RD QUARTER PERFORMANCE REPORT FOR THE FINANCIAL … · 3RD QUARTER PERFORMANCE REPORT FOR THE...
Transcript of RD QUARTER PERFORMANCE REPORT FOR THE FINANCIAL … · 3RD QUARTER PERFORMANCE REPORT FOR THE...
2
TABLE OF CONTENTS
DESCRIPTION PAGE NO.
1. INTRODUCTION
3
2. SERVICE DELIVERY PERFORMANCE REPORT
4
2.1 Basic Service Delivery
4
2.2 Municipal Institutional Development & Transformation
38
2.3 Local Economic Development
40
2.4 Municipal Financial Viability
43
2.5 Good Governance
46
3
1. INTRODUCTION Section 52 of the Municipal Finance Management Act requires the Mayor to, within 30 days of the end of each quarter; submit a report to Council on the implementation of the budget and the financial state of affairs of the municipality.
The accounting officer conducted performance review sessions with all directors to assess the performance in line with commitment contained in the service delivery and budget implementation plan. Reliability of the performance report submitted was audited internally in terms of section 45 (a) of the municipal systems act and directorates advised about the finding and areas of correction.
.
4
2. SERVICE DELIVERY AND PERFORMANCE REPORT 2.1 BASIC SERVICE DELIVERY Objective: To ensure provision of quality basic services and investment of funds into infrastructure projects to benefit the community. KPI1
NumberofreportsonindigentregistrationandverificationtabledbeforeCouncil
Annualtarget
3rdquartertarget
PerformanceActual Variance
4 1 1 -CommentontheachievementoftheKPIandremedialmeasuresGeneralstatementAchievedThe indigent registration was done in the third quarter Number of registrations : Jan - 8587 Feb - 4707 Mar - 5041 Thetotalforthefinancialyearapprovedforms=18335Ref:CFO1KPI2
PercentagecompletionofupgradingofCivicCentre Annualtarget
3rdquartertarget
PerformanceActual Variance
60% N/A N/A -CommentontheachievementoftheKPIandremedialmeasuresGeneralstatementThekeyperformanceindicatorisapplicableforthefourthquarter.
Ø Thekeyperformanceindicatorwasbrokendowntobeabletomeasureprogressregisteredbyidentifyingwhatneedstobedone.Thescopeofworkdonewasreducedtosixtypercent(60%)tobeachievedbythefourthquarter.
Ø AnamountofR800,000willbecarriedovertothe2014/2015financialyearfortheinstallationofsoundandlightning.Thecompaniesthatsubmittedbidsdidnotmeettherequiredstandard.
5
Projectmilestones-plasticchairs;steeltables;steelbanquetchairshavebeenprocured,deliverandbarcoded.Flagpoleshavebeeninstalledaswell.ProjectDescription
Budget
Expenditure
Percentage
UpgradingofCivicCentre
R2000000.00 R878383.00
44
Ref:DCD1KPI3
PercentageconstructionofablutionblockatBethaniecemetery
Annualtarget
3rdquartertarget
PerformanceActual Variance
100% N/A 100% CommentontheachievementoftheKPIandremedialmeasuresGeneralstatementAchieved
Ø ServiceProvidersignedSLAon29/08/2013.Sitehandoverwasdoneon06/09/2013.Ø ProjectcompletedassetoutintheSDBIP
ProjectDescription
Budget
Expenditure
Percentage
ConstructionofAblutionBlockatBethanieCemetery
R350000.00 R171588.00
49
Ref:DCD3KPI4
PercentageconstructionofablutionblockatLethabongcemetery
Annualtarget
3rdquartertarget
PerformanceActual Variance
100% N/A 100% CommentontheachievementoftheKPIandremedialmeasuresGeneralstatement-AchievedTheKPIwasapplicableduringthesecondquarter.
Ø ServiceProvidersignedSLAon29/08/2013.SiteHandoverwasdoneon06/09/2013.Ø ProjectcompletedassetoutintheSDBIPØ AdditionalfundsarefromtheBethaniecemeteryvote.
6
Ref:DCD4
ProjectDescription
Budget
Expenditure
Percentage
ConstructionofAblutionBlockatLethabongCemetery
R475000.00 R513269.10
108
KPI5
NumberofboreholesdrilledatMarikanaandRietvleicemeteries
Annualtarget
3rdquartertarget
PerformanceActual Variance
02 N/A 02 -CommentontheachievementoftheKPIandremedialmeasuresGeneralstatementAchieved
Ø SKSEnvironmentalTechnologieswereawardedacontractfordrillingboreholesatMarikanaandRietvleicemeteriesandwereonsitefrom26August2013.
Ø Drillingofwaterboreholeshasbeencompleted.ProjectDescription
Budget
Expenditure
Percentage
DrillingofBoreholesatRietvleiandMarikanaCemeteries
R200000.00 R198140.00
99
Ref:DCD5 KPI6 PercentagecompletionofupgradingofPaul
BodensteinPark(PhaseII)Annualtarget
3rdquartertarget
PerformanceActual Variance
100% N/A 100% CommentontheachievementoftheKPIandremedialmeasuresGeneralstatement-Achieved
Ø Clearandgrabcompleted,cleaningofponds/damscompleted,irrigationsysteminstalled,demolitionofoldbraaiareasdone,demolitionofoldthatchroofsdone,newthatchroofscompleted,constructionofnewablutionblockscompleted,newbraaiareascompleted,newgrasshasbeenplantedandnewpavedwalkwayscompleted.
Ø Targetachievedandhandedoveron17thJanuary2014.
7
Ref:DCD6
ProjectDescription
Budget
Expenditure
Percentage
UpgradingofPaulBodensteinPark
R3000000.00 R2962847.95
99
KPI7 PercentagecompletionofparkinTlhabane–Phase2
Annualtarget
3rdquartertarget
PerformanceActual Variance
100% 100% -CommentontheachievementoftheKPIandremedialmeasuresGeneralstatement-Achieved
Ø Constructionofablutionfacilities,guardhouseandbraaiareasaswellaslandscapingandmainwaterconnectionandallhavebeencompletedasperSDBIP.
Ø Projectcompleted.
ProjectDescription
Budget
Expenditure
Percentage
AmusementParkTlhabane R3800000.00 R3787648.89
100
Ref:DCD7
KPI8 PercentagecompletionofRankelenyane/
MabitsesportsfacilityAnnualtarget
3rdquartertarget
Performance
Actual Variance
25% N/A N/A -CommentontheachievementoftheKPIandremedialmeasuresGeneralstatementTheprojectisapplicableforcompletioninthefourthquarter.
Ø Projectwasadvertisedon11October2013.Thebiddocumentwasavailablefrom16October2013andthetenderclosedon04November2013.
Ø Scopeofworkcomprisesofthefollowing:constructionofboundarywallandinstallationof1.8mhighrazordiamond-meshfencearoundthefacility;constructionofacombicourt,installationofhighmastlighting,constructionofpavedentranceroadandgravelparkingatabudgetofR3690910.74.Thecontractorwasappointedandsitewashandedoveron19February2014.Expecteddateofcompletionasperprojectworksprogrammeis19July2014.
8
Ø Progressmade:existingseptictanksexposingandcleaned;existingirrigationpipelineswithsprinklersexposingcompleted;removalofexistingprecastconcretewallcompleted;caretakerfacilitycompleted;ticketofficecompleted;storeroomcompleted.
