RCC - ACBAR: Home Page
Transcript of RCC - ACBAR: Home Page
0
Graphical Scale, 1:1 (m)
50 100 200 500 1000
Road Crossing
Proposed Land for
Solar House
Villages Center
Stand Tap
15 m
3
STG T
5 m
3
STG T
Water Pipe Line
Boundary Line
Kakar Abad Tube Well
Well Point and
Solar House
5m3 RCC
Storage ST#1
ST#2 ST#3ST#4
ST#8
ST#5
ST#6ST#7
L=250mØ=2"
L=50
0mØ=2
"
L=850m
Ø=2"
HERAT-TOURGHOUNDY HIGHWAY
15m 3 RCC STG
Existing Wash
D
E
T
A
I
L
-
1
S
I
T
E
P
L
A
N
500 100 200 500
Tube Well
(KAKAR ABAD)
END DATE
START DATE
SCALE
Shee
t No.
PROVINCENo
REVIEWED BY:
APPORVED BY:
SURVEYED BY:1 19DESIGNED BY:
DATE1
2
3
4
TASK AND RESPONSIBLE PROJECT WASH/CRS/OFDA
PROJECTSUB TITLE
DRAWING No.
1:1
25-December-2019
11-December-201901-Fberuary-2020
30-April-2020
HERAT
GENERAL SITE PLAN
SOLAR POWERED WATER SUPPLY SYSTEMDISTRICT Kushk Rabat Sangi
VILLAGE NAME GANG EZAT ABAD
VILLAGE CODE
M.Fahim Amiry
HIKMAT ARIFZAI
MARGOT DURIN
M.Fahim Amiry
KRS-14
5 m3 STG T
ST#1
L=100mØ=2"
ST#3
ST#4
ST#8
ST#5ST#6
ST#7
A1
B
DE
F G H
C
L=30mØ
=1"
L=90mØ=1"
L=110m
Ø=1"
L=100m
Ø=1"
L=80mØ
=1"
L=80mØ
=1"
L=120mØ
=1"
L=45mØ
=1"
L=85mØ=2"
L=85mØ=2"
L=45mØ=2" L=110mØ=1.5"
L=70mØ=1"
L=65mØ=1"
L=100mØ=2"
15m3 STG T
L=80mØ
=1"
ST#2
A0L=85mØ=1"
PIPE NETWORK
20cm fined sand
PE100, PN 16, Ø2"
Backfilling with nearby
excavated materials.
80
.0
20
.0
G.L
50.0
Valve Box
Valve Box
Valve Box
Valve Box
Valve Box
Valve Box
Valve Box
Valve Box
Valve Box
END DATE
START DATE
SCALE
Shee
t No.
PROVINCENo
REVIEWED BY:
APPORVED BY:
SURVEYED BY:2 19DESIGNED BY:
DATE1
2
3
4
TASK AND RESPONSIBLE PROJECT WASH/CRS/OFDA
PROJECTSUB TITLE
DRAWING No.
1:1
25-December-2019
11-December-201901-Fberuary-2020
30-April-2020
HERAT
PIPE NETWORK
SOLAR POWERED WATER SUPPLY SYSTEMDISTRICT Kushk Rabat Sangi
VILLAGE NAME GANG EZAT ABAD
VILLAGE CODE
M.Fahim Amiry
HIKMAT ARIFZAI
MARGOT DURIN
M.Fahim Amiry
KRS-14
0.5
0.511.0
11.5
3.1
4.4
4.4
3.1
PV ARRANGEMENT
SO
LA
R H
OU
SE
Stock Room
5.0
2.8
12
.9
0.5
0.51.50.510.00.53.00.5
0.5
12
.1
3.7
0.5
13
.9
16.5
16
.7
0.8
DETAIL 1
· All Dimensions are in meter unless otherwise mentioned
Manhole at well Point
for more detail please refer
to page
10
19
of this drawing.
2.0
END DATE
START DATE
SCALE
Shee
t No.
