : TASK CLOSEr : SECY-2011-0179 New Jersey's Nuclear Safety Oyster Creek : ... 213 Congress Senator

Description of document: Logs of Congressional Correspondence to the Nuclear Regulatory Commission (NRC), 2011-2012

Request date: 2013 Released date: 07-June-2013 Posted date: 08-December-2014 Records enclosed: 2011 & 2012 Electronic Document Agency Tracking System,

(EDATS) Quick Search log of Congressional Correspondence during the years 2011 & 2012

2013 Executive Director for Operations Tracking System (ETS) log of Congressional Correspondence during 2012

Source of document: US Nuclear Regulatory Commission

Mail Stop T-5 F09 Washington, DC 20555-0001 Fax: 301-415-5130 E-mail: [email protected]

The governmentattic.org web site (“the site”) is noncommercial and free to the public. The site and materials made available on the site, such as this file, are for reference only. The governmentattic.org web site and its principals have made every effort to make this information as complete and as accurate as possible, however, there may be mistakes and omissions, both typographical and in content. The governmentattic.org web site and its principals shall have neither liability nor responsibility to any person or entity with respect to any loss or damage caused, or alleged to have been caused, directly or indirectly, by the information provided on the governmentattic.org web site or in this file. The public records published on the site were obtained from government agencies using proper legal channels. Each document is identified as to the source. Any concerns about the contents of the site should be directed to the agency originating the document in question. GovernmentAttic.org is not responsible for the contents of documents published on the website.

Page 2: RECORDS BEING RELEASED IN THEIR ENTIRETY€¦ · Senator Robert Menendez : Letter : TASK CLOSEr : SECY-2011-0179 New Jersey's Nuclear Safety Oyster Creek : ... 213 Congress Senator

NRC FORM 464 Part I U.S. NUCLEAR REGULATORY COMMISSION FOIA/PA RESPONSE NUMBER (10-2012)

RESPONSE TO FREEDOM OF INFORMATION ACT (FOIA) I PRIVACY

ACT(PA)REQUEST

2013-0218

RESPONSE TYPE

DFINAL [{]PARTIAL

REQUESTER DATE JUN 0 7 2013

D D D D D

PART I. --INFORMATION RELEASED

No additional agency records subject to the request have been located.

Requested records are available through another public distribution program. See Comments section.

!APPENDICES

i

-~ 1

Agency records subject to the request that are identified in the listed appendices are already available for j public inspection and copying at the NRC Public Document Room.

Agency records subject to the request that are identified in the listed appendices are being made available for public inspection and copying at the NRC Public Document Room.

Enclosed is information on how you may obtain access to and the charges for copying records located at the NRC Public Document Room, 11555 Rockville Pike, Rockville, MD 20852-2738.

I/] IAPPENDICES ---1 L!..J I A ! Agency records subject to the request are enclosed.

L__ ______ ~ D Records subject to the request that contain information originated by or of interest to another Federal agency have been referred to that agency (see comments section) for a disclosure determination and direct response to you.

[{] We are continuing to process your request.

D See Comments.

AMOUNT*

PART I.A -- FEES

D You will be billed by NRC for the amount listed.

D You will receive a refund for the amount listed.

[{] None. Minimum fee threshold not met.

D Fees waived.

s I o.oo • See comments

for details

D

D D

PART 1.8 --INFORMATION NOT LOCATED OR WITHHELD FROM DISCLOSURE

No agency records subject to the request have been located. For your information, Congress excluded three discrete categories of law enforcement and national security records from the requirements of the FOIA. See 5 U.S.C. § 552(c) (2006 & Supp. IV (2010). This response is limited to those records that are subject to the requirements of the FOIA. This is a standard notification that is given to all our requesters and should not be taken as an indication that excluded records do, or do not, exist.

Certain information in the requested records is being withheld from disclosure pursuant to the exemptions described in and for the reasons stated in Part II.

This determination may be appealed within 30 days by writing to the FOIA/PA Officer, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Clearly state on the envelope and in the letter that it is a "FOIA/PA Appeal."

PART l.C COMMENTS (Use attached Comments continuation page if required)

SIGNATURE - FREEDOM OF INFORMATION ACT AND PRIVACY ACT OFFICER

Donna L. Sealing

NRC FORM 464 Part 1 (10-2012)

Page 3: RECORDS BEING RELEASED IN THEIR ENTIRETY€¦ · Senator Robert Menendez : Letter : TASK CLOSEr : SECY-2011-0179 New Jersey's Nuclear Safety Oyster Creek : ... 213 Congress Senator

RE: FOIA/PA-2013-00218

APPENDIX A RECORDS BEING RELEASED IN THEIR ENTIRETY

NO. DATE DESCRIPTION/PAGE COUNT

1. 2011 & 2012 Electronic Document Agency Tracking System, (EDA TS) Quick Search log of Congressional Correspondence during the years 2011 & 2012 (10 Pages)

2. 2013 Executive Director for Operations Tracking System (ETS} log of Congressional Correspondence during 2012 {6 Pages}

Page 4: RECORDS BEING RELEASED IN THEIR ENTIRETY€¦ · Senator Robert Menendez : Letter : TASK CLOSEr : SECY-2011-0179 New Jersey's Nuclear Safety Oyster Creek : ... 213 Congress Senator

Page 1 oflO

Task Number OEDO

OEDo-2011-0204

OEDO-2011-0256

OEDO-2011-0276

OEDo-2011-0285

OEDo-2012-0157

OEDo-2012-0352

OEDo-2012-0528

OEDo-2012-0536

SBCR

SBCR-2011-0003

SECY

SECY-2011-0021

SECY-2011-0061

SECY-2011-0062

SECY-2011-0076

SECY-2011-0099

SECY-201l-0107

SECY-20ll-01LS

Subject

Description of Actions Taken to Ensure Safety

Measures of Public Health and the Environment

Post Hearing Questions from the March 31,

2011 Hearing on 2012 Budget Request for the

Nuclear Regulatory Commission and

Department of Energy's Nuclear Energy

Programs

Post Hearing Questions from the March 16, 2011 Hearing on FY

2012 DOE/NRC Budgets and the March

30,2011 Hearing on Nuclear Safety

Post Hearing Qs from the March 30, 2011

Hearing on Improving the Nation's Response

to catastrophic Disasters: How to

Minimize COsts and Streamline our

Emergency Management Program

Request for Automated Dose History Report

Post Questions from the June 13, 2012

Hearing on Nomination of Allison Macfarlane and Re-Nomination of

Kristine L. Svinicki

Questions from the July 24, 2012 Hearing on

"NRC Policy and Governance OVersight"

Palisades Nuclear Generating Station ­

Request for Information Regarding the August 12, 2012

Shutdown of the Nuclear Reactor

Safety Concerns Regarding Kewaunee

Power Plant

COntract Specialist Position

Compliance with FOlA Procedures

Distribution of Smoke Alarms Which Require

NRC Licensing Safety Concerns at

Kawaunee Power Plant

Southern Nuclear Company - Edwin I.