Ø Tobecompletedinthenewfinancialyear.ProjectDescription
Budget
Expenditure
Percentage
DevelopmentofRankelenyane/MabitseSportsFacility(MIG)
R4100000.00 R383304.38
9
Ref:DCD8KPI9PercentagecompletionofTlhabanesportsfacility Annual
target3rdquartertarget
PerformanceActual Variance
25% N/A Projectonhold
-
CommentontheachievementoftheKPIandremedialmeasuresGeneralstatement-theprojectisapplicableforthefourthquarter.
Ø Scopeofworkcomprisesofthefollowing:constructboundarywallandinstall1.8mhighrazordiamond-meshfencearoundthefacility;constructacombicourt,installhighmastlighting,constructpavedentranceroadandgravelparking.
Ø Theprojectisonholdduetodisruptionbysomedisgruntledcommunitymembers.ProjectDescription
Budget
Expenditure
Percentage
DevelopmentofTlhabaneSportsComplex(MIG)
R4000000.00 R328994.80
8
Ref:DCD9
9
KPI10Quarterlyprogressreportsonfacilitationofhousingdevelopment
Annualtarget
3rdquartertarget
PerformanceActual Variance
4 1 3 2CommentontheachievementoftheKPIandremedialmeasuresGeneralstatementAchieved
DinieEstatesBeneficiaryAllocation
• ThehousingProvisionunitembarkedonahousingneedassessmentonthefarmslocatedonWard36.Variousplotsonthefarmsweretargetedforauditpurposes,thosethathadbackyarddwellersandthosewithnoformalstructures.
Relocationofyizoyizo
• RelocationplanandSocialfacilitationhasbeencompleted.BokamosoHousingDevelopment
• DevelopmentofBokamosoatplanningphasewithprogressregisteredasfollows;
v Land-TransferandregistrationoflandtobecompletedinFebruary2014v EIA–Anglotoappointconsultantsbyweekending13December2013.DurationofEIA
investigationistotake+-5monthsv TownPlanning–Sitelayoutandtrafficassessmentstudyandgeotechcompletedv BulkSewer–OptionanalysisdonebyRPM.Outsewerdesignscompletedv Electricity–RLMtocommunicateandconfirmwithEskom
Roads–DesignsdoneasperRLMguide.AshortfallofR20.4mtobeexperiencedwhen45mmasphalt
isused.Ref:DPHS3
10
KPI11DateoffinalizationofAccreditationImplementationProtocol
Annualtarget
3rdquartertarget
PerformanceActual Variance
March2014
March2014
-
CommentontheachievementoftheKPIandremedialmeasuresGeneralstatementNotAchievedAnAccreditationtaskteamconsultativemeetingwasheldonthe11February2014anditwasconcludedthat:
- TheHousingAccountbetransferredtotheProvincewithallliabilities.- Themunicipalitytoimplementhousingprojectsasfrom2014/2015withstartupof97housing
subsidies.- TheDepartmentofHousingtoprovideletterofcommitmentforhousingsubsidies.
Ref:DPHS4 KPI12QuarterlyprogressreportsinthedevelopmentofasocialhousingentityforRLMtabledbeforeCouncil
Annualtarget
3rdquartertarget
PerformanceActual Variance
4 1 1 -CommentontheachievementoftheKPIandremedialmeasuresGeneralstatementAchieved
- Ameetingwiththeprovincewasheldonthe24October2013,wheretheserviceproviderwasintroducedtotheProvinceandidentifiedlandforsocialhousingpresented.ArequestwasmadetotheserviceprovidertostartpreparingbusinessplansforsocialhousingdevelopmentthatwillbesubmittedtotheProvinceandSHRA.
Ref:DPHS5
11
KPI13Percentageoffundsspentonlandacquisition Annualtarget
3rdquartertarget
PerformanceActual Variance
100 75 75 -CommentontheachievementoftheKPIandremedialmeasuresGeneralstatementAchieved
- 300standsinSeralengwerepurchasedfromXstrataatacostofR4218000- Portion84oftheFarmPaardekraal279JQacquiredatacostofR2800000
ProjectDescription
Budget
Expenditure
Percentage
SeralengandSeralengExtension
6000000
R4218000 116%
Portion84ofthefarmPaardekraal 2800000
- Theshortfallwasfundedfromre-directedfunds.Ref:DPHS6KPI14Dateofdisposalofexcessimmovablecapitalassetsforlandtrustfund
Annualtarget
3rdquartertarget
PerformanceActual Variance
June2014
N/A ProgressReport
-
CommentontheachievementoftheKPIandremedialmeasuresGeneralstatementAchieved
- Anauctionwasheldonthe19October2013wherestandstothevalueofR1390000weresold.
- StandstothevalueofR2080000werealsosoldafterauction.Ref:DPHS7
12
KPI15Percentageupgradingofmunicipalairport Annualtarget
3rdquartertarget
PerformanceActual Variance
100 40 26 (14)CommentontheachievementoftheKPIandremedialmeasuresGeneralstatementTheKPIisapplicableinthefourthquarter.Thefollowingwereimplemented:
Project Budget Expenditure PercentageInternalupgradeoftheairport R1358915.00 R0.00 0Developmentoftheairportmasterpla
R536655.00 R165850.00 31
Constructionoftheperimeterwall
R1743110.00 R833127 48
Ref:DPHS8KPI16DateofcompletionofprecinctplansforZinniavilleandMarikanaClusters
Annualtarget
3rdquartertarget
PerformanceActual Variance
Sept2013
N/A 6Dec2013
-
CommentontheachievementoftheKPIandremedialmeasuresGeneralstatementAchievedThefinalprecinctplansforZinniaville,RustenburgNorth,RustenburgEast,MarikanaandKarlienParkwereapprovedbyCouncilon06thDecember2013.
Project Budget Expenditure PercentagePrecinctplansforZinniaville,RustenburgNorth,RustenburgEast,MarikanaandKarlienPark
R310 000.00 R310 000.00 100
Ref:DPHS9
13
KPI17Percentagefundsspentonupgradingofpedestrianwalkways
Annualtarget
3rdquartertarget
PerformanceActual Variance
100 50 47 3CommentontheachievementoftheKPIandremedialmeasuresGeneralstatementAchievedProjectDescription
Budget
Expenditure
Percentage
Upgradingofpedestrianwalkways:Monnakato
1574810 951955 47
Ref:DPHS10KPI18PercentagefundsspentonroadlinksfromBoitekong Annual
target3rdquartertarget
PerformanceActual Variance
100 16 40 24CommentontheachievementoftheKPIandremedialmeasuresGeneralstatementTheKPIisapplicableinthe4thquarter.AppointmentofroutedeterminationandplanningofnewBoitekonglinkroadwasawardedtoAurecon,thescopingoptionreportwascompletedandonly40%oftheprojectwasachieved.ProjectDescription
Budget
Expenditure
Percentage
RoadlinksfromBoitekong R495900.00 R0.00 0Ref:DPHS11
14
KPI19Monthlyreportsonimpactofairqualitymonitoringprogramonenvironment
Annualtarget
3rdquartertarget
PerformanceActual Variance
12 3 3 -CommentontheachievementoftheKPIandremedialmeasuresGeneralstatementAchieved
- January2014–TheanalysisofdatafromtheRLMstationsshowedthatthestationshadgoodcollectionefficiencyaftervalidationexceptforReatile:DatarecoveryforBoitekongwas98.24%,Marikana93.03%andReatile64.32%
- February2014–Datarecoveryaftervalidationwas77.66%:Boitekongwas94.42%,Marikana67.46%andReatile94.42%.
