PARTNERS LLC August 20, 2019 224 Aviation Road Houma, LA 70363 (985)879-3516 Bureau of Safety and Enviromnental Enforcement Gulf ofMexico OCS Region 1201 Elmwood Park Boulevard New Orleans, LA 70123-2394 Attention: Angie Gobert MS 5232 Re: Decommission OCS-G 1687J, PSN 4228 Eugene Island Block 250A Line 523M-9700 Dear Angie: In accordance with Title 30 CFR Part 250, Subpart J, 250.1006 and 250.1019, Kinetica Partners, LLC hereby requests approval to decommission, permanently abandon and relinquish approximately 3.54 miles of twenty inch (20") pipeline in the Eugene Island Area, Gulf ofMexico, offshore Louisiana. Kinetica will follow Tennessee Gas Pipeline Company's previously accepted decommissioning procedures which have already been approved by BSEE, a copy of which is attached hereto. If you should require any additional information regarding this matter, please call me at (985)209-2283. Sincerely, Kinetica Partners, LLC Kurt Cheramie Sr. Director Approval is hereby granted. Date jo/if/ll Stephen P/D^rsauer Regional Supervisor Bureau of Safety and Environmental Enforcement Bureou of Solely ond Env i ronmento! Enforcemen l (ESEE) RECEIVED AUG 22 2019 Office of Field Operations Pipeline Section

Transcript of RECEIVED - BSEE Data Center · 2019. 11. 18. · 2.1.5 Install plumber's plug into abandoned end of...

Page 1: RECEIVED - BSEE Data Center · 2019. 11. 18. · 2.1.5 Install plumber's plug into abandoned end of 523M 9700 pipeline. Bury end of pipe to 3 ft. BML and cover with 3:1 bags. 2.2

P A R T N E R S L L C

August 20, 2019

224 Aviation Road Houma, LA 70363 (985)879-3516

Bureau of Safety and Enviromnental Enforcement Gulf ofMexico OCS Region 1201 Elmwood Park Boulevard New Orleans, LA 70123-2394 Attention: Angie Gobert

MS 5232

Re: Decommission OCS-G 1687J, PSN 4228 Eugene Island Block 250A Line 523M-9700

Dear Angie:

In accordance with Title 30 CFR Part 250, Subpart J, 250.1006 and 250.1019, Kinetica Partners, LLC hereby requests approval to decommission, permanently abandon and relinquish approximately 3.54 miles of twenty inch (20") pipeline in the Eugene Island Area, Gulf ofMexico, offshore Louisiana. Kinetica will follow Tennessee Gas Pipeline Company's previously accepted decommissioning procedures which have already been approved by BSEE, a copy of which is attached hereto.

If you should require any additional information regarding this matter, please call me at (985)209-2283.

Sincerely,

Kinetica Partners, LLC

Kurt Cheramie Sr. Director

Approval is hereby granted. Date j o / i f / l l

Stephen P/D^rsauer Regional Supervisor Bureau of Safety and Environmental Enforcement

Bureou of Solely ond Environmento! Enforcemenl (ESEE)

R E C E I V E D AUG 22 2019

Office of Field Operations Pipeline Section

Page 2: RECEIVED - BSEE Data Center · 2019. 11. 18. · 2.1.5 Install plumber's plug into abandoned end of 523M 9700 pipeline. Bury end of pipe to 3 ft. BML and cover with 3:1 bags. 2.2

United States Depanment of the Interior 111 IREAU OF SAFETY AND ENVIRONMENTAL ENFORf EMENT

it* f\A • rv-c D SCAN UPDATE Oull ot Mexico OCS Region 1201 Elmwood Park Boulevard SEGMENT 4228

New Orleans 1 ouw.ana 70123-2304 R Q W OCS-G01687J

In Kcph Refer To: (U- 1035A JuK 29. 2016

Ms. Denise Mathews Tennessee Gas Pipeline Company 1001 Louisiana St. 1 lousion. TX 77002

Dear Ms. Mathews:

Refeience is made to Tennessee Gas Pipeline Company, L.L C ' s (TGPC) April 1. 2016 and amended April 13, 2016 applications to decommission Pipeline Segment No. (PSN) 4228 associated with Pipeline Right-of-way No. OCS-Grt 1687.1.