Hatch

vermont Yankee Decommissioning

Process

Security Violation at Pilgrim Power Station

APIOOO Reactor Design Approval

Description Originating Organization

Congress

Congress

Congress

Congress

Congress

Congress

Congress

Congress

Congress

Congress

Congress

Congress

Congress

Congress

Congress

Congress

COngress

Quick Search

Originator

Representative Dennis J. Kucinich

House of Appropriations Subcommittee on Energy & Water Development

Rep. Bobby L Rush/Rep. Jim Matheson/Sen. Mary landrieu

Representative Jeff Denham

Representative Jared Polis

Senator Barbara Boxer and Senator James M. Inhofe

Representative Ed Whitefield

Representative Edward J. Markey

Senator Herb Kohl

Representative Chris Van Hollen

Representative Darrell Issa

Representative Gary G. Miller

Senator Herb Kohl

Senator Johnny Isakson

Sen. Patrick leahy, Sen, Bernard Sanders, Rep. Peter Welch

Representative Edward J. Markey

Representative Edward J. Markey

Incoming Task Type Current Stet:

letter TASK CLOSE[

Post Questions Process Task Assi,

Post Hearing Q's Process Task Assi!

Letter TASK CLOSE[

Letter TASK CLOSE!

Letter Process Task Assi!

letter Process Task Assi,

Letter OCM Signatur

Letter TASK CLOSE[

Letter TASK ClOSE!

letter TASK CLOSE!

Letter TASK CLOSE!

Letter TASK CLOSE!

Letter TASK CLOSE!

Letter OCM Signature Cic

Letter TASK CLOSE[

Letter TASK CLOSE[

,/~, f f

06/05/2013

Page 5: RECORDS BEING RELEASED IN THEIR ENTIRETY€¦ · Senator Robert Menendez : Letter : TASK CLOSEr : SECY-2011-0179 New Jersey's Nuclear Safety Oyster Creek : ... 213 Congress Senator

Page 2 of 10

Nuclear Proliferation Assessment as Part of

the Process for

SECY-2011-0126 Commercial Applications for

Congress Rep. Howard L Berman and Rep. Ileana Ros-Lehtinen Letter oeM Signatur

Enrichment and Reprocessing Technologies

Nuclear Proliferation Assessment as Part of

the Process for

SECY-2011-0127 Commercial Applications for Congress Rep. Jeff Fort~nbeny and Rep. Adam Schiff Letter oeM Signatur

Enrichment and Reprocessing Technologies

SECY-2011-0139 Vermont Yankee Decommissioning

Congress Representative John W. Olver Letter TASK CLOSE!

Seismic Safety Features

SECY­20 11-0142 in United Stares Operational Nuclear

Congress Representative Edward J. Markey and Representative lois Capps Letter TASK CLOSE[

Reactors

Potential Impacts of the Earthquake in

SECY-2011-0143 Japan and Implications Congress Representative Edward J. Markey Letter Process Task Assi! for our Domestic

IndJstry

SECY-2011-0147 Indian Point Congress Nita M. Lowey Letter TASK CLOSE!

Description of Actions Taken to Ensure Safety

SECY-2011-0148 Measures of Public Congress Representative Dennis J. Kucinich Letter oeM Signature Cie Health and the Environment

Safety of Nudear SECY-2011-0149 Power Plants ­ Congress Senator Barbara Boxer and Senator Dianne Feinstein Letter Process Task Assi!

Earthquake Faults

Impacts on the Release

SECY-2011-0150 of Radiation from the

Fukushima Daiichi Congress Representative Earl Blumenauer Letter TASK CLOSE!

Nuclear Facility

Investigation of Nuclear Facilities In the United

SECY-2011-0151 States Withstand Congress Senator Barbara Boxer and Senator Tom Carper Letter Assign OEDO Sec. Catastrophic Natural or

Man-Made Disasters

NRC'S Assessment of Damages (1) and Assessment of the

SECY-2011-0156 Worst Case Consequences

Congress Senator Edward J. Markey Letter TASK CLOSE[

Assodated with the Current Nuclear

Emergency in Japan (2)

NRC's Oversight of 5ECY-201l-0158 Nuclear Power Plants in Congress Senator Richard Blumenthal Letter TASK CLOSEI

the United States

Conduct an

SECY-2011-0163 Investigation of All Nuclear facilities in the Congress Senator Barbara Boxer Letter TASK CLOSE!

United States

Ucense Renewal

SECY-2Qll-0168 Process for Diablo Canyon Nuclear Power Congress Representabve lois Capps Letter EDO Signatur

Plant SECY-2011-0173 Hatch Nuclear Plant Congress Representative Jack Kingston Allegation TASK CLOSE!

SECY-20ll-0I7S New Jersey's Nuclear Safety Congress Senator Robert Menendez Letter TASK CLOSEr

SECY-2011-0179 New Jersey's Nuclear Safety Oyster Creek Congress Senator Frank R. Lautenberg Letter TASK CLOSEI

Michigan House Concurrent ResolUtion

No.4 - Urging DOE and SECY·2011-0182 NRC to Allow Yucca Congress Gary L. Randall Letter Signature Close

Mountain Repository to Begin Accepting High-Level Nuclear Waste Level of Risk from

Accident at Japan's SECY-2011-0185 Fukushima Daiichi Congress Senator Maria Cantwell Letter TASK CLOSEI

Nuclear Poses on Washington State

Porentiai Impacts of the Earthquake in

SECY-2011-0195 Japan and Implications Congress Representative Edward J. Markey Letter Acceptance Rev for our DomestiC

Industry

Generic Issue 199: "Implications of

Updated Probabilistic

06/05/2013

Page 6: RECORDS BEING RELEASED IN THEIR ENTIRETY€¦ · Senator Robert Menendez : Letter : TASK CLOSEr : SECY-2011-0179 New Jersey's Nuclear Safety Oyster Creek : ... 213 Congress Senator

Page 3 of 10

Seismic Hazard Estimates in Center and Eastem United States

SECY-201J.0202 on Existing Plants" - Congress Senator Kirsten E. Gililbrand Letter TASK CLOSEr Seek Additional

