Page 1: Rayong Electricity Generating Co.,Ltd.€¦ · I) ST-20 start-up too slow by HRSG-21 after schedule outage. “After schedule outage, board operators feel that ST-20 start-up too

Rayong Electricity Generating Co.,Ltd.(REGCO)

18 February 2005

Page 2: Rayong Electricity Generating Co.,Ltd.€¦ · I) ST-20 start-up too slow by HRSG-21 after schedule outage. “After schedule outage, board operators feel that ST-20 start-up too

2

REGCO CASESREGCO CASES’’ APPLICATIONAPPLICATIONFOR PROCESSFOR PROCESS--ITIT

Page 3: Rayong Electricity Generating Co.,Ltd.€¦ · I) ST-20 start-up too slow by HRSG-21 after schedule outage. “After schedule outage, board operators feel that ST-20 start-up too

3

Requirements for ProcessRequirements for Process--ITIT

• Provide Database for Plant Historical Data• Provide Analytic Tool for Diagnostic• Monitor&Improve Plant Performance• Summarize all necessary Data for better

tracking• Provide Data Source for Engineer &

Supervisor as required

Page 4: Rayong Electricity Generating Co.,Ltd.€¦ · I) ST-20 start-up too slow by HRSG-21 after schedule outage. “After schedule outage, board operators feel that ST-20 start-up too

4

Users for ProcessUsers for Process--ITIT

• Operator (all levels) - for basic functions• Operator - for Data Logging via PDA• Supervisor & Engineer for Analytic Functions(Historical and Special Trends)

• Efficiency for all functions• Maintenance • Executive & Management Levels

Page 5: Rayong Electricity Generating Co.,Ltd.€¦ · I) ST-20 start-up too slow by HRSG-21 after schedule outage. “After schedule outage, board operators feel that ST-20 start-up too

5

REGCO Simplify DiagramREGCO Simplify Diagram

Page 6: Rayong Electricity Generating Co.,Ltd.€¦ · I) ST-20 start-up too slow by HRSG-21 after schedule outage. “After schedule outage, board operators feel that ST-20 start-up too

6

CasesCases’’ ApplicationApplication

I) ST-20 start-up too slow by HRSG-21 after schedule outage.

II) Sometimes, ST-40 start-up faster than ST-10, ST-20, and ST-30 .

Page 7: Rayong Electricity Generating Co.,Ltd.€¦ · I) ST-20 start-up too slow by HRSG-21 after schedule outage. “After schedule outage, board operators feel that ST-20 start-up too

7

CaseCase--II:: Steam TurbineSteam Turbine--2020

I) ST-20 start-up too slow by HRSG-21 after schedule outage.

“After schedule outage, board operators feel that ST-20 start-up too slow by HRSG-21,when compared with start-up by HRSG-22 or other units”

Page 8: Rayong Electricity Generating Co.,Ltd.€¦ · I) ST-20 start-up too slow by HRSG-21 after schedule outage. “After schedule outage, board operators feel that ST-20 start-up too

8

CaseCase--II:: Steam TurbineSteam Turbine--2020

I) ST-20 start-up too slow by HRSG-21 after schedule outage.

Possible Causes of problem• GT-21 compressor fouling ----> OK• HRSG-21 Coil problems --------> more data• Bypass Damper leakage --------> OK• No Problem (only feel) ----------> OK

Page 9: Rayong Electricity Generating Co.,Ltd.€¦ · I) ST-20 start-up too slow by HRSG-21 after schedule outage. “After schedule outage, board operators feel that ST-20 start-up too

9

CaseCase--II:: Steam TurbineSteam Turbine--2020

ST.20 start up curve at 2Jun03

.50.

100.150.200.250.300.350.400.450.500.550.600.650.700.750.800.850.900.950.

1,000.1,050.1,100.

1 11 21 31 41 51 61 71 81 91 101 111 121 131 141 151 161 171 181 191 201 211 221 231 241 251

Time (Min)

Valu

e

LP. STEAM TURB INLET PRESS( Actual หารดวย 50)

MAIN STEAM TURB INLET PRESS( Actual หารดวย 10)

LP. STEAM TURB INLET TEMP.

Main STEAM TURB INLET TEMP.