The PSN -1 228 is described as fo lows: Segment

No. Size Length

(Inches) (feet) Service Origin Destination

4228 20 18,700 Gas Platform A 30-inch SSTI Eugene Island Area Eugene Island Area Block 250 Block 227

Ftfectise Date of Expiration: December 18, 2005

In accordance with 30 CFR 250.1750 and 250.1751, your request to decommission this pipeline in place is hereby approved, and in accordance with 30 CFR 250.1010(h), the requirement that the pipeline be removed is hereby waived.

Flowever. pursuant to 30 CFR 250 1754, please be reminded that you may be ordered to remove the pipeline, should the Regional Supervisor delermine that lhe pipeline is an obstmction to other users of the Gulfof Mexico Ouler Continental Shelf.

We have determined that the decommissioning procedures set forth in your application are consistent with regulatory requirements applicable to thc proposed operations. Sec. e.g.. 30 CFR 250.1703. 250.1751 You must perform lhe decommissioning operations in accordance with those procedures or obtain prior written approval ofany changes.

Your request to complete decommissioning of this pipeline no later than the earlier of fi} one year following the completion of TGPC's appeal; or (ii) December M, 2017 is herebv granted.

Please be reminded that, pursuant to 30 CFR 250.1753, you must submit a written report to this office wilhin 30 days alter decommissioning a pipeline. Your report should include the date thc

Page 3: RECEIVED - BSEE Data Center · 2019. 11. 18. · 2.1.5 Install plumber's plug into abandoned end of 523M 9700 pipeline. Bury end of pipe to 3 ft. BML and cover with 3:1 bags. 2.2

Page 2

decommissioning was completed and an indication that the decommissioning was completed in accordance with the procedure approved.

If you have any questions conceming this approval lettet . please contact Mr Bimal Shrestha at (504) 736-2548 or by e-mail at bimal.shresthatebsee.gov .

Sincerely,

BIMAL SHRESTHA *«?HJ t *a !K iV io OD ; |.)40D

For: Bryan A. Domangue Acting Regional Superv isor Regional Field Operations

Page 4: RECEIVED - BSEE Data Center · 2019. 11. 18. · 2.1.5 Install plumber's plug into abandoned end of 523M 9700 pipeline. Bury end of pipe to 3 ft. BML and cover with 3:1 bags. 2.2

Abandonment Procedure for Line S23M 9700, 20 inch, Segment #4228

Rev 3-03/30/2016

Valve Designations: El 227 SSTI: Valve E, Valve F El 227 Tap: Valve X El 250A Platform: Valve A, Valve B, Valve C,

Scope of Work

1.0 P.'f 20-inch 523M-9700 Pipeline (El 250A Platform to El 227 SSTI) 1.1 Company and Contractor shall lock out and tag out (LOTO) El 250A Platform 1.2 Mobilize Dive Support Vessel (DSV) with pump equipment and high pressure

hoses to El 250A Platform 1.3 Prepare 523M-9700 line for pigging operations

1.3.1 On El 250A Platform, verify CLOSEO Valve A, Valve B, and Valve C (Reference Drawing Number 141112_523M 9700_Schematic)

1.3.2 Bleed down existing El 250 pig launcher and install foam disc pig(s) into launcher (Reference Drawing Number 141112_523M-9700_Schematic)

1.3.3 At El 227 SSTI, verify that Valve E is in the pinned-open position (Reference Drawing Number 141112_523M-970O_Schematic)

1.3.4 At El 227 SSTI, place Valve F into the 25% open position. Pin open Valve E (Reference Drawing Number TO-F2-523M-9700-1B)

1.4 Pig 523M-9700 Line 1.4.1 Contractor will flush the 523M 9700 pipeline via existing pig launcher on

the El 250A Platform deck 1.4.2 Contractor will install pumping equipment and high pressure hoses on

pig launcher and launch pig(s) by utilizing fiange from Valve B 1.4.3 Contractor will verify OPEN Valve C for pigging operations (Reference

