March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE: Horace Mann School Asbestos Inspection IEA Project #0824003 Dear Ted: Enclosed please find the inspection report for the above-referenced location. If you have any questions or require additional information, please do not hesitate to contact me. Sincerely, IEA, INC. Jeff Carlson Director of Inspection Services JC/wb 032409 Enclosures cc File

Transcript of RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009...

Page 1: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:

March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE: Horace Mann School – Asbestos Inspection IEA Project #0824003 Dear Ted: Enclosed please find the inspection report for the above-referenced location. If you have any questions or require additional information, please do not hesitate to contact me. Sincerely, IEA, INC. Jeff Carlson Director of Inspection Services JC/wb 032409 Enclosures cc File

Page 2: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:

ASBESTOS INSPECTION PROFILE

Horace Mann School 2001 Eleanor Avenue Saint Paul, MN 55116

Submitted to:

Ted Sherman Saint Paul Public Schools

Submitted by: Institute for Environmental Assessment 9201 West Broadway North, Suite 600

Brooklyn Park, MN 55445-1922

763-315-7900 / 800-233-9513

Client #2001

IEA Project #0824003

Page 3: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:

INDEX

SECTION I

Asbestos Summary and Inspection Report SECTION II

Floor Plans SECTION III

Asbestos Laboratory Report SECTION IV

Asbestos Inspector and Management Planner Licenses

Page 4: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:

SECTION I

Asbestos Summary and Inspection Report

Page 5: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:

© IEA, Inc. 2009 Page 1 of 1

Asbestos Summary Horace Mann School 2001 Eleanor Avenue Saint Paul, MN 55116

On February 25 2009, an inspection for asbestos-containing materials (ACM) was performed at the above-referenced location. The scope of the inspection included all accessible suspect ACM within the building. Since this was a limited inspection, there may be additional materials not identified on the report located within wall cavities, pipe chases and/or other inaccessible locations. Suspect ACM was identified and sampled for asbestos content. Identified materials confirmed to be ACM include the following: Air cell pipe insulation and associated fittings Pre-formed pipe insulation and associated fittings Millboard pipe insulation Boiler gaskets Boiler refractory 9” x 9” floor tile and mastic The following suspect materials were not sampled as part of the inspection. These materials are assumed to contain asbestos and shall be treated as ACM or sampled prior to disturbance to determine if they are ACM or not. Identified materials assumed to be ACM include the following: Millboard pipe insulation 9” x 9” floor tile and mastic 12” x 12” floor tile and mastic Wood floor mastic/felt/vapor barrier Chalkboard adhesive See the attached report for specific quantities and locations. Destructive sampling was not performed as a part of this inspection. This inspection does not meet the requirements of the Minnesota Pollution Control Agency (MPCA) or Minnesota OSHA (MNOSHA) for an asbestos demolition/renovation inspection. Bulk Samples of accessible suspect material were collected and analyzed in accordance with Environmental Protection Agency (EPA) sampling and analytical procedure requirements. Sampling was conducted in a manner determined by the inspector to be sufficient to identify whether the suspect materials are asbestos containing. Where deemed appropriate, prior sample results were used and are referenced in the report. Roof samples were not collected as part of this inspection. Suspect roofing materials should be handled as asbestos or sampled prior to disturbance to determine if they are ACM or not. Specific locations of these materials, as well as those suspect materials which were analyzed and were found not to contain asbestos, are identified in the attached report.

Page 6: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:

Chart B - Assessment of Asbestos-Containing Building Materials (ACBM)All asbestos-containing events listed here are to be inspected during each six-month periodic surveillance inspection for changes in condition. The Institute for EnvironmentalAssessment (IEA) highly recommends an in depth "front end" inspection prior to any general renovation or remodeling to determine if those activities may disrupt building materialsthat may involve existing or undiscovered asbestos. Potentially inaccessible or exempt asbestos-containing materials not included in this plan may include: adhesives, caulking, putty,woven blankets, curtains, gloves and gaskets, electrical wiring insulation and heat shields above lights, paints and coatings, roofing felts, flashings and shingles, and mineral core firedoors.

Damaged materials which require corrective action to reduce a potential hazard are indicated on Chart A. All non-damaged ACBM identified in Chart B should be monitored throughscheduled inspections and removed prior to renovation or demolition activities, or when their condition deteriorates.

District administration will direct another formal inspection by a federally certified inspector within three (3) years, and will maintain an ongoing file for each building.Specific recommendations on how to manage the different types of asbestos-containing material are identified in the Asbestos Management Plan.

PLEASE NOTE: Based on EPA recommendations, materials analyzed utilizing PLM and found to contain between 0% and 10% should be assumed asbestos containing unlessbuilding owner wishes the laboratory to utilize "point counting." For samples analyzed prior to 1994 containing 1% or less (trace) of asbestos, resampling utilizing the 1993 EPATest Method or point counting is strongly recommended for purposes of demolition or renovation before treating these materials as non-asbestos containing. Contact your localIEA office for questions or additional information.

EPA ASSESSMENT CATEGORIES: 1 = Damaged or significantly damaged TSI ACM. 5 = ACBM w/potential for damage.2 = Damaged friable surfacing ACM. 6 = ACBM w/potential for significant damage.3 = Significantly damaged friable surfacing ACM. 7 = Any remaining friable ACBM or friable suspected ACBM.4 = Damaged or significantly damaged friable miscellaneous ACM.

IEAEvent

No.

IEAMaterial

Type Location

EstimatedAmount

Total Friable? % Asbestos

EPAAssess.

