Readiness for installation W0 -...
Transcript of Readiness for installation W0 -...
Readiness for installation W0 CMS RPC
group
10
W 03 bi gap
out
274
-
2
3
6233
339
335
300
236
276
19
192
271338
334
287
232
277
24
237
74
169320
181
278363
215
239
77
3
258
288
229
272
333
170 322
228
89
101
-
5
214217216
Z Face
12193
79
158
294
188
293 135309
191
95
311
185
344
132
16
176
353
7
171
781666
247
92
2
40
84165
20
194
964
119
8
-
-
-
-
-213 212
70
189
81
161
To be built
Ready at ISR
Tested in Italy or
under testid
All chambers but sect.4/5 will be installed
Jan06 – Feb 06
Missing 1 RB2/sect 4. under testing in Bari.
Expected at ISR at the end of January 06
Installation Sect 4/5 end of August
MB4 sect 9-11 October 8th
Readiness for installation W-1CMS RPC
group
Readiness for next installation sect
10/11 End Feb 06:
1 RB2 under test in Bari
at ISR end Jan06 –ready endFeb06
4
8
351
911
1
2
W -1
--
-
-
-
3 bi gap
out
-
-
-
6
53
2
-
178
240
345
50
352298
319
290
128 124
163
196
349
342
340
348
343
302
305
350
341
346
308
136
9
13
7297
362
101
380
383
361
360
120
321
301
172
12
248
250
256
241
354358356359
355357
244
254 255
252
253
324
245246
197
251
325
326
260
262
264
261
263
265266
364
1RB1 in construction in Bari. Expected at ISR at the end of
January 06
2 RB2 under test in Bari. At ISR at the end of January
6 RB2 under construction in GT. Expected at ISR in March
06.308
To be built
Ready at ISR
Tested in Italy or
under testid
At ISR
All chambers ready in May
Installation remaining 8 sectors:
Beginning Sept.06
Readiness for installation W-2CMS RPC
group
Production site
To be built
Ready at ISR
Tested in Italy or
under testid
At ISR8
372
11
12
W -2
-
-
-
-
3 bi gap
out
-
-
6
5
4
3
2
Z (-) Face
-
30
249
238
230
58
85
5313
160 159
131
57
310
312
243
382
381
384385
386
387
388
374
375 376377
378
379
195
bb
259
365
367
366
368
369
391
242
394
371370
389
28
398
397
400
392
393
390
396
399
2RB1 in construction in GT in January. Expected at ISR in
March 06
5 RB2 under test in Bari. At ISR at the end of January
9 RB2 under construction in GT. Expected at ISR in March
06.
Readiness for next installation sect
10/11 End Feb 06:
1 RB2 to be tested in Bari
at ISR end Jan06 –ready end Feb06
All chambers ready in June
Installation remaining 8 sectors:
Middle Oct.06
Gas system test:
• Commissioning the final gas distributor DONE ON W+1 and W+2 but not easy operation
• Gas line equalization :
Each CMS gas line supplies in parallel 2 chambers in same station.
Very important to equalize the gas flow between the chambers. Needed in W+2 due to different
input impedance between some chambers. DONE
GAS IN
Additional work on the wheels CMS RPC
group
VALVE
Gas in
Standard Equalization example:
case chamber 2 lower impedence than chamber 1
Chamber 1
Chamber 2
Gas patch panel on the wheel
VALVE
Gas in
HV cables :
1 day HV conditioning test
LV cables: 1 day threshold
setting/reading checks
On flight gas pipes on the sector: 2 days flushing
bubblers at the chamber outputs
Noise test with frequency-meter:1 day
Status
Gas System
•Final gas mixture
•Gas mixture monitor done
•Interlock system done
•Final distributor under
commissioning
Chamber test
6 sector/10 sectors tested
•Conditioning under HV
•Connectivity check
•Noise test
Planning1 sector/week will be
improved next week using
the final gas distributor
Chamber commissioning on wheel W+1 M.Maggi
A.Colaleo
Chamber commissioning on wheel W+1 RPC group
Problems Found:
1)1 disconnected connector (8 strips) from front-end board
2)1 Distribution Board was accidentally broken during operation
3)High voltage problem inside in RB2 sect 5 need to replace the chamber. But the
chamber have be put under test now. Ready middle of Jan 06.
First 2 chambers repaired last week with help of DT group –about 3 hours of work each
chamber:
Both muon stations pushed out about 30 cm on Z- side
During operation cooling from patch panel and DT cables/ground cables were
disconnected
The commissioning must be finished by 9 Jan. 06 due to cabling activity on W+1
but we plan to finish the test one week later.
CMS RPC
group Commissioning on wheel W+2
The commissioning was postponed due to the cabling activity
In order to save time a fast check of all front-end board started with a portable frequency-
meter
Up to now Sect 8/9/12 checked. Aim to finish middle December.
Problem found :
1 Broken FB in sect 9
Repaired last week : muon station was pulled out of about 70 cm with cradle on Z- side
The commissioning can start during the cabling operation breaking on W+2
Commissioning plan: 9 Jan- 10 Feb 8 sectors
5-15 Feb. Sect 10/11
From Middle of Feb. test sect 10/11 with final cables and LBB+RBC