Real Time Financial Analysis in Process Plants
description
Transcript of Real Time Financial Analysis in Process Plants
![Page 1: Real Time Financial Analysis in Process Plants](https://reader035.fdocuments.us/reader035/viewer/2022062809/568157d6550346895dc55c9f/html5/thumbnails/1.jpg)
Real Time Financial Analysis in Process Plants (Energy and Performance Information System)
![Page 2: Real Time Financial Analysis in Process Plants](https://reader035.fdocuments.us/reader035/viewer/2022062809/568157d6550346895dc55c9f/html5/thumbnails/2.jpg)
Presenters
• Steve Sussman President, Kesler Engineering
Value Added RtPM Solutions for Process Industry
• Dennis Lawless, Information Services, Citgo Inc. Corpus Christi, Texas Refinery
![Page 3: Real Time Financial Analysis in Process Plants](https://reader035.fdocuments.us/reader035/viewer/2022062809/568157d6550346895dc55c9f/html5/thumbnails/3.jpg)
Why RtPM in Oil and Gas?
• Global competition is driving the need for Performance improvement
• Performance GAPS must be identified in real time while the opportunity can be ACTED upon
![Page 4: Real Time Financial Analysis in Process Plants](https://reader035.fdocuments.us/reader035/viewer/2022062809/568157d6550346895dc55c9f/html5/thumbnails/4.jpg)
KEI Online Analytics
You can’t improve what you can’t measure.– KEI online analytics measures actual operational performance and
calculates performance targets in real time.– KEI analytics provides “Root Cause Analysis” and presents ways to
reduce the performance gap.– GAP Analysis justifies performance services
• Creates a record of hard dollar justification
• Creates demand for other performance solutions including human performance services.
![Page 5: Real Time Financial Analysis in Process Plants](https://reader035.fdocuments.us/reader035/viewer/2022062809/568157d6550346895dc55c9f/html5/thumbnails/5.jpg)
Kesler Methodology
• Measures operational and financial performance.
• Compares to targets.
• Adjusts the targets dynamically using models.
• Calculates the financial opportunity gap.
• Actionable advisories
• Personalized Visualization • Historical comparison for variability analysis.
![Page 6: Real Time Financial Analysis in Process Plants](https://reader035.fdocuments.us/reader035/viewer/2022062809/568157d6550346895dc55c9f/html5/thumbnails/6.jpg)
RtPM Management Components
![Page 7: Real Time Financial Analysis in Process Plants](https://reader035.fdocuments.us/reader035/viewer/2022062809/568157d6550346895dc55c9f/html5/thumbnails/7.jpg)
Citgo Refinery Project, by D Lawless
Application
•Presents Actionable Engineering Best Practices
Application
•Presents Actionable Engineering Best Practices
Application•Measures performance and identifies opportunities. •Calculates financial impact. •Adjusts targets on event.
Application•Measures performance and identifies opportunities. •Calculates financial impact. •Adjusts targets on event.
Management Team:• Determines root cause of problems and proposes solutions.
– Training
– Organization
– Automation/APC
– Supply chain …
![Page 8: Real Time Financial Analysis in Process Plants](https://reader035.fdocuments.us/reader035/viewer/2022062809/568157d6550346895dc55c9f/html5/thumbnails/8.jpg)
Citgo Refinery Scope of Supply
– Crude and Vacuum Unit– Platformer– Coker– Plant wide steam systems– Cogeneration– KPI tracking– Environmental and safety reporting
![Page 9: Real Time Financial Analysis in Process Plants](https://reader035.fdocuments.us/reader035/viewer/2022062809/568157d6550346895dc55c9f/html5/thumbnails/9.jpg)
Real Time Performance Analysis
• Energy Monitoring– Plant wide steam balance and optimization (AFE dependent)– EII calculations on line for plant or unit– Fuel, electricity usage, online targets and recommended savings– Fired Heater Monitoring
• Capacity Monitoring– Actual vs. target (permit limited)
• Asset management and safety monitoring / advisories
• Online reports in terms of KPI’s and Gross Margin Opportunity– Current Annual, Daily potential savings.– Cumulative Savings over time—day, week, shift, month, year, etc– Best Practice Recommendations on event
![Page 10: Real Time Financial Analysis in Process Plants](https://reader035.fdocuments.us/reader035/viewer/2022062809/568157d6550346895dc55c9f/html5/thumbnails/10.jpg)
Application Architecture
Leverage existing plant infrastructure
– Visualization layer in OSIsoft Process Book or RT Portal (WEB)
– Application Scheduling and Event notification
– User Defined Rules/Calculations using OSIsoft ACE
– Process models and algebraic equations using the Kesler Sentinel
– Real Time and Historical Data in OSIsoft PI
![Page 11: Real Time Financial Analysis in Process Plants](https://reader035.fdocuments.us/reader035/viewer/2022062809/568157d6550346895dc55c9f/html5/thumbnails/11.jpg)
Real Time Financial Analysis
![Page 12: Real Time Financial Analysis in Process Plants](https://reader035.fdocuments.us/reader035/viewer/2022062809/568157d6550346895dc55c9f/html5/thumbnails/12.jpg)
Energy Aggregation Advisory
![Page 13: Real Time Financial Analysis in Process Plants](https://reader035.fdocuments.us/reader035/viewer/2022062809/568157d6550346895dc55c9f/html5/thumbnails/13.jpg)
Plant Wide Steam System Advisories
![Page 14: Real Time Financial Analysis in Process Plants](https://reader035.fdocuments.us/reader035/viewer/2022062809/568157d6550346895dc55c9f/html5/thumbnails/14.jpg)
Electrical Opportunity Advisory
![Page 15: Real Time Financial Analysis in Process Plants](https://reader035.fdocuments.us/reader035/viewer/2022062809/568157d6550346895dc55c9f/html5/thumbnails/15.jpg)
Crude Unit Capacity Opportunity Advisory
![Page 16: Real Time Financial Analysis in Process Plants](https://reader035.fdocuments.us/reader035/viewer/2022062809/568157d6550346895dc55c9f/html5/thumbnails/16.jpg)
Early use shows payback under 4 monthsAdvisory to use spare
compressor to reduce pressure in tower increases Capacity
OOE calculates improvement (reduction of lost opportunity) of $8,000/day
![Page 17: Real Time Financial Analysis in Process Plants](https://reader035.fdocuments.us/reader035/viewer/2022062809/568157d6550346895dc55c9f/html5/thumbnails/17.jpg)
Project Schedule
– Proof of Concept Prototype Completed February, 2004
– Seek AFE approval for 2 units and Steam system adaptation May, 2004
– Primary Build Complete 2nd Quarter, 2004– Assessment of Benefits during 3rd and 4th
Quarter, 2004– Seek Secondary Build AFE and Implementation
during 1st Quarter, 2005
![Page 18: Real Time Financial Analysis in Process Plants](https://reader035.fdocuments.us/reader035/viewer/2022062809/568157d6550346895dc55c9f/html5/thumbnails/18.jpg)
Real Time Financial Analysis
• Other Planned Improvements to EIS
– Environmental Emissions Tracking and Reporting– Slow Down Tracking– Automation of Adhoc Energy Monitoring
![Page 19: Real Time Financial Analysis in Process Plants](https://reader035.fdocuments.us/reader035/viewer/2022062809/568157d6550346895dc55c9f/html5/thumbnails/19.jpg)
Real Time Financial Analysis in Process Plants (Energy Information System)