Information/Completion of Assessment

license Transfer­SECY-2011"()213 Congress Senator Joseph 1. Lieberman Letter TASK CLOSE[ARMZ/Uranium One

Business Operations SECY-2011-0221 Development of Congress Senator Mark Kirk Letter Acceptance Rev

Nuclear Technologies

Agency Operations in SECY-2011-0222 the Absence of Congress Representative Darrell Issa Letter TASK CLOSEr

Appropriations

Suggestion for Remediation of theSECY-2011-0224 Congress Representative John J. Duncan, Jr. Letter TASK CLOSE[Japanese Nudear

Disaster Assessment of the

Safety and Viability of SECY-2011"()228 America's On-Site Congress Senator Richard Blumenthal Letter TASK QOSE[

Nuclear Waste Storage Facilities

Movement of Nuclear Fuels Spent Fuel

SECY-2011-0229 Congress Senator Dianne Feinstein Letter TASK CLOSE[Pools into Dry cask Storage Systems

Delay License Renewal Application for DiabloSECY-2011"()234 Congress Representative lois capps Letter TASK CLOSEr canyon Nuclear Power

Plant

Nuclear Regulatory Commission Evacuation

Recommendation forSECY-2011"()235 Congress Senator Jim Webb Letter TASK CLOSE[U.S. Residents Within 50 Miles of Fukushima

Reactors Post-Fukushima

Meltdown Inspections SECY-2011-0239 Conducted by NRC at Congress Edward J. Markey Letter TASK QOSEl

U.S. Nuclear Power Plants

Examine Seismic and Tsunami Hazards, Operational Issues,

Plant Security, Emergency

SECY-2011-0252 Preparedness, Spent Congress Senator Dianne Feinstein Letter TASK CLOSE[ Fuel Storage Options

and Elements of Nudear Power Planfs Design Basis Within Rellcensing Process

Urges Wlllte House_~ ..;-~-. "" .;~ 'Cooidinall with Nil. .,,~ .'" and FEMA to Ensure

SOundness of the Emergency Evacuation

SECY-2011-0258 ProceSS/Full Congress Representative Nita M. Lowey Letter TASK QOSE[ Consideration of the

RiSks and Consequences

Associated with Indian Point

Nuclear Emergency in SECY-20 11-0259 Light of the Japan Congress Senator Richard G. Lugar Letter TASK CLOSEr

Nuclear Incident Urges White House to Coordinate with NRC and FEMA to Ensure

SOundness of the Emergency Evacuation

SECY-2011-0260 Process/Fu[J Congress Representative Nita M. Lowey Letter TASK CLOSEr Consideration of the

Risks and Consequences

Assodated with Indian Point

American Technology ­Plan that Addresses the Contamination of the

SECY-2011-0265 Congress Senators Sheldon Whitehouse, Saxby Chambiiss & Johnny Isakson Letter TASK CLOSErOcean Near the Fukushima Daiichi

Reactor

SECY-2011-0269 Employment Congress Erick Garcia Luna, Senator Amy Klobuchar Fax OEDO Signature a Post Hearing Questions from the April 12, 2011

Hearing Before the Committee on

06/05/2013

Page 7: RECORDS BEING RELEASED IN THEIR ENTIRETY€¦ · Senator Robert Menendez : Letter : TASK CLOSEr : SECY-2011-0179 New Jersey's Nuclear Safety Oyster Creek : ... 213 Congress Senator

Page 4 of 10

Environment and Public Works Regarding

SECY-2011-0281 "Review of the Nuclear Emergency in Japan Congress Senator Barbara Boxer and Senator James M. Inhofe Letter TASK CLOSE!

and Implications for the U.S."

Town of Plympton's

SECY-2011-0287 Acceptance into the PiIgMm Emergency Congress Senator Scott P. Brown Letter TASK CLOSE!

Planning Zone Pilgrim Nudear Power

SECY-2011-Q290 Plant - May 10, 2011 Congress Representative Edward J. Markey Letter TASK CLOSE! Event

Urges the NRC to Initiate Rulemaking

SECY-2011-0296 Process to Require a More Rapid Shift: of

Congress Senator Dianne Feinstein Letter TASK CLOSE[

Spent Nuclear Fuel to Dry Cask Storage

Oversight of Safety at SECY-2011-0302 Nuclear Plants in the Congress Senator AI Franken Letter TASK CLOSE!

United States Recent Inspection of

SECY-2011-0312 Indian Point Nuclear Generating Units 2 and Congress Senator Kirsten E. Gillibrand Letter TASK CLOSE!

3 ACRS Request for

Scientific Data Necessary to Review

SECY-2011-Q317 the NRCs Response to Fukushima Daiichi Congress Representative Darrell Issa Letter OCM Signatur

Nuclear Power Fadlity Incident/Decision-

Making Process

Clean-up of Radioactive SECY-2011-0319 Water Caused by the Congress Representative Lynn Woolsey Fax TASK CLOSE!

Japan Earthquakes

NRCs Annual

SECY-2011-0328 Assessment Meeting for Indian Point Energy Congress Represenlative Nita M. Lowey Letter TASK CLOSE!

Center

SECY-2011-0337 Pilgrim Nuclear Power Plant Safety Concerns Congress Senator Scott P. Brown Letter TASK CLOSE!

Post Hearing Q's from the May 13, 2011

SECY-2011-Q344 Hearing Entitled Congress Rep. Paul Broun and Rep. Andy Harris Letter Signature Oose Nuclear Energy Risk

Management

Post Hearing Q's from the April 6, 2011

SECY-2011-0345 Hearing Entitled· The

U.S. Government Response to the

Representative Fred Upton, Congress Carly McWilliams E-rnail Signature Close

Nuclear Power Plant Inddent in Japan

Distribution of Potassium Iodide

SECY-2011-0349 (Kl)/Residents Within Congress Representative Edward J. Markey, et aI., Letter TASK CLOSE! 20 Miles of Nuclear

Power Plants

Indian Point Units 2

SECY-2011-0364 and 3 - Recent InspectiOn and Safety Congress Senator Kirsten E. GlIIibrand Letter TASK CLOSEt

Concerns

SECY-2011-0366 Indian Point - Safety Concerns

Congress Senator Kirsten E. Gillibrand Letter TASK CLOSE!

