Real Results: ActOnEnergy Business Customer Case Studies · 2017-10-05 · Case Study: Busey Bank...

27
Real Results: ActOnEnergy Business Customer Case Studies Chad Whitehead, Energy Advisor, GDS Associates, Inc., an Ameren Illinois ActOnEnergy Partner June 5, 2013

Transcript of Real Results: ActOnEnergy Business Customer Case Studies · 2017-10-05 · Case Study: Busey Bank...

Page 1: Real Results: ActOnEnergy Business Customer Case Studies · 2017-10-05 · Case Study: Busey Bank What equipment was installed T12 to T8 lighting upgrades to 20 of 35 locations. Incentive

Real Results: ActOnEnergy Business Customer Case Studies

Chad Whitehead, Energy Advisor, GDS Associates, Inc., an Ameren Illinois ActOnEnergy Partner June 5, 2013

Page 2: Real Results: ActOnEnergy Business Customer Case Studies · 2017-10-05 · Case Study: Busey Bank What equipment was installed T12 to T8 lighting upgrades to 20 of 35 locations. Incentive

Practical Items

Please type any questions you have during the presentation into the Chat window located on the right-side of your computer screen.

If you can't hear me, please type a message in the Chat window located on the right-hand side of your screen.

Page 3: Real Results: ActOnEnergy Business Customer Case Studies · 2017-10-05 · Case Study: Busey Bank What equipment was installed T12 to T8 lighting upgrades to 20 of 35 locations. Incentive

What do you already know about energy efficiency?

1. Where can you find typical wattages for various types of lighting?

2. Which of the following is a method for quantifying your project?

3. For a custom project, if you have both electric and gas savings, can you claim both on the same application?

Quiz

Page 4: Real Results: ActOnEnergy Business Customer Case Studies · 2017-10-05 · Case Study: Busey Bank What equipment was installed T12 to T8 lighting upgrades to 20 of 35 locations. Incentive
Page 5: Real Results: ActOnEnergy Business Customer Case Studies · 2017-10-05 · Case Study: Busey Bank What equipment was installed T12 to T8 lighting upgrades to 20 of 35 locations. Incentive

Lighting Wattage Guide

Page 6: Real Results: ActOnEnergy Business Customer Case Studies · 2017-10-05 · Case Study: Busey Bank What equipment was installed T12 to T8 lighting upgrades to 20 of 35 locations. Incentive

Lighting Wattage Guide

Page 7: Real Results: ActOnEnergy Business Customer Case Studies · 2017-10-05 · Case Study: Busey Bank What equipment was installed T12 to T8 lighting upgrades to 20 of 35 locations. Incentive

What equipment was

installed

Replaced 672 metal halide fixtures

with 672 HP T8 fixtures

Energy savings in

kWhs

1,078,721 kWhs

Energy savings in

dollars

$86,298.00

Project cost $141,120.00

Incentive received $54,978.00

% of project covered

by incentive

38.95%

Payback with

incentive

1.0 year

Case Study: High Bay Replacement

Page 8: Real Results: ActOnEnergy Business Customer Case Studies · 2017-10-05 · Case Study: Busey Bank What equipment was installed T12 to T8 lighting upgrades to 20 of 35 locations. Incentive

Have you ever seen the Lighting Wattage Guide?

Page 9: Real Results: ActOnEnergy Business Customer Case Studies · 2017-10-05 · Case Study: Busey Bank What equipment was installed T12 to T8 lighting upgrades to 20 of 35 locations. Incentive

Case Study: Busey Bank

Page 10: Real Results: ActOnEnergy Business Customer Case Studies · 2017-10-05 · Case Study: Busey Bank What equipment was installed T12 to T8 lighting upgrades to 20 of 35 locations. Incentive

Case Study: Busey Bank

What equipment was

installed

T12 to T8 lighting upgrades to

20 of 35 locations.

Incentive received >$30,000

Payback with incentive Typically under 4 years

Other benefits Certified as a sustainable business

through the Illinois Green Business

Association

Other Opportunities Exit lights, occupancy sensors, exterior

lighting….

Page 11: Real Results: ActOnEnergy Business Customer Case Studies · 2017-10-05 · Case Study: Busey Bank What equipment was installed T12 to T8 lighting upgrades to 20 of 35 locations. Incentive

Efficiency NOW Newsletter

Page 12: Real Results: ActOnEnergy Business Customer Case Studies · 2017-10-05 · Case Study: Busey Bank What equipment was installed T12 to T8 lighting upgrades to 20 of 35 locations. Incentive

Have you subscribed to the Efficiency NOW Newsletter?

Page 13: Real Results: ActOnEnergy Business Customer Case Studies · 2017-10-05 · Case Study: Busey Bank What equipment was installed T12 to T8 lighting upgrades to 20 of 35 locations. Incentive

Case Study: PMP Fermentation

Page 14: Real Results: ActOnEnergy Business Customer Case Studies · 2017-10-05 · Case Study: Busey Bank What equipment was installed T12 to T8 lighting upgrades to 20 of 35 locations. Incentive

• What equipment

was installed

• Surveyed 64 steam traps and replaced 8

steam traps rated at > 50 psig

• Energy savings in

therms

• 7,154 therms

• Energy savings in

dollars

• $60,000.00

Incentive received $3200 for the survey and $1600 for

repair/replacement

Case Study: PMP Fermentation

Page 15: Real Results: ActOnEnergy Business Customer Case Studies · 2017-10-05 · Case Study: Busey Bank What equipment was installed T12 to T8 lighting upgrades to 20 of 35 locations. Incentive

Did you attend the 2013 ActOnEnergy Business Symposium in either East Peoria or Collinsville, IL?

