Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program...
Transcript of Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program...
![Page 1: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/1.jpg)
San Joaquin River Restoration Program
Recapture and Recirculation Plan Kick-offMerced, CA
October 3, 2018
![Page 2: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/2.jpg)
Agenda
• Introductions• Plan Background• Plan Relationship to EIS/R• Revision Process• Issues Brainstorming• Issues Prioritization and Discussion• Next Steps
2Preliminary Draft, Subject to Revision
![Page 3: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/3.jpg)
INTRODUCTIONS
3Preliminary Draft, Subject to Revision
![Page 4: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/4.jpg)
Purpose
Preliminary Draft, Subject to Revision 4
• We believe a restored San Joaquin River can co-exist with San Joaquin Valley farming
• Through implementing both goals of the Settlement
• In particular:– updating and completing the plan for recirculation,
recapture, reuse, exchange or transfer of Restoration Flows
– in consultation with the parties– Consistent with the Settlement and Settlement Act
![Page 5: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/5.jpg)
Settlement Goals
• Restoration GoalTo restore and maintain fish populations in “good condition” in the main stem of the San Joaquin River below Friant Dam to the confluence of the Merced River, including naturally reproducing and self-sustaining populations of salmon and other fish.
• Water Management GoalTo reduce or avoid adverse water supply impacts to all of the Friant Division long-term contractors that may result from the Interim Flows and Restoration Flows provided for in the Settlement.
5Preliminary Draft, Subject to Revision
![Page 6: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/6.jpg)
Starts with Flows
• Temporary actions to release and recapture Interim Flows
– Interim Flows EAs: 2009, 2010, 2011– Temporary Water Rights Orders: 2009 - 2013
• Permanent change for Interim and Restoration Flows
– PEIS/R and ROD: Sept 2012– Permanent Water Rights Order: Oct 2013
Preliminary Draft, Subject to Revision 6
![Page 7: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/7.jpg)
Restoration Flows
What they are:• Releases from Friant
Dam• For instream flow
dedication• In accordance with
Reclamation’s SJR water rights and Settlement Exhibit B
What they aren’t:• Holding Contract releases• Flood Releases• King’s River or other
tributary flow into the SJR downstream of Friant Dam
• SJR Exchange Contract deliveries
7Preliminary Draft, Subject to Revision
![Page 8: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/8.jpg)
Water Management Goal Tools
• Settlement Paragraph 16– Recirculate, recapture, reuse,
exchange or transfer Restoration Flows
– Recovered Water Account program• Settlement Act (Part III)
– Friant-Kern and Madera Canals Capacity Restoration
– Friant-Kern Canal Reverse Flow Pump-Back Facilities
– Financial assistance for local groundwater projects
8Preliminary Draft, Subject to Revision
![Page 9: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/9.jpg)
PLAN BACKGROUND
9Preliminary Draft, Subject to Revision
![Page 10: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/10.jpg)
Recapture & Recirculation
• Settlement Paragraph 16(a)• Directs the Secretary to develop and implement
“A plan for recirculation, recapture, reuse, exchange, or transfer of Interim Flows and Restoration Flows for the purpose of reducing or avoiding impacts to water deliveries to all of the Friant Division long-term contractors caused by the Interim Flows and Restoration Flows.”
Preliminary Draft, Subject to Revision 10
![Page 11: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/11.jpg)
Plan Constraints
• Recapture permitted only for Restoration Flows originating at Friant Dam
• No adverse impact on:– The Restoration Goal, water quality or fisheries.– The ability to meet contractual obligations to CVP long-
term contractors, other than Friant Division contractors.• Subject to:
– Use of CVP facilities to make Project water and transfer water available to south-of-Delta CVP contractors;
– COA, including any agreement to resolve conflicts; and– Applicable laws, regulations and standards
Preliminary Draft, Subject to Revision 11
![Page 12: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/12.jpg)
Recapture Water
The portion of scheduled Restoration Flows released from Friant Dam under Reclamation’s SJR water rights and rediverted into south-of-Delta facilities
12Preliminary Draft, Subject to Revision
Delta Export Facilities
Lower San Joaquin River:• Patterson ID
• Banta-Carbona ID
In the Restoration Area (Mendota Pool, Sack
Dam, Refuges)
![Page 13: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/13.jpg)
Recapture Compliance & Permits
• PEIS/R and 2013 Order cover long-term recapture at:
– Restoration Area locations– Delta export facilities