SECY­20 11-0367 Indian Point - Safety Concerns Congress Senator Kirsten E. Gillibrand Letter Acceptance Rev

SECY-2011-0371 Security Clearance Assislance Congress Senator Jeff Sessions Letter TASK CLOSEI

SECY-2011-0373 Operating and Aging GE Mark I Reactors Congress Senator Ha rry Reid Letter TASK CLOSEI

Independent Investigation Regarding

SECY-2011-0374 Fukushima - Urging Congress Senator Harry Reid Letter TASKCLOSH NRC not to Grant New

Permits

Security Concerns at SECY-2011-0378 Palisades Nuclear Congress Senator Carl Levin Letter TASK CLOSE!

Power Plant

Safety of Nuclear

SECY-2011-0379 Power in the Aftermath of the Japanese Congress Senator Jack Reed Letter TASK CLOSE!

Nuclear Crisis

License Permitting SECY-2011-0389 Radioactive Waste from

Germany to be Congress Representative Bob Goodlatte Letter TASK CLOSEI

Incinerated at Oak

06/05/2013

Page 8: RECORDS BEING RELEASED IN THEIR ENTIRETY€¦ · Senator Robert Menendez : Letter : TASK CLOSEr : SECY-2011-0179 New Jersey's Nuclear Safety Oyster Creek : ... 213 Congress Senator

Page 5 of 10

Ridge, Tennessee

June 2011 GAO Report entitled, 'Nudear

Regulatory Commission, OverSight

SECY-2011-0390 of Underground Piping Systems Congress Representative Jon Runyan Letter TASKCLOSEI

Commensurate with Risk, but Proactive

Measures Could Help Address Future Leaks"

Constituent Concerns SECY-2011-0392 re: Radiation/Medical Congress Senator John McCain Letter TASKCLOSEI

Event Nuclear Accident

SECY-2011-0400 Notifications for Braidwood, Dresden,

Congress Senator Mark Kirk Letter TASK CLOSE!

and laSalle Stations

PosSible Strike of the International

SECY-201l-0401 Brothertlood of Congress Senator Kirsten Glilibrand Letter TASK CLOSEI EledJical Workers Local

97 at Nine Mile POint

Decision-Making Process Related to the

Pending Ucense SECY-2011-0403 Application for Congress Rep. Fred Upton, Rep. John Shimkus Letter TASK CLOSE!

Construction of a High-Level Waste Repository

at Yucca Mountain

Comparison of U.S.

SECY-201 Hl404 Regulatory

Requirements with Congress Senator James Inhafe Letter Assign OEDO Sec,

Those in Japan

Rulemaking on Design SECY-2011-0405 Certifications for the Congress Representative Jason Altmire, et al. Letter TASK CLOSE!

Westinghouse AP1000

Constituent's Concern

SECY- 20 11-0408 re: Possible Contaminated Property Congress Representative Kathy Hochul letter Process Task Assi!

Due to Burted Waste

NRC Safety Requirements for

SECY-2011-D411 ReactOfS Granted Congress Representative Edward Markey letter TASK ClOSEI Construction Permits

Prior to 1971

Status Update on SECY-2011-0413 Events at Dresden Congress Representative Bobby L. Rush Letter TASK CLOSE!

Generating Station

Recommendations for Enhancing Reactor Safety in the 21st

Century: The Near­SECY-2011-0421 Term Task Force Congress Representative Fred Upton, et al. Letter OCM Signatur

Review of Insights from the Fukushima Dai-lchi Accident - Process of

Review

SECY-2011-0430 Indian Point Safety

Concems Congress Representative Nita M. Lowey letter OCM Signatur

SECY-2011-0433 Calvert Olffs Congress Benjamin Cook E-mail TASK CLOSE! Safety Concerns with

SECY-201Hl442 westinghouse APl000 Congress Representative Edward J. Markey Letter TASK CLOSE[ Nuclear Reactor Design

Post Hearing Questions from the June 16, 2011 Oversight Hearing on

SECY-2011-0455 the NRC's Preliminary Results of the Nuclear Congress Senator Barbara Boxer and Senator James M. Inhofe letter TASK CLOSE!

Safety Review in the U.S. Following Events at Fukushima Daiichl

Exelon Generation Company, llC - Peach Bottom Units 2 and 3 ­

SECY-2011-0457 Environmental Congress Senator Robert Casey E-mail TASK CLOSE! Assessment and

Finding of No Significant Impact

SECY-2011-0459 Safety Concerns at Nuclear Power Plants

Congress Senator Richard G. lugar letter TASK CLOSE!

Safety Concerns at Fort SECY-2011-0460 Calhoun Nuclear Power Congress Senator Herb Kohl Letter TA5KClOSE!

Plant

SECY-2011-0461 Pa'ina Hawaii llC Congress Representallve COileen Hanabusa letter TASKCLOSE(

SECY-2011-0463 Nuclear waste Dump Sites In Utah Congress Senator Harry Reid letter TASK CLOSE!

Safeguarding Nuclear

06/05/2013

Page 9: RECORDS BEING RELEASED IN THEIR ENTIRETY€¦ · Senator Robert Menendez : Letter : TASK CLOSEr : SECY-2011-0179 New Jersey's Nuclear Safety Oyster Creek : ... 213 Congress Senator

Page 6 of 10

Reactors from Natural and Manmade

SECY-2011-0468 Disasters and Congress Representative Roscoe G. Bartlett Letter OCM Signatur Electromagnetic Pulse

(EMP) Blue Ribbon

SECY-2011-0472 Commission - 51Drage Congress Senator Ron Johnson E-mail TASK CLOSE! of Nuclear Waste

Proper Maintenance of SECY-2011-0484 Emergency Diesel and Congress Representluve Edward J. Markey Letter OCM Signatur

Battery Generators

Drinking Water Threat ­SECY-2011-0485 limerick Nudear Power Congress Representative Jim Gerlach E-mail TASK CLOSE!

Plant

Reeva!uate and Upgrade Protection

Against Hurricanes and

SECY-2011-1J491 Other Extreme Weather

Events at Nuclear Congress Representltlve Edward J. Markey Letter TASK CLOSE!

Power Plants/Near-Term Task Force

Report on Fukushima

Safety from Threats

SECY-2011-0492 Posed by NUClear Fadlities Following a

Congress Senator Barbara Boxer Letter TASK CLOSE[

Natural Disaster

Compliance with

SECY-2011-0493 Seismic Safety

Specifications for North Congress Representltlve Edward J. Markey letter ACS Closeoul

Anna

lincoln University Application to the

SECY-2011-0497 Nudear Regulatory

Commission's MinOrity Congress Senator Robert P. Casey, Jr. letter TASK CLOSE!

