35
ADAMS-COLUMBIA ELECTRIC COOPERATIVE Rates Board Approved 2-27-19 Effective 4-8-19

Transcript of Rates - mk0acecwimf55vfrtbrb.kinstacdn.com · MC6 Coincident demand billed firm (no load control)...

ADAMS-COLUMBIA ELECTRIC COOPERATIVE

Rates

Board Approved 2-27-19

Effective 4-8-19

1

TABLE OF CONTENTS

RATE CODE DESCRIPTIONS ......................................................................................................2

RATE CODE DESCRIPTIONS (continued)...................................................................................3

RATE DESCRIPTIONS (continued) ..............................................................................................4

RATE SCHEDULE AVAILABILITY AND DISCLAIMER .........................................................5

GENERAL SINGLE-PHASE, FARM & RESIDENTIAL SERVICE............................................6

GENERAL SERVICE TIME-OF-DAY (TOD) ..............................................................................7

DAIRY FARM SERVICE ...............................................................................................................8

ELECTRIC SPACE HEATING ......................................................................................................9

ELECTRIC SPACE HEATING TIME-OF-DAY (TOD) .............................................................11

INTERRUPTIBLE - DUAL FUEL ELECTRIC SPACE HEATING ...........................................13

COMMERCIAL SERVICE (3ϕ) ...................................................................................................15

COMMERCIAL SERVICE (3ϕ) TIME-OF-DAY (TOD) ............................................................16

LARGE POWER SERVICE..........................................................................................................17

LARGE POWER SERVICE (OVER 1000 KVA) ........................................................................19

LARGE POWER ECONOMIC DEVELOPMENT (OVER 10,000 KVA) ..................................20

LARGE POWER SERVICE – TIME-OF-DAY (TOD) ...............................................................21

IRRIGATION SERVICE - NO ACEC CONTROL ......................................................................23

IRRIGATION SERVICE NO ACEC CONTROL - COINCIDENT ............................................25

IRRIGATION SERVICE OFF PEAK – ACEC CONTROLLED ................................................27

YARD LIGHT RENTAL FACILITIES ........................................................................................29

STREET LIGHT RENTAL FACILITIES .....................................................................................30

RENEWABLE GENERATION RATE – CLOSED RATE ..........................................................31

RENEWABLE GENERATION RATE – CLOSED RATE ..........................................................32

RENEWABLE GENERATION RATE – CLOSED RATE ..........................................................33

RENEWABLE GENERATION RATE .........................................................................................34

Effective dates referenced in this document indicate that the rate will be effective for all invoices

prepared on or after this date, regardless of the period being billed.

2

ADAMS-COLUMBIA ELECTRIC COOPERATIVE Rate Descriptions

Friendship, Wisconsin Effective: 9/8/14

RATE CODE DESCRIPTIONS

Type Rate Code Description Page

Residential 21 Single-phase service for full-time residential use. For accounts

with maximum demand less than 40kW.

6

Residential

TOD

T1 Single-phase time-of-day (TOD) service for full-time residential

use.

7

Residential

Resistance Heat

E1H Second-meter electric service for electric resistant heat (only) for

full-time residential use.

9

Residential

Resistance Heat

(plus)

X1H Second-meter electric service for electric resistant heat (only) for

full-time residential use where other loads have been added to the

second meter service.

9

Residential

Resistance Heat

TOD

H1T Second-meter electric service for time-of-day (TOD) electric

resistant heat (only) for full-time residential use.

11

Residential

Resistance Heat

TOD (plus)

X1T Second-meter electric service for time-of-day (TOD) electric

resistant heat (only) for full-time residential use where other loads

have been added to the second meter service.

11

Residential

Interruptible

Resistance Heat

I1H Sub-metered second-meter electric service for interruptible

electric resistant heat (only) for full-time residential use in a home

that has back up fossil fuel heat. This Is A Closed Rate (not

available for new connects)

13

Residential

Interruptible

Resistance Heat

J1H Second-meter electric service for interruptible electric resistant

heat (only) for full-time residential use in a home that has back up

fossil fuel heat.