Tunbine speed( Actual คูณดวย 5)

Steam chest Temp.

Condenser press.

Page 10: Rayong Electricity Generating Co.,Ltd.€¦ · I) ST-20 start-up too slow by HRSG-21 after schedule outage. “After schedule outage, board operators feel that ST-20 start-up too

10

CaseCase--II:: Steam TurbineSteam Turbine--2020

HRSG.21 start up curve at 2Jun03

.5.

10.15.20.25.30.35.40.45.50.55.60.65.70.75.80.85.90.95.

100.105.110.115.120.125.130.135.140.145.150.

1 13 25 37 49 61 73 85 97 109

121

133

145

157

169

181

193

205

217

229

241

253

Time (Min)

Valu

e

Load GT21

LP.HRSG.21 Outlet Press Actual หาร

ดวย 5)HP.HRSG.21 Outlet Press

Page 11: Rayong Electricity Generating Co.,Ltd.€¦ · I) ST-20 start-up too slow by HRSG-21 after schedule outage. “After schedule outage, board operators feel that ST-20 start-up too

11

CaseCase--II:: Steam TurbineSteam Turbine--2020

HRSG. 22 start up curve at 2Jun03

.5.

10.15.20.25.30.35.40.45.50.55.60.65.70.75.80.85.90.95.

100.105.110.115.120.125.130.135.140.145.150.

1 13 25 37 49 61 73 85 97 109

121

133

145

157

169

181

193

205

217

229

241

253

Time (Min)

Valu

e

Load GT22

LP.HRSG.22 Outlet Press Actual หารดวย

5)HP.HRSG.22 Outlet Press

Page 12: Rayong Electricity Generating Co.,Ltd.€¦ · I) ST-20 start-up too slow by HRSG-21 after schedule outage. “After schedule outage, board operators feel that ST-20 start-up too

12

CaseCase--II:: Steam TurbineSteam Turbine--2020HRSG.21& 22 start up curve at 2Jun03

.5.

10.15.20.25.30.35.40.45.50.55.60.65.70.75.80.85.90.95.

100.105.110.115.120.125.130.135.140.145.150.

1 13 25 37 49 61 73 85 97 109

121

133

145

157

169

181

193

205

217

229

241

253

Time (Min)

Valu

e

Load GT21

LP.HRSG.21 Outlet Press Actual หารดวย 5)

HP.HRSG.21 Outlet Press

Load GT22

LP.HRSG.22 Outlet Press Actual หารดวย 5)

HP.HRSG.22 Outlet Press

Page 13: Rayong Electricity Generating Co.,Ltd.€¦ · I) ST-20 start-up too slow by HRSG-21 after schedule outage. “After schedule outage, board operators feel that ST-20 start-up too

13

CaseCase--II:: Steam TurbineSteam Turbine--2020HRSG.21& 22 start up curve at 2Jun03

.5.

10.15.20.25.30.35.40.45.50.55.60.65.70.75.80.85.90.95.

100.105.110.115.120.125.130.135.140.145.150.

1 13 25 37 49 61 73 85 97 109

121

133

145

157

169

181

193

205

217

229

241

253

Time (Min)

Valu

e

Load GT21

LP.HRSG.21 Outlet Press Actual หารดวย 5)

HP.HRSG.21 Outlet Press

Load GT22

LP.HRSG.22 Outlet Press Actual หารดวย 5)

HP.HRSG.22 Outlet Press

Page 14: Rayong Electricity Generating Co.,Ltd.€¦ · I) ST-20 start-up too slow by HRSG-21 after schedule outage. “After schedule outage, board operators feel that ST-20 start-up too

14

CaseCase--II:: Steam TurbineSteam Turbine--2020

• HP Pressure for HRSG-21 increases faster than HRSG-22, but LP Pressure for HRSG-21increases slower than HRSG-22 at same load.

• Possible cause: HP water flow for HRSG-21 is higher than normal and causes heat absorption from exhaust gas instead of LP water flow.

• Different water flow from design But How?