Serving Institutions Program

Post Hearing Questions from the April 6, 2011

SECY-2011-0S07 Hearing on Review of Congress Representative Cliff Stearns Letter TASK CLOSE! the Nuclear Incident in

Japan

Post Hearing Questions from the April 6, 2011

SECY-2011-0S08 Hearing on Review of Congress Representative Cliff Steams Letter Signature Close the Nudear Incident in

Japan Regulation

Identification Number SECY-201HlS14 (RULE) Flexibility on Congress Representative Nita M. Lowey Letter TASK CLOSE!

Relicensing Terms ­Indian Point

SECY-2011-0515 Relicenslng of Indian Point Congress Representative Nita M. Lowey Letter TASK CLOSE!

Constituent's Concern SECY-2011-0526 reo Boiling Water Congress Senator Jeff Bingaman Letter TASK CLOSE[

Reactors

SECY-2011-0S47 Operating license for Construction at Vogtle Congress Senator Jim DeMint letter OEDO Signature CI

Safe Operation of the SECY-2011-0556 Davis-Besse Nuclear Congress Representltive Edward J. Markey letter Management Reo

Power Plant The Nuclear Regulatory

Commission's Regulations and

Expectations Related to SECY-2011-0564 Licensees' Statements Congress Representative Edward J, Markey letter OCM Signatur

to the Media and Other Members of the Public -

Entergy Nuclear and Vermont Yankee

Post Hearing Questions from the October 6,

2011 Oversight Hearing

SECY-2011·0567 on Federal ACtions to Clean Up Congress Senator Barbara Boxer & Senator James M, Inhofe letter Process Task Assi!

Contlmination from Uranium Mining and Milling Operations

Post Hearing Questions from the August 2, 2011 Hearing on

Review of the N Res SECY-2011-0568 Near-Term Task Force Congress Senator Barbara Boxer, Senator James M. Inhofe letter TASK CLOSE!

Recommendations for Enhancing Reactor Safety In the 21st

Century

SECY-2011-0569 Distribution of Bad Data In the Nuclear

Congress Senator Richard G. lugar Letter OEDO Signature CI

06/05/2013

Page 10: RECORDS BEING RELEASED IN THEIR ENTIRETY€¦ · Senator Robert Menendez : Letter : TASK CLOSEr : SECY-2011-0179 New Jersey's Nuclear Safety Oyster Creek : ... 213 Congress Senator

Page 70flO

Industry

National Research Universal (NRU) Tests TRAC/RElAP Advanced

SECY-2011-0582 Computational Engine Congress Senator James E. Risch Letter TASK CLOSE! (TRACE) Predictions ­

Code Development Program

Cracks in the Concrete Wall of the Shield

SECY-2011"()631 Building of the Davis- Congress Representative Oennls J. Kudnich Letter TASK CLOSEI Besse Nudear Power

Plant

SECY-2011-0635 Seabrook Congress Senator Jeanee Shaheen letter OE DO Signature CI Recent Results of

Nudear Regulatory SECY-20 11-0639 CommiSSion Congress Representative Edward J. Markey Letter TASK CLOSE!

Investigation of Palisades Shutdown

Dissolution of Concrete

SECY-2011-0640 In Safety Related

Systems at Nuclear Congress Rep. Edward J. Markey and Rep. JOhn F. Tierney Letter TASK CLOSE[

Power Plants

Current Environment at the NRC and

SECY-2011-0654 Management Congress Representative Darrell Issa Letter TASK CLOSE[ Commitment to Its Va lues and Culture

Clatification re: National Research

SECY-201H672 Universal (NRU) Tests Discussed In the

Congress Senator James E. Risch Letter TASK CLOSEr

12/06/11 Ltr to Senator Risch

SECY-2011-ll676 New Power Plant In Alabama

Congress Senator Harry Reid Letter TASK CLOSE!

Retention of the Inte!lectua I

Expertise/Preservation of the Scientific

SECY-201l-0001 Information and

Records During the Congress Senator Mark Kirk, et al. Letter TASK CLOSE!

Consideration of Yucca Mountain as a

Geological Waste Repository

Post Hearing Questions from the December 14.

SECY-2012"()027 2011 Hearing Entitled "The Leadership of the Congress Representative Darrell Issa Letter Process Task AsS;,

Nuclear Regulatory Commission"

Testing of Water Steam per PRM S(}-76­

SECY-20l2-0060 Clarification of Congress Senator James E. Risch Letter TASK CLOSE! Information Received in 12/6/11 Response

SECY-20ll-0072 St. Lucie Nudear Power Plant Congress Senator Bill Nelson Letter TASK CLOSE!

San Onofre Nudear SECY-ZOn-0073 Generating Station Congress Barbara Boxer letter TASK CLOSE!

Safety Issues Post Hearing Questions from the December 15,

2011 Hearing on Review of the NRCs

SECY-201l-0077 Near-Term Task Force Congress Senator Barbara Boxer and Senator James M. Inhofe Letter Process Task AssI! Recommendations fOr

Enhancing Reactor Safety in the 21st

Century Safety and Security of United States Nudear

Power Plants and Ongoing Review of

SECY-2012-00S6 Processes and Regulations of the Congress Representative Brad Sherman Letter TASK CLOSEt

United States Plants Following the Accident at Fukushima DaHchl

Plant

Urges NRC Not to Reiicense the Pilgrim Nuclear Power Station

SECY-2012-0096 Until All Legal Requirements Congress RepresentaUve Edward J. Markey Letter TASK CLOSEr

Stipulated by the Endangered Species Act Have Been Met

06/05/2013

Page 11: RECORDS BEING RELEASED IN THEIR ENTIRETY€¦ · Senator Robert Menendez : Letter : TASK CLOSEr : SECY-2011-0179 New Jersey's Nuclear Safety Oyster Creek : ... 213 Congress Senator

Page 8 of 10

Turkey Point Nuclear

SECY-20l2-0097 Plant's Ability to Withstand and Respond

Congress Representative!beana Ros-Lehtlnen Letter TASK CLOSE[

In Possible Disaster

Post-Hearing Questions from the House Appropriations

SECY-2012-0122 Subcommittee on Congress Representative Harold Rogers E-mail TASKCLOSEI Energy and Water

Hearing of March 7, 2012

Concerns about Evacuation Plans for

SECY-2012-0127 Impacts of a Fukushima-level

Congress Representative Nita M. Lowey Letter TASK CLOSE!

Accident at Indian Point

SECY-2012-0128 Request for Automated Dose History Report Congress Representative Jared Polis Letter TASK CLOSE!

