RECEIVING PROBLEM & COUNTERMEASURE RESPONSE

2
RECEIVING PROBLEM & COUNTERMEASURE RESPONSE RPCR #: Responsible Department Responsible Department Responsible Department Responsible Department Occurrence Analysis 5-Why (Occurrence) (Non-Detection) 5-Why (1) (2) (3) (4) (5) (1) (2) (3) (4) (5) 8/31/01 RPCR.PPT Page 1/2 RPCR Due Date: Rank: Supplier: Date: Supplier Code: Problem Summary:

description

RECEIVING PROBLEM & COUNTERMEASURE RESPONSE. Occurrence Analysis. Responsible Department. Responsible Department. (1). (2). (3). (4). (5). 5-Why. (Occurrence). Responsible Department. Responsible Department. (1). (2). (3). (4). (5). 5-Why. (Non-Detection). Page 1/2. - PowerPoint PPT Presentation

Transcript of RECEIVING PROBLEM & COUNTERMEASURE RESPONSE

Page 1: RECEIVING PROBLEM & COUNTERMEASURE RESPONSE

RECEIVING PROBLEM & COUNTERMEASURE RESPONSE

RPCR #:

Res

pons

ible

Dep

artm

ent

Res

pons

ible

Dep

artm

ent

Res

pons

ible

Dep

artm

ent

Res

pons

ible

Dep

artm

ent

Occurrence Analysis

5-W

hy

(Occ

urre

nce)

(Non

-Det

ectio

n)5

-Wh

y

(1) (2) (3) (4) (5)

(1) (2) (3) (4) (5)

8/31/01 RPCR.PPT

Page 1/2

RPCR Due Date:Rank:Supplier:

Date:Supplier Code:

Problem Summary:

Page 2: RECEIVING PROBLEM & COUNTERMEASURE RESPONSE

Res

pons

ible

Dep

artm

ent

Res

p. D

ept.

Res

pons

ible

Dep

artm

ent

Summary: Responsible Due Status

Countermeasures

Across-Line Action

ApprovedResponsible Section Approvals:

Checked WrittenProduction Control Engineering Approvals:

Approved CheckedDistributed

Pro

d C

trl E

ngr

(Place countermeasure number(s) in corresponding result of 5-why)

Return to Production Control Engineering when completed and approved.

(Inclds approval for NDSALES Fax)

8/31/01 RPCR.PPT

CAUSE & EFFECT INVESTIGATION LOG Date: ______________

EFFECT:

Branch Potential Causes

Typeof

Investigation

PersonResponsiblefor Action

Resultsof

Investigation

Actual Cause

YES NO ?

X

Mac

hine

Mat

eria

lM

etho

dsM

anM

ili e

u

Page 2/2