Category

Horace Mann School2001 Eleanor Avenue, Saint Paul, MN 55116 Inspection Dates: 2/25/2009

11 A1A Mudded Pipe Joints on Air Cell Insulation BOILER ROOM (BR-1) 1 Joints Y 20 AM 1

1930 Original Building

LOOSE PIECE OF FITTING BEHIND CONDUIT AT NORTHWEST CORNER ABOVE J-BOX.Comments:CAD#

12 D1A Boiler Gaskets BOILER ROOM (BR-1) 5 Sq. Ft. N 40 CH 5

Boiler #2

Comments:CAD#

Page 1Horace Mann School

Page 7: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:

IEAEvent

No. Location

EstimatedAmount

Total Friable? % Asbestos

EPAAssess.

Category

Horace Mann School2001 Eleanor Avenue, Saint Paul, MN 55116 Inspection Dates: 2/25/2009

IEAMaterial

Type

13 D2A Interior Boiler Insulation BOILER ROOM (BR-1) 8 Sq. Ft. N ASSUMED 5

Door Refractory (Boiler #2)

Comments:CAD#

14 D2B Interior Boiler Insulation BOILER ROOM (BR-1) 50 Sq. Ft. N ASSUMED 5

Interior Refractory (Boiler #2)

Comments:CAD#

16 D2C Interior Boiler Insulation BOILER ROOM (BR-1) 25 Sq. Ft. N ASSUMED 5

Interior Refractory (Boiler #1)

Comments:CAD#

19 B1A Air Cell Pipe Insulation COAL STORAGE (BR3) 1 Lin. Ft. Y 30 CH 1

1930 Original Building

AT WALL PENETRATION NEAR ENTRANCE. OPEN END.Comments:CAD#

20 B2A Millboard Pipe Insulation BOILER ROOM RESTROOM (BR2) 3 Lin. Ft. N ASSUMED 5

1930 Original Building

AT SOUTH WALL PENETRATION.Comments:CAD#

23 S0B Wood Floor Mastic / Felt / Vapor Barrier CUSTODIAL OFFICE (1B) 140 Sq. Ft. N ASSUMED 5

1939 Addition (On-Grade)

Comments:CAD#

25 S0B Wood Floor Mastic / Felt / Vapor Barrier ROOM 1 860 Sq. Ft. N ASSUMED 5

1939 Addition (On-Grade)

UNDER CARPET & TILE.Comments:CAD#

29 S0B Wood Floor Mastic / Felt / Vapor Barrier ROOM 4 220 Sq. Ft. N ASSUMED 5

1939 Addition (On-Grade)

UNDER TILE.Comments:CAD#

31 S0B Wood Floor Mastic / Felt / Vapor Barrier ROOM 3 280 Sq. Ft. N ASSUMED 5

1939 Addition (On-Grade)

UNDER CARPET.Comments:CAD#

Page 2Horace Mann School

Page 8: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:

IEAEvent

No. Location

EstimatedAmount

Total Friable? % Asbestos

EPAAssess.

Category

Horace Mann School2001 Eleanor Avenue, Saint Paul, MN 55116 Inspection Dates: 2/25/2009

IEAMaterial

Type

33 S0B Wood Floor Mastic / Felt / Vapor Barrier ROOM 2 240 Sq. Ft. N ASSUMED 5

1939 Addition (On-Grade)

UNDER CARPET.Comments:CAD#

36 K0D 9" x 9" Vinyl Floor Tile & Mastic BASEMENT STORAGE (23) 50 Sq. Ft. N 10 CH (MASTIC ONLY) 5

Gray w/Multi-Colored Splatters

Comments:CAD#

42 K2B 12" x 12" Vinyl Floor Tile & Mastic 1ST FLOOR HALLWAY FROM ROOMS 101-106 460 Sq. Ft. N ASSUMED 5

Gray w/Light Gray & Pink Smudges

SAMPLE PRIOR TO DISTURBANCE.Comments:CAD#

43 S0A Wood Floor Mastic / Felt / Vapor Barrier THROUGHOUT 1930 ORIGINAL BUILDING 1STFLOOR

2500 Sq. Ft. N ASSUMED 5

1930 Original Building (Elevated)

Comments:CAD#

52 X0A Miscellaneous Material ROOM 101 5 Sq. Ft. N ASSUMED 5

Wood Frame Chalkboard Adhesive (1930)

Comments:CAD#

67 S0BB Wood Floor Mastic / Felt / Vapor Barrier THROUGHOUT 1939 ADDITION 1ST FLOOR 2000 Sq. Ft. N ASSUMED 5

1939 Addition (Elevated)

Comments:CAD#

70 K0C 9" x 9" Vinyl Floor Tile & Mastic 1939 ADDITION 1ST FLOOR HALLWAY 25 Sq. Ft. N 10 CH (TILE &MASTIC)

5

Gray w/Black & White Streaks

AT BOOT RACK.Comments:CAD#

72 X0B Miscellaneous Material ROOM 105 10 Sq. Ft. N ASSUMED 5

Wood Frame Chalkboard Adhesive (1939)

Comments:CAD#

75 X0B Miscellaneous Material ROOM 106 20 Sq. Ft. N ASSUMED 5

Wood Frame Chalkboard Adhesive (1939)

Comments:CAD#

Page 3Horace Mann School

Page 9: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:

IEAEvent

No. Location

EstimatedAmount

Total Friable? % Asbestos

EPAAssess.

