Recent Time and Frequency Activities at PTBX-Band 15-minute means, one point per hour Sigma of...

13
6th M eeting ofrepresentatives oflaboratories contributing to TAI,2004/03/31 TW STFT between USNO andPTB: Recentcalibration Results USNO •Time linksbetweenUSNO andPTB •TWSTFT X-band /Ku-band •Recentcalibration exercises

Transcript of Recent Time and Frequency Activities at PTBX-Band 15-minute means, one point per hour Sigma of...

6th M eeting of representatives of laboratoriescontributing to TAI, 2004/03/31

TW STFT betw eenUSNO and PTB:

Recent calibration Results

USNO

•Tim e links betw een USNO and PTB

•TW STFT X-band /Ku-band

•Recent calibration exercises

Time LinksUSNO

CalibrationUSNO

4 calibrationexercises usingFly-away X-band station from USNO:

June 2002January 2003July 2003March 2004

CalibrationUSNOJune 2002Determination ofCALR value

January 2003Perfect agreement with previous calibration result

July 2003No results

March 2004Preliminary evaluationshows agreement at 1 ns level.

TWSTFT X-band PerformanceUSNOX-band MC2 - HM(PTB)nominal 24 sessions/dayduration 15 min/session

Sample data Jan- Feb 2004

TWSTFT USNO(MC2) - H4(PTB)X-Band 15-minute means, one point per hourSigma of individual measurement results STDev of observations around daily linear regression

MJD53010 53030 53050 53070

σ / n

s

0.0

0.2

0.4

0.6

0.8

1.0

MJD_Xobs vs Sigma_indiv MJD_Day vs STDev_Day

USNOKu-bandschedule: daily4 points/day

X-band7 points/weekmidpoint of dailylinear regression

TWSTFT Results

Ku X

Jan. 2004 Feb 2004

USNO TWSTFT Results

Double difference

daily points:

mean: 0.26 nssigma: 0.82 ns

equivalent to0.6 ns foreach link

03/2003 01/2004

Calibration ExerciseUSNOUSNO TWSTFT X-band fly away station at PTB

Calibration March 2004USNO

Ku-band X-band

Fly-away

Session

Calibration March 2004USNO

Ku

X

Summary of CalibrationsUSNO

Calibration failed

IntelsatSatellitechange

ConclusionUSNO

Intelsat satellite change had caused interruption of US -EU link,X-band link interrupted because of hardw are failure

G PS CV TAIP3 link used to bridge the IS gap (Piester, PTTI2003).

M arch 2004 calibration successful,

Final results and determ ination of a new CALR value after closure m easurem ents, i.e. w hen FX is back at USNO

Apparent error of the currently applied CALR about1-2 ns.

Further analysis: Stability of TAI P3 link and G PS CV link

• USNO A. M cKinley, P.W heeler, A.Sm ith, E.New m an, G . Luther, D. M atsakis

• VSL G . de Jong (support during satellite change)

• BKG U. Hessels (operation of geodetic G PS)

• BIPM G . Petit (TAI P3 processing)

• PTB D. Piester, J. Becker, T. Polew ka

AcknowledgementsUSNO