ProjectDescription
OriginalBudget(R)
Adjustment
Expenditure
Percentage
Airqualitymonitoringprogram 800000 283419 153149 54%Ref:DPHS12KPI20Numberofenvironmentaleducationandawarenesscampaignsconducted
Annualtarget
3rdquartertarget
PerformanceActual Variance
4 1 2 1CommentontheachievementoftheKPIandremedialmeasuresGeneralstatementAchievedTwo(2)environmentaleducationcampaignswereconducted:
- Kick-startingEco-SchoolsandWorldWetlandsDay- RecyclingandGreeningProjectsfortheEco-ClubswithintheRLMcommunities.
Project Budget Adjustment Expenditure PercentageEnvironmentaleducationandawarenesscampaigns
R89500 R389505 R246197 63
Ref:DPHS13
15
KPI21PercentagefundsspentonreplacementoftheCOanalyser
Annualtarget
3rdquartertarget
PerformanceActual Variance
100 100 97% 3%CommentontheachievementoftheKPIandremedialmeasuresGeneralstatementAchievedTheprojectwascompletedduringthe2ndquarter.DeliveryofanewSM200s/wpluspumpandsparesatBoitekongstationwasonthe04/10/2013.
Project Budget Expenditure PercentageReplacementoftheCOAnalyser R300000 R292000 97
Ref:DPHS14KPI22Percentagefundsspentonacquisitionoftyreshredder
Annualtarget
3rdquartertarget
PerformanceActual Variance
100 100 93 7CommentontheachievementoftheKPIandremedialmeasuresGeneralstatementAchievedTheprojectwascompleted;theshredderwiththeconveyorbeltwasdeliveredtoRLM-WasteManagementonthe17thJanuary2014.
Project Budget Expenditure PercentageAcquisitionoftyreshredder R800000 R742000 93
Ref:DPHS15
16
KPI23Dateofcompletionofthelayout/buildingplansfortheExpansionofCCTVSurveillanceRoom
TARGETS PERFORMANCEAnnual Quarterly
Actual Variance
June2014
Designforlay-outplandone.
AppointmentofServiceProvider
-
GeneralStatement:Theprojectisapplicableduringthe4thquarter.The Contractorwas appointed on 29October 2013 at an amount of R7299050.00. The availablebudgetisonlyR1000000.00.Designforlay-outplanhasbeencompletedandenclosedasevidence.Theprojectisonholdduetolackofmoney.
Project Budget Expenditure %CCTVsurveillanceroomexpansion R1000000.00 R261000.00 26
Reasonfornotachieving:Inadequate funding (R1000000.00) and R261000.00 has already been spent, the balance isR739000.00.Remedialmeasures:AnadjustmentofR6299050.00willbedoneduringadjustmentbudgetin2015.Ref:DPS1
17
KPI24Numberofmultidisciplinaryandin-houseoperationsforcrimefightingandprevention.
TARGETS PERFORMANCEAnnual
Quarterly
Actual Variance
40 10 16 6GeneralStatement:AchievedEvidence of 16 operations has been included and it is not includingwarrant operationswhich arecarried out on daily basis tomaximize the collection of revenue. One hundred and fifty six (156)operationshavealreadybeenconductedwhichexcludeaboutsixtysix(66)warrantoperations.SafeandCleanCitycampaignstakeplaceeveryFridayandCommunityPolicingForumprogrammes.Project Budget Expenditure %Joint law enforcement operations andcrimepreventionprogrammes
operational 0 0
Ref:DPS2
KPI25NumberofreportsontheimplementationofMunicipalInterventionSchemeandPatrols(MISAP)
TARGETS PERFORMANCEAnnual
Quarterly
Actual Variance
8 6 13 7
GeneralStatement:AchievedAchieved. Thirteen (13) reports have been submitted. This programme has just been started inNovember 2013. It serves as an environmental scanner and identifies potential risks, as well asperceptual and actual riskswith an intention to intervene and coordinate relevant stakeholders tointervene.
Project Budget Expenditure %MISAP N/A Operational Ref:DPS3
18
KPI26NumberofPeaceandStabilityProgrammesconducted
TARGETS PERFORMANCEAnnual
Quarterly
Actual Variance
4 3 6 3GeneralStatement:AchievedA Conflict Resolution Committeewas established in October 2011 to address the concerns of thecommunity. Theobjectivesof this committeeare tomaintain stability, peaceand social cohesion;ensure that the rule of law prevail and create a platform for dialogue. Six (6) programmeswereundertakeninthethirdquarter.
Project Budget (intendedcollection)
ConflictManagementMechanism N/B(operational)Ref:DPS4
KPI27DateofOperationalisationoflicensinginCharora.
TARGETS PERFORMANCEAnnual
Quarterly
Actual Variance
June2014
N/AOperationallicensingoffice
-
GeneralStatement:AchievedThe licensing office in Charora is operational. The printout reports were not retrieved due todisruption(cabletheft)–inspectioninLocoisrecommended.
Project Budget Expenditure %Decentralisationofservices Operational Ref:DPS5
19
KPI28PercentagecompletionoftheMarikanaLicensingandTestingoffice
TARGETS PERFORMANCEAnnual Quarterly
Actual Variance
100% 75% 90% 15%GeneralStatementNotAchieved.Provincial Department of Public Safety allocated R445000.79 for Marikana Licensing Centre.Remainingwithinstallationofcubiclesandappointmentofstaff.Project Budget Expenditure %MarikanaLicensingandTestingoffice
R955000.79 0 0
ReasonsfornotachievingTheprojectisdelayedduetoexhaustedfundcontributedbythemunicipality.RemedialActionAdditional funds of about R47000.00 is still remaining with the province for the completion ofcubicles.Ref:DPS6
KPI 29 Date of Operationalisation of theLearner’sTestingclassinRobega.
TARGETS PERFORMANCEAnnual Quarterly
Actual Variance
June2014
Furniture issupplied.
Ready foroperation.
Authorizationfromtheprovince
GeneralStatement:Achieved.Inspection was already conducted by the Department of Transport. The class is ready foroperationalisation. Registrationnumber is thedelaying factorbut anticipated that the registrationnumbermaybeissuedbeforeendofMay2014.Ref:DPS7
20
KPI30PercentageimplementationofIntegratedCommunicationCentre
TARGETS PERFORMANCEAnnual Quarterly
Actual Variance
100% 75% 100% 25%GeneralStatement:AchievedThecrisiscentreandcallcentrearefullyoperationalrecommendinspection-in-loco.
Project BudgetIntegratedCommunicationCentre operational
Ref:DPS8KPI31.%Impactofroadusers’educationprogrammesconducted
TARGETS PERFORMANCEAnnual
Quarterly
Actual Variance
5 27 71 44
GeneralStatement:AchievedAchieved.Seventy one (71) road users’ education was conducted and 37 schools were enrolled for scholarpatrolinRustenburg.Ref:DPS9
KPI32Numberofhighschoolsenrolledforlearnerlicenses
TARGETS PERFORMANCEAnnual
Quarterly
Actual Variance
30 15 5 10GeneralStatement:AchievedThisisaperiodofre-enrollingschools.Five(5)schoolshavebeenregisteredforthisproject.In2013,30schoolswereregistered.Reasonfornotachieving/challengesItgoesparallelwiththere-enrolmentofprimaryschoolsforscholarpatrols.
21
KPI34PercentageconstructionoftheNorthWestCorridor
AnnualTarget 3rdQuarterTargets
Actual Variance
100%
100%
100% -
CommentontheachievementoftheKPIandremedialmeasures GeneralStatementAchievedThecontractstartedonthe18June2013,thecompletiondatewas20thNovember2013.TheContractorwasaffordedanextensionoftimetothe28thFebruary2014.
