Career Point Cares
A Reporton
An overview of manufacturing planning
Submitted to:- Mr. Amardeep kumar sir
Submitted by:- Ravi shankar bordiya(k12256)
B.Tech (civil) Ist year
Career Point Cares
contents• Definition• Material Requirements Planning• An MPC System Framework• Reference
Career Point Cares
DefinitionA Manufacturing Planning and Control
system is a methodology designed to manage efficiently the flow of material,
the utilization of people and equipment, and to respond to customer requirements by utilizing the capacity of our suppliers,
that of our internal facilities, and in some cases that of our customers to meet customer demand.
Career Point Cares
A Context for Thinking about Manufacturing Planning and Control (MPC)
What are processes?
Processes define how we do things! Step 1 Step 2 Step 3 etc.
So, what is the role of MPC?
The MPC system tells the processes what to work on.Plans the resources that processes use (i.e. people, equipment, material).Plans for what processes will be doing in the future.
Career Point Cares
Costs and Benefits of MPC systems
• The costs of an MPC are substantial but so can be the
• Rewards (see examples).
• Common to see ERP system costs measured at 5-10% of cost of goods sold.
Career Point Cares
An MPC System Framework
• Front End– Set of activities and systems for overall direction setting
(Demand Management, Sales & Operations Planning, Resource Planning and MPS)
• Engine– Material Requirements Plans (MRP): Systems for
detailed material and capacity planning.• Back End– Depicts the MPC execution systems
Career Point Cares
ResourcePlanning
Sales and operationsplanning
Demandmanagement
Master productionscheduling
Detailed capacityplanning
Detailed materialplanning
Shop-floorsystems
Suppliersystems
Enterprise Resource Planning (ERP) System
Front End
Engine
Back end
Manufacturing Planning and Control System
Material Requirements Plans (MRP)
Career Point CaresProduction Planning and Control- Materials Requirement Planning (8)
Material Requirements Planning
Given a master schedule, what raw materials and components quantities are needed and when.
Requires:• Bill of material (Manufacturing tree)• Inventory status• Lead times
Master ProductionScheduling
Material RequirementsPlanning
InventoryStatus
Bills ofMaterial
Quantities andOrder Times
Career Point Cares
REFERENCES