RDT&E PROGRAMResearch, Development, Test and Evaluation, Defense Wide - USSOCOM September 2008
Millions of Dollars
FY 2008 SUPPLEMENTALProgram Original FY 2008 Budget FY 2008 Total
P-1/R-1 Element for FY 2008 Amendment GWOT Cost FY 2008 Service APPN BA Line R&D Lines Line Item Name GWOT MRAP Adjustment GWOT
Research, Development, Test and Evaluation, Defense Wide - USSOCOM
USSOCOM RDTE, DW 7 213 0305208BB 3.170 3.170USSOCOM RDTE, DW 7 235 1160408BB SOF Operational Enhancements 1 2.270 2.270USSOCOM RDTE, DW 7 241 1160428BB USSOCOM Unmanned Vehicles 74.968
Distributed Common Ground/Surface Systems
1 - Details are classified and will be provided under separate cover.
74.968 0.000 5.440 80.408TOTAL RDT&E
Exhibit R-1
RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) DATE SEPTEMBER 2007
APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7
R-1 ITEM NOMENCLATURE / PROJECT NO. PE 0305208BB Distributed Common Ground/Surface Systems (DCGS)/S400A
R-1 Shopping List Item No. 213 R-2, RDT&E Budget Item Justification
Page 1 of 6 Pages
COST (Dollars in Millions) Original FY 2008 GWOT
FY 2008 GWOT
Cost Adjustment
Total FY 2008 GWOT
PE 0305208BB 3.170 3.170
S400A, Distributed Common Ground/Surface Systems
3.170 3.170
FY 2008 SUPPLEMENTAL A. Mission Description and Budget Item Justification: This program element provides for the identification, development, and testing of the Distributed Common Ground System (DCGS). The DCGS Special Operations Forces (SOF) architecture interconnects the warfighter and sensors to “find and fix” terrorist and/or individuals. DCGS-SOF provides SOF leadership with situational awareness for planning and executing SOF missions. DCGS-SOF integrates tactical processing, exploitation, and dissemination data into the SOF Information Enterprise (SIE). DCGS-SOF develops and integrates SOF networks providing USSOCOM with unique decision capabilities to include: measurement and signature data, sensor exploitation, data compressions and man-portable workstations. DCGS-SOF provides the supporting architecture to link the Global Sensor Network (GSN) to those who will interpret the data for rapid transmission to collaborative partners via the SIE. DCGS-SOF will initially provide SOF with capabilities to conduct exploitation of Full Motion Video from unmanned aerial vehicle assets organic to SOF. DCGS-SOF will integrate and implement the DCGS Integration Backbone standards and architecture on the SIE that will support net-centric data sharing between SOF fixed, tactical capabilities, and sensors. In coming years, DCGS-SOF will expand to incorporate connectivity to attended and unattended sensors via the GSN. B. Program Change Summary: FY 2008 Supplemental Request - Request for Supplemental Funding of $3.170M for DCGS.
Exhibit R-2a, RDT&E Project Justification Date: SEPTEMBER 2007 Appropriation/Budget Activity RDT&E BA # 7
Distributed Common Ground/Surface Systems/Project S400A
R-1 Shopping List Item No. 213 Exhibit R-2A, RDT&E Project Justification Page 2 of 6 Pages
Cost ($ in millions) Original FY 2008 GWOT
FY 2008 GWOT Cost Adjustment
Total FY 2008 GWOT
Distributed Common Ground/Surface Systems (DCGS)
3.170 3.170
RDT&E Articles Quantity
FY 2008 SUPPLEMENTAL
A. Mission Description and Budget Item Justification: This project provides for the identification, development, and testing of the Distributed Common Ground System (DCGS). The DCGS Special Operations Forces (SOF) architecture interconnects the warfighter and sensors to “find and fix” terrorist and/or individuals. DCGS-SOF provides SOF leadership with situational awareness for planning and executing SOF missions. DCGS-SOF integrates tactical processing, exploitation, and dissemination data into the SOF Information Enterprise (SIE). DCGS-SOF develops and integrates SOF networks providing USSOCOM with unique decision capabilities to include: measurement and signature data, sensor exploitation, data compressions and man-portable workstations. DCGS-SOF provides the supporting architecture to link the Global Sensor Network (GSN) to those who will interpret the data for rapid transmission to collaborative partners via the SIE. DCGS-SOF will initially provide SOF with capabilities to conduct exploitation of Full Motion Video from unmanned aerial vehicle assets organic to SOF. DCGS-SOF will integrate and implement the DCGS Integration Backbone standards and architecture on the SIE that will support net-centric data sharing between SOF fixed, tactical capabilities, and sensors. In coming years, DCGS-SOF will expand to incorporate connectivity to attended and unattended sensors via the GSN. B. Accomplishments/Planned Program: Original FY 2008 Total FY 2008 GWOT Cost FY 2008 FY 2008 Supplemental Request GWOT Adjustment GWOT DCGS 3.170 3.170 RDT&E Articles Quantity FY08 Program Justification: USSOCOM Processing, Exploitation and Dissemination (PED) squadron (11 IS) conducts 24/7 PED of real-time intelligence feeds in direct support of combat operations in the Global War on Terror. RDT&E is required to fund the developmental effort to enhance PED support to the warfighter, specifically to develop, integrate, test, and evaluate the SOF DCGS Integrated Backbone (DIB), resource adaptors, Joint Intelligence Operations Capability, and DCGS-SOF PED system.