Remedialmeasures:Theregistrationwillbecompletedinthe4thquarter.Ref:DPS10KPI33NumberofreportsoncomputerizationoflearnerslicenseclasssystemtabledtoCouncil
TARGETS PERFORMANCEAnnual
Quarterly
Actual Variance
12 3 3 -GeneralStatementAchieved.Recommendinspection-in-locofollowingcabletheft.Reasonfornotachieving/challenges: Reducednumberofapplicants. Remedialmeasures:Popularizethesystemtoourcommunities.Ref:DPS11
22
AWorksCompletioninspectionisscheduledforthe4thApril2014.
PracticalCompletionwasachievedonthe26thFebruary2014,2daysbeforethedateoftheintendedPCdate(28thFebruary2014).Ref:RRT1
KPI35PercentageconstructionoftheNorthEastCorridor.
AnnualTarget 3rdQuarterTarget
Actual Variance
60%Completion
45%expenditure
45%
-
ExpectedProgressonsite
45% 36%
9%
CommentontheachievementoftheKPIandremedialmeasures GeneralStatementNotachievedTheproject(RLM/MM/0099/20112/13ConstructionoftheRustenburgRapidTransportNorthEastCorridor)isamultiyearproject,dividedintothreecontractsthatstartedinAugust2013andwillendinOctober2015.Forcalculationsonexpenditureandprogressonsite,theaverageofthe3contractswillbeused.Project Budget Expenditure PercentageConstructionoftheNorthEastCorridor
R679000000 R305323463 45%
Progressonsite: ContractA(MCivils)-48%ContractB(UmsoConstruction)-28%ContractC(MCivils)-33% ContractAisonscheduleContractBisbehindschedulefor7weeksbecausethecontractorwasdelayedbytheservicestoberemovedbythemines,thereforehehadlateaccessonthebridge,and4weeksisattributedtotherainsexperiencedinFebruary2014.ContractCisbehindschedule.Theattributingfactorscanbeseenontherisksummaryfactor,inthe
23
progressreport.Thisismainlyduetothefactthatthereisapproximately2kilometersofroadreservethatisencroachingonthelandthatbelongstotheDepartmentofCorrectionalServices(Rustenburg),withintheirfenceboundary.Thisineffectinhibitsaccesstothecontractortoaportionofworkofthecontract.RemedialAction:TheContractorwasrequestedtogiveamethodtomakeupondelaysonContractB.Resourceshavebeenincreasedwithsiteseniorpersonnel,machineryandequipment.ConstantcommunicationwiththeDepartmentofCorrectionalServicesHeadOfficeandDepartmentofPublicWorkstakingplace.ThematterwillberesolvedinApril,wherethefencewillberelocated.Ref:RRT2KPI36DateofCompletionoftheDetailedDesignReport(otherstations)
AnnualTarget 3rdQuarterTarget
Actual Variance
June2014
DraftTenderDocumentto
BidSpecification
NotAchieved
-
CommentontheachievementoftheKPIandremedialmeasures GeneralStatementNotAchievedReasonsfornotachievingTheappointmentofabuildingcontractorfortheconstructionof13stationsuperstructuresforcorridorsAandB.Thefinalizationofthisbidspecificationwasalsodependentontheoperationalrequirementsofthesystem,intermsofwhetherthe2stationsintheCBDshouldbeincludedinthetenderornot.Thedrafttenderdocumentspecificationwasnotcompleteattheendofthethirdquarter.RemedialAction
Thebidwillserveatbidspecificationonthe14thApril2014;thetendertobeadjudicatedinacompressedperiodoftimeinordertomeettheJune2014target.
Ref:RRT3
24
KPI37DateofcompletionPhase1Depots
a) ProcurementofDesignConsultants
b) Design
AnnualTarget
3rdQuarterTarget
Actual Variance
June2014
AppointmentofDepotDesignConsultantsandfinalizationofcontractdocumentation
Achieved
-
CommentontheachievementoftheKPIandremedialmeasures GeneralStatementAchievedTheaboveKPIisfortheprocurementofprofessionalservicesofArchitectsasleadconsultantsandotherdesignconsultant’sfordesignoftheRRTphase1depot.BidRLM/MM/0219/2013/14DesignandConstructionSupervisionforRRTBusDepotsservedatBidSpecificationCommitteeonthe31March2014andwasapprovedfortheadvertisement.Thedrafttenderdocumentspecificationwasnotcompleteattheendofthethirdquarter.Ref:RRT4
KPI38DateofapprovalforthedevelopmentoftheComprehensiveIntegratedTransportPlan(CITP)forRustenburgbyAugust2014
AnnualTarget
3rdQuarterTarget
Actual Variance
June2014 Recommendedsuccessfulbidderandappointment
Achieved
-
CommentontheachievementoftheKPIandremedialmeasures GeneralStatementAchievedAsperNationalLandTransportActNo9of2009,allmunicipalitiesaretodevelopintegratedtransportplansfortheirareasevery5years.Toattestthisfollowinghavebeenachieved:
• BidRLM/MM/0131/2013/14AppointmentofaServiceProviderfortheDevelopmentofaComprehensiveIntegratedTransportPlanforRustenburgLocalMunicipalityfor2013-2018wasadvertised.
25
• Compulsorybriefingsessionwasheld,minutesattachedasevidence• Successfultenderclosingon8November2013• Responsestothebidwerereceived,evaluationandrecommendationshaveapproved• Appointmentletter
Ref:RRT5KPI39Dateofcompletionofrefurbishmentofreservoir
Baseline AnnualTarget
3rdQuarterTarget
Actual Variance
71% 1June2014 Construction Completion 0
CommentontheachievementoftheKPIandremedialmeasures
ü Generalstatement
Achieved.
Theprojectwascompletedonthe12December2013.
Votes Project Budget Expenditure %429/103/2643 Tlhabane West reservoir and
pumpstation3,000000.00 2799374.57 93%
Ref:DTIS1KPI40Numberofpumpstationsconstructed Annual
Target3rdQuarterTarget
Actual Variance
1 Construction Completion 0
CommentontheachievementoftheKPIandremedialmeasures
ü GeneralstatementProjectwascompletedon21January2014.Theavailablefundsaresavingsthatwererealized.
Vote Project Budget
(Adjusted)Expenditure %
429/102/2649 Construction of access road to reservoirsandpumpstations
502611.00
339878.00 68%
Ref:DTIS2
26
KPI41Numberofsubstationsupgraded
AnnualTarget
3rdQuarterTarget
Actual Variance
1 N/A 0 -
CommentontheachievementoftheKPIandremedialmeasures
ü Generalstatement
Thisisamulti-yearprojectanditisexpectedtobefinalizedbyDecember2015.DirectorateisstillawaitingaconnectionfromEskom.
Vote Project Budget
(Adjustment)Expenditure %
406/120/2650 Upgrading/refurbishmentofWaterkloofandMotorCity33kVsubstation
400,000 0 0
Ref:DTIS3KPI42Numberofsubstationsconstructed Annual
Target3rdQuarterTarget
Actual Variance
1 Establishment
Establishment 0
CommentontheachievementoftheKPIandremedialmeasures
ü Generalstatement
Thisisamulti-yearprojectanditisexpectedtobefinalizedbyDecember2015.DirectorateisstillawaitingaconnectionfromEskom.