Category

Horace Mann School2001 Eleanor Avenue, Saint Paul, MN 55116 Inspection Dates: 2/25/2009

IEAMaterial

Type

77 K0A 9" x 9" Vinyl Floor Tile & Mastic 2ND FLOOR HALLWAY FROM ROOMS 201-207 230 Sq. Ft. N ASSUMED 5

Tan

INLAID IN CENTER OF HALLWAY.Comments:CAD#

78 K0B 9" x 9" Vinyl Floor Tile & Mastic 2ND FLOOR HALLWAY FROM ROOMS 201-207 230 Sq. Ft. N ASSUMED 5

Brown

INLAID IN CENTER OF HALLWAY.Comments:CAD#

79 S0A Wood Floor Mastic / Felt / Vapor Barrier THROUGHOUT 1930 ORIGINAL BUILDING 2NDFLOOR

2500 Sq. Ft. N ASSUMED 5

1930 Original Building (Elevated)

Comments:CAD#

84 X0A Miscellaneous Material ROOM 201 15 Sq. Ft. N ASSUMED 5

Wood Frame Chalkboard Adhesive (1930)

Comments:CAD#

88 X0A Miscellaneous Material ROOM 202 20 Sq. Ft. N ASSUMED 5

Wood Frame Chalkboard Adhesive (1930)

Comments:CAD#

92 X0A Miscellaneous Material ROOM 203 20 Sq. Ft. N ASSUMED 5

Wood Frame Chalkboard Adhesive (1930)

Comments:CAD#

97 X0A Miscellaneous Material ROOM 204 15 Sq. Ft. N ASSUMED 5

Wood Frame Chalkboard Adhesive (1930)

Comments:CAD#

100 S0BB Wood Floor Mastic / Felt / Vapor Barrier THROUGHOUT 1939 ADDITION 2ND FLOOR 2000 Sq. Ft. N ASSUMED 5

1939 Addition (Elevated)

Comments:CAD#

102 X0B Miscellaneous Material ROOM 206 15 Sq. Ft. N ASSUMED 5

Wood Frame Chalkboard Adhesive (1939)

Comments:CAD#

Page 4Horace Mann School

Page 10: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:

IEAEvent

No. Location

EstimatedAmount

Total Friable? % Asbestos

EPAAssess.

Category

Horace Mann School2001 Eleanor Avenue, Saint Paul, MN 55116 Inspection Dates: 2/25/2009

IEAMaterial

Type

104 X0B Miscellaneous Material ROOM 207 20 Sq. Ft. N ASSUMED 5

Wood Frame Chalkboard Adhesive (1939)

Comments:CAD#

109 B2C Millboard Pipe Insulation ROOM 107 2 Lin. Ft. N 5 CH 5

1954 Addition

ABOVE CEILING. AT EAST WALL PENETRATIONS.Comments:CAD#

110 B3C Pre-Formed Pipe Insulation ROOM 107 1 Lin. Ft. N 40 AM 5

1954 Addition

ABOVE CEILING. AT EAST WALL PENETRATIONS.Comments:CAD#

119 B3C Pre-Formed Pipe Insulation ROOM 109 60 Lin. Ft. N 40 AM 5

1954 Addition

ESTIMATED ABOVE CEILING. SOME VISIBLE FROM ABOVE CEILING IN HALLWAY.Comments:CAD#

120 A3C Mudded Pipe Joints on Pre-formed Insulation ROOM 109 5 Joints N 20 AM 5

1954 Addition

ESTIMATED ABOVE CEILING. SOME VISIBLE FROM ABOVE CEILING IN HALLWAY.Comments:CAD#

122 X0C Miscellaneous Material ROOM 109 20 Sq. Ft. N ASSUMED 5

Metal Frame Chalkboard Adhesive (1954)

Comments:CAD#

127 B3C Pre-Formed Pipe Insulation ROOM 110 30 Lin. Ft. N 40 AM 5

1954 Addition

ESTIMATED ABOVE CEILING. SOME VISIBLE FROM ABOVE CEILING IN HALLWAY.Comments:CAD#

128 A3C Mudded Pipe Joints on Pre-formed Insulation ROOM 110 5 Joints N 20 AM 5

1954 Addition

ESTIMATED ABOVE CEILING. SOME VISIBLE FROM ABOVE CEILING IN HALLWAY.Comments:CAD#

130 X0C Miscellaneous Material ROOM 110 20 Sq. Ft. N ASSUMED 5

Metal Frame Chalkboard Adhesive (1954)

Comments:CAD#

Page 5Horace Mann School

Page 11: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:

IEAEvent

No. Location

EstimatedAmount

Total Friable? % Asbestos

EPAAssess.

Category

Horace Mann School2001 Eleanor Avenue, Saint Paul, MN 55116 Inspection Dates: 2/25/2009

IEAMaterial

Type

134 B3C Pre-Formed Pipe Insulation ROOM 111 60 Lin. Ft. N 40 AM 5

1954 Addition

ESTIMATED ABOVE CEILING. VISIBLE FROM ABOVE CEILING IN HALLWAY.Comments:CAD#

135 A3C Mudded Pipe Joints on Pre-formed Insulation ROOM 111 5 Joints N 20 AM 5

1954 Addition

ESTIMATED ABOVE CEILING. VISIBLE FROM ABOVE CEILING IN HALLWAY.Comments:CAD#

138 X0C Miscellaneous Material ROOM 111 20 Sq. Ft. N ASSUMED 5

Metal Frame Chalkboard Adhesive (1954)

Comments:CAD#

141 K0D 9" x 9" Vinyl Floor Tile & Mastic STORAGE OFF OF 1954 ADDITION WESTSTAIRWELL

40 Sq. Ft. N 10 CH (MASTIC ONLY) 5

Gray w/Multi-Colored Spatters

Comments:CAD#

144 B2C Millboard Pipe Insulation 1954 ADDITION 2ND FLOOR HALLWAY 1 Lin. Ft. N 5 CH 5

1954 Addition

ABOVE CEILING. AT WALL PENETRATION. ABOVE DRINKING FOUNTAIN. VISIBLE FROM CEILING HATCH.Comments:CAD#

153 X0C Miscellaneous Material ROOM 209 20 Sq. Ft. N ASSUMED 5

Metal Frame Chalkboard Adhesive (1954)

Comments:CAD#

158 X0C Miscellaneous Material ROOM 210 20 Sq. Ft. N ASSUMED 5

Metal Frame Chalkboard Adhesive (1954)

Comments:CAD#

Page 6Horace Mann School

Page 12: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:

Chart C - All Materials List

Location % Asbestos Sample No. New Sample LocationEstimated

TotalAmount

IEAEvent

No.