Exhibit R-2a, RDT&E Project Justification Date: SEPTEMBER 2007 Appropriation/Budget Activity RDT&E BA # 7
Distributed Common Ground/Surface Systems/Project S400A
R-1 Shopping List Item No. 213 Exhibit R-2A, RDT&E Project Justification Page 3 of 6 Pages
C. Other Program Funding Summary: To Total FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 Complete Cost PROC, SOF Intelligence Systems 12.442 2.308 14.750 14.750 Acquisition Strategy: DCGS-SOF will leverage available funds against ongoing efforts by other government agencies to meet SOF-peculiar documented requirements. DCGS-SOF technology will allow for seamless integration with DOD, interagency, or coalition Intelligence Surveillance and Reconnaissance TPED systems.
Exhibit R-3 RDT&E Project Cost Analysis DATE: SEPTEMBER 2007APPROPRIATION / BUDGET ACTIVITY Distributed Common Ground/Surface System (DCGS)/PE0305208BBRDT&E DEFENSE-WIDE / 7 Distributed Common Ground/Surface System (DCGS)/S400A
Actual or Budget Value ($ in millions)Cost Categories Contract Total Budget Award Budget Award Budget Award(Tailor to WBS, or System/Item Method Performing Activity & Location PYs Cost Date Cost Date Cost Date To TotalRequirements) & Type Cost FY07 FY07 FY08 FY08 FY09 FY09 Complete ProgramProduct Development DCGS-SOF TBD TBD 3.170 Dec-08FY 2008 Supplemental Request DCGS-SOF TBD TBD 3.170 Dec-07 Cont. Cont. Subtotal Product Dev 0.000 0.000 3.170 3.170 Cont. Cont.Remarks:
Support Costs
Subtotal Support Costs 0.000 0.000 0.000 0.000 Cont. Cont.Remarks:
Test & Evaluation
Subtotal T&E 0.000 0.000 0.000 0.000 0.000Remarks:
Management Services
Subtotal Management 0.000 0.000 0.000 0.000 Cont. 0.000Remarks:
Total Cost 0.000 0.000 3.170 3.170 Cont. Cont.Remarks
R-1 Shopping List Item No. 213 4 of 6 Pages Exhibit R-3, Cost Analysis
Appropriation/Budget ActivityRDT&E/7
1 2 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
DCGS-SOF
FY 2008 Supplemental Request
DCGS-SOF
Project S400A/DCGSProject Number and Name
Date: SEPTEMBER 2007Exhibit R-4, RDT&E Program Schedule Profile
2013Fiscal Year
2006 20112007 2008 2009 2010 2012
R-1 Shopping List Item No. 213 5 of 6 Pages R-4 Schedule Profile
Exhibit R-4a, RDT&E Program Schedule Detail
Appropriation/Budget Activity Program Element Number and Name Project Number and Name
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013DCGS-SOF 1-4Q 1-4Q 1-4Q 1-4Q 1-4QFY 2008 Supplemental RequestDCGS-SOF 1-4Q
Schedule Profile
Date: SEPTEMBER 2007
RDT&E/7 PE0305208BB/Distributed Common Ground/Surface System (DCGS) Project S400A/DCGS
R-1 Shopping List - Item No. 2136 of 6 Pages Exhibit R4A, Schedule Detail
RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) DATE SEPTEMBER 2007
APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7
R-1 ITEM NOMENCLATURE / PROJECT NO. PE 1160428BB Unmanned Vehicles (UV)/S850
R-1 Shopping List Item No. 241 R-2, RDT&E Budget Item Justification
Page 1 of 7 Pages
COST (Dollars in Millions) Original FY 2008 GWOT
FY 2008 GWOT
Cost Adjustment
Total FY 2008 GWOT
PE1160428BB 74.968 74.968
S850, Unmanned Vehicles 74.968 74.968
FY 2008 SUPPLEMENTAL
A. Mission Description and Budget Item Justification: This program element addresses spiral development efforts validated in requirements documents for mid and long endurance Unmanned Aircraft Systems; supports development testing; and integrates system upgrades such as heavy fuel engine, increased endurance, reduced signature, increased telemetry range, and increased payload capacity for the Vehicle Craft Unmanned Aircraft System (VCUAS) and Logistics Support Vehicles to meet SOF mission requirements. B. Program Change Summary: FY 2008 Supplemental Request - Request $74.968 million to continue efforts started with a FY 2007 Congressional add for the GO Long Endurance UAS.