SECY-2012-0130 Personnel Matters Congress Senator Barbara Mikulski Letter TASK CLOSE[

Regulations and Polides to Undertake

Safety and Other SECY-2012-0131 Improvements by NRC Congress Representative Edward J. Markey Letter TASK CLOSEI

Ucensees as Part of Ucense Extension

Proceedings

Evacuation Plans and Medical

SECY-2012-0132 Countermeasures in Congress Representative Gus Bilirakls Letter TASK CLOSE! the Event of a Nuclear

Disaster

Evacuation Plans and Medical

SECY-2012-0133 Countermeasures In Congress Representative Gus Bilirakis Letter OEOO Signature CI the Event of a Nuclear

Disaster Near Term Task Force

Addressing Lessons

SECY-2012-0140 Learned from Fukushima ­ Congress Senator Dianne Feinstein Letter TASK CLOSE!

Implementation of Recommendations

SECY-2012-Q147 Seabrook Nudear Station Congress Senator Kelly A. Ayotte Letter TASK CLOSEt

Post Hearing Questions from the March 15,

2012 Hearing on Lessons from

Fukushima One Year SECY-2012-0159 Later NRC's Congress Senator Barbara Boxer and Senator James M. lnhofe Letter Process Task Ass;'

Implementation of Recommendations for

Enhandng Nuclear Reactor Safety in the

21st Century

Emergency Evacuation

SECY-2012-0176 Plans of Nuclear Power Plants Located In Congress Senator Robert P. casey, Jr. Letter TASK CLOSE[

Pennsylvania

Safety Issues at SECY-2012-0178 Seabrook Nuclear

Power Plant Congress Senator John f. Kerry E-mail OCM Signatur

United States Power

SECY-2012-0181 Plants in Comparison to Japan's Fukushima Dai- Congress Senator Richard G. Lugar Letter TASK CLOSE[

ichi

Seabrook Nuclear

SECY-201Z-0195 Power Plant ­Degradation of Congress Representatives Edward J. Markey & John F.1iemey Letter TASK CLOSE[

Concrete Nuclear Regulatory

CommisSion Letter to the Colorado

SECY-Z012-020S Department of Public Congress Representative Scott R. Tipton Letter TASK CLOSEt Health and the

Environment (CDPH E) Clarification

Emergency Evacuation

SECY-Z01Z-0209 Plans of Nuclear Power Plants Located In

Congress Senator Robert P. casey, Jr. Letter TASK CLOSEt

Pennsylvania

SECY-Z01Z-OZ10 St. Lucie Nuclear Power Plant Congress Senator Bill Nelson Letter TASK CLOSE[

The Nuclear Regulatory

SECY-2012-Q218 Commission's

Processes to Ensure Congress Representative Fred Upton, et al. Letter TASK CLOSEr Employees are Free to Raise Concerns without

06/05/2013

Page 12: RECORDS BEING RELEASED IN THEIR ENTIRETY€¦ · Senator Robert Menendez : Letter : TASK CLOSEr : SECY-2011-0179 New Jersey's Nuclear Safety Oyster Creek : ... 213 Congress Senator

Page 9 of 10

Fear of Reprisal Assessment of the

SECY-2012-o219 Current Conditions at

the Fukushima Dai-ichi Congress Senator Dianne Feinstein Letter TASK CLOSE!

Site Committee on

Government Reform's SECY-2012-0230 Investigation into Congress Representative Darrell Issa Letter New EDATSTc

Agency Spending on Conferences

Committee on Government Reform's

SECY-2012-0231 Investigation into Congress Representative Darrell lssa Letter TASK CLOSE[ Agency Spending on

Conferences National Technology

SECY-2012-0232 Transfer and

Advancement Act of Congress Senator Mark Udall Letter TASK CLOSE!

1995 GAO Report Nuclear Regulation: Nuclear

Regulatory Commission's Oversight

sECY-2012-0240 of Nuclear Power Reactors'

Congress Representative Edward J. Markey Letter TASK CLOSE!

Decommissioning Funds Could be Further Strengtihened (GAO-12­

. 0258)

sECY-2012-0241 Allegations from Region IV Employees

Congress Representative Edward J. Markey Letter TASK CLOSEt

Committee on Government Reform's

sECY-2012-o242 Investigation into Congress Representative Darrell E. Issa Letter TASKCLOSE[ Agency Spending on

Conferences Request for Documents

SECY-2012-0243 Related to tihe Safety of

San Onofre Nuclear Congress Senator Barbara Boxer Letter TASK CLOSE!

Generating Station Publish Radiological

SECY-2012-0247 Monitoring Data from Commercial Nuclear

Congress Senator Dianne feinstein Letter TASK CLOSE!

Power Plants

Funding Opportunity No: SBCR-FN-0511­

SECY- 2012-0250 MSIP02 Annual Congress Representative James E. Clyburn Letter Process Task Ass;' Summer camps and

Internships

establishing Policies for

SECY-2012-0256 Addressing Domestic VIOlence in tihe Federal Congress President Barrack Obama Memo TASK CLOSE[

Workforce Establishing Policies for

SECY-2012-0257 Addressing DomestiC Violence in tihe Federal Congress President Barrack Obarpa Memo Process Task Assi.

Workforce Establishing Policies for

SECY-2012-0258 Addressing Domestic Violence in the Federal

Congress President Barrack Obama Memo Process Task Assi!

Workforce Request that the

Nuclear Regulatory

SECY-2012-0270 Commission Deny Staff's Request to Re-

Congress Representative Edward J. Markey Letter TASK CLOSEt

Ucense the Pilgrim Nuclear Power Plant Safety Issues with

SECY-2012-0279 Palisades Nuclear Congress Senator Debbie Stabenow Letter TASK CLOSE! Power Plant

Restart of San Onofre SECY-2012-0280 Nuclear Generating Congress Senator Dianne Feinstein Letter TASK CLOSE[

Station (SONGS) Need to Include a Nonproliferation

Assessment as Part of SECY-2012-0297 the Nudear Regulatory Congress Rep. Jeff Fortenberry/Rep. Gerry Connolly/Rep. Devin Nunes Letter TASKCLOSE[

Commission's Process for Evaluating Ucense

Applications GAO Recommendation

SECY-2012-0300 Regarding Risk

Analyses for Nuclear Congress Senator Dianne Feinstein Letter TASKCLOSE[

Plants

Safety of the 23 Mark I

SECY-2012-0302 Boiling Water Reactors Current Operating In Congress Representative Howard L. Berman Letter TASK CLOSE! the United States -

White House Referral

06/05/2013

Page 13: RECORDS BEING RELEASED IN THEIR ENTIRETY€¦ · Senator Robert Menendez : Letter : TASK CLOSEr : SECY-2011-0179 New Jersey's Nuclear Safety Oyster Creek : ... 213 Congress Senator

Page 10 of 10

WHI082296

SECY-2012-0303 Allegations from Region IV Employees

Congress Representative Edward J. Markey letter OCM Slgnatu.

