Ravi Shah's June 19, 2015 APA Presentation

56
Retrofitting an Inner-Ring Suburb Transformation and Results June 19, 2015 Ravi Shah, CBO, Assoc. AIA

Transcript of Ravi Shah's June 19, 2015 APA Presentation

Page 1: Ravi Shah's June 19, 2015 APA Presentation

Retrofitting an Inner-Ring Suburb

Transformation and Results

June 19, 2015

Ravi Shah, CBO, Assoc. AIA

Page 2: Ravi Shah's June 19, 2015 APA Presentation

Carrollton’s Philosophy:Build a sustainable future by providing opportunities for connecting people.

Page 3: Ravi Shah's June 19, 2015 APA Presentation

Area 37 square miles

Population (Estimated as of July 2013)

126,700

Median Household Income

$69,592

Average Home Value-a variety of housing types, from single-family, townhouses and apartments

$186,000

Parks

More than 1,200 acres of park land

Page 4: Ravi Shah's June 19, 2015 APA Presentation

• Tax rate reduction of a quarter cent per hundred dollars of valuation. Ninth year in a row without a tax rate increase.

• AAA rating from Standard & Poors and Fitch

• Aa1 from Moody’s

• 3% salary adjustment for City employees

• Commercial tax base increase: $374,584,640

• Assessed valuation is now over $10 billion

2014-2015 Budget Highlights

Page 5: Ravi Shah's June 19, 2015 APA Presentation

• Top 10 Cities in Texas to Raise a Family

- “Best Texas Cities for Young Families” nerdwallet 2013

• Number 3 “Best Place to Live in America” for cities over 100,000

Areavibes 2013

• One of 50 Safest Cities in TexasSafewise 2013

• Number 6 on Ten Texas Cities to get “Biggest Bang for your Buck”

SaveOn Energy 2014

City Recognition

Page 6: Ravi Shah's June 19, 2015 APA Presentation

When does Government step in?

City’s Goals

Today’sMarket

Realities

Page 7: Ravi Shah's June 19, 2015 APA Presentation

CORRIDOR BEAUTIFICATION

Median Landscaping (GDS) Real Estate Signage Regulation “Sail” Sign elimination Monument Signage Regulation Driveways, Stacking and Loading Detention Pond aesthetics Roof Top Utility Screening Exterior Façade Materials Glare Window Signage Screening Walls Landscape Ordinance Amendments

Page 8: Ravi Shah's June 19, 2015 APA Presentation

CORRIDOR BEAUTIFICATION PLAN

Amended sign code to prohibit ‘sail signs’. Arterial corridors enhanced, blight removed.

Amended sign code: limits placement of freestanding can signs, improved aesthetics, allowances for performance-based signs.

Updating Article XXV (Landscaping) of the CZO

GDS amended and aesthetic standards created

Page 10: Ravi Shah's June 19, 2015 APA Presentation

Intersection Design – the four corners

Page 11: Ravi Shah's June 19, 2015 APA Presentation
Page 12: Ravi Shah's June 19, 2015 APA Presentation

Existing Conditions: Old Denton

Page 13: Ravi Shah's June 19, 2015 APA Presentation

Completed: Old Denton

Page 14: Ravi Shah's June 19, 2015 APA Presentation

Corridor Beautification

New Corridor Planting               

Since October 2012:• 2,392 new trees and

4,278 new shrubs

• $1.2 Million funding.

Page 15: Ravi Shah's June 19, 2015 APA Presentation

Typical Right of Way Before & After Planting

Corridor Beautification

Page 16: Ravi Shah's June 19, 2015 APA Presentation
Page 17: Ravi Shah's June 19, 2015 APA Presentation

Median Trees planted to compliment R.O.W. plantings

Corridor Beautification

Page 18: Ravi Shah's June 19, 2015 APA Presentation

Corridor Beautification – Greenbelt Markers

Corridor Beautification

Page 19: Ravi Shah's June 19, 2015 APA Presentation

Retail Rehab

Page 20: Ravi Shah's June 19, 2015 APA Presentation

2006 Tax Assessment Valuation: $10,113,730 2010 Tax Assessment Valuation: $20,144,390.00

City’s Contribution in 2006: $0

City’s Contribution as of 2009: $700,000

Page 21: Ravi Shah's June 19, 2015 APA Presentation

Painting throughout to promote “village” concept

2009 Overall Construction Costs: $5,076,091 New detailing at pedestrian levelEnhanced site lighting and street

furnitureExpanded plaza area to maximize pedestrian access2009 – Improved Landscaping