Vote Project Budget Expenditure %406/120/2655 Motorcity33/11kVsubstationbuilding
andequipment18,458,456.00
67062.57 0
Ref:DTIS4
27
KPI43Percentagemaintenanceofelectricalnetwork
AnnualTarget
3rdQuarterTarget
Actual
Variance
100 100 100 0
CommentontheachievementoftheKPIandremedialmeasures
Generalstatement
Achieved.Vote Project Budget Expenditure % Project Budget Expenditure %406/105/3408 Substationtrippingunits 200,000.00 92,908.00 46% Substationtrippingunits(vote406/105/3408) 200,000 92,908 46%BidRLM/DTIS/0016/2013/14wasadjudicatedon13September2013.InfutureallunitswillbeorderedfromthesuccessfulbidderasandwhenNeeded.Percentageis0,046%
Quotationsweresoughtandordersplaced.Moreunitswillbeorderedasandwhenneededinsubstations.Projectwillbecompletedduringthirdquarter.
406/105/1483 HVmeteringequipment 500,000.00 493,679.00
0 HVmeteringequipment(vote406/105/1483)RLM/DTIS/0020/2013/14
500,000 0 0
BidRLM/DTIS/0020/2013/14wasadjudicatedandRLMisawaitingavalidtaxclearancecertificatefromtheserviceprovidertoobtainanorder.Percentageis99,9%
Tendersinvited.Inevaluationprocess.Projectearmarkedforsecondquarter.
406/105/1962 HVtestingequipment 54,600.00 54516.00 100% HVtestingequipment(vote406/105/1962)QU/DTIS/0039/2013/14
60,000 0 0
BidQU/DTIS/0039/2013/14wasevaluatedandanorderwasissued.Percentageis99,9% Quotationsobtainedandevaluated.Projectearmarkedtobecompletedduringsecondquarter.310/038/0648 Networkmaintenance 14,129,389.00 13,764,778.99 42% Networkmaintenance(vote310/038/0648) 27,231,389 3941199 14%TheinitialbudgetedamountofR27231389.00isreducedbyR3000000.00asitwastransferredtoanotherunit.Percentageis97% Projectwellontrackandwillbecompletedbeforetheendofthefinancialyear.Paymentofseveralinvoicesstillneedsto
bemadetothecontractor.Ref:DTIS5
28
KPI44Numberofelectricalpre-paidvendingequipmentinstalled
AnnualTarget
3rdQuarterTarget
Actual Variance
4 4 4 N/A
CommentontheachievementoftheKPIandremedialmeasures
GeneralstatementAchieved.
Vote Project Budget Expenditure %406/105/2677 Pre-paidautomaticvendingmachine
equipment549,762.00 549,762.00 100
Ref:DTIS6KPI45%electricalbulklineconnected
AnnualTarget
3rdQuarterTarget
Actual Variance
100 0 0 N/A
CommentontheachievementoftheKPIandremedialmeasures
ü Generalstatement
TheKPIisapplicabletothe4thquarter.
Vote
ProjectSource Budget Expenditure %
406/123/1966 IkemelengbulklineDME 4, 110575.00
2,931,720.4 71%
Ref:DTIS11
29
KPI46NumberofKmofsewerpipelineconstructed
AnnualTarget
3rdQuarterTarget
Actual Variance
9.81 Construction
Construction N/A
CommentontheachievementoftheKPIandremedialmeasures
GeneralstatementTheKPIisapplicabletothe4thquarter.
Vote Project Budget Expenditure %428/127/1606 LethabongWard27&28Internal
SewerReticulation&ToiletStructures
24,396,368.00
4,065,335.40
17%
Ref:DTIS7
KPI47NumberofVIPtoiletsconstructed
Baseline AnnualTarget
3rdQuarterTarget
Actual Variance
153 410 410 410 0
CommentontheachievementoftheKPIandremedialmeasures
ü GeneralStatementAchieved.Theprojectiscomplete.
Vote Project Budget Expenditure %127/2037 Marikana-VIPToilets 2,553,776.00
2,549,538.90
100%
Ref:DTIS8
30
KPI48Numberofhouseholdsconnectedtosewerline
AnnualTarget
3rdQuarterTarget
Actual Variance
515 N/A Construction N/A
CommentontheachievementoftheKPIandremedialmeasures
ü GeneralstatementTheKPIisapplicabletothe4thquarter.Theprogressonsiteisat98.8%andstreamcrossingistheonlyoutstandingwork.
Vote Project Budget Expenditure %428/127/1531 Monnakato Ext4- Installation
of outfall sewer line andreticulation
999867.00
841,330.33
84%
Ref:DTIS9KPI49Numberof10klwatertanksinstalled Annual
Target3rdQuarterTarget
Actual Variance
34 Construction Construction 0
CommentontheachievementoftheKPIandremedialmeasures
ü Generalstatement
Theprojectis85%complete.TheprojectwillbecompletedduringJune2014.Theareaswherethe10KLtanksareinstalledareasfollows:NO. AREA NO. AREA1. Mshongoville 13. BethanieWest
2. Chachalaza
14. Modikwe
3. Boshoek
15. Barseba
4. Lekgalong
16. Lulandsville(Bethanie)
5. BethanieEast
17. Benny
6. Stormhuis 18. Group5
31
7. Skierlik(Marikana) 20. Braampie
8. Nkaneng
21. Zakhele
9. Phuane
22. Ikemelengnewstands
10. FreedomPark
23. Sywerbult
11. BonoloFarm
24. DinnieEstate
12. Modderfontein
25.
Vote Project Budget Expenditure %429/103/1404 Informal settlements-
Installationof10kltanks1,000000 523,652.13 67
Ref:DTIS10
KPI50Numberofkmofnewroadsandstormwaterdrainagesystemsconstructed
Annual
Target
3rdQuarterTarget
Actual Variance
19.5
Construction
Construction 0
CommentontheachievementoftheKPIandremedialmeasures
GeneralStatementTheKPIisapplicabletothe4thquarter.Seeattachedprogressreportsandsiteminutes.
Project Budget Expenditure %
(a) Roadsandstorm-water-wards23 3,000,000
1,716202.72 60
Projectiscomplete.Seeattachedcompletioncertificate.1Kmwereconstructed(b) Roadsandstorm-water–ward26 3,000000 1,321180.52 40%Projectiscomplete.Seeattachedcompletioncertificate.1Kmwereconstructed(c)Boitekong-Roadsandstorm-water 5936870.00 4847513.50 84%
32
Projectiscomplete.Seeattachedcompletioncertificate.21,4Kmwereconstructed(d)Monnakato-Roadsandstorm-water 12,909,059.10
10 004031.13
81%
Projectiscomplete.Seeattachedcompletioncertificate.3Kmwereconstructed(e)Lethabong–RoadsandStormwater-Ward27&28 23254014.86 22626560 97,3%Projectiscomplete.Seeattachedcompletioncertificate.6Kmwereconstructed(f)BoitekongExt8-RoadsandStormwater 6,000,000.00 5,501,339.11 82%BatlhalefiProjectswasappointedonthe08February2013.1,5Kmwereconstructed
(g)Ikemelengstorm-waterdrainageconstruction 9,000000 82511822 91,58%Projectiscomplete.Seeattachedcompletioncertificate.4Kmwereconstructed(i)LethabongextRoadsandstorm-water 3,000000 2,009,400.96 65%Seeattachedsiteminutes.1.5KmwereconstructedRef:DTIS12KPI51NumberofKmofroadsandstormwaterdrainagesystemsmaintained
AnnualTarget
3rdQuarterTarget
Actual Variance
237 237 237 N/A
CommentontheachievementoftheKPIandremedialmeasures
Generalstatement
Achieved.Maintenanceisbeingdoneonanongoingbasis.