• EA/FONSIs and Temporary water rights orders cover temporary recapture at:
– Patterson ID– Banta-Carbona ID
Preliminary Draft, Subject to Revision 13
![Page 14: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/14.jpg)
• Made available to Friant Contractors to reduce impacts• Allocated on a pro-rata basis according the current year’s
water supply declaration• Recirculation =
Direct delivery (AEWSD/SWID); Reuse; Exchange; or Transfer
Preliminary Draft, Subject to Revision 14
FriantDamMadera
Canal
MendotaPool
CVPSWP
Pumps
San LuisReservoir
Recirculation Water
![Page 15: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/15.jpg)
Recirculation NEPA Compliance
• Recirculation EA/FONSIs for Interim Flows– 2010, 2011 and 2012
• 5-year Recirculation EA/FONSI in April 2013– Transfers and exchanges through existing facilities– Water contract year 2013 through 2017– May 2017 FONSI added Pleasant Valley WD– February 2018 FONSI continues short term
recirculation actions• 10-year Transfer and Exchange to the Red
Top Area EA/FONSI in October 2016• FKC Pumpback EA in development
Preliminary Draft, Subject to Revision 15
![Page 16: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/16.jpg)
Draft Plan History
• Draft Plan released February 2011– developed in consultation with the FWA, NRDC,
SLDMWA, SJRECWA, and DWR– Stalled primarily over treatment of reduced Friant
flood management releases• Technical meetings with Friant Contractors
resumed in mid-2012– Settlement’s confidential Dispute Resolution
Process– Recirculation chapter largely completed fall 2013– Plan put on hold due to focus on drought issues in
2014 and 2015
Preliminary Draft, Subject to Revision 16
![Page 17: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/17.jpg)
In the mean time…
• Water right for Restoration Flows• RFG completed and Restoration Flows start• Extreme drought 2014 and 2015
– Exchange Contractor call on Friant – SGMA 2014
• Initiated long-term R&R EIS/R process• Awarded and completed 3 of 4 Part III projects• Restoration Flows connected from Friant Dam
to Delta in fall 2016 – Recapture in lower San Joaquin River
• Initiated FKC Pumpback project with Drought Funding (under Secure Water Act)
Preliminary Draft, Subject to Revision 17
![Page 18: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/18.jpg)
WHAT’S THE DIFFERENCE BETWEEN THE PLAN AND THE EIS/R?
18Preliminary Draft, Subject to Revision
![Page 19: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/19.jpg)
Plan versus EIS/R
Plan• Tool box of recapture and
recirculation measures• Procedures for:
– Measuring– Forecasting– Scheduling – Allocating – Accounting
EIS/R• Project level environmental
compliance for:– Long-term recirculation – Recapture in lower San Joaquin
River– Expansion of recapture or
recirculation capability
• Bookend analysis to support:– State Board petition for lower
San Joaquin River diversion– Agreements to convey, transfer,
or exchange recaptured Restoration Flows
Preliminary Draft, Subject to Revision 19
![Page 20: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/20.jpg)
EIS/R Alternatives
• Alternative 1 - No Action/No Project
• Alternative 2 – Continue Existing Temporary Recirculation Actions
• Alternative 3 – Maximize Use of Existing Facilities
• Alternative 4 – Expand Existing Facilities
• Alternative 5 – Construct New Facilities
20Preliminary Draft, Subject to Revision
![Page 21: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/21.jpg)
San Joaquin River Restoration Program
Recapture and Recirculation Plan
Revision Process Overview
Preliminary Draft, Subject to Revision 1
October 3rd, 2018
![Page 22: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/22.jpg)
Revision Process Overview
Preliminary Draft, Subject to Revision 2
Preparation Packet
Kick-Off Meeting
September 26th October 3rd
Small Workgroup Meetings
![Page 23: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/23.jpg)
Revision Process Overview
Preliminary Draft, Subject to Revision 3
Preparation Packet
Kick-Off Meeting
September 26th October 3rd
Small Workgroup Meetings
Objectives:• Review the working draft Plan• Identify issues that they want to elevate during the Kick-Off Meeting
![Page 24: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/24.jpg)
Revision Process Overview
Preliminary Draft, Subject to Revision 4
Preparation Packet
Kick-Off Meeting
September 26th October 3rd
Small Workgroup Meetings
Objectives:• To provide an overview of the Working Draft R&R Plan• Present its known gaps and issues• Get participant input on potential issues
Identified Issues
![Page 25: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/25.jpg)
Revision Process Overview
Preliminary Draft, Subject to Revision 5
Preparation Packet
Kick-Off Meeting
September 26th October 3rd
Small Workgroup Meetings
Objectives:• After participants are familiarized with the issues for each
topic, a prioritization survey will be conducted.
