    Policy Framework and Key Incentives for RE Technologies

    Technology Policy Framework Key Incentives

    1 Wind PowerFiscal and financial incentives import duty on specified wind turbine Parts

    80% accelerated depreciation

    Customs and Excise duty relief

    2

    Grant for setting up projects in North Eastern States

    3 Biomass Power

    subsidy for commercial biomass power projects

    4

    Si

    No

    Wheeling, banking, Third party sale, Buy-backfacility by statesCapital subsidies and sales tax incentives incertain states

    Loans through IREDA (Indian Renewable Energy Development AgencyLimited )

    Small HydroPower

    Fiscal and financial incentives Detailed project report preparation at discounted price

    Wheeling, banking, Third party sale, Buy-backfacility by states

    Capital subsidies and sales taxFinancial support for renovation, modernization and capacity up-rating of

    old SHP (Small Hydro Potential) stationsincentives in certain states Financial support for development/upgradation of water mills

    Soft loans from IREDA for setting up of SHP projects upto 25 MW capacity

    Enactment of favorable policy regimes at thestate as well as the Central levels

    Buy-back/Wheeling/Banking of generatedelectricity by the SEBs

    Upto 3% interest subsidy for biomass/bagasse cogeneration (commercialprojects)

    Incentives in the form of sales tax exemptions,equity and grants, etc.

    Capital subsidy for cogeneration projects in Joint

    Venture model/IPP ( Independent Power Project ) mode incooperative/public sector sugar millFinancial assistance under the National BiomassResource Assessment Program (NBRAP)

    Energy fromWaste

    Easy allotment of land, supply of garbage andfacilities for evacuation, sale and purchase ofpower to encourage setting up of waste-to-energy projects

    Commercial Projects: Financial assistance as interest subsidy for reducingrates of interest

    Demonstration Project: Financial assistance on capital cost of the project

    Power Generation at Sewage Treatment Plants:

    Financial assistance on incremental cost for Generation of power from thebio-gas

  • 8/8/2019 Re Incentive

    2/2

    5

    No specific conditions for JV formation

    6 Biogas

    Central subsidy to users

    Organizational and infrastructure

    SolarPhotovoltaics

    MNES financial incentives for solar PV grid

    EOU to set up a manufacturing plant connected power projects

    Technology transfer for the manufacture of

    silicon solar cells and and PV Systems

    IREDA financial package for solar photovoltaic (power generation

    systems)MNES(Ministry of Non- Conventional Energy Sources) Financial Incentivesfor Solar Photovoltaic Systems

    Special incentives are available for turnkey

    Remuneration to SEWs entrepreneurs in rural areas

    Dealership support to Fair Price ShopsLoans from commercial and cooperative banks for setting up of biogasplants under Agricultural Priority Area

    Automatic refinancing by NABARD( National Bank Of Agriculture and RuralDevelopment)

    support to implementing agencies

    Technical and training support

    Source: Ministry of New and Renewable Energy, India.