Project Budget Expenditure %RoadsandRuralareas(200km) 12,000
000.0010476,969.06
93%
Re-graveling&Gradingofroadsaspermaintenanceplan
Stormwaterdrainage(25Km) 1,680000.00
1654554.92 100%
Cleaning&repairsofstormwaterdrainage
Streets(12Km) 24,000000.00
21 008206.17
88%
Ref:DTIS13
33
KPI52Numberofwastebinsdelivered Annual
Target
3rdQuarte
rTarget
Actual Variance
414 410 410 0
CommentontheachievementoftheKPIandremedialmeasures
ü GeneralstatementTheKPIwasachievedduringthe2ndquarter.Theremaining4streetlitterbinsaretobepurchasedduringthe4thquarterasthefundswereonlyavailedduringthebudgetadjustment.
Project Budget Expenditure %Streetlitterbins 400,000 399,177.14 99,78%373 Street Litter Bins were bought andinstalled
Skipbins
530,000.00 234,518.00 56%27 Skip Containers were bought anddeliveredRollonrolloffcontainersRef:DTIS14
KPI53PercentagecompletionoflandfillSite
Baseline AnnualTarget
3rdQuarterTarget
Actual Variance
25 100 0 0 0
CommentontheachievementoftheKPIandremedialmeasures
ü Generalstatement
TheKPIisapplicableto4thquarter.Theoverallprogressoftheprojectisat85%,slightlybehindthescheduled90%duetoinsufficientfunds.However,additionalfundswereavailedduringthebudgetadjustmentandtheprojectisanticipatedtobecompletedbytheendofJune2014.
34
Vote Project RevisedBudget Expenditure %
467/160/1140 Construction of Watervallandfillsite
21,265,979.00 20,880,460.39 40
467/160/2757 Waterval, Regional wastedisposalfacilityphase
69,215,464.00 56,862,881.76 100
467/309/2864 Construction of Watervallandfillsite
6,000,000.00 0.00 0
TOTAL 96,481,443.00 77,743,342.15 Ref:DTIS15
KPI54Percentagehouseholdswithaccesstobasiclevelofweeklysolidwasteremoval
AnnualTarget 3rdQuarterTarget
Actual Variance
100 100 100 0
CommentontheachievementoftheKPIandremedialmeasures
Generalstatement
Achieved.Totalof40,644householdshavebeenreachedandarebeingservicedonamonthlybasis.Vote Project Budget Expenditure %360/042/0401 Refuseremoval-Marikana(1,252
households)930,510000 881904.00 95%
PeuYaAfricaConstructionhasbeenappointed for collection servicesatMarikanaWest,MarikanaCBDandRDPswithanestimated1902servicepoints/households.360/042/0402 RefuseremovalCBD(38,000households) 2,000000 530,811.27 47%NospecificserviceproviderwasappointedastheCBDiscurrentlybeingservicedbythemunicipalityonanon-goingbasis.360/042/0715 Refuseremoval-Olifantsnek(3000
households)240,000.00 239,720.86 100%
LosabaTranshasbeenappointedforwastecollectionservicesatBoitekong18&22,Freedompark,Olifantsnek,NtsedimaneandWatervalareawithanestimated5450servicepoints/households360/042/0716 RefuseremovalRDPs(30891households) 1,800000.00 1,7999,969.46 100%Householdsoverlapintoareascoveredbythefollowingserviceproviders:
Ø SunrisePark,Seralengestimated7729servicepointsØ BoitekongExt1,2,3,4,5,GG,Bester,Sundown,Glycerin,Ramochanaestimated11676servicepointØ BoitekongExt6,7,8,13,22estimated6046servicepoints
35
Ø BoitekongExt23,15,MeritingExt1,2,Ikagengestimated5440serviceprovider360/042/0717 Refuseremoval-Informalsettlement
(40,644households)600,000.00 599,238.50 100%
Householdsoverlapintoareascoveredbythefollowingserviceproviders:Ø Privista&thewastegroup-Oldlocation,FoxLake(servicepoints1943)Ø BelerutwaneInvestments-Phatsima,PhatsimaRDP,Boshoek,Robega(servicepoints5802)Ø Tedco-Lethabong(servicepoints7150)Ø PeuYaAfrica-Bethanie,Barseba,Modikwe,Makolokwe,Rankelenyane,Maumong(servicepoints5802)
Ref:DTIS16KPI55Percentagecompletionoftheruraldevelopmentwaterprojects
AnnualTarget
3rdQuarterTarget
Actual Variance
100 N/A 0 0
CommentontheachievementoftheKPIandremedialmeasures
ü Generalstatement
TheKPIisapplicableto4thquarter.TheBoschdalWaterSupplyprojectiscurrentlyexperiencingdelayswiththefinalizationoftheEnvironmentalImpactAssessmentsfordesignpurposes.RemedialMeasuresAlltherecommendedprocesseshavebeenconcludedandDirectorateiscurrentlyawaitingapprovalfromDepartmentofEnvironmentalAffairs.
Project Budget Expenditure % Lekgalong-upgradingofwatersupplyandyardconnections 1778386.00 1764,573.54 100%BaMmabolepuConstructionwasappointedon30/09/2013atamountof2,293,572.27.Handoverwason22/10/2013andtheprogressonsiteis51%.
(a) Maumong-installationofwatersupplyandyardconnections 1,599907.00 1,028,527.64 96%SiteestablishmentwasinOctober2013.Theprogressonsiteis52%.
(b) Rankelenyane,Lekojaneng-Completionofwatersupply 2,537,795.00 2,337,795.00 100%Theprogressonsiteis65%.
(c) Bethanie,Modikwe,Barseba-Reservoir 5,372,003.00 5,372,002.17 100%Theprogressonsiteis80%.
(d) Makolokwewatersupply 3,002143.00 2002143.01 70%
36
(e) Ikemelengwatersupply 3,000000.00 1,050,067.22 35%
Theprogressonsiteis80%. (f) Boschdalwatersupply 13,000000.00 0.00 0%
Ref:DTIS17KPI56Upgradingofpowerfactorcorrectionequipmentupgraded AnnualTarget 3rdQuarter
TargetActual Variance
1 N/A 96 4
CommentontheachievementoftheKPIandremedialmeasuresGeneralStatementTheKPIisapplicableto4thquarter.Project Budget Expenditure %Upgradingofpowerfactorcorrectionequipment 1500000.00 1444073.00 96Ref:DTIS18KPI57PercentagecompletionoftheModernizationoflifts-MpheniHouse
AnnualTarget
3rdQuarterTarget
Actual Variance
100% N/A 100% 0
CommentontheachievementoftheKPIandremedialmeasures
ü GeneralStatementAchievedduringsecondquarter.
Vote Description Budget Expenditure %417/308/4654 Modernizationoflifts 1,009,599.00 1,009,598.64 100
37
KPI58DateofapprovalbyCouncilofaWaterMasterPlan AnnualTarget
3rdQuarterTarget
Actual Variance
June2014 N/A 0 N/A
CommentontheachievementoftheKPIandremedialmeasuresGeneralStatementTheKPIisapplicableto4thquarter.Thedrafthasnotbeenfinalized.
Vote Description Budget Expenditure %340/044/0530 Water&Sanitationmasterplan
:DWAF52000.00 0 0
Ref:DTIS19KPI59DateofapprovalbyCouncilofanIntegratedWasteManagementStrategyforRLM
AnnualTarget
3rdQuarterTarget
Actual Variance
June2014 N/A 0 0
CommentontheachievementoftheKPIandremedialmeasuresGeneralStatement
TheKPIisapplicableto4thquarter.Thedrafthasnotbeenfinalized.