PROVINCENo
REVIEWED BY:
APPORVED BY:
SURVEYED BY:3 19DESIGNED BY:
DATE1
2
3
4
TASK AND RESPONSIBLE PROJECT WASH/CRS/OFDA
PROJECTSUB TITLE
DRAWING No.
1:1
25-December-2019
11-December-201901-Fberuary-2020
30-April-2020
HERAT
SOLAR HOUSE FOUNDATION PLAN
SOLAR POWERED WATER SUPPLY SYSTEMDISTRICT Kushk Rabat Sangi
VILLAGE NAME GANG EZAT ABAD
VILLAGE CODE
M.Fahim Amiry
HIKMAT ARIFZAI
MARGOT DURIN
M.Fahim Amiry
KRS-14
D(120x225)
D(120x225)
Stock Room(400x300)
2.8
Win(250x150)b=75
2.84.4
2.8
3.1
1.5
3.3
4.2
3.0
3.5
A A
CC
B B
6.00
5.0
Contaliver Slab 0.50 m
Contaliver Slab 0.50 m
· All Dimensions are in meter unless otherwise mentioned
2.0
Manhole at well Point
for more detail please refer
to page
10
19
of this drawing.
END DATE
START DATE
SCALE
Shee
t No.
PROVINCENo
REVIEWED BY:
APPORVED BY:
SURVEYED BY:4 19DESIGNED BY:
DATE1
2
3
4
TASK AND RESPONSIBLE PROJECT WASH/CRS/OFDA
PROJECTSUB TITLE
DRAWING No.
1:1
25-December-2019
11-December-201901-Fberuary-2020
30-April-2020
HERAT
SOLAR HOUSE PV ARRANGEMENTS
SOLAR POWERED WATER SUPPLY SYSTEMDISTRICT Kushk Rabat Sangi
VILLAGE NAME GANG EZAT ABAD
VILLAGE CODE
M.Fahim Amiry
HIKMAT ARIFZAI
MARGOT DURIN
M.Fahim Amiry
KRS-14
0.70
1.00
1.00
1.0
0
0.70
0.7
0
column section
foundation reinforcement
Ground level
1.0
0
0.2
01
.7
0
1) All the dimensions are in m.
2) the RCC mark should be 1:1:2 (250)
3) the steel bars should be clean from
oil, corrosion, and etc
4) the water must be clean
6Ø12@17cm-c/c *110cm
in both side
8Ø16
Ø8@15cm
5) the dimensions of main steel
pipe in concrete column should be
5in diameter and 5mm thickness
6) the dimensions of rotational
steel pipe should be 4in diameter
and 5mm thickness
7) the thickness of fixed flange
should be 12mm
8) the thickness of movable flange
should be 12mm
9) the dimension of main fram
should be steel box(5cm*5cm) and
the weight should be15kg
10) the dimension of sub frame
should be steel box(4cm*4cm) and
the weight should be15kg
11) the dimension of supporters
fram should be steel
box(4cm*4cm) and the weight
should be15kg
the reinforcement and details plan
of solar pile foundation and frame
0.8
00
.4
5
DETAILS OF SECTION (A-A)
3.50
3.0
0
0.5
0
2.90
2.4
0
1
.
8
0
1
.
8
0
1
.
8
0
0.3
00
.3
0
0.3
00
.3
0
0.300.30
1
.
8
0
S
t
e
e
l
P
l
a
t
e
4
0
x
4
0
x
2
0
m
m
1.00
1.0
00
.2
0
Ground level
SECTION (A-A)
1.7
0
END DATE
START DATE
SCALE
Shee
t No.
PROVINCENo
REVIEWED BY:
APPORVED BY:
SURVEYED BY:5 19DESIGNED BY:
DATE1
2
3
4
TASK AND RESPONSIBLE PROJECT WASH/CRS/OFDA
PROJECTSUB TITLE
DRAWING No.