Homogeneous AreaID Code

(Material Type)

The following list contains all events observed by the inspector, whether or not theyactually contained asbestos, and are grouped by homogeneous area (material type).

Horace Mann School2001 Eleanor Avenue, Saint Paul, MN 55116 Inspection Dates: 2/25/2009

A1A Mudded Pipe Joints on Air Cell Insulation1930 Original Building Total Amount: 1 Joints

11 BOILER ROOM (BR-1) 20 AM 207Q-4A 1 Joints

A3C Mudded Pipe Joints on Pre-formed Insulation1954 Addition Total Amount: 15 Joints

120 ROOM 109 20 AM 5 Joints

128 ROOM 110 20 AM 5 Joints

135 ROOM 111 20 AM 2001-1501-MN-13,14,15 5 Joints

B1A Air Cell Pipe Insulation1930 Original Building Total Amount: 1 Lin. Ft.

19 COAL STORAGE (BR3) 30 CH 207Q-7A 1 Lin. Ft.

B2A Millboard Pipe Insulation1930 Original Building Total Amount: 3 Lin. Ft.

20 BOILER ROOM RESTROOM (BR2) ASSUMED 3 Lin. Ft.

B2C Millboard Pipe Insulation

1954 Addition Total Amount: 3 Lin. Ft.

109 ROOM 107 5 CH 2001-1501-MN-4,5 2 Lin. Ft.

144 1954 ADDITION 2ND FLOOR HALLWAY 5 CH 1 Lin. Ft.

Page 1Horace Mann School

Page 13: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:

Location % Asbestos Sample No. New Sample LocationEstimated

TotalAmount

IEAEvent

No.

Homogeneous AreaID Code

(Material Type)

Chart C - All Materials List - Horace Mann School (cont.)

B3C Pre-Formed Pipe Insulation1954 Addition Total Amount: 151 Lin. Ft.

110 ROOM 107 40 AM 2001-1501-MN-1,2,03;ACB450M-B1

1 Lin. Ft.

119 ROOM 109 40 AM 60 Lin. Ft.

127 ROOM 110 40 AM 30 Lin. Ft.

134 ROOM 111 40 AM 60 Lin. Ft.

D1A Boiler GasketsBoiler #2 Total Amount: 5 Sq. Ft.

12 BOILER ROOM (BR-1) 40 CH 022509-MA-08 5 Sq. Ft.

D1B Boiler GasketsBoiler #1 Total Amount: 3 Sq. Ft.

15 BOILER ROOM (BR-1) NONE DETECTED 022509-MA-09 3 Sq. Ft.

D2A Interior Boiler InsulationDoor Refractory (Boiler #2) Total Amount: 8 Sq. Ft.

13 BOILER ROOM (BR-1) ASSUMED 8 Sq. Ft.

D2B Interior Boiler InsulationInterior Refractory (Boiler #2) Total Amount: 50 Sq. Ft.

14 BOILER ROOM (BR-1) ASSUMED 50 Sq. Ft.

D2C Interior Boiler InsulationInterior Refractory (Boiler #1) Total Amount: 25 Sq. Ft.

16 BOILER ROOM (BR-1) ASSUMED 25 Sq. Ft.

I1A 1' x 1' Acoustical Ceiling TilePegboard (1930) Total Amount: 6,310 Sq. Ft.

44 1930 ORIGINAL BUILDING 1ST FLOOR HALLWAY NONE DETECTED 500 Sq. Ft.

46 1930 ORIGINAL BUILDING EAST STAIRWELL NONE DETECTED 518-11 240 Sq. Ft.

49 ROOM 101 NONE DETECTED 950 Sq. Ft.

Page 2Horace Mann School

Page 14: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:

Location % Asbestos Sample No. New Sample LocationEstimated

TotalAmount

IEAEvent

No.

Homogeneous AreaID Code

(Material Type)

Chart C - All Materials List - Horace Mann School (cont.)

55 ROOM 102 NONE DETECTED 1100 Sq. Ft.

60 ROOM 103 NONE DETECTED 250 Sq. Ft.

63 1930 ORIGINAL BUILDING SOUTHWEST STAIRWELL NONE DETECTED 170 Sq. Ft.

80 1930 ORIGINAL BUILDING 2ND FLOOR HALLWAY NONE DETECTED 500 Sq. Ft.

82 ROOM 201 NONE DETECTED 650 Sq. Ft.

86 ROOM 202 NONE DETECTED 650 Sq. Ft.

90 ROOM 203 NONE DETECTED 650 Sq. Ft.

94 ROOM 204 NONE DETECTED 650 Sq. Ft.

I1B 1' x 1' Acoustical Ceiling TilePegboard (1954) Total Amount: 4,105 Sq. Ft.

38 1954 ADDITION EAST STAIRWELL NONE DETECTED 022509-MA-31 325 Sq. Ft.

68 1939 ADDITION 1ST FLOOR HALLWAY NONE DETECTED 70 Sq. Ft.