Consideration of SECY-2012-0309 Implementation of congress Senator Robert Menendez letter TASKCLOSEI

Filtered Vents Concerns about Current Emergency Response

SECY-2012-0310 capabilities at Pilgrim Congress Representative Edward Markey let1er TASK CLOSE! Nuclear Generating

Station

Constituent Request for Independent

SECY-2012-0320 Investigation or Allegations of Congress Senator Harry Reid letter TASK CLOSE!

Retaliation Against NRC Staff

constituent concerns about NRC PractIces

SECY-2012-0322 Regarding the Safety of Congress Representative J. Randy Forbes Letter TASK CLOSEI Nuclear Power Plants

North Anna

Shutdown of Palisades

SECY-2012-ll330 Nudear Power Plant ­leak in Water storage

Congress RepresentatiVe Edward J. Markey letter TASK CLOSE!

Tank

SECY-2012-0332 Operations or Umenck Nuclear Power Plant Congress Scott Savett of RepresentatiVe Jim Gerlach Staff E-mail TASK CLOSE!

SECY-2012-0338 Water Levels Controlled by Peach Bottom Congress RepresentatiVe Joseph R. Pitts letter TASKCLOSEI

Safety or Our Aging

SECY-2012-0341 Nuclear Power Plants with Focus on Oyster Congress Senator Robert Menendez Letter TASK CLOSE!

Creek SECY-2012-0357 VogtIe Safety concerns Congress RepresentatiVe TIm Scott letter TASK CLOSE!

SECY-2012-0358 Proposed Pinon Creek Uranium Mill Congress Senator Mark E. Udall letter TASK CLOSE!

SECY-2012-ll359 Prposed Pinon Ridge Uranium Mill

Congress Senator Mark E. Udall letter TASK ClOSE[

Emergency Response capability at the Pilgrim

SECY-20!2-0393 Nuclear Generating Congress Rep. Edward J. Markey/Rep. Bill Keating Letter OCM Signatur Station During Labor

Dispute

North Anna Plant Units SECY-Z012-0404 1 and 2 Structural Congress Representative J. Randy Forbes letter TASK CLOSEI

capability

Constituent concerns Regarding NRC and

SECY-2012-0433 Dominion Activity Handling North Anna

Congress Senator Mark Warner Letter TASK CLOSE!

Following the Earthquake

06/05/2013

Page 14: RECORDS BEING RELEASED IN THEIR ENTIRETY€¦ · Senator Robert Menendez : Letter : TASK CLOSEr : SECY-2011-0179 New Jersey's Nuclear Safety Oyster Creek : ... 213 Congress Senator

Page 1 of 6

BLANK

\

C"\ , ..

A •.

Page 15: RECORDS BEING RELEASED IN THEIR ENTIRETY€¦ · Senator Robert Menendez : Letter : TASK CLOSEr : SECY-2011-0179 New Jersey's Nuclear Safety Oyster Creek : ... 213 Congress Senator

Page 2 of6

I 10 Task Num . I Subject Description, Cross Ref# Originator Org. Originator Assigned OfficeL._... ,._,_._._.~_,.. _.__ , _. _... __________________________L _________.__ ,~ ___________________

Nuclear Regulatory Commission's Recent Remarks Regarding the Department of Energy's Intention to View ..

Senator Dianne1627 G20120947 Award Funding to LTR-12-0769 Congress OEDO Closed Ticket

Feinstein •Support Small Modular, Reopen"" Reactors Before it has Released its Strategy

, for the Management of SpE)nt Nuclear Fuel Issue with the United Union of Security

View..Guards and Labor Representative

1491 G20120882 : L TR-12-0695 Congress OEDO Closed TicketContracts with Steny H. Hoyer Reopen ..Government Solutions, Inc.

Rep. Paul M. San Onofre Nuclear Grijalva, Rep. View ..

1484 G20120876 iGenerating Station L TR-12-0681 Congress Luis V. Gutierrez, OEDO Closed Ticket (SONGS) Rep. Dennis J. Reopen"""

Kucinich Post Hearing Questions from the September 12, 2012 Cover Sheet Hearing on "NRC's Senators Barbara

1435 G20120841 Implementation of LTR-12-0627 Congress Boxer and James RegionlV Routing Slip Edit.. Recommendations for Inhofe Enhancing Nuclear Check List Reactor Safety in the 21 st Century" Post Hearing Questions from the

· September 12, 2012 Hearing on "NRC's Senators Barbara View ...

1434 G20120841 ; Implementation of LTR-12-0627 Congress Boxer and James OE Closed Ticket Recommendations for Inhofe Reopen.. Enhancing Nuclear Reactor Safety in the 2,15t Century"

· Post Hearing Questions from the

· September 12, 2012 Senators Barbara View.. 1433 G20120841 • Hearing on "NRC's LTR-12-0627 Congress Boxer and James OCHCO Closed Ticket

Implementation of Inhofe Reopen""" Recommendations for Enhancing Nuclear

Page 16: RECORDS BEING RELEASED IN THEIR ENTIRETY€¦ · Senator Robert Menendez : Letter : TASK CLOSEr : SECY-2011-0179 New Jersey's Nuclear Safety Oyster Creek : ... 213 Congress Senator

Page 3 of6

Description, Cross Ref# Originator Org. Originator Assigned Office Reports Actions

Post Hearing Questions from the September 12, 2012 Hearing on "N RC's Senators Barbara' View..

1432 G20120841 Implementation of LTR-12-0627 Congress Boxer and James NRR Closed Ticket , Recommendations for Inhofe Reopen.. Enhancing Nuclear Reactor Safety in the 21 st Century" Post Hearing Questions from the September 12, 2012 Hearing on "NRC's Senators Barbara View..

1431 G20120841 Implementation of L TR-12-0627 Congress Boxer and James NRO Closed Ticket Recommendations for Inhofe Reopen.. Enhancing Nuclear Reactor Safety in the 21 st Century" Post Hearing Questions from the September 12, 2012 Hearing on "NRC's Senators Barbara View..