1:1
25-December-2019
11-December-201901-Fberuary-2020
30-April-2020
HERAT
SOLAR MOUNTED STRUCTURE
SOLAR POWERED WATER SUPPLY SYSTEMDISTRICT Kushk Rabat Sangi
VILLAGE NAME GANG EZAT ABAD
VILLAGE CODE
M.Fahim Amiry
HIKMAT ARIFZAI
MARGOT DURIN
M.Fahim Amiry
KRS-14
50.0 400.0 50.0
500.0
24
0.0
31
0.0
1. PCC M15(1:2:4)5-7cm
2. Bitumen Insulation(ISOGAM)
3. 15 RCC slab M25(1:1.5:3)
4. Plaster with two coat painting.
1. PCC-M15
2. BOLDERS
3. COMPACTED SOIL
90
.0
25
.0
30
.0
1%slope
PV
C P
IP
E 4
"
35
15
35
15
Ø12@20cm C/C
in both direction
SECTION (B-B)
600
100
15
END DATE
START DATE
SCALE
Shee
t No.
PROVINCENo
REVIEWED BY:
APPORVED BY:
SURVEYED BY:6 19DESIGNED BY:
DATE1
2
3
4
TASK AND RESPONSIBLE PROJECT WASH/CRS/OFDA
PROJECTSUB TITLE
DRAWING No.
1:1
25-December-2019
11-December-201901-Fberuary-2020
30-April-2020
HERAT
WELL HOUSE
SOLAR POWERED WATER SUPPLY SYSTEMDISTRICT Kushk Rabat Sangi
VILLAGE NAME GANG EZAT ABAD
VILLAGE CODE
M.Fahim Amiry
HIKMAT ARIFZAI
MARGOT DURIN
M.Fahim Amiry
KRS-14
250.0
15
0.0
250.0
15
0.0
D60
G.L
43
.0
20
15
0.0
16
65
CAPPING PCC-M150
WELL BURNT BRICK WITH
MORTAR
BOTH SIDE PLASTER
3LAYER S PAINTING WITH LIME
ALL PROFILE SHOULD BE 16GUAGE
PAINTED WITH (ONE LAYER OF RUST PROOF
,TWO LAYERS OF SILVER COLOR OIL PAINT)
SECTION (C-C)
71
0
RCC SLAB 10CM
EXIT FOR DRAIN WATER
PCC-M15,@7CM
STONEMASONRY
80
.0
15
0.0
120.0
50.0
25.0
110.0
22
5.0
21
5.0
DOOR CASING -U-LARAN 16GUAGE
DOOR PANELS- 18GUAGE-IRON SHEET
DOOR RAIL -PROFILE (8x4)cm 16GUAGE
DOOR GLASS PANELS - 4mm BLUE COLOR GLASS
MANUAL LOCK AND LATCH SET AT BOTH SIDE
PRIOR TO INSTALLATION DOOR SHOULD BE
PROPERLY PAINTED WITH (ONE LAYER OF RUST
PROOF ,TWO LAYERS OF SILVER COLOR OIL PAINT).
20
60
86
6
8
.
1
2" GI PIPE 1.5mm,C/C
2METER
1-HEAVY GALVANIZED CONCERTINA WIRE
2KG/BONDLE
2-SUPPORTED WITH 4 LINE DOUBLE WIRE
BARBED WIRE>
3-FIXED AT SHAPE POE C/C 2METERS
SECTION (C-C)
30
30
PIPE ENCASEMENT DETAIL.
M(1:2:4)
3#8mm
#8mm@2m C/C
END DATE
START DATE
SCALE
Shee
t No.
PROVINCENo
REVIEWED BY:
APPORVED BY:
SURVEYED BY:7 19DESIGNED BY:
DATE1
2
3
4
TASK AND RESPONSIBLE PROJECT WASH/CRS/OFDA
PROJECTSUB TITLE
DRAWING No.
1:1
25-December-2019
11-December-201901-Fberuary-2020
30-April-2020
HERAT
BOUNDARY WALL SECTION
SOLAR POWERED WATER SUPPLY SYSTEMDISTRICT Kushk Rabat Sangi
VILLAGE NAME GANG EZAT ABAD
VILLAGE CODE
M.Fahim Amiry
HIKMAT ARIFZAI
MARGOT DURIN
M.Fahim Amiry
KRS-14
Clay seal
63 PE pipe Rising Pipe
schedule 100 PN10
Gravel pack with
(3-6mm)fraction size
nature or river gravel
G.L=0.00
1100
2500
6000
filter with
1mm slot opening
Class(C)
Clayey silt
Hard compressed
gravel
Coarse sand
and fine gravel
Cap
W.L measure point
Borehole Well Design in Unconsolidated Formation
S.W.L
8"
1400
16"
Sanitay Seal
PCC M15 (1:2:4)
300
END DATE
START DATE
SCALE
Shee
t No.
PROVINCENo
REVIEWED BY:
APPORVED BY:
SURVEYED BY:8 19DESIGNED BY:
DATE1
2
3
4
TASK AND RESPONSIBLE PROJECT WASH/CRS/OFDA
PROJECTSUB TITLE
DRAWING No.
1:1
25-December-2019
11-December-201901-Fberuary-2020
30-April-2020
HERAT
WELL PROFILE
SOLAR POWERED WATER SUPPLY SYSTEMDISTRICT Kushk Rabat Sangi
VILLAGE NAME GANG EZAT ABAD
VILLAGE CODE
M.Fahim Amiry
HIKMAT ARIFZAI
MARGOT DURIN
M.Fahim Amiry
KRS-14
300.0
60.030.0
300.0
6000.0
22
0
8”PVC pipe for Screen class-C (10 bar)
PE Rising Pipe 63mm
Schedule 100 PN 16 bar
200.00
22
0
6000.00
22
0
8”PVC pipe for Casings class-C (10 bar)
HD
PE
P
IP
E-P
E 1
00
, P
N1
6, Ø
63
mm
END DATE
START DATE
SCALE
Shee
t No.
PROVINCENo
REVIEWED BY:
APPORVED BY:
SURVEYED BY:9 19DESIGNED BY:
DATE1
2
3
4
TASK AND RESPONSIBLE PROJECT WASH/CRS/OFDA
PROJECTSUB TITLE
DRAWING No.
1:1
25-December-2019
11-December-201901-Fberuary-2020
30-April-2020
HERAT
CASING, SCREENS AND RAISING PIPE DET
SOLAR POWERED WATER SUPPLY SYSTEMDISTRICT Kushk Rabat Sangi
VILLAGE NAME GANG EZAT ABAD
VILLAGE CODE
M.Fahim Amiry
HIKMAT ARIFZAI
MARGOT DURIN
M.Fahim Amiry
KRS-14
PE pipe 63 mm
GI Pipe 2"
GI Coupling 2"
GI nipple 2"
Steel plate
GI Elbow 2"
PE Coupling 63 mmx2"
Electrical Wire
Electrical Conduit
to control panel
Stainless steel NR Valve 2"
100.0
140.0
200.0
50.0100.050.0
20.020.0
200.0
20
0.0
Refer to Detail 1 of this page
10
.0
USE # 12 @ 15cm C/C
10cm PCC
15cm Gravel
10
0
PE
pipe 63 m
m
GI P
ipe 2"
GI C
oupling 2"
GI nipple 2"
Steel plate
GI E
lbow
2"
PE
C
oupling 63 m
mx2"
Electrical W
ire
Electrical C
onduit
to control panel
Stainless steel N
R V
alve
2"
10cm
P
CC
15cm
G
ravel
END DATE
START DATE
SCALE
Shee
t No.
PROVINCENo
REVIEWED BY:
APPORVED BY:
SURVEYED BY:10
19DESIGNED BY:
DATE1
2
3
4
TASK AND RESPONSIBLE PROJECT WASH/CRS/OFDA
PROJECTSUB TITLE
DRAWING No.
1:1
25-December-2019
11-December-201901-Fberuary-2020
30-April-2020
HERAT
Manhole at Well Point
SOLAR POWERED WATER SUPPLY SYSTEMDISTRICT Kushk Rabat Sangi
VILLAGE NAME GANG EZAT ABAD
VILLAGE CODE
M.Fahim Amiry
HIKMAT ARIFZAI
MARGOT DURIN
M.Fahim Amiry
KRS-14
DE
TA
IL
#
1
156015
1560
15
Drain pipeGI 2"inch
Out let 2" inch GI pipe
Main hole60x60 cm
Inlet Pipe 2"GI pipe
Over flow Pipe1" GI Pipe
1% Slope
AA
BB
1510015
2015
250
1520
100
1545
015
2015250320
20 15
PLAN
20 10 260 2010
1030
1015
1521
015
165
Inlet pipe
Over flow pipe
SECTION A-A
195
20
2028020320
20
Plaster (1:3) with Padlow Powder
PCC (1:2:4) 10cmBack filling with Compacted soil
RCC (1:1.5:3) 15cm
Plaster (1:3) with Padlow PowderRCC Slab (1:1.5:3) 15cm ThickIsogam for isolation 1 layerPCC (1:2:4) 5cm
15
Ladder 3"GI Pipe
280
30
Note:1- All dimensions are in cm unless otherwise stated.2- During RCC work vibrator must be used to avoid water leakage from reservoir.3- All PCC works should be with 1:2:4 mortar unless otherwise stated.4- All RCC works should be with 1:1:2 mortar.5- Isolation material is glass wool.7- Curing must be continued upto 28 days.8- Clear and Clean water must be used every where.9- The inlet, outlet, overflow and washing pipes should be adjusted according to site condition.
15M3 STORAGE TANK
2" Ventilation PVC Pipe
END DATE
START DATE
SCALE
Shee
t No.
PROVINCENo
REVIEWED BY:
APPORVED BY:
SURVEYED BY:11 19DESIGNED BY:
DATE1
2
3
4
TASK AND RESPONSIBLE PROJECT WASH/CRS/OFDA
PROJECTSUB TITLE
DRAWING No.
1:1
25-December-2019
11-December-201901-Fberuary-2020
30-April-2020
HERAT
15 CUBIC METER RESERVIOR PLAN
SOLAR POWERED WATER SUPPLY SYSTEMDISTRICT Kushk Rabat Sangi
VILLAGE NAME GANG EZAT ABAD
VILLAGE CODE
M.Fahim Amiry
HIKMAT ARIFZAI
MARGOT DURIN
M.Fahim Amiry
KRS-14
1595
10
Out let Pipe
Washingpipe
2 No RCCPlates
5
110
Ø10
@20
c/c
Ø12
@20
c/c
Ø12
@20
c/c
Ø12@15 c/c
Corner Steel Bar
Ø12@15 c/c
Corner Steel Bar
Ø12@15 c/c
Corner Steel Bar
Ø12@15 c/c
Corner Steel Bar
Ø12
@20
c/c
Ø12
@20
c/c
20 95 20320
15 100 15 15
1828
018
450
1510
015
C
C
C
C
100
Ø12@20 c/c
Ø8@15 c/c
Ø8@15 c/c
Ø8@
15 c
/c
Ø8@
15 c
/c
Ø12@20 c/c
Ø12@20 c/c
Ø12@20 c/c
Corner Steel Bar Ø12 @15 c/cL=250cm
104
104
20 10 250 2010
1030
1015
1521
015
165
195
20
15
280
15x15Splay
60
30
30
Ladder 3"GI Pipe
30
SECTION B-B
1% Slope
Iron Gate (60x60)cmwith lock able system
Inlet Pipe
Plaster (1:3) with Padlow Powder
RCC Wall (1:1.5:3) 22cm ThickPlaster (1:3)
NaturalGroundlevel
REINFORCEMENT PLAN
2" Ventilation PVC Pipe
END DATE
START DATE
SCALE
Shee
t No.
PROVINCENo
REVIEWED BY:
APPORVED BY:
SURVEYED BY:12 19DESIGNED BY:
DATE1
2
3
4
TASK AND RESPONSIBLE PROJECT WASH/CRS/OFDA
PROJECTSUB TITLE
DRAWING No.
1:1
25-December-2019
11-December-201901-Fberuary-2020
30-April-2020
HERAT
15 m3 RCC RESERVIOR SECTIONS
SOLAR POWERED WATER SUPPLY SYSTEMDISTRICT Kushk Rabat Sangi
VILLAGE NAME GANG EZAT ABAD
VILLAGE CODE
M.Fahim Amiry
HIKMAT ARIFZAI
MARGOT DURIN
M.Fahim Amiry
KRS-14
20 15 250 2015
Ø10@20 c/c Ø10@20 c/c
Ø12@20 c/c2028020
320
Ø12@15 c/c
Ø8@15 c/c
Ø12
@15
c/c
Ø8@
15 c
/c
Ø8@
15 c
/c
Ø8@
15 c
/c
Ø12@20 c/c
Ø12@20 c/c
Ø12@20 c/c
Ø12@20 c/c
20 15 250 2015
Ø10@20 c/c Ø10@20 c/c
Ø12@20 c/c2028020
320
Ø12@15 c/c
Ø8@15 c/c
Ø12
@15
c/c
Ø8@
15 c
/c Ø8@
15 c
/c
Ø8@
15 c
/c
Ø12@20 c/c
Ø12@20 c/c
Ø12@20 c/c
Ø12@20 c/c
Ø10
@20
c/c
Ø10@20 c/c
Ø8@15 c/c
Ø12@10 c/c
285
2515
1515
200
15
2515
1515
200
15
285
SECTION D-DSECTION C-C
30
30
END DATE
START DATE
SCALE
Shee
t No.
PROVINCENo
REVIEWED BY:
APPORVED BY:
SURVEYED BY:13 19DESIGNED BY:
DATE1
2
3
4
TASK AND RESPONSIBLE PROJECT WASH/CRS/OFDA
PROJECTSUB TITLE
DRAWING No.
1:1
25-December-2019
11-December-201901-Fberuary-2020
30-April-2020
HERAT
SOLAR POWERED WATER SUPPLY SYSTEMDISTRICT Kushk Rabat Sangi
VILLAGE NAME GANG EZAT ABAD
VILLAGE CODE
M.Fahim Amiry
HIKMAT ARIFZAI
MARGOT DURIN
M.Fahim Amiry
KRS-14 15 m3 RERSERVIOR STEEL BAR DETAILS
Drain pipeGI 2"inch
Out let 2" inch GI pipe
Inlet Pipe 2"GI pipe
Over flow Pipe2" GI Pipe M
an ho
le
60x6
0 cm
BB
AA
201513020200
156015
1560
15
2015
165
3515
100
15
330
20 10 140 2010
1030
1015
1521
015
165
Inlet pipe
Over flow pipeGI 2"
SECTION A-A
195
20
2016020200
20
Plaster (1:3) with Padlow Powder
PCC (1:2:4) 10cmBack filling with Compacted soil
RCC (1:1:2) 15cm
Plaster (1:3) with Padlow PowderRCC Slab (1:1.5:3) 15cm ThickIsogam for isolation 1 layerPCC (1:2:4) 5cm
15
Ladder 3"GI Pipe
160
30
15
5M3 STORAGE TANK
2" Ventilation PVC Pipe
1. The overflow pipe from 5m3 reservoir will supply water to 15m3 reservoir2. All dimensions are in centimeters unless otherwise mentioned.3. Mark for RCC concrete shall be 25Mpa at 28-day-age cylinder crush.
END DATE
START DATE
SCALE
Shee
t No.
PROVINCENo
REVIEWED BY:
APPORVED BY:
SURVEYED BY:14 19DESIGNED BY:
DATE1
2
3
4
TASK AND RESPONSIBLE PROJECT WASH/CRS/OFDA
PROJECTSUB TITLE
DRAWING No.
1:1
25-December-2019
11-December-201901-Fberuary-2020
30-April-2020
HERAT
SOLAR POWERED WATER SUPPLY SYSTEMDISTRICT Kushk Rabat Sangi
VILLAGE NAME GANG EZAT ABAD
VILLAGE CODE
M.Fahim Amiry
HIKMAT ARIFZAI
MARGOT DURIN
M.Fahim Amiry
KRS-14 5 CUBIC METER RESERVIOR PLAN
20 15 130 2015
Ø10@20 c/c Ø10@20 c/c
Ø12@20 c/c2016020
200
Ø12@15 c/c
Ø8@15 c/c
Ø12
@15
c/c
Ø8@
15 c
/c
Ø8@
15 c
/c
Ø8@
15 c
/c
Ø12@20 c/c
Ø12@20 c/c
Ø12@20 c/c
Ø12@20 c/c
20 15 130 2015
Ø10@20 c/c Ø10@20 c/c
Ø12@20 c/c2016020
200
Ø12@15 c/c
Ø8@15 c/c
Ø12
@15
c/c
Ø8@
15 c
/c Ø8@
15 c
/c
Ø8@
15 c
/c
Ø12@20 c/c
Ø12@20 c/c
Ø12@20 c/c
Ø12@20 c/c
Ø10
@20
c/c
Ø10@20 c/c
Ø8@15 c/c
Ø12@10 c/c
285
2515
1515
200
15
2515
1515
200
15
285
SECTION D-DSECTION C-C
30
30
END DATE
START DATE
SCALE
Shee
t No.
PROVINCENo
REVIEWED BY:
APPORVED BY:
SURVEYED BY:15 19DESIGNED BY:
DATE1
2
3
4
TASK AND RESPONSIBLE PROJECT WASH/CRS/OFDA
PROJECTSUB TITLE
DRAWING No.
1:1
25-December-2019
11-December-201901-Fberuary-2020
30-April-2020
HERAT
SOLAR POWERED WATER SUPPLY SYSTEMDISTRICT Kushk Rabat Sangi
VILLAGE NAME GANG EZAT ABAD
VILLAGE CODE
M.Fahim Amiry
HIKMAT ARIFZAI
MARGOT DURIN
M.Fahim Amiry
KRS-14 5 m3 RCC RESERVIOR SECTIONS
1595
10
Out let Pipe
Washingpipe
2 No RCCPlates
5
110
Ø10
@20
c/c
Ø12
@20
c/c
Ø12
@20
c/c
Ø12@15 c/c
Corner Steel Bar
Ø12@15 c/c
Corner Steel Bar
Ø12@15 c/c
Corner Steel Bar
Ø12@15 c/c
Corner Steel Bar
Ø12
@20
c/c
Ø12
@20
c/c
2013
020
330
1510
015
C
C
C
C
100
Ø12@20 c/c
Ø8@15 c/c
Ø8@15 c/c
Ø8@
15 c
/c
Ø8@
15 c
/c
Ø12@20 c/c
Ø12@20 c/c
Ø12@20 c/c
104
104
20 10 140 2010
1030
1015
1521
015
165
195
20
15160
15x15Splay
60
30
30Ladder 3"GI Pipe
30
SECTION B-B
1% Slope
Iron Gate (60x60)cmwith lock able system
Inlet Pipe
Plaster (1:3) with Padlow Powder
RCC Wall (1:1.5:3) 22cm ThickPlaster (1:3)
NaturalGroundlevel
2" Ventilation PVC Pipe
END DATE
START DATE
SCALE
Shee
t No.
PROVINCENo
REVIEWED BY:
APPORVED BY:
SURVEYED BY:16 19DESIGNED BY:
DATE1
2
3
4
TASK AND RESPONSIBLE PROJECT WASH/CRS/OFDA
PROJECTSUB TITLE
DRAWING No.
