RATUA FOUNDATION, ASSOCIATION DE MELE, SHaRM PIKININI ECOLE FOUNDATION WITH STUART FRIEND, SUE and VOLUNTEER VANUATU
Rebuild of Suango Mele Primary School Building 3
Building 3 refurbishment in progress September 2015
Report dated: 30 October 2015
Prepared by : SHaRM Pikinini Ecole Foundation for Ministry of Education
PO Box 128, Port Vila, Vanuatu
Ph: (+678) 7788224
Email. [email protected]
Website :www.sharmfoundation.com
================================================================
Final Reporting
Post-Pam April 2015
A working group of Ratua Foundation, Cyrille Mainguy and for Association de Mele and SHaRM Pikinini Ecole Foundation met post-PAM with the School Board, School Headmaster and Executive for the School as to how we could jointly assist Suango Mele Primary School with reconstruction on the school buildings damaged by Cyclone PAM. A plan was formulated for the reconstruction subject to fundraising by the various groups involved.
Following is a plan and layout of the School and identification of the School Building 3 consisting of one classroom and storage, the subject of this report.
Proposed site plan of rebuilding programme for Suango Mele Primary School
Rebuild
The combined team who joined together working with the Project Manager for Suango Mele Primary School, Cyrille Mainguy, Consulting Engineer and Project Management, consisted of :
Ratua Foundation
Association de Mele
Sue a volunteer from Australia as contributing donor
BlueScope Lysaght
Volunteer Vanuatu including Pat Miller who undertook planning and trusse designs
Stuart Friend (Project Manager for SHaRM Pikinini Ecole Foundation) and others
SHaRM Pikinini Ecole Foundation
Beach Bar and Promedical
This work commenced on 15th September 2015 and was finally completed on 23rd October 2015 but the class was able to resume their occupation of the classroom on or about 10th October 2015.
The work consisted of a total refurbishment of all the roofing trusses and replacement with all new roofing iron donated by BlueScope Lysaght, strengthening work and general maintenance together with painting and refurbishing both the interior and exterior of Building 3.
Our group engaged local Mele builders under the direction of Sam Michael with labourers who worked with SHaRM’s project manager, Stuart Friend with parent-helpers from Mele with assistance from Foster Rakom and his team who had completed work on Block2.
Cyrille Mainguy, as project manager for Suango was overseeing the work and inspections plus reporting back to the Ministry during the course of the reconstruction.
Painting and roofing being finalised on 15th September 2015
COSTINGS
Final cost for the total rebuild was :
Details Donor Cost in Vatu
Materials purchased PVH Ratua / Association de Mele
Sue – Australian Volunteer
277,548
81,258
BlueScope Lysaght – purchase of long run roofing sheet and Flashings and accessories
BlueScope 228,084
Washers and Screws - roofing washers and screws (amount unknown)
The Beach Bar and Promedical
Unknown donation
Materials for finishing and exterior finishing, cement, mesh plus paint
SHaRM 86,186
Wages – Wages SHaRM
14,600
Total cost of the Rebuild – Classroom – Building 3
658,476 VT
FURTHER WORK TO BE CONSIDERED BY THE PROJECT TEAM OR SOUGHT BY OTHER DONORS
This classroom will require:
Electricity run to the classroom -Building 3
Shelving in the storage room (to be supplied by SHaRM)
Replacement of all chairs and desks for all students (supplied by SHaRM)
Teaching resources (to be supplied by SHaRM)
Landscaping and repair to ground outside of classrooms.
INSPECTION AND SIGN OFF BY CYRILLE MAINGUY, PROJECT MANAGER FOR SUANGO
Working with Cyrille Mainguy, Project Manager on all the rebuilding at Suango, Cyrille has been reporting throughout the rebuild of Building 3 providing interim technical reports following inspections directly to the Ministry of Education.
Cyrille will provide this report to the Ministry of Education, following his further final inspection of Building 3 and circulation of this report.
……………………………………………………………………..
For and on behalf of the Combined Group assisting Suango Mele Primary Rebuild Per: Stephanie (Steph) Neilson
Dated 30 October 2015
(Attached)
1. Photos of the Building 3 before and during the rebuilding 2. Excel Spreadsheet of payments 3. Final evidence of rebuild payment receipts 4. Acknowledgements
Building 3 – taken before refurbishment in August 2015
New roofing taking shape on Building 3
Interior of classroom being refurbished
Work in progress with painting to finish
New desks and chairs provided in Building 3
Completed refurbished Building 3
Excel Spreadsheet of expenses incurred Building 3
Evidence of payments
Acknowledgements:
Cyrille Mainguy, Engineer and Project Management for project managing the rebuild
Sue- Australian Volunteer with Volunteer Vanuatu as donor for rebuild
Volunteer Vanuatu team for rebuilding and repainting
Pat Miller – design of building trusses and plans
Ben Michael – for overseeing building and replacement of trusses during roof rebuilding
Foster Rakom and team of builders from Mele
BlueScope Lysaght
Ratua Foundation
Association de Mele
SHaRM Pikinini Ecole Foundation
Stuart Friend and Deb Friend
Port Vila Hardware
Wilco Limited
School parents for providing helpers for rebuilding
School Board and Committee assisting during the rebuilding and Mamas for their provision of meals for the volunteers
===================