southlandeng.com a Division of Southland Industries SOURCES • Lean Construction Institute (LCI): The Business Case for Lean Construction • Dodge Data & Analytics: SmartMarket Reports • Southland Engineering: Conventional Engineering is Failing Business Owners BUILDING A BRIGHTER FUTURE WHERE THE CONNECTED ENGINEER IS THE ADVOCATE FOR CHANGE More Predictable Costs 4X Safer Installation Reduce RFIs SOUTHLAND ENGINEERING PROJECTS USING CONNECTED ENGINEERING EXPERIENCE Southland Engineering is Leading the Change Engineering Redefined The industry needs a connected engineering approach to deliver better results. Engineers are positioned to be leaders that create collaborative relationships, improve quality, and complete projects on budget and on schedule. ENGINEERS Optimize technical solutions to meet owners’ needs Seek real cost, construction and maintenance input to influence design Value innovation, solving multiple challenges over defaulting to conventional solutions OWNERS Receive projects on time, on budget, at better quality FACILITIES Maintain lower energy costs, safer work environment ARCHITECTS Eliminate value engineering, improve coordination, minimize change orders, reduce construction admin GENERAL CONTRACTORS Achieve cost targets, reduce risk, maintain schedule, improve coordination CONTRACTORS Construct safer, install faster, build modular, improve quality CONNECTED ENGINEERING REDEFINES THE EXPECTATIONS OF A MODERN-DAY ENGINEERING FIRM BY DELIVERING CUSTOM, PERFORMANCE-DRIVEN SOLUTIONS THAT ARE COST-RESPONSIBLE, CONSTRUCTIBLE, AND MAINTAINABLE More Important Than Ever to Collaborate ENGINEERS MUST TAKE A LEADERSHIP ROLE TO CHANGE THE INDUSTRY Connected Engineering 70% MEPS +50% OF THE COORDINATION ISSUES OCCUR HERE UP TO 50% OF THE OVERALL PROJECT COST MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION ( MEPF ) WORK ACCOUNTS FOR APPROXIMATELY 70% OF THE OVERALL COORDINATION Impact to Engineering Facility Design Cost Analysis Construction & Maintenance REQUIRES GREATER COORDINATION ENERGY CONSERVATION INCREASED TECHNOLOGY BUSINESS DEMANDS Buildings Are Becoming More Complex SINCE THE 1960s, CONSTRUCTION LABOR EFFICIENCY AND PRODUCTIVITY HAS DECREASED, WHILE NON-FARMING LABOR EFFICIENCY IN GENERAL HAS DOUBLED. WHY? The Silo Slowdown: Why Now? MOST PROJECTS ARE STRUCTURED IN SILOS THAT CAUSE INEFFICIENCIES THROUGHOUT THE DEVELOPMENT PROCESS CONSULTING ENGINEERS Inadequately equipped with real cost, construction and maintenance data ARCHITECTS Misinformed during design resulting in late-stage value engineering and change orders CONTRACTORS Often selected for lowest price instead of total value provided to the project GENERAL CONTRACTORS Challenged to eliminate scope gaps, poor coordination and complex installation sequences OWNERS Actual users often excluded from providing design input FACILITIES Expected to operate with little input into project design Pinpointing the Cause 70% 30% OF OWNERS ARE UNHAPPY WITH OUTCOMES OF THE PROJECT Performance Issues for Owners COST QUALITY SCHEDULE 92% of projects to not meet schedule expectations 63% of projects fail to meet quality expectations 85% of projects are overbudget Project Performance is Falling Short Re-Engineering the Engineering Industry CONNECTED ENGINEERING: A BETTER WAY TO DESIGN

Transcript of Re-Engineering the Engineering Industry · custom, performance˚driven solutions that are...

