Readiness and Homeland Security Workshop Streamer Requirements Update And USACE Response...
Transcript of Readiness and Homeland Security Workshop Streamer Requirements Update And USACE Response...
![Page 1: Readiness and Homeland Security Workshop Streamer Requirements Update And USACE Response Capabilities.](https://reader035.fdocuments.us/reader035/viewer/2022081813/56649e3f5503460f94b2f6a6/html5/thumbnails/1.jpg)
Readiness and Homeland Security Workshop
Streamer Requirements Update And
USACE Response Capabilities
![Page 2: Readiness and Homeland Security Workshop Streamer Requirements Update And USACE Response Capabilities.](https://reader035.fdocuments.us/reader035/viewer/2022081813/56649e3f5503460f94b2f6a6/html5/thumbnails/2.jpg)
R&HS Program Update
• 2010 New Streamer Criteria– Savannah – Large Post – 2 Required and 6 of 8
Desired– 3 Principal Criteria• Collaborate and Conduct Outreach
– One Required and three desired criteria• Training and Education of Committee Members
– One required and two desired criteria• Committee Members Engage in Discussion of R&HS
Outside of the Post– Three desired criteria
![Page 3: Readiness and Homeland Security Workshop Streamer Requirements Update And USACE Response Capabilities.](https://reader035.fdocuments.us/reader035/viewer/2022081813/56649e3f5503460f94b2f6a6/html5/thumbnails/3.jpg)
USACE Response Capabilities• USACE Civil Disaster
– Emergency Support Function #3 Lead under the National Response Framework
– Cadres• Team Leaders and Assistant Team Leaders• Local Government Liaisons• Structural Safety Assessment for Urban Search and Rescue
– Subject Matter Experts– Planning and Response Teams
• Response: Power, Water, Ice, Infrastructure Assessment• Recovery: Debris, Roofing /Rapid Repair, Housing/Critical Public
Facilities– We have recently used team members for work in Haiti and
Pakistan – and foresee more of this happening
![Page 4: Readiness and Homeland Security Workshop Streamer Requirements Update And USACE Response Capabilities.](https://reader035.fdocuments.us/reader035/viewer/2022081813/56649e3f5503460f94b2f6a6/html5/thumbnails/4.jpg)
USACE Response Capabilities• USACE Field Force Engineering – Support to COCOMs– Field Engineering Support Team (FEST-A and M)– Contingency Real Estate Support Team (CREST)– Environmental Support Team (EnvST)– Reachback
• USACE Reachback Operations Center– Automated Route Recon Kit (ARRK)– Tele-Engineering Equipment - mobile, secure VTC– Have used these teams for Civil Disaster work and see
using them more in the future
![Page 5: Readiness and Homeland Security Workshop Streamer Requirements Update And USACE Response Capabilities.](https://reader035.fdocuments.us/reader035/viewer/2022081813/56649e3f5503460f94b2f6a6/html5/thumbnails/5.jpg)
USACE Advanced Contract Initiative (ACI) Contracts
• Temporary Power• Water• Ice• Debris• Roofing• World-wide Power from NAP (Not ACI – but
we can use it!)
![Page 6: Readiness and Homeland Security Workshop Streamer Requirements Update And USACE Response Capabilities.](https://reader035.fdocuments.us/reader035/viewer/2022081813/56649e3f5503460f94b2f6a6/html5/thumbnails/6.jpg)
Questions to Members
• Do you know your firm’s capabilities in disaster response?
• Have you spoken with you local County or City Emergency Manager regarding the gaps they have found?
• Are you on a team that holds a USACE ACI Contract?
• Are you on a team that holds a FEMA IA-TAC or PA-TAC contract?