13

General

Service

42 Single-phase service for non-full-time residential (second homes,

cottages) use, including sheds, garages, outbuildings, town halls,

churches, stock waterers and camper services). For accounts with

maximum demand less than 40kW.

6

General

Service TOD

T2 Single-phase time-of-day (TOD) service for non-full-time

residential (second homes, cottages) use, including sheds,

garages, outbuildings, town halls, churches, stock waterers and

camper services.

7

General

Service

Resistance Heat

E2H Second-meter electric service for electric resistant heat (only) for

a home for non-full-time residential (second homes, cottages) use.

9

General

Service

Resistance Heat

(plus)

X2H Second-meter electric service for electric resistant heat (only) for

non-full-time residential (second homes, cottages) use where

other loads have been added to the second meter service.

9

General

Service

Resistance Heat

TOD

H2T Second-meter electric service for time-of-day (TOD) electric

resistant heat (only) for non-full-time residential (second homes,

cottages) use.

11

3

ADAMS-COLUMBIA ELECTRIC COOPERATIVE Rate Descriptions

Friendship, Wisconsin Effective: 9/8/14

RATE CODE DESCRIPTIONS (continued)

Type Rate Code Description Page

Residential

Seasonal

Resistance Heat

TOD (plus)

X2T Second-meter electric service for time-of-day (TOD) electric

resistant heat (only) for non-full-time residential (second homes,

cottages) use where other loads have been added to the second

meter service.

11

Residential

Seasonal

Interruptible

Resistance Heat

J2H Second-meter electric service for interruptible electric resistant

heat (only) for non-full-time residential (second homes, cottages)

use in a home that has back up fossil fuel heat.

13

Dairy Farm DF Single- or three-phase service for dairy farm accounts with

maximum demand less than 40kW.

8

Small

Commercial

23 Single-phase service for commercial accounts with maximum

demand less than 40kW. Includes services like convenience

stores, small businesses, county parks, campgrounds, billboards,

grain dryers and irrigation pivot-only.

6

Small

Commercial

TOD

T3 Single-phase time-of-day (TOD) service for non-residential

accounts with maximum demand less than 40kW. Includes

services like convenience stores, small businesses, county parks,

campgrounds, billboards, grain dryers and irrigation pivot-only.

7

Small

Commercial

Resistance Heat

E3H Second-meter single-phase electric service for electric resistant

heat (only) for commercial accounts.

9

Small

Commercial Resist. Heat (plus)

X3H Second-meter single-phase electric service for electric resistant

heat (only) for commercial accounts where other loads have been

added to the second meter service.

9

Small

Commercial Resist. Heat TOD

H3T Second-meter single-phase electric service for time-of-day (TOD)

electric resistant heat (only) for non-residential accounts.

11

Small

Commercial

Interruptible

Resistance Heat

J3H Second-meter single-phase electric service for interruptible

electric resistant heat (only) for non-residential accounts that have

back up fossil fuel heat. Includes services like billboards, and

irrigation pivot-only services.

13

Commercial 34 Three-phase electric service for non-residential accounts with

maximum demand less than 40kW

15

Commercial

TOD

34T Three-phase time-of-day (TOD) electric service for non-

residential accounts with maximum demand less than 40kW

16

Large Power 63 Single-phase electric service for large commercial services with

maximum demand of 40kW or more. Demand (KW) is billed

17

Large Power

Resistance Heat

E4H Second-meter three-phase electric service for electric resistant

heat (only) in a large commercial establishment.

9

Large Power Resistance Heat TOD

H4T Second-meter three-phase electric service for time-of-day (TOD)

electric resistant heat (only) for a large commercial establishment.

11

4

ADAMS-COLUMBIA ELECTRIC COOPERATIVE Rate Descriptions

Friendship, Wisconsin Effective: 1/1/17

RATE DESCRIPTIONS (continued)

Type Rate Code Description Page

Large Power

Interruptible

Resistance Heat

J4H Second-meter three-phase electric service for interruptible electric

resistant heat (only) for a large commercial establishment that has

back up fossil fuel heat.