112 MEDIA CENTER & ASSOCIATED ROOMS NONE DETECTED 207Q-6A 2000 Sq. Ft.

139 1954 ADDITION WEST STAIRWELL NONE DETECTED 280 Sq. Ft.

142 1954 ADDITION 2ND FLOOR HALLWAY NONE DETECTED 1250 Sq. Ft.

147 1954 ADDITION 2ND FLOOR BOYS' RESTROOM NONE DETECTED 80 Sq. Ft.

164 1954 ADDITION 2ND FLOOR GIRLS' RESTROOM NONE DETECTED 100 Sq. Ft.

I1C 1' x 1' Acoustical Ceiling Tile

Small Gouges & Pin Holes Total Amount: 6,290 Sq. Ft.

40 1954 ADDITION EAST STAIRWELL NONE DETECTED 90 Sq. Ft.

65 1930 ORIGINAL BUILDING SOUTHWEST STAIRWELL NONE DETECTED 200 Sq. Ft.

117 ROOM 109 NONE DETECTED 1000 Sq. Ft.

125 ROOM 110 NONE DETECTED 1000 Sq. Ft.

132 ROOM 111 NONE DETECTED 022509-MA-03 1000 Sq. Ft.

150 ROOM 209 NONE DETECTED 022509-MA-20 1000 Sq. Ft.

Page 3Horace Mann School

Page 15: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:

Location % Asbestos Sample No. New Sample LocationEstimated

TotalAmount

IEAEvent

No.

Homogeneous AreaID Code

(Material Type)

Chart C - All Materials List - Horace Mann School (cont.)

155 ROOM 210 NONE DETECTED 1000 Sq. Ft.

160 ROOM 211 NONE DETECTED 1000 Sq. Ft.

I2A 2' x 2' Acoustical Ceiling Tile

Small Gouges w/Pin Holes & Revealed Edge Total Amount: 25,000 Sq. Ft.

2 THROUGHOUT BUILDING NONE DETECTED 022509-MA-04 MA-04: 1ST FLOOR HALLWAY. 25000 Sq. Ft.

I2B 2' x 2' Acoustical Ceiling TileGrubs w/Pin Holes Total Amount: 4,820 Sq. Ft.

108 ROOM 113 NONE DETECTED 300 Sq. Ft.

114 MEDIA CENTER & ASSOCIATED ROOMS NONE DETECTED 518-04 1400 Sq. Ft.

124 ROOM 112 (COMPUTER ROOM) NONE DETECTED 720 Sq. Ft.

167 THROUGHOUT 1995 ADDITION NONE DETECTED 2400 Sq. Ft.

I2C 2' x 2' Acoustical Ceiling Tile

Vinyl-Covered Sheetrock Total Amount: 800 Sq. Ft.

173 1995 ADDITION KITCHEN AREAS NSM 800 Sq. Ft.

J3A Miscellaneous Cementitious MaterialBlack Window Sills (1930) Total Amount: 139 Sq. Ft.

48 1930 ORIGINAL BUILDING EAST STAIRWELL NONE DETECTED 20 Sq. Ft.

53 ROOM 101 NONE DETECTED 15 Sq. Ft.

58 ROOM 102 NONE DETECTED 20 Sq. Ft.

59 ROOM 104 NONE DETECTED 4 Sq. Ft.

62 ROOM 103 NONE DETECTED 8 Sq. Ft.

85 ROOM 201 NONE DETECTED 18 Sq. Ft.

89 ROOM 202 NONE DETECTED 18 Sq. Ft.

93 ROOM 203 NONE DETECTED 18 Sq. Ft.

98 ROOM 204 NONE DETECTED 022509-MA-01 18 Sq. Ft.

Page 4Horace Mann School

Page 16: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:

Location % Asbestos Sample No. New Sample LocationEstimated

TotalAmount

IEAEvent

No.

Homogeneous AreaID Code

(Material Type)

Chart C - All Materials List - Horace Mann School (cont.)

J3B Miscellaneous Cementitious MaterialBlack Window Sills (1939) Total Amount: 120 Sq. Ft.

26 ROOM 1 NONE DETECTED 518-16 518-16: ROOM 1. 18 Sq. Ft.

30 ROOM 4 NONE DETECTED 4 Sq. Ft.

32 ROOM 3 NONE DETECTED 8 Sq. Ft.

34 ROOM 2 NONE DETECTED 8 Sq. Ft.

73 ROOM 105 NONE DETECTED 518-18 518-18: ROOM 105. 20 Sq. Ft.

76 ROOM 106 NONE DETECTED 20 Sq. Ft.

101 ROOM 205 NONE DETECTED 4 Sq. Ft.

103 ROOM 206 NONE DETECTED 18 Sq. Ft.

105 ROOM 207 NONE DETECTED 20 Sq. Ft.

K0A 9" x 9" Vinyl Floor Tile & MasticTan Total Amount: 230 Sq. Ft.

77 2ND FLOOR HALLWAY FROM ROOMS 201-207 ASSUMED 230 Sq. Ft.

K0B 9" x 9" Vinyl Floor Tile & MasticBrown Total Amount: 230 Sq. Ft.

78 2ND FLOOR HALLWAY FROM ROOMS 201-207 ASSUMED 230 Sq. Ft.

K0C 9" x 9" Vinyl Floor Tile & MasticGray w/Black & White Streaks Total Amount: 25 Sq. Ft.

70 1939 ADDITION 1ST FLOOR HALLWAY 10 CH (TILE &MASTIC)

022509-MA-05 25 Sq. Ft.

K0D 9" x 9" Vinyl Floor Tile & MasticGray w/Multi-Colored Splatters Total Amount: 90 Sq. Ft.