1:1
25-December-2019
11-December-201901-Fberuary-2020
30-April-2020
HERAT
SOLAR POWERED WATER SUPPLY SYSTEMDISTRICT Kushk Rabat Sangi
VILLAGE NAME GANG EZAT ABAD
VILLAGE CODE
M.Fahim Amiry
HIKMAT ARIFZAI
MARGOT DURIN
M.Fahim Amiry
KRS-14 5 m3 RERSERVIOR STEEL BAR DETAILS
150
1010 10 110 10
10
10
100
10
10
140
30
150
STAND TAP
10
510
10
10
5
Stone Masonry
M200 (1:4) Mortar
G.L
50cm60cm50cm
10cm
105cm
10cm
70cm
70cm
160cm
160cm
A
A
PCC (M150)
Gate Valve 1
1/4"
GI Pipe
PE Pipe 50mmPE Pipe 50mm
Frost Line
Frost Line
Male Adapter
Nipple
Union
10
0
10 30 70 10 150 5
295
14
30
64
11
5
80
101010
10
10
510
PCC (1:2:4)
Ground Level
SLOPE MIN 1:50
4
RCC M20
Section A-A
Valve Box
Use #12mm @ 15cm C/C
END DATE
START DATE
SCALE
Shee
t No.
PROVINCENo
REVIEWED BY:
APPORVED BY:
SURVEYED BY:17 19DESIGNED BY:
DATE1
2
3
4
TASK AND RESPONSIBLE PROJECT WASH/CRS/OFDA
PROJECTSUB TITLE
DRAWING No.
1:1
25-December-2019
11-December-201901-Fberuary-2020
30-April-2020
HERAT
SOLAR POWERED WATER SUPPLY SYSTEMDISTRICT Kushk Rabat Sangi
VILLAGE NAME GANG EZAT ABAD
VILLAGE CODE
M.Fahim Amiry
HIKMAT ARIFZAI
MARGOT DURIN
M.Fahim Amiry
KRS-14 STAND TAP PLAN, SECTIONS
13
0
120
1
2
3
10
10
10
101010
40
5Ø6,L=118cm
4Ø
10
,L
=1
13
cm
D D
END DATE
START DATE
SCALE
Shee
t No.
PROVINCENo
REVIEWED BY:
APPORVED BY:
SURVEYED BY:18 19DESIGNED BY:
DATE1
2
3
4
TASK AND RESPONSIBLE PROJECT WASH/CRS/OFDA
PROJECTSUB TITLE
DRAWING No.
1:1
25-December-2019
11-December-201901-Fberuary-2020
30-April-2020
HERAT
SOLAR POWERED WATER SUPPLY SYSTEMDISTRICT Kushk Rabat Sangi
VILLAGE NAME GANG EZAT ABAD
VILLAGE CODE
M.Fahim Amiry
HIKMAT ARIFZAI
MARGOT DURIN
M.Fahim Amiry
KRS-14 STAND TAP RCC DETAIL
1Ø6,L=490cm
5Ø6@21c/c,L=160cm
4Ø6@23c/c,L=171cm
10
0
10 30 70 10 150 5
295
14
30
64
11
5
80
101010
10
10
510
PCC (1:2:4)
Ground Level
SLOPE MIN 1:50
4
RCC M20
Section A-A
END DATE
START DATE
SCALE
Shee
t No.
PROVINCENo
REVIEWED BY:
APPORVED BY:
SURVEYED BY:19 19DESIGNED BY:
DATE1
2
3
4
TASK AND RESPONSIBLE PROJECT WASH/CRS/OFDA
PROJECTSUB TITLE
DRAWING No.
1:1
25-December-2019
11-December-201901-Fberuary-2020
30-April-2020
HERAT
SOLAR POWERED WATER SUPPLY SYSTEMDISTRICT Kushk Rabat Sangi
VILLAGE NAME GANG EZAT ABAD
VILLAGE CODE
M.Fahim Amiry
HIKMAT ARIFZAI
MARGOT DURIN
M.Fahim Amiry
KRS-14 STAND TAP RCC DETAIL