ENERGY CONSERVATION FOR TEXTILE WET
PROCESSING INDUSTRIES BY OPTIMIZINGELECTRICAL POWER SYSTEM
Reed Consulting Bangladesh Ltd.
BY:MD. ABDUL ALIMCEOWELLMAKE ENGINEERING & TECHNOLOGY
-
7/31/2019 RCB-UG-Alim
2/18
ELECTRICAL SYSTEM EVALUATION
A small improvement in electrical systemhas multiple positive impacts on total
electrical energy system in
Generation
Distribution
Consumption
2
-
7/31/2019 RCB-UG-Alim
3/18
SAVINGS OF ELECTRICAL ENERGY
The electrical system needs to be studied properlyprior to take any step for achieving energy efficiency.Be remember that
SAVINGS MUST BE ACHIEVED WITHOUTSACRIFICING PURPOSES
Beside savings following issues must be considered:
System safety and equipment safety
Complexity of distribution networkSystem flexibility & ease of operation
Troubleshooting & maintenance issues
3
-
7/31/2019 RCB-UG-Alim
4/18
CONSIDERATIONS FOR ELECTRICAL ENERGY SAVINGS
4
Efficient utilization of resources through
Monitoring
Prioritizing
Load management
-
7/31/2019 RCB-UG-Alim
5/18
CONSIDERATIONS FOR ELECTRICAL ENERGY SAVINGS
5
Efficient distribution network through
Maintaining & practicing electrical norms
Proper sizing of cables & wires
Proper sizing of PFC (power factor correction)
Proper placement of PFC in distribution network
-
7/31/2019 RCB-UG-Alim
6/18
CONSIDERATIONS FOR ELECTRICAL ENERGY SAVINGS
6
Optimization of electrical load & consumption
Implementing energy efficient technologies
Implementing energy efficient practices
Using energy efficient devices & appliances
Using high energy efficient motor
Using energy efficient servo motor & electronic ballast
-
7/31/2019 RCB-UG-Alim
7/18
7
Coal
100 units 35 units 33 units
100 units saved at
point of use plug
300 units savedat the power plant
Energy
transformation
Energy
distribution
Efficient generation matters but efficient use
has more impact, more quickly
CONSIDERATIONS FOR ELECTRICAL ENERGY SAVINGS
-
7/31/2019 RCB-UG-Alim
8/18
8
CONSIDERATIONS FOR ELECTRICAL ENERGY SAVINGS
Energy conservation
Reduced consumption withreduced results
Energy efficiency withsame results
EFFICIENCY IS NOT INEFFECTIVENESS
-
7/31/2019 RCB-UG-Alim
9/18
9
Efficient devices and efficient installation (10 to 15 %)
Low consumption devices, insulated building
Optimized usage of installation and devices (5 to 15%)
Turn off devices when not needed, regulate motors or
heating at the optimized level
Permanent monitoring and improvement program (2 to 8%)
Rigorous maintenance program, measure
and react in case of deviation
30% savings are available today
PassiveEE
Active
EE
CONSIDERATIONS FOR ELECTRICAL ENERGY SAVINGS
-
7/31/2019 RCB-UG-Alim
10/18
10
Sustain the savings!
Savings might be lost quickly due to:
Unplanned, unmanaged shutdowns of equipment and processes
Lack of automation and regulation (motors, heating)
No continuity of behaviours
Energy
Consumption
100%
70%
Efficientdevices
andinstallation
Optimizedusa
ge
viaautomatio
n
Monitoring & Maintenance
Up to 8% per year is lost withoutmonitoring and maintenance program Up to 12% per year is lost withoutregulation and control systems
Time
Control andmonitoring
technologieswill sustainthe savings
CONSIDERATIONS FOR ELECTRICAL ENERGY SAVINGS
-
7/31/2019 RCB-UG-Alim
11/18
11
Lifecycle solutions for energy efficiencyEnergy Audit& Measure
Active Energy Efficiency
Optimise throughautomation &
regulation
Monitor,maintain,improve
Fix the basics
Low consumption devices,insulation material, power
factor correction
HVAC control, lighting control,variable speed drives
Meters installation, monitoringservices, EE analysis software
CONSIDERATIONS FOR ELECTRICAL ENERGY SAVINGS
-
7/31/2019 RCB-UG-Alim
12/18
POWER FACTOR CORRECTION
12
BASIC CONSIDERATIONS:
Accurate sizing
Matching with load demand
Operation with load side in all source mode
Generator characteristics
Harmonic issues
http://pfc-location.jpg/http://pfc-location.jpg/http://pfc-location.jpg/http://pfc-location.jpg/http://pfc-location.jpg/http://pfc-location.jpg/http://pfc-location.jpg/http://pfc-location.jpg/http://pfc-location.jpg/http://pfc-location.jpg/http://pfc-location.jpg/http://pfc-location.jpg/http://pfc-location.jpg/http://pfc-location.jpg/http://pfc-location.jpg/http://pfc-location.jpg/ -
7/31/2019 RCB-UG-Alim
13/18
POWER FACTOR CORRECTION
13
Source/Generator
Load/Motor
Real power