36 BASEMENT STORAGE (23) 10 CH (MASTICONLY)

518-14 50 Sq. Ft.

141 STORAGE OFF OF 1954 ADDITION WEST STAIRWELL 10 CH (MASTICONLY)

022509-MA-06 40 Sq. Ft.

Page 5Horace Mann School

Page 17: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:

Location % Asbestos Sample No. New Sample LocationEstimated

TotalAmount

IEAEvent

No.

Homogeneous AreaID Code

(Material Type)

Chart C - All Materials List - Horace Mann School (cont.)

K1A Sheet Vinyl Flooring & MasticBrown & Tan Mosaic Pattern Total Amount: 8 Sq. Ft.

21 BOILER ROOM RESTROOM (BR2) NONE DETECTED 022509-MA-35; 518-17 8 Sq. Ft.

K2A 12" x 12" Vinyl Floor Tile & Mastic

Gray w/White & Blue Total Amount: 13,194 Sq. Ft.

27 ROOM 1 STORAGE NONE DETECTED 30 Sq. Ft.

28 ROOM 4 NONE DETECTED 220 Sq. Ft.

37 1995 ADDITION BASEMENT ELEVATOR LOBBY NONE DETECTED 64 Sq. Ft.

106 1954 ADDITION 1ST FLOOR ELEVATOR LOBBY NONE DETECTED 30 Sq. Ft.

107 CUSTODIAL CLOSET (143) NONE DETECTED 022509-MA-02 40 Sq. Ft.

111 ROOM 108 NONE DETECTED 160 Sq. Ft.

116 1954 ADDITION 1ST FLOOR HALLWAY NONE DETECTED 1250 Sq. Ft.

145 1954 ADDITION 2ND FLOOR HALLWAY NONE DETECTED 1250 Sq. Ft.

146 1954 ADDITION 2ND FLOOR ELEVATOR LOBBY NONE DETECTED 150 Sq. Ft.

168 THROUGHOUT 1995 ADDITION NONE DETECTED 10000 Sq. Ft.

K2B 12" x 12" Vinyl Floor Tile & Mastic

Gray w/Light Gray & Pink Smudges Total Amount: 460 Sq. Ft.

42 1ST FLOOR HALLWAY FROM ROOMS 101-106 ASSUMED 460 Sq. Ft.

K2D 12" x 12" Vinyl Floor Tile & MasticLight Green Mottle Total Amount: 1,155 Sq. Ft.

24 ROOM 1 NONE DETECTED 600 Sq. Ft.

51 ROOM 101 NONE DETECTED 100 Sq. Ft.

57 ROOM 102 NONE DETECTED 35 Sq. Ft.

71 ROOM 105 NONE DETECTED 022509-MA-19 60 Sq. Ft.

96 ROOM 204 NONE DETECTED 60 Sq. Ft.

121 ROOM 109 NONE DETECTED 50 Sq. Ft.

Page 6Horace Mann School

Page 18: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:

Location % Asbestos Sample No. New Sample LocationEstimated

TotalAmount

IEAEvent

No.

Homogeneous AreaID Code

(Material Type)

Chart C - All Materials List - Horace Mann School (cont.)

129 ROOM 110 NONE DETECTED 50 Sq. Ft.

136 ROOM 111 NONE DETECTED 50 Sq. Ft.

152 ROOM 209 NONE DETECTED 50 Sq. Ft.

157 ROOM 210 NONE DETECTED 50 Sq. Ft.

162 ROOM 211 NONE DETECTED 50 Sq. Ft.

L0A Fabric Isolation Joints

Green Canvas Total Amount: 14 Sq. Ft.

149 1954 ADDITION 2ND FLOOR MECHANICAL ROOM OFF OFBOYS' RESTROOM

NONE DETECTED 2001-1504-G1 10 Sq. Ft.

166 1954 ADDITION 2ND FLOOR GIRLS' RESTROOM PIPECHASE

NONE DETECTED 4 Sq. Ft.

M0A Plaster1930 Original Building Total Amount: 15,000 Sq. Ft.

10 THROUGHOUT 1930 ORIGINAL BUILDING NONE DETECTED 022509-MA-11;2001-01364-01,02;

510-H1,H2,H3; 1140-8

MA-11: 1ST FLOOR HALLWAY. H1: EASTSTAIRWELL. H2: SOUTHWEST STAIRWELL. H3:STAIRWELL TO BOILER ROOM.

15000 Sq. Ft.

M0B Plaster1939 Addition Total Amount: 15,000 Sq. Ft.

22 THROUGHOUT 1939 ADDITION NONE DETECTED 022509-MA-24,25,26,27,28,29; 518-8

MA-24: ROOM 206. MA-25: ROOM 107. MA-26:ROOM 105. MA-27: ROOM 106. MA-28: ROOM 01.MA-29: ROOM 03.

15000 Sq. Ft.

M0C Plaster

1954 Addition Total Amount: 20,000 Sq. Ft.

35 THROUGHOUT 1954 ADDITION NONE DETECTED 022509-MA-32,33,34;518-2,3; 1140-3,9

MA-32: ROOM 108. MA-33: WEST STAIRWELLCLOSET. MA-34: 2ND FLOOR BOYS' RESTROOMFAN ROOM.

20000 Sq. Ft.

N0A Sheetrock & Taping CompoundTotal Amount: 10,000 Sq. Ft.

1 THROUGHOUT BUILDING NONE DETECTED 510-H4; 518-13,15 510-H4: ROOM 102B. 10000 Sq. Ft.

Page 7Horace Mann School

Page 19: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:

Location % Asbestos Sample No. New Sample LocationEstimated

TotalAmount

IEAEvent

No.