Page 22: Ravi Shah's June 19, 2015 APA Presentation

The Randy Twist Project: Before

Page 23: Ravi Shah's June 19, 2015 APA Presentation

The Randy Twist Project: After

Page 24: Ravi Shah's June 19, 2015 APA Presentation
Page 25: Ravi Shah's June 19, 2015 APA Presentation
Page 26: Ravi Shah's June 19, 2015 APA Presentation

Keller Springs & Marsh Lane: After

Page 27: Ravi Shah's June 19, 2015 APA Presentation

Keller Springs & Marsh Lane: After

Page 28: Ravi Shah's June 19, 2015 APA Presentation

SE Keller Springs & Marsh Lane: Before

Page 29: Ravi Shah's June 19, 2015 APA Presentation

SE Keller Springs & Marsh Lane: After

Page 30: Ravi Shah's June 19, 2015 APA Presentation

SE Belt Line Road and Josey Lane: Before

Page 31: Ravi Shah's June 19, 2015 APA Presentation

SE Belt Line Road and Josey Lane: After

Page 32: Ravi Shah's June 19, 2015 APA Presentation
Page 33: Ravi Shah's June 19, 2015 APA Presentation

Frankford Road and Josey Lane: Before

Page 34: Ravi Shah's June 19, 2015 APA Presentation

Frankford Road and Josey Lane: After

Page 35: Ravi Shah's June 19, 2015 APA Presentation

Kelly and Keller Spring: Before

Page 36: Ravi Shah's June 19, 2015 APA Presentation

Kelly and Keller Spring: Before

Page 37: Ravi Shah's June 19, 2015 APA Presentation
Page 38: Ravi Shah's June 19, 2015 APA Presentation
Page 39: Ravi Shah's June 19, 2015 APA Presentation
Page 40: Ravi Shah's June 19, 2015 APA Presentation
Page 41: Ravi Shah's June 19, 2015 APA Presentation
Page 42: Ravi Shah's June 19, 2015 APA Presentation
Page 43: Ravi Shah's June 19, 2015 APA Presentation
Page 44: Ravi Shah's June 19, 2015 APA Presentation

Project Raiford

Page 45: Ravi Shah's June 19, 2015 APA Presentation

Multi-Modal Connections

Page 46: Ravi Shah's June 19, 2015 APA Presentation

Trinity Mills Transit Center

Hotels

New SingleFamily Neighborhood

Carrollton’s Vision for Trinity Mills and Project Raiford:

Hospital

Mixed-Use Development

Shops atOld Denton

Page 47: Ravi Shah's June 19, 2015 APA Presentation

Raiford Crossing A New Single

Family Neighborhood

Hive CarrolltonMixed-Use Development

Page 48: Ravi Shah's June 19, 2015 APA Presentation

Raiford Crossing

• 90 townhomes• 120 homes• Proposed home prices: 

$300,000-$450,000 with custom homes at $500,000

• Home construction begins Winter 2014

New Single Family Homes

Page 49: Ravi Shah's June 19, 2015 APA Presentation

Raiford Road

McC

oy R

oad

President George Bush Turnpike

Trinity Mills

Raiford Crossing

Page 50: Ravi Shah's June 19, 2015 APA Presentation

6-Story 145 Room Hotel20,000 sf Conference facility

Opens Fall 2015.

FutureHotel

Page 51: Ravi Shah's June 19, 2015 APA Presentation

North Texas Regional Hospital

Page 52: Ravi Shah's June 19, 2015 APA Presentation

Trinity Mills

Where Multiple Connections Happen!

trinitymills.org

Page 53: Ravi Shah's June 19, 2015 APA Presentation

Transi

t Syst

em

Map

Future Rail Line

Fut

ure

Rai

l Lin

e

Page 54: Ravi Shah's June 19, 2015 APA Presentation

Shifting the Paradigm

Page 55: Ravi Shah's June 19, 2015 APA Presentation

Downtown TreasuresVaried and exciting shopping,

dining, and entertainment

Page 56: Ravi Shah's June 19, 2015 APA Presentation

Thank You

[email protected]

[email protected]

Making Connections Happen!

On FaceBook: CarrolltonTOD

On Twitter: @CarrolltonTOD

On Pinterest: Carrollton TOD