Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade...
-
Upload
hazel-deas -
Category
Documents
-
view
217 -
download
2
Transcript of Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade...
![Page 1: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/1.jpg)
1
Readiness of Forward Muon Arms for W Detection
Itaru NakagawaFor the PHENIX Muon Trigger
Upgrade Collaboration
![Page 2: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/2.jpg)
22
1. Muon Tracking Chambers– 3 stations of Cathode strip
chambers– Each station has multiple planes
for redundancy– Slow read out -> No trigger
2. Muon Identifier– 5 layers of Iarocci tubes in x and y– 80 cm of steel plate absorber
(total)– Provides trigger p > 2 GeV
St#1
St#2
St#3
MuTr
Same configuration in SouthSame configuration in South
MuID
B
Current Muon System
![Page 3: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/3.jpg)
3
Observed in Run9 pp
B
p,k
n
mfake High PT m
Study done by Yoshinori Fukao (RIKEN)
![Page 4: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/4.jpg)
4
Efficiency Measurement with Cosmic Ray
cosmic High Efficiency underClean Circumstance!
Study done by Yoshinori Fukao (RIKEN)
![Page 5: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/5.jpg)
MuTRG System Run09 performance
5
•MuID Algorithm•Track Matching w/ MuID•Timing cut w/ RPC•Track Matching w/ RPC•Neutron Backgrounds• Yoshimitsu Imazu’s Talk
•etc ..
MuTrg-FEE x MuID
Study done by Yoshinori Fukao (RIKEN)
![Page 6: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/6.jpg)
6
Rate Dependence of MuID Rejection Power
•Can RPC substitute MuID?•Does RPC give better Rejection Power?
![Page 7: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/7.jpg)
7
Road Map to Run11 Production Run
MuTRGMuTRG
RPC3
Run11
RPC3
absorber
![Page 8: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/8.jpg)
Completed Installation of Absorbers
8
North Station-1
New Hadron Absorber
North South
35cm thickSUS310(2 interaction Length)
![Page 9: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/9.jpg)
9
Final Muon Trigger Configuration
MuTRGMuTRG
RPC3
Run12
RPC3
absorber
RPC1
![Page 10: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/10.jpg)
10
MuTr X-Talk
![Page 11: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/11.jpg)
11
MuTr Cross Talk
HV (1800 V)
1 MWAnode wire
1 MW
100 pF ....
Cathode strips (96 strip)
~0.1 pF/strip
Rise time of anode signal ~ 10 nsec
Removed to reduce HV trips
Anode Readout
100mV
3V
Serious Issue for Big Pulse
Pointed out by Tsutomu Mibe@KEK
Decap
Doesn’t exist.
![Page 12: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/12.jpg)
12
ADC
MIP
MIP
Event Display of ADC Distribution
Strip
Gap 1Stereo
Gap 2Stereo
Gap 3Stereo
Gap 1NonStereo
Gap 2NonStereo
Gap 3NonStereo
Origin of Big Pulse -> Neutrons?
![Page 13: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/13.jpg)
13
Can be serious issue at high rate
x2 (Run 11?) x5 (design)
Current set up
Recap (1/10? cross talk)
Luminosity
Rate
per
strip
(kH
z)
Run 9, 500 GeV data
10ms Pileup at 100kHz
![Page 14: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/14.jpg)
14
SolutionHV (1800 V)
1 MWAnode wire
100 pF ....
Cathode strips (96 strip)
~0.1 pF/strip
Rise time of anode signal ~ 10 nsec
R<<1M W1 MW
Additional Circuit to let anode current escape to ground.
![Page 15: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/15.jpg)
15
Pads for surface mount capacitorsLeft over Solder + Coating
To Anode Wire
MuTr Station-3 Anode Card
Capacitor (Removed)
![Page 16: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/16.jpg)
16
North Station-3 Anode Gap
25mm28mm
Geometrical Constraint
Anode cards are only accessible from their back. Front pattern can only be visible using an inspection mirror.