Vote Description Budget Expenditure %360/044/0308 DevelopmentofanIntegrated
WasteManagementStrategy700000.00 556026.00 79%
Ref:DTIS20
38
2.2MunicipalInstitutionalDevelopment&Transformation KPI60
PercentageofthemunicipalitybudgetimplementationontheWorkplaceSkillsPlan
AnnualTarget
3rdQuarter
Actual Variance
100 75 85 (10)CommentontheachievementoftheKPIandremedialmeasures GeneralstatementNotAchievedAnamountofR1 438 483.99 was spent on the Workplace Skills Plan.
ReasonsforNon-Achievement• During the adjustment budget an amount of R1.3 million was taken from the Training of
PersonnelVote.• Delayinprocurementprocesses.RemedialMeasuresAdvertiseduringthecurrent financialyeartoprocureserviceproviderstobeabletotrainwhenthenewfinancialyearcommences.
Ref:DCS1
Project OriginalBudget
RevisedBudget
Expenditure %
WorkplaceSkillsPlan R3,692,500 R2,392500 2,032,726 85
KPI61 Timeousassessmentoftheimpactoftraining
interventionsonallemployeesAnnualTarget
3rdQuarter
Actual Variance
June2014
N/A - -
CommentontheachievementoftheKPIandremedialmeasures GeneralstatementApplicableinthefourthquarter.
• AttachMemotoMM–DeviationfromSCMprocess.• WSPfundswereusedtopayDelloite’sCPMFprogramme
Ref:DCS2
39
KPI62
NumberofpeoplefromemploymentequitytargetgroupsemployedinthethreehighestlevelsofmanagementincompliancewiththeMunicipality’sapprovedEEplan.
AnnualTarget
3rdQuarter
Actual1
Variance
40 40 40 -
CommentontheachievementoftheKPIandremedialmeasures GeneralstatementAchieved
• RLMhasa5yearEEplancommencing2013to2017.Targetsareasfollows- Year1–40%- Year2–50%- Year3–60%- Year4–70%
Year5–80%Ref:DCS3KPI63 TimeoussubmissionoffullyconsultedEE
reporttoDOLAnnualTarget
3rdQuarter
Actual
Variance
October2013
October2013
01Oct2013 -
CommentontheachievementoftheKPIandremedialmeasures GeneralstatementAchievedLetterofacknowledgementofreceiptbytheDepartmentofLabourdated01Oct2013.Ref:DCS4
40
2.3LocalEconomicDevelopment
KPI 64
% Completion of Rustenburg Hawkers Stalls at Taxi Rank Area Annual
target 3rd Quarter Target
Actual for 3rd Qtr
Variance
50% 25% 14% 11% Comment on the achievement of the KPI and remedial measures GeneralstatementAchievedCommentontheachievementoftheKPIandremedialmeasures:
• AppointmentofServiceProviderontheUpgradingofHawkersStallsMaxbornmanAreaPhase2:RLM/DPS/0132/2013/14(ThutoConstruction)foraperiodof06Months,withintentiontocommenceon29October2013withcompletiontimesetforJune2014
• ConstructionhowevercommencedinJanuary2014(3rdQuarter)afterrequestfromHawkersandtheprojectwasfurtherdelayedduetotorrentialrainsandhadtobeextended.Thetargetforthequarterwasthereforesetfor25%.
• TheContractcompletionperioddatehasbeenextendedtoAugust2014
Ref:LED1
Project Budget Expenditure %Hawkers Stalls at Taxi Rank Area R5696809.14 R743612.60 14%
KPI65PercentageofbidsawardedtocompanieswithBBBEEcontentinlinewithmunicipality’sPreferentialProcurementPolicy
AnnualTarget
3rdQuarterTarget
Actual Variance
80% 80% 93 (13)
CommentontheachievementoftheKPIandremedialmeasures
GeneralStatementAchieved.
Month NumberofBidsAwarded
No.ofbidswithBBBEEStatus %
January 25 2 80February 9 9 100March 3 3 100Average 93
Ref:MM
41
KPI66Numberofjobscreatedthroughmunicipality’slocaleconomicdevelopmentinitiativesincludingcapitalprojects
AnnualTarget
3rdQuarterTarget
Actual Variance
3000 1000 1216 (216)
CommentontheachievementoftheKPIandremedialmeasures
GeneralStatementAchieved
Project NumberofJobscreated
EPWP(Waste) 270LED–ConstructionofHawkersStalls 59DPHS 305DTISRoadsandStormwater 405RRT 80TOTAL 1216
Ref:MM
KPI67RandvalueoflinkagesonSMMEProcurementfacilitatedwithbigbusiness.
Target
3rdQuarterTarget
Actual Variance
R200m R200m R 556 million -Impala R2.6 billion Glen core
GeneralStatementAchieved
• R22millionBrandingContracthasbeenawardedtoBrandLeadership&Kgokagano(localcompany)
• R15millionInternationalMusic&LifestyleFestivaltenderhasbeenawardedtoKeiko&TTTJV• R2millioncontractonMiningSummithasbeenawardedtoUthoCapital• R5750000contractforrenovationofVisitorInformationCenterhasbeenawardedtoMogaki
Civils• R5696809.14contracthasbeenawardedtoThusoConstructionforrenovationofhawker
stallsatMaxBornmanTriangularArea(TaxiRank)• R5millioncontracthasbeenawardedtoNalediaGroupforimplementationoftheLEDstrategy• R3millioncontracthasbeenawardedtoYaRonaTemoforMathopestadAgriculturalProject• R850000contracthasbeenawardedtoGSA&DitsamaiInvestment&Projectsforfeasibilityof
FleaMarketinRustenburgRef:LED3
42
KPI68 %implementationofLEDStrategy Annualtarget
3rdQuarter
Actualfor3rdQtr
Variance
100 75% 75% -CommentontheachievementoftheKPIandremedialmeasuresGeneralstatementAchieved
- GroupNalediahasfacilitatedstrategicpartnerswiththefollowingorganizations:- MoUwithSmallEnterpriseDevelopmentAgency(SEDA),- NationalEmpowermentFund(NEF),- NWK(NoordwesKorporasie)and- UniversityofPretoriatoleverageresourcesintheimplementationofLEDStrategy- Theserviceproviderhasalsodevelopedatimeframeonmilestonesattachedpleasefind
progressreportontheappointedServiceProvider(NalediaGroup)ontheImplementationofLEDStrategy
Ref:LED4 KPI69 %completionoftheCityBrandingStrategyPhase
1Annualtarget
3rdQuarterTarget
Actual Variance
35% N/A 35% Generalstatement:AchievedTheprojectisontrack,withthefirstphasecompletedandworkonthesecondphasehascommenced.Thefollowingmilestoneswereachievedduringthefirstphase:
- BranddeliveryLaunch- Brandpositioningandidentity- Preliminarybrandidentity- Brandpositioningandidentityvalidationresearch- FinalBrandPositioning–Refinements- FinalBrandidentity–refinements
*Rollout:WebsiteandAdvertisingproducts(Marketing,AdvertisingStrategyandconcepts,Brandimplementationandmarketing)TheitemoncitybrandingwillservebeforeCouncilattheendofMay2014.Ref:LED5
43
2.4 MunicipalFinancialViabilityKPI70Percentageofmunicipality’scapitalbudgetactuallyspentoncapitalprojectsidentifiedforthefinancialyearintermsoftheIDP
AnnualTarget
3rdQuarterTarget
Actual Variance
95% 75% 46.76 (28.24)
CommentontheachievementoftheKPIandremedialmeasures
GeneralstatementNotAchieved
Reasonsfornon-achievement
- ObjectionsontheRRTproject
Budget Expenditure Percentage1,359,436,000 635,732,000 46.76
KPI71DateofsubmissionofMFMAcompliantmulti-yearbudgettothebudgetOffice
AnnualTarget
3rdQuarterTarget
Actual Variance
15January2014
15January2014
15January2014
N/A
CommentontheachievementoftheKPIandremedialmeasures
Generalstatement
Achieved.
MFMAcompliantmulti-yearbudgetwassubmittedonthe15thJanuary2014.Ref:BTO2
44
KPI72MonthlyreportsfromBTOtoshowthatassetregisterismaintainedinaccordancewiththeassetmanagementpolicy.
Annual
Target
3rdQuarterTarget
Actual Variance
12 9 9 0
CommentontheachievementoftheKPIandremedialmeasures
ü GeneralstatementMonthlyassetstatementsfortheperiodJanuary-March2014foralldirectorateshavebeensubmitted.
Ref:BTO3KPI73Percentageexpenditureonoperatingbudgetexceedingbudgetedamount
AnnualTarget
3rdQuarterTarget
Actual Variance
0% 0% 0% 0%
CommentontheachievementoftheKPIandremedialmeasures
GeneralstatementAchieved.Theoperationalbudgetwasnotexceeded.
Ref:BTO4
Budget Expenditure Percentage27,773,724,000 2,303,576,000 64.04
45
KPI74Dateofsubmissionofqualityrevisedestimatesforthebudgetadjustmentasperguideline.
AnnualTarget
3rdQuarterTarget
Actual Variance
15January2014
15January2014
15January2014
-
CommentontheachievementoftheKPIandremedialmeasures
GeneralstatementAchieved.Revisedestimatesforthebudgetadjustmentweresubmittedonthe15thJanuary2014bydirectorates.Ref:BTO5
KPI75Percentageexpenditureonovertimebudgetexceedingbudgetedamount
AnnualTarget
3rdQuarterTarget
Actual Variance
0% 0% 0% -
CommentontheachievementoftheKPIandremedialmeasures
Generalstatement
NotAchieved
Reasonsfornon-achievement
Theover-expenditurewasasaresultofMunicipalityclosureduringDecember2013wheremostemployeeswereworkingovertimeinorderforservicedeliverynottobecompromised.Remedialmeasures
Thefollowinghavebeenidentifiedascostcontainmentmeasureswhichwillassist:- Introductionofshiftsystem.- Exercisestrictmanagementintermsofallocationofovertimeduties,aspertheCouncil
resolution.Ref:BTO6
Budget Expenditure Percentage 30 928 781 28 636 449 93
46
KPI76Dateofsubmissionofannualinventorycountreport
AnnualTarget
3rdQuarterTarget
Actual Variance
2(Juneand
Feb)
11
-
CommentontheachievementoftheKPIandremedialmeasures
GeneralStatementAchieved.PhysicalassetverificationwillbedoneinJuneandJuly2014.Ref:BTO2
2.5GoodGovernanceKPI77Percentageimplementationoftheperformancemanagementsystem
AnnualTarget
3rdQuarterTarget
Actual Variance
100 100 100 -
CommentontheachievementoftheKPIandremedialmeasures
GeneralStatementAchieved3rdquarterperformancereviewsessionsforSection56managerswereconductedonthe16thand19thMay2014respectively.Ref:MM1
KPI78Percentageimplementationoftermsandconditionsofallcontracts’contractmanagement
AnnualTarget
3rdQuarterTarget
Actual Variance
100 100 100 -
47
CommentontheachievementoftheKPIandremedialmeasures
GeneralStatementAchieved.Reportsoncontractmanagementaresubmittedonamonthlybasis.Ref:MM2KPI79Dateofcompletionoftheinternalandexternalauditqueriesaddressedwithin5workingdays/asperrequirementontheauditreport
AnnualTarget
1stQuarterTarget
Actual Variance
5workingdays
5workingdays
5workingdays
-
CommentontheachievementoftheKPIandremedialmeasures
GeneralStatementAchieved.ReportsonresponsetoauditqueriesaresubmittedtotheCAEonamonthlybasis.Ref:MM3KPI80QuarterlyreportsonimplementationofCouncilresolutionsservedbeforetheMayoralCommittee
AnnualTarget
3rdQuarterTarget
Actual Variance
4 1 1 -
CommentontheachievementoftheKPIandremedialmeasures
GeneralStatementAchieved.ReportsonimplementationofCouncilresolutionsservebeforeCouncilonamonthlybasis.Ref:DCS
48
KPI81DateofcompletionoftheCredibleanduptodatereviewedIDPandsubmissiontotheMECforLocalGovernmentandTraditionalAffairsandNationalTreasury
AnnualTarget
1stQuarterTarget
Actual Variance
May2014 N/A - -
CommentontheachievementoftheKPIandremedialmeasures
GeneralStatement-Applicableinthe4thQTR.ThedraftIDPservedbeforeCouncilduringMarch2014.FinalapprovalbyCouncilwillbeinMay2014.Ref:IDP
KPI82DateoftablingofMSAandMFMAcompliantannualreporttoCouncil
AnnualTarget
1stQuarterTarget
Actual Variance
Jan2014 N/A 31March2014
-
CommentontheachievementoftheKPIandremedialmeasures
GeneralStatementAchievedTheAnnualReport2012/2013servedbeforeCouncilonthe28January2014,re-tabledonthe31January2014andthereafterpublicizedforpubliccomments.AnOversightReportontheAnnualReportwastabledattheendofApril2014.Ref:PMS KPI83NumberofPublicParticipationforummeetingsheldandconsultationsessionswithOtherStakeholders
AnnualTarget
1stQuarterTarget
Actual Variance
4 1 1 -
CommentontheachievementoftheKPIandremedialmeasures
GeneralStatementAchieved.
• AnIDPRepForummeetingwasheldonthe14February2014.Ref:EM1
49
KPI84DateofcompletionofMayoralOutreachProgrammeinlinewithprocessPlan
AnnualTarget
3rdQuarterTarget
Actual Variance
1 N/A N/A -
CommentontheachievementoftheKPIandremedialmeasures
GeneralStatementAchieved.TheMayoralImbizowasheldonthe21Octoberto28November2013.Ref:EM2
KPI85NumberofminimumsittingsofthePerformanceAuditCommitteeandreportssubmittedtoCouncil
AnnualTarget
3rdQuarterTarget
Actual Variance
4 1 1 -
CommentontheachievementoftheKPIandremedialmeasures
GeneralStatementNotAchieved.
• ThePerformanceAuditCommitteesatonthe07March2014.Ref:CAE KPI86Numberofquarterlyriskmitigationandimplementationplans
AnnualTarget
3rdQuarterTarget
Actual Variance
4 1 1 -
CommentontheachievementoftheKPIandremedialmeasures
GeneralStatement:Achieved.TheActingChiefRiskOfficerintheofficeoftheMunicipalManagerhasfacilitatedcompletionoftheRiskRegistersandquarterlyupdatesforalldirectorates.Ref:MM4
50
KPI87Dateofachievementofacleanauditopinion
AnnualTarget
3rdQuarterTarget
Actual Variance
UnqualifiedOpinionbyJune2014
N/A N/A -
CommentontheachievementoftheKPIandremedialmeasures
GeneralStatement:TheKPIisapplicableinthe4thquarter.QueriesraisedbytheAuditorGeneralareattendedtoandprogressreportstabledtoCouncilonamonthlybasis.Ref:MM5