Page 1: Re-Engineering the Engineering Industry · custom, performance˚driven solutions that are cost˚responsible, constructible, and maintainable more important than ever to collaborate

Lorem ipsum

southlandeng.com a Division of Southland Industries

SOURCES• Lean Construction Institute (LCI): The Business Case for Lean Construction

• Dodge Data & Analytics: SmartMarket Reports

• Southland Engineering: Conventional Engineering is Failing Business Owners

BUILDING A BRIGHTER

FUTURE WHERE THE CONNECTED ENGINEER IS

THE ADVOCATE FOR CHANGE

More Predictable Costs

4X Safer Installation

Reduce RFIs

SOUTHLAND ENGINEERING PROJECTS USING CONNECTED ENGINEERING EXPERIENCE

Southland Engineering is Leading the Change

Engineering Redefined

The industry needs a connected engineering approach to deliver better results.

Engineers are positioned to be leaders that create collaborative relationships, improve quality, and complete projects on budget and on schedule.

ENGINEERS

Optimize technical solutions to meet owners’ needs

Seek real cost, construction and maintenance input to influence design

Value innovation, solving multiple challenges over defaulting to conventional solutions

OWNERS

Receive projects on time, on budget,

at better quality

FACILITIES

Maintain lower energy costs, safer work environment

ARCHITECTS

Eliminate value engineering, improve coordination, minimize change orders,

reduce construction admin

GENERAL CONTRACTORS

Achieve cost targets, reduce risk, maintain schedule,

improve coordination

CONTRACTORS

Construct safer, install faster, build modular, improve quality

CONNECTED ENGINEERING REDEFINES THE EXPECTATIONS OF A MODERN-DAY ENGINEERING FIRM BY DELIVERING CUSTOM, PERFORMANCE-DRIVEN SOLUTIONS THAT ARE COST-RESPONSIBLE, CONSTRUCTIBLE, AND MAINTAINABLE

More Important

Than Ever to Collaborate

ENGINEERS MUST TAKE A LEADERSHIP ROLE TO CHANGE THE INDUSTRY

Connected Engineering

70%MEPS

+50%OF THE COORDINATION ISSUES OCCUR HERE

UP TO50%

OF THE OVERALL PROJECT COST

MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION (MEPF) WORK ACCOUNTS FOR APPROXIMATELY 70% OF THE OVERALL COORDINATION

Impact to Engineering

Facility Design

Cost Analysis

Construction & Maintenance

REQUIRES GREATER COORDINATION

ENERGY CONSERVATION

INCREASED TECHNOLOGY

BUSINESS DEMANDS

Buildings Are Becoming More Complex

SINCE THE 1960s, CONSTRUCTION LABOR EFFICIENCY AND PRODUCTIVITY HAS DECREASED, WHILE NON-FARMING

LABOR EFFICIENCY IN GENERAL HAS DOUBLED. WHY?

The Silo Slowdown: Why Now?

MOST PROJECTS ARE STRUCTURED IN SILOS THAT CAUSE INEFFICIENCIES THROUGHOUT

THE DEVELOPMENT PROCESS

CONSULTING ENGINEERS

Inadequately equipped with real cost, construction

and maintenance data

ARCHITECTSMisinformed during design

resulting in late-stage value engineering and

change orders

CONTRACTORSOften selected for lowest

price instead of total value provided to the project

GENERAL CONTRACTORS

Challenged to eliminate scope gaps, poor coordination and

complex installation sequences

OWNERSActual users often

excluded from providing design input

FACILITIESExpected to operate with little input into

project design

Pinpointing the Cause

70%

30%

OF OWNERS ARE UNHAPPY WITH OUTCOMES

OF THE PROJECT

Performance Issues for Owners

COST

QUALITY

SCHEDULE92% of projects to not meet schedule expectations

63% of projects fail to meet quality expectations

85% of projects are overbudget

Project Performance

is Falling Short

Re-Engineering the Engineering IndustryCONNECTED ENGINEERING: A BETTER WAYTO DESIGN