Drawing Number 141112_523M-9700_Schematic) 1.4.4 Contractor will push a minimum of 110% pipeline volume of seawater

during pigging operations (Reference Drawing Number 141112_ S23M-9700_Schematicl

1.4 5 Contractor will catch foam disc plg(s) at El 227 SSTI using Valve F (Reference Drawing Number 141112_523M-9700_Schematic)

1.4.6 All seawater and pigging/flushing fluids will be pushed into the connecting third-party natural gas pipeline at the El 227 SSTI (Reference Drawing Number 141112_523M 9700_Schematic)

2.0 Abandonment of 20-inch 523M-9700 2.1 El 227 SSTI, subsea;

2.1.1 Close Valve F, un-pin and close Valve E. (Reference Drawing Number TO-F2-523M-9700-1B)

2.1.2 Un-flange pipeline from Valve E, cut and remove 523M-9700 gooseneck pipe from El 227 SSTI (Reference Drawing Number TO-F2-523M-9700 IB)

Page 5: RECEIVED - BSEE Data Center · 2019. 11. 18. · 2.1.5 Install plumber's plug into abandoned end of 523M 9700 pipeline. Bury end of pipe to 3 ft. BML and cover with 3:1 bags. 2.2

2.1.3 Install blind flange on Vaive E 2.1.4 Bunker El 227 SSTI with 3:1 bags and cover (Reference Drawing Number

TO-f2-523M-9700-lB) 2.1.5 Install plumber's plug into abandoned end of 523M 9700 pipeline. Bury

end of pipe to 3 ft. BML and cover with 3:1 bags. 2.2 El 227 Tap, subsea:

2.2.1 Verify the abandonment and disconnection of foreign line from the El 227 Tap location (Reference Drawing Number TO-F2-523M-9700-1) Cut and remove Valve X and El 227 SSTI Tap gooseneck assembly. Install plumber's plug into the open ends of the 523M-9700 pipeline. Bury area to 3 ft. BML and cover with 3:1 bags (Reference Drawing Number TO-f2-523M 970O-l)

2.3 Ei 250A Platform, topside: 2.3.1

2.2.2

2.2.3

2.3.2 Install a blind fiange on Vatve A and Valve B after top-side piping removal (Reference Drawing Number 14nU_S23M-9700_Schematk)

2.4 El 250 A Platform, subsea: 2.4.1 Cut riser at 3 ft above mud line (Reference Drawing TO F2 S23M 9700

1A1) 2.4.2 Remove tube-turn at the base of El 250 A Platform (Reference Drawing

TO-F2-523M-9700 IAI) 2.4.3 Jet to uncover and then remove an additional 25 ft of pipe downstream

from the El 250 A tube-turn (Reference Drawing Number TO-F2-523M-9700-1A1)

2.4.4 Instal! plumber's plug into open end of line 2.4.5 Bury area to 3 ft. BML and cover with 3:1 bags (Reference Drawing 70-

F2-523M-9700-1A1) 2.4.6 Demobilize Dive Support Vessel and crew

Page 6: RECEIVED - BSEE Data Center · 2019. 11. 18. · 2.1.5 Install plumber's plug into abandoned end of 523M 9700 pipeline. Bury end of pipe to 3 ft. BML and cover with 3:1 bags. 2.2

fi -

gams

Abandon in-place approximately 18 599 24 ft of 20 natural gas pipeline Average water depth of approximately 150 ft Segment No 4228 El 250A Platform to El 227 SSTI

s sits

El 250 A Plaiformj

AS BUILT COLUMBIA 20" P IPELINE rwitt ai < 740 TO

CUOENF ISC AND ARE *

Page 7: RECEIVED - BSEE Data Center · 2019. 11. 18. · 2.1.5 Install plumber's plug into abandoned end of 523M 9700 pipeline. Bury end of pipe to 3 ft. BML and cover with 3:1 bags. 2.2

Foreign Line Crossing - Mich.-Wise Line

El 227 SSTI

Verify tap at SSTI has been abandoned Cut and remove Valve X and gooseneck. Install plumber's plug into open ends of pipeline Bury area to 3ft. BML and cover with 3 1 bags

.. ant .

Page 8: RECEIVED - BSEE Data Center · 2019. 11. 18. · 2.1.5 Install plumber's plug into abandoned end of 523M 9700 pipeline. Bury end of pipe to 3 ft. BML and cover with 3:1 bags. 2.2

IValve B

Kinetica Partners LLC Eugene Island Area

Block 250-A Platform Valve A

Remove douded pipe and install blind flanges on Valve A and Valve 8 after flushing procedure

Remove clouded after flushing procedures Install blind flange on Valve E

Block Valve not present at El 227 SSTI

TBS T. B A K E R SMITH

-^z—=- Sc^wni t ic Snowing E.n ' rvq 20"TCP i . * * Ho 5 2 J U - 9 7 0 0 S ^ r - r - i t 4238 9*t»«en Euqen* mono * s r a . ttock 2 5 0 - * Waffor— caxl Eugene iManl Areo, Wocli 227 Subseo Tit-ftl

TarrMsaaeGmPlpefcw Corrpany, LLC.

t*tfij_i2a l-,mo.

Page 9: RECEIVED - BSEE Data Center · 2019. 11. 18. · 2.1.5 Install plumber's plug into abandoned end of 523M 9700 pipeline. Bury end of pipe to 3 ft. BML and cover with 3:1 bags. 2.2

ft I

il---

Remove pipeline riser tube tum plus an additional 25 ft of downstream pipeline Install plumber's plug into abandoned end of line Bury area to 3 ft BML and cover with 3; 1 bags

Remove entire pipeiine riser pipe, riser clamps and ail top-side piping associated with the 523M-9700 pipeline

^ 1 — « 0

Page 10: RECEIVED - BSEE Data Center · 2019. 11. 18. · 2.1.5 Install plumber's plug into abandoned end of 523M 9700 pipeline. Bury end of pipe to 3 ft. BML and cover with 3:1 bags. 2.2

I Cut nser pipe 3ft above mud-line Remove pipeline nser tube tum plus an additional 25 ft of downstream pipeline Install plumber's plug into abandoned end of (me Bury area to 3 ft BML and cover with 3.1 bags

z—.-

• r ••-_,=•... ? cat I

I •

Page 11: RECEIVED - BSEE Data Center · 2019. 11. 18. · 2.1.5 Install plumber's plug into abandoned end of 523M 9700 pipeline. Bury end of pipe to 3 ft. BML and cover with 3:1 bags. 2.2
Page 12: RECEIVED - BSEE Data Center · 2019. 11. 18. · 2.1.5 Install plumber's plug into abandoned end of 523M 9700 pipeline. Bury end of pipe to 3 ft. BML and cover with 3:1 bags. 2.2

Pa) gov - Receipt Page i o f 1

Paygov Receipt Your payment is complete

Pay gov Tracking ID: 25QDS9M9 Agency Tracking ID: 74975318403 Form Name Application to Decommission a pipeline - ROW Application Name: BSEE Application to Decommission a ROWPipeline BU

Payment Information Payment Type Debit or credit caid Payment Amount $2 .170 00 Transaction Date 03/10/2016 05 13:06 PM EST Payment Date: 03/10/2016 Region Gulf of Mexico Contact: Rick Sellers 337-738-6144 Company Name/No: Tennessee Gas Pipeline Company, 00014 Pipeline Segment No 4228 Originating Area/Block; Eugene Island El, 227 Terminating Area/Block Eugene Island El. 250

Account Information Card Holder Name Rick Sellers Card Type: Visa Card Number: • • " " • •*** , 3633

Email Confirmation Receipt Confirmation Receipts have been emailed to rick_sellers@kindermorgan com

hups wwvk .pay.gov/pubIic/coiiecticifl confinn/print/2SQDS9M9 3/10/2016