![Page 17: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/17.jpg)
17
Recap Clamp PrototypesR&D byYoshinori Fukao (RIKEN) Yoshimitsu Imazu (RIKEN)Kentaro Watanabe (Rikkyo)
![Page 18: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/18.jpg)
18
Effect of Recap
![Page 19: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/19.jpg)
19
Test Bench Setup
90Sr Source
Anode wire
Strip
#22
w/ and w/o Clamp
![Page 20: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/20.jpg)
20
Comparison w/ .vs w/o Terminator
22
27
17
Trigger
w/o Clamp
Strip#
22
27
17
w/ Clamp w/ Clamp
Trigger
w/o Clamp
![Page 21: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/21.jpg)
Comparison w/ .vs w/o Clamp
w/o Clamp
With Clamp
Strip Number
Aver
age
ADC
[cha
nnel
]Conductive Rubber
21
![Page 22: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/22.jpg)
22
Neutron Absorber
![Page 23: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/23.jpg)
23
The full muon arm again• Only 1/20 of all PYTHIA
events• Only MuTr St1• Y-scale is from old macro• Only neutrons from
upstream of St1
Neutrons in St1 Current setup SS310 absorber +SWX207HD5 Only SWX207
![Page 24: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/24.jpg)
Thermal Neutron
• Origin of Big Pulse
• Thermal Neutron Absorber
Thermal Neutron photonAbsorber Borated Poly 2.5cm Pb 1cm + Fe 1cm
Attenuation ~10-2 ~5x10-2
€
11B + n→7Li* +α7Li*→7 Li + γ (478keV )
€
A + n(thermal) → (A +1) + γ(≤ 8MeV )
478keV
B 25mm Pb 1cm MuTr
25meV neutron
(e,g)
Fe 1cm 24
![Page 25: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/25.jpg)
25
Summary• High Momentum Muon Trigger (MuTrig-FEE &
RPC3) is to be commissioned in Run11• Sufficient Rejection Power can be achieved, but
trade off of efficiency.• 99% Efficiency with Cosmic at High PT • Thermal Neutron is suspect degrades MuTr
performance– Neutron Absorber Partial Install– Recapacitation Clamp Prototypes to be tested in Run11
![Page 26: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/26.jpg)
26
Backup Slides
![Page 27: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/27.jpg)
27
Towards Successful Installation
![Page 28: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/28.jpg)
28Fiber Scope
Alignment
Spacer determines Transversedirection within ~ 300mm.
Possible misalignment can be found by visual inspection using a fiber scope
Fiber scope shot
![Page 29: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/29.jpg)
29
Electrical Contact
Readout socket
Readout BoardElectrical Contact will be confirmedby measuring Voltage using temporaryreadout tool.
To be removed after the measurement.
![Page 30: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/30.jpg)
30
Installation Proposal
To be installed North Bottom Octants
![Page 31: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/31.jpg)
31
Clamp Coating Max Current Average Current
w/o w/ <1uA <1uA
w/ w/o >100uA Tripped after 2 min.
w/ w/ 1uA 1uA
w/ w/o >100uA Tripped after 1min.
w/ w/ 2uA 2uA
Extreme Breathing Test
HV=1900VDuration 2min
![Page 32: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/32.jpg)
32
MuTr Station-3
![Page 33: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/33.jpg)
33
Recapacitation (Station-3)
Capacitorはすべて取り外し済み。Station-3 Chamberを取り出すの実質的に難しい。簡易的に取り付けられるクリップでグラウンドに落とす。
![Page 34: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/34.jpg)
34
Coating
Anode CardParylene CPrint Kote
remover
Takes time, but removable
化学的に溶かすには 175℃でクロロナフタレンに反応して溶解(1時間以上)。事実上ムリ。
De-Capacitation(コンデンサーの取り外し)の際にパリレンが溶けてるのでは?
![Page 35: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/35.jpg)
35
DAQによる測定
ADC>1000ch以上の事象
ADC>1000以上の大きなパルスを観測したとき、周辺のストリップには逆電価のシグナルが観測される。
…,13,14 31,32,……21,22,23…
90Sr線源
ストリップ番号
ストリップ番号
ストリップ番号AD
C [c
hann
el]
ADC
[cha
nnel
]
Anode wireを共有していない
Anode wireを共有していない
線源直下のストリップ
![Page 36: Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.](https://reader035.fdocuments.us/reader035/viewer/2022062515/56649c755503460f949286ea/html5/thumbnails/36.jpg)
36
Low energy neutrons• Low energies• Fluctuation before
SWX needs investigation
• Suppression of very low energies might depend on input neutrons
behind SWX207HD5
before SWX207HD5