Exhibit R-2a, RDT&E Project Justification Date: SEPTEMBER 2007 Appropriation/Budget Activity RDT&E BA # 7
Unmanned Vehicles (UV)/Project S850
R-1 Shopping List Item No. 241 Exhibit R-2A, RDT&E Project Justification Page 2 of 7 Pages
Cost ($ in millions) Original FY 2008 GWOT
FY 2008 GWOT Cost Adjustment
Total FY 2008 GWOT
UV 74.968 74.968
RDT&E Articles Quantity 2 2
FY 2008 SUPPLEMENTAL
A. Mission Description and Budget Item Justification: This project addresses spiral development efforts validated in requirements documents; supports development testing for mid and long endurance Unmanned Aircraft Systems; integrates system upgrades under an evolutionary acquisition strategy to obtain objective SOF mission requirements; and develops upgrades which include payload integration, platform improvements, targeting capabilities and digital datalink for the Rucksack Portable Unmanned Aircraft System (RPUAS); and heavy fuel engine, increased endurance, reduced signature, increased telemetry range, and increased payload capacity for the Vehicle Craft Unmanned Aircraft System (VCUAS); and develops a Logistics Support Vehicle (LSV). B. Accomplishments/Planned Program: Original FY 2008 Total FY 2008 GWOT Cost FY 2008 FY 2008 Supplemental Request GWOT Adjustment GWOT Global Observer 74.968 74.968 RDT&E Articles Quantity 2 2 FY08 Program Justification: This effort adds two additional air vehicles, one launch and recovery element, three government furnished equipment Intelligence, Surveillance and Reconnaissance (ISR) and communication relay payloads, and additional testing and evaluation (e.g., ground duration and load testing for airworthiness certification, flight envelope expansion testing, and military user assessment) to the Global Observer effort started in FY 2007. Operationally, the GO UAS will provide an economical unmanned multi-functional platform to operate missions for up to seven days with a single aircraft. Missions can be performed supporting persistent ISR and targeting, Communications Relay and Battle Management Command and Control (C2), and Psychological Operations (PSYOP). Gaps in situational awareness and battlefield communications are the result without a near-term solution in development.
Exhibit R-2a, RDT&E Project Justification Date: SEPTEMBER 2007 Appropriation/Budget Activity RDT&E BA # 7
Unmanned Vehicles (UV)/Project S850
R-1 Shopping List Item No. 241 Exhibit R-2A, RDT&E Project Justification Page 3 of 7 Pages
C. Other Program Funding Summary: To Total FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 Complete Cost Unmanned Vehicles PROC 40.107 37.107 26.200 17.035 12.498 15.266 15.673 Cont. Cont. Small Arms and Weapons PROC 19.905 19.905 Acquisition Strategy: Leverages efforts of sole source Joint Capabilities Technology Demonstration fabrication and testing contract to demonstrate multi-aircraft operations and multiple payload capability in an operationally relevant environment.