Identified Issues
Scheduling/Prioritization
![Page 26: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/26.jpg)
Revision Process Overview
Preliminary Draft, Subject to Revision 6
Preparation Packet
Kick-Off Meeting
September 26th October 3rd
Small Workgroup Meetings
What to expect after the Kick-Off Meeting:
Identified Issues
Scheduling/Prioritization
![Page 27: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/27.jpg)
Revision Process Overview
Preliminary Draft, Subject to Revision 7
Preparation Packet
Kick-Off Meeting
September 26th October 3rd
Small Workgroup Meetings
What to expect after the Kick-Off Meeting:
Identified Issues
Scheduling/Prioritization
• Debriefing: list of all the gathered input• Scheduling for SWG and next steps
![Page 28: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/28.jpg)
Revision Process Overview
Preliminary Draft, Subject to Revision 8
Preparation Packet
Kick-Off Meeting
September 26th October 3rd
Small Workgroup Meetings
Objectives:• Address identified revision topics in small workgroups• Make revisions to the Draft RR Plan
Identified Issues Address Issues
Scheduling/Prioritization
![Page 29: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/29.jpg)
Preliminary Draft, Subject to Revision 9
Small Workgroup Meetings
Restoration Area
Recapture
Recirculation
Lower San Joaquin River
Recapture
Delta Recapture
Topic 1 Topic 2
Topic 4 Topic 3
Proposed Small Workgroups: Composition
![Page 30: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/30.jpg)
San Joaquin River Restoration Program
Recapture and Recirculation Plan
Topic Overview
Preliminary Draft, Subject to Revision 1
October 3rd, 2018
![Page 31: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/31.jpg)
Restoration Area Recapture
Preliminary Draft, Subject to Revision 2
River channel and the Eastside and Mariposa bypass channels from Friant Dam to the confluence of the Merced and San Joaquin rivers
![Page 32: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/32.jpg)
Restoration Area Recapture
Preliminary Draft, Subject to Revision 3
• Section 2.2.1• Secretary will use the Restoration Area when it is
necessary to divert Restoration Flows• Mendota Pool and Sack Dam • East Bear Creek Unit and Lone Tree Unit• Describes coordination, accounting, and monitoring
procedures
• Potential Issues to Address• Flow monitoring• Accounting• Losses• Recapture locations• Effects to SOD CVP Contractors
![Page 33: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/33.jpg)
Lower SJR Recapture
Preliminary Draft, Subject to Revision 4
Downstream of the confluence with the Merced River to the Sacramento-San Joaquin Delta
![Page 34: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/34.jpg)
Lower SJR Recapture
Preliminary Draft, Subject to Revision 5
• Section 2.2.2• Existing connections between the Lower San Joaquin
River and the DMC• Patterson ID• West Stanislaus ID• Banta-Carbona ID
• Describes dependency of entering in agreements with non-Federal facilities, and compliance
• Potential Issues to Address• Flow monitoring• Accounting• Losses• Water Rights Permits• Consistency with Paragraph 16(a)(1)
![Page 35: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/35.jpg)
Delta Recapture
Preliminary Draft, Subject to Revision 6
Existing CVP and SWP facilities in the Delta (i.e. Jones and Banks Pumping Plants)
![Page 36: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/36.jpg)
Delta Recapture
Preliminary Draft, Subject to Revision 7
• Section 2.2.3• Secretary shall determine the amount of Restoration
Flows reaching the CVP and SWP facilities in coordination with the State
• Describes coordination, accounting, and monitoring procedures
• Potential Issues to Address• Flow monitoring• Accounting• Coordinated Operations Agreement• Delta Operational Constraints
![Page 37: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/37.jpg)
Recirculation
Preliminary Draft, Subject to Revision 8
Actions that recirculation, exchange, transfer, reuse, or otherwise deliver Recapture Flows for a Friant Division long-term contractors
![Page 38: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/38.jpg)
Recirculation
Preliminary Draft, Subject to Revision 9
• Section 3• Describes forecasting procedure (3.2), measures for
returning Recirculation Water (3.3), allocation procedures (3.4), advanced delivery (3.5), agreements (3.6), priority in San Luis (3.7), and RWA replacement (3.8)
• Potential Issues to Address• Allocation• Recirculation pathways• Advanced deliveries• RWA offsets• Water quality• Conveyance and/or exchange agreements
![Page 39: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/39.jpg)
Topic Overview
Preliminary Draft, Subject to Revision 10
Rotation 1: 25 minutes
Rotation 2: 20 minutes
Rotation 3: 15 minutes
Rotation 4: 10 minutes
Restoration Area Recapture
Recirculation
Lower San Joaquin River
Recapture
Delta Recapture
Table 1 Table 2
Table 4 Table 3
Adam
KellyeChad
RaymondIan
Maritza Evan
Erika
![Page 40: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/40.jpg)
Mind Maps
Preliminary Draft, Subject to Revision 11
![Page 41: Recapture and Recirculation Plan Kick-offOct 03, 2018 · San Joaquin River Restoration Program Recapture and Recirculation Plan Kick-off. Merced, CA. October 3, 2018](https://reader030.fdocuments.us/reader030/viewer/2022040610/5ece5b5b73171a196779bbcb/html5/thumbnails/41.jpg)
Mind Mapping
Preliminary Draft, Subject to Revision 12
1. This is a group brainstorm--no evaluation, no censorship, no agreement is required.
2. The person who names a trend says where it goes on the map. They also indicate if it is a category or part of a category.
3. Concepts should be content centered rather than positional. It is idea generating rather than problem solving.
4. Give concrete examples of what is proposed and the types of issues that may be incorporated.