Page 16: Real Results: ActOnEnergy Business Customer Case Studies · 2017-10-05 · Case Study: Busey Bank What equipment was installed T12 to T8 lighting upgrades to 20 of 35 locations. Incentive

Case Study: Evonik VFD’s

Page 17: Real Results: ActOnEnergy Business Customer Case Studies · 2017-10-05 · Case Study: Busey Bank What equipment was installed T12 to T8 lighting upgrades to 20 of 35 locations. Incentive

What equipment was

installed

Various size VFD’s and associated

equipment. Approximately 900 hp.

Energy savings in

kWh’s

1.01 million kWh’s annually

Energy savings in

dollars

$80,809 annually

Incentive received $51,564

Payback with

incentive

Just under 14 months.

Case Study: Evonik VFD’s

Page 18: Real Results: ActOnEnergy Business Customer Case Studies · 2017-10-05 · Case Study: Busey Bank What equipment was installed T12 to T8 lighting upgrades to 20 of 35 locations. Incentive

Case Study: Pekin Hospital

Page 19: Real Results: ActOnEnergy Business Customer Case Studies · 2017-10-05 · Case Study: Busey Bank What equipment was installed T12 to T8 lighting upgrades to 20 of 35 locations. Incentive

What equipment was

installed

New burner and controls

Energy savings 41,000 kWh’s

11,600 therms

Energy savings in

dollars

$6500 annually

$2500/$4000

% of project covered

by incentive

Nearly 30%

Payback with

incentive

Was reduced by 2 years.

Case Study: Pekin Hospital

Page 20: Real Results: ActOnEnergy Business Customer Case Studies · 2017-10-05 · Case Study: Busey Bank What equipment was installed T12 to T8 lighting upgrades to 20 of 35 locations. Incentive

PY1 – PY5 Accomplishments

Ameren Illinois business customers have:

• Saved over 1.8 billion kWh and 14 million therms in

annual energy savings – equivalent to powering over 185,000 homes for a year!

• Received over $40 Million in cash incentives

• Completed thousands of energy efficiency projects that have saved over $132 Million in energy costs

Page 21: Real Results: ActOnEnergy Business Customer Case Studies · 2017-10-05 · Case Study: Busey Bank What equipment was installed T12 to T8 lighting upgrades to 20 of 35 locations. Incentive

ActOnEnergy® Incentives Available

STANDARD

• Lighting

• HVAC/Water Heaters

• VFDs

• Steam Traps

• Leak Survey & Repair

• Specialty Equipment

CUSTOM

• Custom

• New Construction

• Feasibility Study

RETRO COMMISSIONING

(RCx)

• Compressed Air

• Healthcare

• Commercial Buildings

Page 22: Real Results: ActOnEnergy Business Customer Case Studies · 2017-10-05 · Case Study: Busey Bank What equipment was installed T12 to T8 lighting upgrades to 20 of 35 locations. Incentive

Ameren Illinois ActOnEnergy

Energy

Advisors

Page 23: Real Results: ActOnEnergy Business Customer Case Studies · 2017-10-05 · Case Study: Busey Bank What equipment was installed T12 to T8 lighting upgrades to 20 of 35 locations. Incentive

Find a Contractor Click here to find a

Contractor who is an ActOnEnergy Program Ally.

Page 24: Real Results: ActOnEnergy Business Customer Case Studies · 2017-10-05 · Case Study: Busey Bank What equipment was installed T12 to T8 lighting upgrades to 20 of 35 locations. Incentive

• Website: ActOnEnergy.com/Business

• Phone: 1.866.800.0747

• Fax: 1.309.677.7950

• Email: [email protected]

Resources

Page 25: Real Results: ActOnEnergy Business Customer Case Studies · 2017-10-05 · Case Study: Busey Bank What equipment was installed T12 to T8 lighting upgrades to 20 of 35 locations. Incentive

What did you learn about energy efficiency?

Quiz

1. Where can you find typical wattages for various types of lighting?

2. Which of the following is a method for quantifying your project?

3. For a custom project, if you have both electric and gas savings, can you claim both on the same application?

Page 26: Real Results: ActOnEnergy Business Customer Case Studies · 2017-10-05 · Case Study: Busey Bank What equipment was installed T12 to T8 lighting upgrades to 20 of 35 locations. Incentive

v

Questions?

Page 27: Real Results: ActOnEnergy Business Customer Case Studies · 2017-10-05 · Case Study: Busey Bank What equipment was installed T12 to T8 lighting upgrades to 20 of 35 locations. Incentive

Building Operator Certification Training

• Peoria area

• 8 classes

PEO 09-13 Course

Tues-Wed, Sept 10-11, 2013 BOC 1001 - Energy Efficient Operation of Building HVAC Systems

Tuesday, September 24, 2013 BOC 1002 - Measuring and Benchmarking Energy Performance

Tuesday, October 8, 2013 BOC 1003 - Efficient Lighting Fundamentals

Tuesday, October 22, 2013 BOC 1004 - HVAC Controls Fundamentals

Tuesday, November 5, 2013 BOC 1005 - Indoor Environmental Quality

Tuesday, November 19, 2013 BOC 1006 - Low-Cost Operational Improvement

Tuesday, December 3, 2013 BOC TBD – Elective to be chosen by partner.