13

Large Power 64 Three-phase electric service for large commercial services with

maximum demand of 40kW or more. Demand (kW) is billed.

17

Large Power

TOD

EBR Single- and three-phase non-irrigation time-of-day (TOD) electric

service. For accounts with maximum demand of 40kW or more.

21

Industrial Various

Three-phase electric service for very large commercial services

(requiring transformer capacity of 1000 kVA or more).

19

Industrial Economic

Development Rate Various

Three-phase electric service for very large commercial services

(requiring transformer capacity of 10,000 kVA or more).

20

Irrigation M6 Firm (no load control) irrigation service for farm irrigation pumps

of 15 HP and greater, billed 12 monthly facility charges.

23

Irrigation M66 Firm (no load control) irrigation service for farm irrigation pumps

of 15 HP and greater, billed 6 monthly facility charges but same

annual facility charges as M6.

23

Irrigation Experimental Rate Only – Not Open

MC6

Coincident demand billed firm (no load control) irrigation service

for farm irrigation pumps of 15 HP and greater, billed 12 monthly

facility charges.

25

Irrigation Experimental Rate Only

– Not Open

MC66

Coincident demand billed firm (no load control) irrigation service

for farm irrigation pumps of 15 HP and greater, billed 6 monthly

facility charges but same annual facility charges as M6.

25

Irrigation N6 Controlled irrigation service for non-farm irrigation pumps of 15

HP and greater, billed 12 monthly facility charges.

27

Irrigation N66 Controlled irrigation service for non-farm irrigation pumps of 15

HP and greater, billed 6 monthly facility charges but same annual

facility charges as N6.

27

Irrigation P6 Controlled irrigation service for farm irrigation pumps of 15 HP

and greater, billed 12 monthly facility charges.

27

Irrigation P66 Controlled irrigation service for farm irrigation pumps of 15 HP

and greater (billed 6 monthly facility charges but same annual facility charges as P6)

27

Yard Light YL Available to all members for lighting yards and other areas. 29

Street Light SL Available to Townships, unincorporated municipalities and select

members for lighting of streets, parking lots, etc.

30

Renewable

Generation

RGS Closed Rate

For members receiving service with renewable energy facilities

not greater than 20 kW connected in parallel with ACEC.

31

Renewable

Generation

RGL Closed Rate

For members receiving service with renewable energy facilities

greater than 20 kW capacity connected in parallel with ACEC.

32

Renewable

Generation

RG Closed Rate

For members receiving service with renewable energy facilities

connected in parallel with ACEC (demand & energy billed, two meters).

33

Renewable

Generation

RG1 For members receiving service with renewable energy facilities

connected in parallel with ACEC (energy billed, one meter).

34

5

RATE SCHEDULE AVAILABILITY AND DISCLAIMER

The availability of a Rate Schedule for a member is based on the member meeting

qualifications of the availability clause and other terms of the Rate Schedule. Rate

Schedules are available upon request and it shall be the member’s responsibility to

see that he/she is charged the rate for which he/she qualifies. In some cases the

member may be eligible to take service under more than one rate.

By request the Cooperative will advise the member in the selection of the rate that

will give him/her the lowest cost of service based on information provided to the

Cooperative; however, the responsibility for the selection of the rate lies with the

member. After the member has selected the rate under which he/she elects to take

service, or when the type or capacity of service(s) needed requires a change to

another rate, the member will not be permitted to change from that rate to another

rate until at least 12 months have elapsed. An exception to this elapsed time

requirement will be made if the service no longer meets the availability clause of the

Rate Schedule. Additionally, it is the responsibility of the member to notify the

Cooperative of any change that affects the rate or charge for service.

No refund will be made of the difference in charges under different rates applicable

to the same class of service.