Homogeneous AreaID Code

(Material Type)

Chart C - All Materials List - Horace Mann School (cont.)

P0A Fire DoorPieced Metal Total Amount: 40 Sq. Ft.

17 BOILER ROOM (BR-1) NSM 20 Sq. Ft.

18 COAL STORAGE (BR3) NSM 20 Sq. Ft.

Q0A Carpet MasticMulti-Colored Berber Carpet Total Amount: 10,000 Sq. Ft.

3 THROUGHOUT BUILDING NONE DETECTED 022509-MA-14 MA-14: ROOM 203. 10000 Sq. Ft.

Q0B Carpet MasticGray & Tan Berber Carpet Total Amount: 8,000 Sq. Ft.

4 THROUGHOUT BUILDING NONE DETECTED 022509-MA-17 MA-17: ROOM 206. 8000 Sq. Ft.

Q0C Carpet MasticTan Berber Carpet Total Amount: 3,000 Sq. Ft.

115 MEDIA CENTER & ROOM 112 NONE DETECTED 022509-MA-21 3000 Sq. Ft.

Q0D Carpet Mastic

Blue Berber Carpet Total Amount: 4,000 Sq. Ft.

169 THROUGHOUT 1995 ADDITION NONE DETECTED 022509-MA-22 MA-22: STAFF LOUNGE. 4000 Sq. Ft.

R0A Baseboard/Mopboard Mastic4" Gray Baseboard Total Amount: 100 Sq. Ft.

5 THROUGHOUT BUILDING NONE DETECTED 022509-MA-15 MA-15: MEDIA CENTER SERVER ROOM. 100 Sq. Ft.

R0B Baseboard/Mopboard Mastic

4" Green Baseboard Total Amount: 200 Sq. Ft.

6 THROUGHOUT BUILDING NONE DETECTED 022509-MA-16 MA-16: ROOM 1. 200 Sq. Ft.

Page 8Horace Mann School

Page 20: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:

Location % Asbestos Sample No. New Sample LocationEstimated

TotalAmount

IEAEvent

No.

Homogeneous AreaID Code

(Material Type)

Chart C - All Materials List - Horace Mann School (cont.)

R0C Baseboard/Mopboard Mastic4" Black Baseboard Total Amount: 100 Sq. Ft.

7 THROUGHOUT BUILDING NONE DETECTED 022509-MA-18 MA-18: ROOM 203. 100 Sq. Ft.

R0D Baseboard/Mopboard Mastic

4" Blue Baseboard Total Amount: 100 Sq. Ft.

170 THROUGHOUT 1995 ADDITION NONE DETECTED 022509-MA-23 MA-23: STAFF LOUNGE. 100 Sq. Ft.

R0E Baseboard/Mopboard Mastic4" Gray/Green Baseboard Total Amount: 100 Sq. Ft.

9 THROUGHOUT BUILDING NONE DETECTED 022509-MA-07 MA-07: ROOM 109. 100 Sq. Ft.

S0A Wood Floor Mastic / Felt / Vapor Barrier

1930 Original Building (Elevated) Total Amount: 5,000 Sq. Ft.

43 THROUGHOUT 1930 ORIGINAL BUILDING 1ST FLOOR ASSUMED 2500 Sq. Ft.

79 THROUGHOUT 1930 ORIGINAL BUILDING 2ND FLOOR ASSUMED 2500 Sq. Ft.

S0B Wood Floor Mastic / Felt / Vapor Barrier

1939 Addition (On-Grade) Total Amount: 1,740 Sq. Ft.

23 CUSTODIAL OFFICE (1B) ASSUMED 140 Sq. Ft.

25 ROOM 1 ASSUMED 860 Sq. Ft.

29 ROOM 4 ASSUMED 220 Sq. Ft.

31 ROOM 3 ASSUMED 280 Sq. Ft.

33 ROOM 2 ASSUMED 240 Sq. Ft.

S0BB Wood Floor Mastic / Felt / Vapor Barrier1939 Addition (Elevated) Total Amount: 4,000 Sq. Ft.

67 THROUGHOUT 1939 ADDITION 1ST FLOOR ASSUMED 2000 Sq. Ft.

100 THROUGHOUT 1939 ADDITION 2ND FLOOR ASSUMED 2000 Sq. Ft.

Page 9Horace Mann School

Page 21: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:

Location % Asbestos Sample No. New Sample LocationEstimated

TotalAmount

IEAEvent

No.

Homogeneous AreaID Code

(Material Type)

Chart C - All Materials List - Horace Mann School (cont.)

V0A Sink UndercoatingGray Total Amount: 56 Sq. Ft.

54 ROOM 101 NONE DETECTED 022509-MA-13 4 Sq. Ft.

74 ROOM 105 NONE DETECTED 4 Sq. Ft.

99 ROOM 204 NONE DETECTED 15 Sq. Ft.

123 ROOM 109 NONE DETECTED 4 Sq. Ft.

131 ROOM 110 NONE DETECTED 4 Sq. Ft.

137 ROOM 111 NONE DETECTED 4 Sq. Ft.

154 ROOM 209 NONE DETECTED 4 Sq. Ft.

159 ROOM 210 NONE DETECTED 4 Sq. Ft.

163 ROOM 211 NONE DETECTED 4 Sq. Ft.

171 1995 ADDITION NURSE'S OFFICE AREA NONE DETECTED 4 Sq. Ft.

172 1995 ADDITION STAFF LOUNGE NONE DETECTED 5 Sq. Ft.

W1A 1' x 1' Ceiling Tile MasticAssociated w/I1A Total Amount: 1,575 Sq. Ft.