Reactive power
Reactive powerPFC
Capacitor bank
Customernetwork
Source/Generator
Load/Motor
Real power
Customernetwork
-
7/31/2019 RCB-UG-Alim
14/18
14
POWER FACTOR CORRECTION
TECHNICAL CONSIDERATIONS:
Optimum level of compensation
Compensation at transformer terminals
Example of PFC application
http://pfc%20selection-01.jpg/http://pfc%20selection-02.jpg/http://pfc-%20example.jpg/http://pfc-%20example.jpg/http://pfc-%20example.jpg/http://pfc-%20example.jpg/http://pfc-%20example.jpg/http://pfc-%20example.jpg/http://pfc-%20example.jpg/http://pfc-%20example.jpg/http://pfc%20selection-02.jpg/http://pfc%20selection-02.jpg/http://pfc%20selection-02.jpg/http://pfc%20selection-02.jpg/http://pfc%20selection-02.jpg/http://pfc%20selection-02.jpg/http://pfc%20selection-02.jpg/http://pfc%20selection-01.jpg/http://pfc%20selection-01.jpg/http://pfc%20selection-01.jpg/http://pfc%20selection-01.jpg/http://pfc%20selection-01.jpg/http://pfc%20selection-01.jpg/http://pfc%20selection-01.jpg/ -
7/31/2019 RCB-UG-Alim
15/18
15
MONITORING & LOAD MANAGEMENT
FACTORS UNDER CONSIDERATIONS:
Load Curve Generation
Rescheduling of Loads Storage of Products/in process material/ process utilities like refrigeration
Shedding of Non-Essential Loads
Operation of Captive Generation and Diesel Generation Sets
Reactive Power Compensation
-
7/31/2019 RCB-UG-Alim
16/18
MONITORING & LOAD MANAGEMENT
16
Load management
Consumption
Day Night
Blue area = billed consumption
Peak sets demand charge
Bill = demand charge + consumption + other elements of the tariff
Shifting loads can help avoid peaks
-
7/31/2019 RCB-UG-Alim
17/18
17
AN ELECTRICAL OVERVIEW OF FACTORIES
Electrical information details
Single line diagram of electrical distribution of TARASHIMA
Single line diagram of electrical distribution of OEKOTEX
Single line diagram of electrical distribution of CASSIOPIA
Single line diagram of electrical distribution of GMS
Single line diagram of electrical distribution of NORTHERN
Single line diagram of electrical distribution of ECHOTEX
Single line diagram of electrical distribution of SF WASHING Single line diagram of electrical distribution of NAZ
http://inventory-02.xls/http://sll-edn-oekotex.jpg/http://sll-edn-cassiopea-p1.jpg/http://sll-edn-cassiopea-p2.jpg/http://sll-edn-gms.jpg/http://sll-edn-northern.jpg/http://sll-edn-echotex-a1.jpg/http://sll-edn-echotex-a2.jpg/http://sll-edn-sf%20washing.jpg/http://sll-edn-naz.jpg/http://sll-edn-naz.jpg/http://sll-edn-naz.jpg/http://sll-edn-naz.jpg/http://sll-edn-naz.jpg/http://sll-edn-naz.jpg/http://sll-edn-naz.jpg/http://sll-edn-naz.jpg/http://sll-edn-naz.jpg/http://sll-edn-naz.jpg/http://sll-edn-naz.jpg/http://sll-edn-naz.jpg/http://sll-edn-naz.jpg/http://sll-edn-naz.jpg/http://sll-edn-naz.jpg/http://sll-edn-naz.jpg/http://sll-edn-sf%20washing.jpg/http://sll-edn-sf%20washing.jpg/http://sll-edn-sf%20washing.jpg/http://sll-edn-echotex-a2.jpg/http://sll-edn-echotex-a1.jpg/http://sll-edn-northern.jpg/http://sll-edn-northern.jpg/http://sll-edn-northern.jpg/http://sll-edn-northern.jpg/http://sll-edn-northern.jpg/http://sll-edn-northern.jpg/http://sll-edn-northern.jpg/http://sll-edn-northern.jpg/http://sll-edn-northern.jpg/http://sll-edn-northern.jpg/http://sll-edn-northern.jpg/http://sll-edn-northern.jpg/http://sll-edn-northern.jpg/http://sll-edn-northern.jpg/http://sll-edn-northern.jpg/http://sll-edn-gms.jpg/http://sll-edn-gms.jpg/http://sll-edn-gms.jpg/http://sll-edn-gms.jpg/http://sll-edn-gms.jpg/http://sll-edn-gms.jpg/http://sll-edn-gms.jpg/http://sll-edn-gms.jpg/http://sll-edn-gms.jpg/http://sll-edn-gms.jpg/http://sll-edn-gms.jpg/http://sll-edn-gms.jpg/http://sll-edn-gms.jpg/http://sll-edn-gms.jpg/http://sll-edn-gms.jpg/http://sll-edn-cassiopea-p2.jpg/http://sll-edn-cassiopea-p1.jpg/http://sll-edn-oekotex.jpg/http://sll-edn-oekotex.jpg/http://sll-edn-oekotex.jpg/http://sll-edn-oekotex.jpg/http://sll-edn-oekotex.jpg/http://sll-edn-oekotex.jpg/http://sll-edn-oekotex.jpg/http://sll-edn-oekotex.jpg/http://sll-edn-oekotex.jpg/http://sll-edn-oekotex.jpg/http://sll-edn-oekotex.jpg/http://sll-edn-oekotex.jpg/http://sll-edn-oekotex.jpg/http://sll-edn-oekotex.jpg/http://sll-edn-oekotex.jpg/http://inventory-02.xls/http://inventory-02.xls/http://inventory-02.xls/http://inventory-02.xls/http://inventory-02.xls/ -
7/31/2019 RCB-UG-Alim
18/18
THANK YOU