(Source – ACEC Service Rules and Regulations)

Adams-Columbia Electric Cooperative provides Internet access to

our rate schedules for the convenience of our membership. While we

strive to keep these documents up to date, please note that the rate

schedules and details included therein are subject to change at the

discretion of the Cooperative’s board of directors. Users should note

that the schedules provided on this web site are not the official

documents and users assume responsibility for reliance upon rate

schedules in electronic format. Please contact the Cooperative with

any questions you may have.

6

ADAMS-COLUMBIA ELECTRIC COOPERATIVE Rate Codes 21, 23, 42

Friendship, Wisconsin Effective: 4/6/18

Rate Schedule: GS

GENERAL SINGLE-PHASE, FARM & RESIDENTIAL SERVICE

1. AVAILABILITY

Available to all single-phase accounts whose measured maximum demands for eleven (11) of

the past twelve (12) months has been less than 40 kW. Service is subject to the established

rules and regulations of the Cooperative.

2. TYPE OF SERVICE

Single-phase, 60 cycles at available secondary voltage

3. RATE

Facility Charge: $ 1.08 per day

Energy Charge: All energy @ 11.2 ¢ per kWh

4. MINIMUM MONTHLY BILL

The facility charge specified above, except where multiple units are served.

(See ACEC Policy #11-3).

5. POWER COST ADJUSTMENT CHARGE

Any adjustment in the Cooperative’s energy cost per kilowatt-hour in accordance with

changes in the Cooperative’s wholesale power cost will be added to or deducted from the

member’s current bill for electric service as appropriate.

6. TERMS OF PAYMENT

The above rates are net. Bills not paid by the due date are subject to a late payment charge

on the unpaid balance in accordance with the Cooperative’s Service Rules & Regulations.

7. TAXES AND FEES

The State of Wisconsin, County and local sales taxes, Non-Taxable Program Fees, and any

other legislative or regulatory fees imposed by governmental agencies will be applied to each

billing for electric services as applicable.

8. OTHER FEES

Additional charges may be added to the Facility Charge for members requiring easement

payments, line crossing charges, insurance charges or any other charge that a member may

impose on the Cooperative. These fees will be prorated to a monthly basis and added to the

Basic Facility Charge.

7

ADAMS-COLUMBIA ELECTRIC COOPERATIVE Rate Codes T1, T2, T3

Friendship, Wisconsin Effective: 4/6/18

Rate Schedule: GS-TOD

GENERAL SERVICE TIME-OF-DAY (TOD)

1. AVAILABILITY

Available to members for all single-phase uses whose measured maximum demands for

eleven (11) of the past twelve (12) months has been less than 40 kW. The capacity of

individual motors served under this schedule shall not exceed 10 HP without prior approval

of the Cooperative. Service is subject to the established rules and regulations of the

Cooperative.

2. TYPE OF SERVICE

Single-phase, 60 cycles at available secondary voltages.

3. RATE

Facility Charge: $1.08 per day

Energy Charge: On-Peak @ 25.8¢ per kWh

Off-Peak @ 7.1¢ per kWh

On-Peak:

November 1 - April 30: 5:00 p.m. to 8:00 p.m.

Monday through Friday, except Holidays

May 1 – October 31: 1:00 p.m. to 8:00 p.m.

Monday through Friday, except Holidays

Off-Peak: All other hours

4. MINIMUM CHARGE

The minimum monthly charge under the above rate shall be the calculated facility charge

noted above, except where multiple units are served. (See ACEC Policy #11-3).

5. POWER COST ADJUSTMENT CHARGE

Any adjustment in the Cooperative’s energy cost per kilowatt-hour in accordance with the

Cooperative’s wholesale power bill power cost will be added to or deducted from the

member’s current bill for electric service as appropriate.

6. TERMS OF PAYMENT

The above rates are net. Bills not paid by the due date are subject to a late payment charge

on the unpaid balance in accordance with the Cooperative’s Service Rules & Regulations.

7. TAXES AND FEES

The State of Wisconsin, County and local sales taxes, Non-Taxable Program Fees, and any

other legislative or regulatory fees imposed by governmental agencies will be applied to each

billing for electric services as applicable.