Exhibit R-3 RDT&E Project Cost Analysis DATE: SEPTEMBER 2007APPROPRIATION / BUDGET ACTIVITY Program Element 1160428BB/Unmanned Vehicles (UV)RDT&E DEFENSE-WIDE / 7 Project Name and Number S850
Actual or Budget Value ($ in millions)Cost Categories Contract Total Budget Award Budget Award Budget Award(Tailor to WBS, or System/Item Method Performing Activity & Location PYs Cost Date Cost Date Cost Date To TotalRequirements) & Type Cost FY07 FY07 FY08 FY08 FY09 FY09 Complete Program
Various USSOCOM, MacDill AFB, FL 0.750 Dec-07 0.765 Dec-08 3.210 4.725
Various USSOCOM, MacDill AFB, FL 0.150 Dec-07 0.153 Dec-08 0.642 0.945
FY 2008 Supplemental RequestGlobal Observer Fabrication Cost Plus Aero Vironment, Simi Valley, CA 30.000 Aug-08 30.000 Subtotal Product Dev 0.000 0.000 30.900 0.918 3.852 35.670Remarks:
VCUAS Development Support Various USSOCOM, MacDill AFB, FL 0.150 Dec-07 0.153 Dec-08 0.642 0.945VCUAS Software Development Various USSOCOM, MacDill AFB, FL 0.150 Dec-07 0.153 Dec-08 0.642 0.945
FY 2008 Supplemental RequestGlobal Observer Design Cost Plus Aero Vironment, Simi Valley, CA 9.968 Aug-08 9.968 Subtotal Spt 0.000 0.000 10.268 0.306 1.284 11.858Remarks:
RPUAS Developmental Test & Various NATICK 0.000 1.481 Nov-06 1.481Evaluation
Various USSOCOM, MacDill AFB, FL 0.150 Dec-07 0.153 Dec-08 0.642 0.945
LSV Develop Test & Evaluation Various 1.559 Jan-07 1.559
FY 2008 Supplemental RequestGlobal Observer Testing Cost Plus Aero Vironment, Simi Valley, CA 10.000 Aug-08 10.000 Subtotal T&E 0.000 3.040 10.150 0.153 0.642 3.985Remarks:
TBD USSOCOM, MacDill AFB, FL 0.150 Dec-07 0.153 Dec-08 0.642 0.945FY 2008 Supplemental RequestGlobal Observer Integration Cost Plus Aero Vironment, Simi Valley, CA 25.000 Aug-08 25.000 Subtotal Management 0.000 0.000 25.150 0.153 0.642 25.945Remarks:
Total Cost 0.000 3.040 76.468 1.530 6.420 77.458Remarks:
VCUAS Developmental Test & Evaluation
VCUAS Contractor Engineering Support
Vehicle Craft Unmanned Aircraft System (VCUAS) Primary Hardware VCUAS Ancillary Hardware Development
R-1 Shopping List Item No. 241 4 of 7 Pages
Exhibit R-3, Cost Analysis
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
Vehicle Craft Unmanned Aircraft System (VCUAS) Block I
Design
Development
Integration
Testing
VCUAS Block II
Design
Development
Integration
Testing
VCUAS Block III
Design
Development
Integration
Testing
Rucksack Portable Unmanned Aircraft System
Development
Integration
Testing
Fiscal Year2006 2007
Appropriation/Budget ActivityRDT&E, Defense-Wide/7 PE1160428BB/Unmanned Vehicles (UV)
2008
Exhibit R-4, RDT&E Program Schedule Profile Date: SEPTEMBER 2007
Project S850 Program Element Number and Name Project Number and Name
20132009 2010 2011 2012
R-1 Shopping List Item No. 2415 of 7 Pages
Exhibit R-4, Schedule Profile
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4Fiscal Year
2006 2007
Appropriation/Budget ActivityRDT&E, Defense-Wide/7 PE1160428BB/Unmanned Vehicles (UV)
2008
Exhibit R-4, RDT&E Program Schedule Profile Date: SEPTEMBER 2007
Project S850 Program Element Number and Name Project Number and Name
20132009 2010 2011 2012
Unmanned Logistics Support Vehicle
Development
Integration
Testing
FY 2008 Supplemental Request
Global Observer
Design
Fabrication
Integration
Testing
R-1 Shopping List Item No. 2415 of 7 Pages
Exhibit R-4, Schedule Profile
Appropriation/Budget Activity Program Element Number and Name Project Number and Name
FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013
Design 1-2Q2-4Q
1-2Q3-4Q
Design 1-2Q3-4Q
1-2Q3-4Q
Design 1-2Q3-4Q
1-2Q Testing 3-4Q
2Q - 4Q 1Q - 4Q3Q - 4Q 1Q
4Q 1Q
2Q - 4Q 1Q3Q - 4Q 1Q
1Q
4Q 1Q4Q 1-2Q
1-3Q2-4Q
Integration Testing
Schedule Profile
Date: SEPTEMBER 2007
Project S850 RDT&E, Defense-Wide/7 PE1160428BB/Unmanned Vehicles (UV)
Exhibit R-4a, RDT&E Program Schedule Detail
Development Integration
VCUAS Block III
Development Integration
VCUAS Block IV Testing
Testing
Rucksack Portable Unmanned Aircraft System Development Integration
Testing
Vehicle Craft Unmanned Aircraft System (VCUAS)
Development Integration
Testing
Unmanned Logistic Support Vehicle Development Integration
Global ObserverFY 2008 Supplemental Request
Design Fabrication
R-1 Shopping List Item No. 2417 of 7 Pages
Exhibit 4a, Schedule Profile