Reclamation and Giant Seawall Jakarta
are not Solution of Land Subsidence
Muslim Muin Ph.D.
Head of Coastal Engineering Research Group
Institut Teknologi Bandung
Muslim Muin Ph.D. Expertise :
◦ Marine Facility Design
◦ Structural Dynamics
◦ Ocean Hydrodynamics, Sediment Transport, and Water Quality Modeling
Place/Date of Birth : Padang, April 7, 1960.
Employer : Institut Teknologi Bandung, 1986 - present
Position History :
◦ 20011 – present,Head of Coastal Engineering Research Group
◦ 20011 – 2012,Head of Ocean Engineering Research Group
◦ 2005 – 2011, Head of Ocean Engineering Program
◦ 2000 – 2004, Faculty member of Ocean Engineering Program
◦ 1998 – 1999, Visiting Research Professor in University of Rhode Island, USA
◦ 1994 – 1997, Faculty member of Ocean Engineering Program
◦ 1987 – 1993, Graduate Student, University of Rhode Island, USA.
Education :
◦ Ph.D. in Ocean Engineering, University of Rhode Island, USA, 1993.
◦ M.Sc. in Ocean Engineering, University of Rhode Island, USA, 1988.
◦ B.E. in Civil Engineering, Institut Teknologi Bandung, Indonesia, 1984.
Website : www.muteknologi.musmuin.com
MuTeknologi Software www.muteknologi.musmuin.com
3D Ocean Hydrodynamics, Sediment Transport, Water Quality Model in GIS System
Non-Orthogonal Curvilinear Coordinate Technique
•MuSed3D
•MoTuM
•MuDrillCutting3D
•MuQual3D
•MuHeat3D
•MuTsunami
Application of 3D Boundary Fitted Model by ASA Inc. (New York, Bay of Fundy, San Francisco Bay, Savannah River, etc.)
RECLAMATION & GSW
St Petersburg Russia, Palm Island Dubai, Netherland, Duriangkang Dam, Jakarta Bay Indonesia
Reclamation dan Giant Sea Wall
(GSW) If we need it and the impact is
measureable, Reclamation and GSW are
not taboo.
But 17 Reclamation Islands and GSW in
Jakarta Bay are Wrong Concept and must
be stopped
JakartaNo Threat from the sea, Huge River Flow, Land Subsidence
Storm Surge ~10cm
Global Sea Level Rise
8mm/yr
Tsunami Krakatau 20cm
3000 m
3/s
Rationale GSW of NCICD
Land Subsidence
Flood Control
Improve Environment
Economic Development
Urban Development
Fresh Water Reservoir
New Land
17 Reclamation Islands are Big Mistake
Sedimentation at the mouth of rivers
Huge Pump
Total 3000 m3/det?
Water Level must be lowered to
reduce the size of Pump
GSW must be build
Giant Seawall is not Solution of Jakarta
Land Subsidence
Huge Operational Cost and Huge Impact
Coastal and River Protection along
Land Subsidence Area
Strengthen Coastal and River
Protection, Jakarta only pump the
water rainfall in Land Subsidence
Area
Jakarta must pump the water
rainfall in (Cipanas, Bogor, dst.)
+ Land Subsidence + Reservoir
Flow Averages
730.000.000/3.600/6/24 = 1.400 m3/s
Flow Maximum ~ 3.000 m3/s
Jakarta don’t need Large Waduk if the
river flow are not blocked
Basic Concept of Reservoir
Flow InFlow Out
Pump
Elevation Change
Elevation Change x Area = Flow In – Flow Out
Reservoir Analysis
Flow Out = 730x3600x24x6 = 378 million m3
Flow In = 730 jt m3
Area 75 km2 = 75 jt m2
Water Fluctuation = 4,7 meter
Jakarta With and Without GSW
With Giant Sea Wall Jakarta Without Giant Sea Wall Jakarta
Pump
1.100 m3/s
Pompa
100 m3/s
NCICD Pump
703 m3/s
Strengthen Coastal and River
Protection, Jakarta only pump
the water rainfall in Land
Subsidence Area
What will happened if Jakarta has Power
Supply?
Small Pump
The Biggest Pump in
the World
Sea wall 3.8 to 5.8 meter
River Banks 3.8 to 5.8 meter
Giant Sea Wall
25 meter
Giant Pump
All urban water +
River Flow from
Upstream
All urban water must be
pumped out
Smaller Waduks???
Jakarta must improve River Water
Quality before constructing
Giant Sea Wall
Separate Drainage and Sewer
Build Sewerage Treatment Plant
Never Close Jakarta Bay
Giant Pump
1.100 m3/s
Water Pump
Flow Averages 300 m3/s
Consumption 30 m3/s
-4.0 LWS?
-3.0m LWS?
0.0 LWS ?
Reaclamation will block river flow
FloodingGradual Flow
Rapid Flow
Monas?
Dry Area when the water elevation at -3.0 m
-0.5m LWS?
Daerah Pantai yang menjadi Kering
Elevasi Reservoir GSW B -3.0 LWSWater Elevation in GSW -3,0LWS
Dry Area
PLTU Muara Karang must be relocated
Sedimentation Rate increase rapidly
Water Elevation
-3.0 LWS
Fishing Port must be relocated
-4.0 LWS?
-3.0 LWS?
Power Supply Problem
Jakarta will be flooded by
water rainfall from upstream
(Bogor, Cipanas, dll.)
Dirty Water
Water Pump Dead?
akarta will be flooded by water
rainfall from upstream (Bogor,
Cipanas, dll.)
Separate Drainage and Sewer
Build STP
-3.0 LWS
PLTU Muara Karang must be relocated
Fishing Port must be relocatedTidal Flushing no more
Water Quality Problem
0.0 LWS
-3.0 LWS
0.0 LWS
Reclamation will block
River Flow
Navigational
Channel must be
dredged
Fishermen must pay
Shipping Lock?
0.0 LWS 0.0 LWS
-3.0 LWS-3.0 LWS
Flooding Risk
increase
Fishing Port and Power Plant
must be relocated
Operational Cost of GSW,
Billion US$ per year
Poor Water Quality
Fishermen
Relocation
Conclusion and So;ution There is no threat from the sea
GSW Jakarta is not solution of Land Subsidence
Reclamation will block River Flow
GSW Jakarta Operational Cost is huge
GSW Concept of NCICD must be stopped
Strengthen Coastal and River Protection, Jakarta pump the water rainfall in Land Subsidence Area.
Separate Sewer and Drainage
Build Sewerage Treatment Plant