45 1930 ORIGINAL BUILDING 1ST FLOOR HALLWAY NONE DETECTED 022509-MA-11 125 Sq. Ft.

47 1930 ORIGINAL BUILDING EAST STAIRWELL NONE DETECTED 1140-7 60 Sq. Ft.

50 ROOM 101 NONE DETECTED 240 Sq. Ft.

56 ROOM 102 NONE DETECTED 275 Sq. Ft.

61 ROOM 103 NONE DETECTED 65 Sq. Ft.

64 1930 ORIGINAL BUILDING SOUTHWEST STAIRWELL NONE DETECTED 45 Sq. Ft.

81 1930 ORIGINAL BUILDING 2ND FLOOR HALLWAY NONE DETECTED 022509-MA-12 125 Sq. Ft.

83 ROOM 201 NONE DETECTED 160 Sq. Ft.

87 ROOM 202 NONE DETECTED 160 Sq. Ft.

91 ROOM 203 NONE DETECTED 160 Sq. Ft.

Page 10Horace Mann School

Page 22: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:

Location % Asbestos Sample No. New Sample LocationEstimated

TotalAmount

IEAEvent

No.

Homogeneous AreaID Code

(Material Type)

Chart C - All Materials List - Horace Mann School (cont.)

95 ROOM 204 NONE DETECTED 160 Sq. Ft.

W1B 1' x 1' Ceiling Tile MasticAssociated w/I1B Total Amount: 1,103 Sq. Ft.

39 1954 ADDITION EAST STAIRWELL NONE DETECTED 022509-MA-31 160 Sq. Ft.

69 1939 ADDITION 1ST FLOOR HALLWAY NONE DETECTED 18 Sq. Ft.

113 MEDIA CENTER & ASSOCIATED ROOMS NONE DETECTED 500 Sq. Ft.

140 1954 ADDITION 2ND FLOOR WEST STAIRWELL NONE DETECTED 70 Sq. Ft.

143 1954 ADDITION 2ND FLOOR HALLWAY NONE DETECTED 022509-MA-30 310 Sq. Ft.

148 1954 ADDITION 2ND FLOOR BOYS' RESTROOM NONE DETECTED 20 Sq. Ft.

165 1954 ADDITION 2ND FLOOR GIRLS' RESTROOM NONE DETECTED 25 Sq. Ft.

W1C 1' x 1' Ceiling Tile Mastic

Associated w/I1C Total Amount: 1,572 Sq. Ft.

41 1954 ADDITION EAST STAIRWELL NONE DETECTED 22 Sq. Ft.

66 1930 ORIGINAL BUILDING SOUTHWEST STAIRWELL NONE DETECTED 50 Sq. Ft.

118 ROOM 109 NONE DETECTED 250 Sq. Ft.

126 ROOM 110 NONE DETECTED 250 Sq. Ft.

133 ROOM 111 NONE DETECTED 022509-MA-03 250 Sq. Ft.

151 ROOM 209 NONE DETECTED 022509-MA-20 250 Sq. Ft.

156 ROOM 210 NONE DETECTED 250 Sq. Ft.

161 ROOM 211 NONE DETECTED 250 Sq. Ft.

X0A Miscellaneous MaterialWood Frame Chalkboard Adhesive (1930) Total Amount: 75 Sq. Ft.

52 ROOM 101 ASSUMED 5 Sq. Ft.

84 ROOM 201 ASSUMED 15 Sq. Ft.

88 ROOM 202 ASSUMED 20 Sq. Ft.

92 ROOM 203 ASSUMED 20 Sq. Ft.

Page 11Horace Mann School

Page 23: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:

Location % Asbestos Sample No. New Sample LocationEstimated

TotalAmount

IEAEvent

No.

Homogeneous AreaID Code

(Material Type)

Chart C - All Materials List - Horace Mann School (cont.)

97 ROOM 204 ASSUMED 15 Sq. Ft.

X0B Miscellaneous MaterialWood Frame Chalkboard Adhesive (1939) Total Amount: 65 Sq. Ft.

72 ROOM 105 ASSUMED 10 Sq. Ft.

75 ROOM 106 ASSUMED 20 Sq. Ft.

102 ROOM 206 ASSUMED 15 Sq. Ft.

104 ROOM 207 ASSUMED 20 Sq. Ft.

X0C Miscellaneous MaterialMetal Frame Chalkboard Adhesive (1954) Total Amount: 100 Sq. Ft.

122 ROOM 109 ASSUMED 20 Sq. Ft.

130 ROOM 110 ASSUMED 20 Sq. Ft.

138 ROOM 111 ASSUMED 20 Sq. Ft.

153 ROOM 209 ASSUMED 20 Sq. Ft.

158 ROOM 210 ASSUMED 20 Sq. Ft.

X0D Miscellaneous MaterialWhite Material Between Metal Window Panels Total Amount: 600 Sq. Ft.

8 THROUGHOUT BUILDING NONE DETECTED 022509-MA-10 MA-10: BOILER ROOM. 600 Sq. Ft.

Page 12Horace Mann School

Page 24: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:

SECTION II

Floor Plans

Page 25: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:
Page 26: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:
Page 27: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:
Page 28: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:

SECTION III

Asbestos Laboratory Report

Page 29: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:
Page 30: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:
Page 31: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:
Page 32: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:
Page 33: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:
Page 34: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:
Page 35: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:
Page 36: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:
Page 37: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:
Page 38: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:
Page 39: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:
Page 40: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:
Page 41: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:
Page 42: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:

SECTION IV

Asbestos Inspector & Management Planner Licenses

Page 43: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE:
Page 44: RE: Horace Mann School Asbestos Inspection IEA Project #0824003 · 2016-07-19 · March 24, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE: