Michael Milliken, Director Network Engineering and Operations
MAEDSOctober 2011
Merit’s History 1966-Present• The Michigan Education Research Information Triad
(MERIT) formed in 1966 because, “significant benefits might be gained from sharing computing resources via an electronic linkage…”
• 1969 NSF grant for computer networking with only comparable work at BBN (ARPANET)
• Dial-up “Hermes” service in 1973 (!)• Designed, engineered, managed and operated the NSFNET
backbone• Received NSF Cooperative Agreement for Routing Arbiter
in 1994 (2nd Solicitation for NSFNET)• Merit provided dial-in access for educational technology
through 2007• Merit Embarked on a Fiber and Wireless Backbone
Strategy in 2003• 2006 Merit leads other R&E Networks in offering
Converged/Cloud Services to its membership.• 2010 Merit awarded $102 MM grant funding to build 2300
miles of fiber.
Vision
There is equal opportunity to access information and knowledge throughout all regions of Michigan and all sectors of society. Merit’s members are strengthening and growing while Merit is acknowledged as a strategic asset with respect to technology services, collaboration, learning.
REACH 3MC and REACH 3MC II Overview
The American Recovery and Reinvestment Act of 2009 (ARRA) established $7.2 Billion in funding for broadband infrastructure, public computing centers and sustainable broadband adoption programs.
Rural, Education, Anchor, Community and Health care Michigan Middle Mile Collaborative (REACH 3MC)
REACH 3MC and REACH 3MC II are referred to as Round I and Round II
Merit submitted a Round I funding request in August 2009 and a Round II funding request in March 2010
Merit has been granted both awardsl Round I award of $42m in Jan 2010 to build 955 miles of fiberl Round II award of $87m in Aug 2010 to build 1,270 miles of fiberl Construction must be completed within 3 years
REACH-3MC Projects
• REACH-3MC• $41.6 M ($33.3 M Grant)• 955 (now over 1000) miles of fiber in 4 corridors• 3 commercial sub-recipient partners• 72 strands, 15 access points, mostly aerial
• REACH-3MC II• $87 M ($69.6 M Grant)• 1272 (now over 1300) miles of fiber in 3 corridors
and 3 states• 7 commercial sub-recipient partners (2 also in
round 1)• 96-168 strands, 28 access points, half trenched
• Collaboration• Public Universities• Mackinac Bridge Authority• Michigan Department of Education• Michigan Department of Information Technology• Michigan 911 Office
Construction & Implementation
Project statusl Federal, State and Local Regulationl Round I:
l Permits – 66% approved l Changes in process:
l Updating wetland permitsl SHPO reviewl Fish and Wildlife reviewl NTIA review
l Round IIl FONSI – August 1, 2011l 95% of field engineering completedl Permit submission(s)
l MDOT, County Road l Wetlands, Federal Forest, State Forest, DNRl Metro, County Drain, Utilities
REACH 3MC I & II Update Cont.
Round I make ready spendl Approved over 1.5 million with more expected
Permits continue to be received 12 RD I Colo Agreements signed
l Additional Agreements pending
RD II Environmental Assessment l FONSI awarded August 2011
RD II Single Source Justificationl Awarded for Material Supplies & Fiber
REACH 3MC I & II Update
Round I is now 21 months into 36 month cycle RFPs have been tendered and selections made
l Fiber and build materialsl Optical transport hardwarel Construction companies
Outstanding RFP Selectionsl Ethernet Route/Switch equipment RFP closedl Responses under review; Decision to come in few weeksl Consulting & Construction of Central Office Entrance
Facilities Closed October 5th Outstanding RFP
l Consulting and Construction of Telecommunications Huts Closes October 21st
REACH 3MC I & II Update Cont.
The many existing fiber locations will have REACH electronics installed 3/4Q 2011
l ADVA OADM and Optronics Equipment expected by 11/20l Merit & Adva will conduct the installations jointly
Grand Rapids/Muskegon/Big Rapids/Mt Pleasant
l Installation tentatively scheduled Oct 24th – Nov 9th St Ignace/Sault Ste Marie/Marquette/Iron
Mountain/Houghtonl Installation tentatively scheduled Nov 9th – Nov 25th
REACH 3MC II Route Breakdown
Round II Routes are in three corridors:
l Middle Corridor, Grand Rapids to Oscoda
l North East Corridor, Oscoda to Mackinaw City
l Northern Corridor, St. Ignace to Ironwood
Additional spurs from the main path:
l Green Bay spur, connects to Wiscnet and BOREASnet
l Duluth spur, connects to BOREASnetl Houghton spur, connects to MTU
What Vendors Are Involved?
Fiber engineering is being performed by Turnkey and CCI
Construction will be done by Earthcom, Fiberlink, Western Tel, Amcomm and Boardman River
Installation of equipment will be done by Merit and Adva
There are 7 sub-recipients on the projects that will own fiber within the bundle
l Great Lakes Comnet ● Lynxl ACDnet ● PFNl Boardman River ● Packerland l TC3
Connecting to the Network
Focus: Manistee Mackinaw City to
Petoskey Petoskey to
Charlevoix Traverse City to
Kalkaska Zeeland Monroe to Adrian Gaylord to Hillman
[including Atlanta] Gaylord to Grayling Gladwin to Mt.
Pleasant
Regional Member Relations Managers
Director of Member [email protected]
Key Source of Information is on the REACH-3MC web portal:
www.merit.edu/meritformichigan Media Events Photo Archive:
www.merit.edu/meritformichigan/photos/ Stimulus Email List (Updates & RFPs):
www.merit.edu/meritformichigan/stimulusemaillist/
Your Regional Member Relations Managerwww.merit.edu/memberrelations/
Send email to: [email protected]
Project Communication
Questions