Recent Developments and Plans from the JPL Analysis Center
1
June2, 2008 IGS Workshop, Miami, Florida, USA Recent Developments and Plans from the JPL Analysis Center • Significant improvement in consistency of JPL’s GPS solutions w.r.t. IGS combined solution starting week 1442. – Primarily due to use of IGS standards for GPS antenna calibrations. – 80-90% variance reduction in orbit and clock differences. • JPL updating models and POD strategy in preparation for reprocessing campaign. – Targeting July 2008 to begin reprocessing, starting with 2008. • New version of GIPSY, version 5.0, to be released June 3, 2008. 0 2 4 6 8 10 12 0 100 200 300 400 500 Days Since January 1, 2007 Week 1442 (August 26, 2007)
-
Upload
florence-weaver -
Category
Documents
-
view
22 -
download
0
description
Recent Developments and Plans from the JPL Analysis Center. Significant improvement in consistency of JPL’s GPS solutions w.r.t. IGS combined solution starting week 1442. Primarily due to use of IGS standards for GPS antenna calibrations. - PowerPoint PPT Presentation
Transcript of Recent Developments and Plans from the JPL Analysis Center
![Page 1: Recent Developments and Plans from the JPL Analysis Center](https://reader037.fdocuments.us/reader037/viewer/2022103100/56813141550346895d97bb4a/html5/thumbnails/1.jpg)
June2, 2008 IGS Workshop, Miami, Florida, USA
Recent Developments and Plans from the JPL Analysis Center
• Significant improvement in consistency of JPL’s GPS solutions w.r.t. IGS combined solution starting week 1442.
– Primarily due to use of IGS standards for GPS antenna calibrations.– 80-90% variance reduction in orbit and clock differences.
• JPL updating models and POD strategy in preparation for reprocessing campaign.– Targeting July 2008 to begin reprocessing, starting with 2008.
• New version of GIPSY, version 5.0, to be released June 3, 2008.
0
2
4
6
8
10
12
0 100 200 300 400 500
Days Since January 1, 2007
Week 1442(August 26, 2007)