    ENERGY CONSERVATION FOR TEXTILE WET

    PROCESSING INDUSTRIES BY OPTIMIZINGELECTRICAL POWER SYSTEM

    Reed Consulting Bangladesh Ltd.

    BY:MD. ABDUL ALIMCEOWELLMAKE ENGINEERING & TECHNOLOGY

  • 7/31/2019 RCB-UG-Alim

    2/18

    ELECTRICAL SYSTEM EVALUATION

    A small improvement in electrical systemhas multiple positive impacts on total

    electrical energy system in

    Generation

    Distribution

    Consumption

    2

  • 7/31/2019 RCB-UG-Alim

    3/18

    SAVINGS OF ELECTRICAL ENERGY

    The electrical system needs to be studied properlyprior to take any step for achieving energy efficiency.Be remember that

    SAVINGS MUST BE ACHIEVED WITHOUTSACRIFICING PURPOSES

    Beside savings following issues must be considered:

    System safety and equipment safety

    Complexity of distribution networkSystem flexibility & ease of operation

    Troubleshooting & maintenance issues

    3

  • 7/31/2019 RCB-UG-Alim

    4/18

    CONSIDERATIONS FOR ELECTRICAL ENERGY SAVINGS

    4

    Efficient utilization of resources through

    Monitoring

    Prioritizing

    Load management

  • 7/31/2019 RCB-UG-Alim

    5/18

    CONSIDERATIONS FOR ELECTRICAL ENERGY SAVINGS

    5

    Efficient distribution network through

    Maintaining & practicing electrical norms

    Proper sizing of cables & wires

    Proper sizing of PFC (power factor correction)

    Proper placement of PFC in distribution network

  • 7/31/2019 RCB-UG-Alim

    6/18

    CONSIDERATIONS FOR ELECTRICAL ENERGY SAVINGS

    6

    Optimization of electrical load & consumption

    Implementing energy efficient technologies

    Implementing energy efficient practices

    Using energy efficient devices & appliances

    Using high energy efficient motor

    Using energy efficient servo motor & electronic ballast

  • 7/31/2019 RCB-UG-Alim

    7/18

    7

    Coal

    100 units 35 units 33 units

    100 units saved at

    point of use plug

    300 units savedat the power plant

    Energy

    transformation

    Energy

    distribution

    Efficient generation matters but efficient use

    has more impact, more quickly

    CONSIDERATIONS FOR ELECTRICAL ENERGY SAVINGS

  • 7/31/2019 RCB-UG-Alim

    8/18

    8

    CONSIDERATIONS FOR ELECTRICAL ENERGY SAVINGS

    Energy conservation

    Reduced consumption withreduced results

    Energy efficiency withsame results

    EFFICIENCY IS NOT INEFFECTIVENESS

  • 7/31/2019 RCB-UG-Alim

    9/18

    9

    Efficient devices and efficient installation (10 to 15 %)

    Low consumption devices, insulated building

    Optimized usage of installation and devices (5 to 15%)

    Turn off devices when not needed, regulate motors or

    heating at the optimized level

    Permanent monitoring and improvement program (2 to 8%)

    Rigorous maintenance program, measure

    and react in case of deviation

    30% savings are available today

    PassiveEE

    Active

    EE

    CONSIDERATIONS FOR ELECTRICAL ENERGY SAVINGS

  • 7/31/2019 RCB-UG-Alim

    10/18

    10

    Sustain the savings!

    Savings might be lost quickly due to:

    Unplanned, unmanaged shutdowns of equipment and processes

    Lack of automation and regulation (motors, heating)

    No continuity of behaviours

    Energy

    Consumption

    100%

    70%

    Efficientdevices

    andinstallation

    Optimizedusa

    ge

    viaautomatio

    n

    Monitoring & Maintenance

    Up to 8% per year is lost withoutmonitoring and maintenance program Up to 12% per year is lost withoutregulation and control systems

    Time

    Control andmonitoring

    technologieswill sustainthe savings

    CONSIDERATIONS FOR ELECTRICAL ENERGY SAVINGS

  • 7/31/2019 RCB-UG-Alim

    11/18

    11

    Lifecycle solutions for energy efficiencyEnergy Audit& Measure

    Active Energy Efficiency

    Optimise throughautomation &

    regulation

    Monitor,maintain,improve

    Fix the basics

    Low consumption devices,insulation material, power

    factor correction

    HVAC control, lighting control,variable speed drives

    Meters installation, monitoringservices, EE analysis software

    CONSIDERATIONS FOR ELECTRICAL ENERGY SAVINGS

  • 7/31/2019 RCB-UG-Alim

    12/18

    POWER FACTOR CORRECTION

    12

    BASIC CONSIDERATIONS:

    Accurate sizing

    Matching with load demand

    Operation with load side in all source mode

    Generator characteristics

    Harmonic issues

    http://pfc-location.jpg/http://pfc-location.jpg/http://pfc-location.jpg/http://pfc-location.jpg/http://pfc-location.jpg/http://pfc-location.jpg/http://pfc-location.jpg/http://pfc-location.jpg/http://pfc-location.jpg/http://pfc-location.jpg/http://pfc-location.jpg/http://pfc-location.jpg/http://pfc-location.jpg/http://pfc-location.jpg/http://pfc-location.jpg/http://pfc-location.jpg/
  • 7/31/2019 RCB-UG-Alim

    13/18

    POWER FACTOR CORRECTION

    13

    Source/Generator

    Load/Motor

    Real power

    Reactive power

    Reactive powerPFC

    Capacitor bank

    Customernetwork

    Source/Generator

    Load/Motor

    Real power

    Customernetwork

  • 7/31/2019 RCB-UG-Alim

    14/18

    14

    POWER FACTOR CORRECTION

    TECHNICAL CONSIDERATIONS:

    Optimum level of compensation

    Compensation at transformer terminals

    Example of PFC application

    http://pfc%20selection-01.jpg/http://pfc%20selection-02.jpg/http://pfc-%20example.jpg/http://pfc-%20example.jpg/http://pfc-%20example.jpg/http://pfc-%20example.jpg/http://pfc-%20example.jpg/http://pfc-%20example.jpg/http://pfc-%20example.jpg/http://pfc-%20example.jpg/http://pfc%20selection-02.jpg/http://pfc%20selection-02.jpg/http://pfc%20selection-02.jpg/http://pfc%20selection-02.jpg/http://pfc%20selection-02.jpg/http://pfc%20selection-02.jpg/http://pfc%20selection-02.jpg/http://pfc%20selection-01.jpg/http://pfc%20selection-01.jpg/http://pfc%20selection-01.jpg/http://pfc%20selection-01.jpg/http://pfc%20selection-01.jpg/http://pfc%20selection-01.jpg/http://pfc%20selection-01.jpg/
  • 7/31/2019 RCB-UG-Alim

    15/18

    15

    MONITORING & LOAD MANAGEMENT

    FACTORS UNDER CONSIDERATIONS:

    Load Curve Generation

    Rescheduling of Loads Storage of Products/in process material/ process utilities like refrigeration

    Shedding of Non-Essential Loads

    Operation of Captive Generation and Diesel Generation Sets

    Reactive Power Compensation

  • 7/31/2019 RCB-UG-Alim

    16/18

    MONITORING & LOAD MANAGEMENT

    16

    Load management

    Consumption

    Day Night

    Blue area = billed consumption

    Peak sets demand charge

    Bill = demand charge + consumption + other elements of the tariff

    Shifting loads can help avoid peaks

  • 7/31/2019 RCB-UG-Alim

    17/18

    17

    AN ELECTRICAL OVERVIEW OF FACTORIES

    Electrical information details

    Single line diagram of electrical distribution of TARASHIMA

    Single line diagram of electrical distribution of OEKOTEX

    Single line diagram of electrical distribution of CASSIOPIA

    Single line diagram of electrical distribution of GMS

    Single line diagram of electrical distribution of NORTHERN

    Single line diagram of electrical distribution of ECHOTEX

    Single line diagram of electrical distribution of SF WASHING Single line diagram of electrical distribution of NAZ

    http://inventory-02.xls/http://sll-edn-oekotex.jpg/http://sll-edn-cassiopea-p1.jpg/http://sll-edn-cassiopea-p2.jpg/http://sll-edn-gms.jpg/http://sll-edn-northern.jpg/http://sll-edn-echotex-a1.jpg/http://sll-edn-echotex-a2.jpg/http://sll-edn-sf%20washing.jpg/http://sll-edn-naz.jpg/http://sll-edn-naz.jpg/http://sll-edn-naz.jpg/http://sll-edn-naz.jpg/http://sll-edn-naz.jpg/http://sll-edn-naz.jpg/http://sll-edn-naz.jpg/http://sll-edn-naz.jpg/http://sll-edn-naz.jpg/http://sll-edn-naz.jpg/http://sll-edn-naz.jpg/http://sll-edn-naz.jpg/http://sll-edn-naz.jpg/http://sll-edn-naz.jpg/http://sll-edn-naz.jpg/http://sll-edn-naz.jpg/http://sll-edn-sf%20washing.jpg/http://sll-edn-sf%20washing.jpg/http://sll-edn-sf%20washing.jpg/http://sll-edn-echotex-a2.jpg/http://sll-edn-echotex-a1.jpg/http://sll-edn-northern.jpg/http://sll-edn-northern.jpg/http://sll-edn-northern.jpg/http://sll-edn-northern.jpg/http://sll-edn-northern.jpg/http://sll-edn-northern.jpg/http://sll-edn-northern.jpg/http://sll-edn-northern.jpg/http://sll-edn-northern.jpg/http://sll-edn-northern.jpg/http://sll-edn-northern.jpg/http://sll-edn-northern.jpg/http://sll-edn-northern.jpg/http://sll-edn-northern.jpg/http://sll-edn-northern.jpg/http://sll-edn-gms.jpg/http://sll-edn-gms.jpg/http://sll-edn-gms.jpg/http://sll-edn-gms.jpg/http://sll-edn-gms.jpg/http://sll-edn-gms.jpg/http://sll-edn-gms.jpg/http://sll-edn-gms.jpg/http://sll-edn-gms.jpg/http://sll-edn-gms.jpg/http://sll-edn-gms.jpg/http://sll-edn-gms.jpg/http://sll-edn-gms.jpg/http://sll-edn-gms.jpg/http://sll-edn-gms.jpg/http://sll-edn-cassiopea-p2.jpg/http://sll-edn-cassiopea-p1.jpg/http://sll-edn-oekotex.jpg/http://sll-edn-oekotex.jpg/http://sll-edn-oekotex.jpg/http://sll-edn-oekotex.jpg/http://sll-edn-oekotex.jpg/http://sll-edn-oekotex.jpg/http://sll-edn-oekotex.jpg/http://sll-edn-oekotex.jpg/http://sll-edn-oekotex.jpg/http://sll-edn-oekotex.jpg/http://sll-edn-oekotex.jpg/http://sll-edn-oekotex.jpg/http://sll-edn-oekotex.jpg/http://sll-edn-oekotex.jpg/http://sll-edn-oekotex.jpg/http://inventory-02.xls/http://inventory-02.xls/http://inventory-02.xls/http://inventory-02.xls/http://inventory-02.xls/
  • 7/31/2019 RCB-UG-Alim

    18/18

    THANK YOU