Page 15: Rayong Electricity Generating Co.,Ltd.€¦ · I) ST-20 start-up too slow by HRSG-21 after schedule outage. “After schedule outage, board operators feel that ST-20 start-up too

15

CaseCase--II:: Steam TurbineSteam Turbine--2020Possible Cause for Flow changes• LP Eco. Coil problems• LP Circulation Pump problems• HP Economizer Recirculation

valve is not working properly

“ After testing of HP EconomizerRecirculation valve, this valve is not operated as designed (full open during start-up) and cause changing of HP and LP flow. ”

“The compress air supply for this ACV is closed manually”

Page 16: Rayong Electricity Generating Co.,Ltd.€¦ · I) ST-20 start-up too slow by HRSG-21 after schedule outage. “After schedule outage, board operators feel that ST-20 start-up too

16

CaseCase--IIII:: Steam TurbineSteam Turbine--4040

II) ST-40 start-up faster than ST-10, ST-20,and ST-30.

“For many times, Steam Turbine 40 start-up faster than other units (10,20, and 30).However, ST-40 always start-up as normal as other units. ”

Page 17: Rayong Electricity Generating Co.,Ltd.€¦ · I) ST-20 start-up too slow by HRSG-21 after schedule outage. “After schedule outage, board operators feel that ST-20 start-up too

17

CaseCase--IIII:: Steam TurbineSteam Turbine--4040

• Steam Turbines are controlled by EHC for start-up, shutdown, loading, and protective devices.

• REGCO’s steam turbines are designed for 3start-up modes; Cold, Warm, and Hot.

• For Cold Start-up Mode (casing temp. below 330oC), Steam Turbine is started and loaded with 2 load-rate, 0.333%/min when load is less than 35%, and 2.60%/min when load is higher than 35%)

Page 18: Rayong Electricity Generating Co.,Ltd.€¦ · I) ST-20 start-up too slow by HRSG-21 after schedule outage. “After schedule outage, board operators feel that ST-20 start-up too

18

CaseCase--IIII:: Steam TurbineSteam Turbine--4040

Steam Turbine Start-up Curve(Cold)

05

101520253035404550556065707580859095

100105110115120

1 13 25 37 49 61 73 85 97 109

121

133

145

157

Time (min)

%Lo

ad

Spec. % load Rate

Load Rate Change

Page 19: Rayong Electricity Generating Co.,Ltd.€¦ · I) ST-20 start-up too slow by HRSG-21 after schedule outage. “After schedule outage, board operators feel that ST-20 start-up too

19

CaseCase--IIII:: Steam TurbineSteam Turbine--4040Trend Load ST.40(Cold) Y2003

05

101520253035404550556065707580859095

100105110115120

1 11 21 31 41 51 61 71 81 91 101

111

121

131

141

151

161

Time (min)

%Lo

ad

Spec. % load Rate % Actual Load(from PLC.)27Oct03-Not pass% Actual Load(from PLC.)17Nov03-Pass% Actual Load(from PLC.)23Jun03-Not pass% Actual Load(from PLC.)15Jul03-Pass% Actual Load(from PLC.)13Nov03-Not pass% Actual Load(from PLC.)8Sep03-Not pass% Actual Load(from PLC.)1Sep03-Not pass

Page 20: Rayong Electricity Generating Co.,Ltd.€¦ · I) ST-20 start-up too slow by HRSG-21 after schedule outage. “After schedule outage, board operators feel that ST-20 start-up too

20

CaseCase--IIII:: Steam TurbineSteam Turbine--4040

• Process-IT Data(23 Jun - 17 Nov 2003), were shown that ST-40 were started 7 times with designed load rate only 2 times, while 5 times of start-up were faster than design curve.

• The problems were caused by prior command from EHC to change load-rate from 0.333%/min to 2.6%/min before 35% load.

“After EHC checking, EHC was found that command signal was not stable and caused prior command. EHC Card was changed”

Page 21: Rayong Electricity Generating Co.,Ltd.€¦ · I) ST-20 start-up too slow by HRSG-21 after schedule outage. “After schedule outage, board operators feel that ST-20 start-up too

21

EpilogueEpilogue

• At the starting point, Process-IT at REGCO are utilized as one of analytic tools for operation &maintenance persons to find out causes of problems.Moreover, the application could be extended due to skill and expertise of users to apply the large amount of information for their purposes.

“A large amount of data/information without utilization is equal to less data”