1430 G20120841 Implementation of LTR-12-0627 Congress Boxer and James NMSS Closed Ticket Recommendations for Inhofe Reopen.. Enhancing Nuclear Reactor Safety in the 21st Century" Post Hearing Questions from the September 12, 2012 Hearing on "NRC's Senators Barbara View..

1429 G20120841 'Implementation of • L TR-12-0627 Congress Boxer and James. RES Closed Ticket . Recommendations for Inhofe Reopen.. . EnhanCing Nuclear . Reactor Safety in the 21 st Century" Post Hearing Questions from the September 12, 2012 Hearing on "NRC's Senators Barbara View..

1406 G20120841 Implementation of LTR-12-0627 Congress Boxer and James OEDO Closed Ticket Recommendations for Inhofe Reopen.. Enhancing Nuclear Reactor Safety in the 21 st Century"

Page 17: RECORDS BEING RELEASED IN THEIR ENTIRETY€¦ · Senator Robert Menendez : Letter : TASK CLOSEr : SECY-2011-0179 New Jersey's Nuclear Safety Oyster Creek : ... 213 Congress Senator

Page 4 of6

Task Num Description, Cross Ref# Originator Org. Originator Assigned Office Reports Actions

Representative View..

to Five-Year on Strategy to

Remediate the G20120814 L TR-12-0602 Congress Edward Markey, OEDO Closed Ticket Uranium et al. Reopen ..

Contamination In and Around the Navajo Nation

View..Closure of Contract Senator Robert 1332 G20120798 'LTR-12-0586, NRC-28-07-262 Congress OEDO Closed Ticket (NRC-28-07 -262) P. Casey, Jr. Reopen..

View.. · Suspension and Congressional1324 G20120797 L TR-12-0582 L Elaine Halchin ; ADM Closed Ticket Debarment Functions Research Service

Reopen..

Pilgrim Nuclear Power View..Senator John F.Station - ~arameters of L TR-12-0581 1323 G20120796 Congress OEDO Closed Ticket the Ten Mile Safety Kerry Reopen..

Zone Requests for

View..Assurance of Senator Barbara 1275 G20120763 L TR-12-0568 Congress OEDO Closed Ticket Investigation at Boxer Reopen..SONGS Safety Culture Problems at the Representative View..

1271 G20120760 Nuclear Regulatory L TR-12-0556 Congress Edward J. OEDO Closed Ticket Commission's Region Markey Reopen.. IV Office Safety Concerns of

View..Calvert Cliffs Nuclear i G20120645, LTR-12-0467, LTR- Representative1264 G20120754 Congress OEDO Closed Ticket Facility (Frank Caesar 12-0562 John P. Sarbanes Reopen ..Branchini)

Safety and Security of View..Senator Kirsten 1144 G20120713 Indian Point Energy LTR-12-0534 Congress OEDO Closed Ticket . E. Gillibrand · Center ReoQen..

Expired Permit for Shipping Sensitive View..Senator John F.1142 G20120712 Electronics that . LTR-12-0533 Congress OEDO Closed Ticket Kerry· Contain Radioactive ReoRen .. Pn:>p€)rti€)s Delaying Limerick Nuclear Power Plant's

View.. I Final Environmental Representative1117 G20120705 • L TR-12-0524 Congress OEDO Closed Ticket · Impact Statement Jim Gerlach Reopen..Public Hearing Until After the Nuclear

Page 18: RECORDS BEING RELEASED IN THEIR ENTIRETY€¦ · Senator Robert Menendez : Letter : TASK CLOSEr : SECY-2011-0179 New Jersey's Nuclear Safety Oyster Creek : ... 213 Congress Senator

Page 5 of6

Task Num Description, Cross Ref# Originator Org. Originator Assigned Office Reports Actions

: Fuel Study is Completed and Reported to the Public Concerns Regarding

. Bill Brand, View..Potential Restart of1103 G20120693 LTR-12-0515 Congress California NRR Closed Ticket San Onofre Nuclear Councilmember Reopen ..Reactors

·Constituent Concerns •Regarding NRC and

View..· Dominion Activity Senator Mark 1090 . G20120684 LTR-12-0505 Congress OEDO Closed Ticket Handling North Anna Warner Reopen ..Following the ~arthqlJakEl Palisades Nuclear Generating Station ­Request for Representative View ..

1006 G20120650 Information Regarding Congress Edward J. OEDO Closed Ticket the August 12, 2012 Markey Reopen.. Shutdown of the Nuclear Reactor Questions~from the July 24, 2012 Hearing View..Representative992 G20120639 ·on "NRC Policy and OEDO-2012-0528 Congress NRO Closed Ticket Ed Whitfield Governance Reopen..

·9ver~ight" ! Questions from the July 24,2012 Hearing View.., Representative

991 G20120639 on "NRC Policy and : OEDO-2012-0528 Congress OE Closed Ticket Ed Whitfield ·Governance Reopen.. Oversight"

•Questions from the •July 24, 2012 Hearing View..Representative

990 G20120639 ·on "NRC Policy and OEDO-2012-0528 Congress OCHCO Closed Ticket . Ed Whitfield Governance Reopen .. QVElrsight" Questions from the July 24,2012 Hearing View..Representative989 G20120639 on "NRC Policy and OEDO-2012-0528 Congress NSIR Closed Ticket Ed WhitfieldGovernance Reopen.. Oversight" Questions from the

: July 24, 2012 Hearing' View..Representative988 G20120639 on "NRC Policy and OEDO-2012-0528 Congress NMSS Closed Ticket Ed Whitfield ·Governance Reopen" Oversight"

06/05/2013

Page 19: RECORDS BEING RELEASED IN THEIR ENTIRETY€¦ · Senator Robert Menendez : Letter : TASK CLOSEr : SECY-2011-0179 New Jersey's Nuclear Safety Oyster Creek : ... 213 Congress Senator

Page 6 of6

Task Num Description, Cross Ref# Originator Org. Originator Assigned Office Reports Actions

987 G20120639 July 24,2012 Hearing on "NRC Policy and Governance

OEDO-2012-0528 Congress . Representative Ed Whitfield

NRR Closed Ticket View..

Reo[!e[J .. , Oversight" Safely of the 23 Mark I

623 G20120414

Boiling Water Reactors. Representative Howard L Currently Operating in Berman Ltr. of 1127112 to the United Stales ­ President Barack Obama 12­White House Referral 0274, EDATS: SECY-2012­WH1082296 (EDATS: 0302

Congress

Representative Howard L. Berman(White House Referral)

OEDO Closed Ticket View..

Reopen..

SECY-2012-0302)