8

ADAMS-COLUMBIA ELECTRIC COOPERATIVE Rate Code DF

Friendship, Wisconsin Effective: 4/6/18

Rate Schedule: DF

DAIRY FARM SERVICE

1. AVAILABILITY

Available to all active dairy farms whose measured maximum demand for eleven (11) of the

past twelve (12) months has been less than 40kW. Service is subject to the established rules

and regulations of the Cooperative.

2. TYPE OF SERVICE

Single-phase and three-phase at available secondary voltage.

3. RATE

Facility Charge: $ 1.08 per day

Energy Charge: All energy @ 11.2¢ per kWh

4. MINIMUM MONTHLY BILL

The minimum charge shall be the calculated facility charge noted above, except where

multiple units are served. (See ACEC Policy #11-3)

5. POWER COST ADJUSTMENT CHARGE

Any adjustment in the Cooperative’s energy cost per kilowatt-hour in accordance with

changes in the Cooperative’s wholesale power cost will be added to or deducted from the

member’s current bill for electric service as appropriate.

6. TERMS OF PAYMENT

The above rates are net. Bills not paid by the due date are subject to a late payment charge

on the unpaid balance in accordance with the Cooperative’s Service Rules & Regulations.

7. TAXES AND FEES

The State of Wisconsin, County and local sales taxes, Non-Taxable Program Fees, and any

other legislative or regulatory fees imposed by governmental agencies will be applied to each

billing for electric services as applicable.

8. CONDITIONS OF SERVICE

A. Dairy farms on this rate must be active dairy producing operations listed with the WI

Department of Agriculture.

B. Active dairy farms whose measured maximum demand for two (2) or more of the past

twelve (12) months has been equal to or greater than 40 kW will be billed under the

LP-1 rate.

9

ADAMS-COLUMBIA ELECTRIC COOPERATIVE Rate Codes E1H, E2H, E3H, E4H,

Friendship, Wisconsin X1H, X2H, X3H

Effective: 4/6/18

Rate Schedule: EH

ELECTRIC SPACE HEATING

1. AVAILABILITY

Available to all members who use separately metered electric energy for heating, conforming

to the specifications set forth hereunder, and who are receiving service at the same location for

other usages. Service is subject to the established rules and regulations of the Cooperative.

2. TYPE OF SERVICE

Single- or three-phase, 60 cycles at available secondary voltage, separately metered.

3. RATE

Facility Charge: $8.50 per month (second meter charge)

Energy Charge: All energy @ 10.5¢ per kWh (September – May billing periods)

All energy @ 15.7¢ per kWh (June – August billing periods)

All energy @ 11.2¢ per kWh all months for X1H, X2H, and X3H

rate codes.

4. MINIMUM CHARGE

The minimum monthly charge under above rate shall be the facility charge noted above.

5. POWER COST ADJUSTMENT CHARGE

Any adjustment in the Cooperative’s energy cost per kilowatt-hour in accordance with changes

in the Cooperative’s wholesale power cost will be added to or deducted from the member’s

current bill for electric service as appropriate.

6. TERMS OF PAYMENT

The above rates are net. Bills not paid by the due date are subject to a late payment charge on

the unpaid balance in accordance with the Cooperative’s Service Rules & Regulations.

7. CONDITIONS OF SERVICE

A. The member shall provide the complete service entrance according to the

Cooperative’s specifications necessary for the separate electric heat meter.

B. Space heating equipment shall be permanently connected and as far as practicable,

shall be 240 volt.

C. The minimum connected heating load shall be 5000 watts resistance-type heat.

D. Not more than 6000 watts of resistance-type space heating equipment shall be

controlled by a single thermostat or manually operated switch.

10

ADAMS-COLUMBIA ELECTRIC COOPERATIVE Rate Codes E1H, E2H, E3H, E4H,

Friendship, Wisconsin X1H, X2H, X3H

Effective: 4/6/18

Rate Schedule: EH

ELECTRIC SPACE HEATING

Page 2 of 2

E. Electric water heaters may not be connected to this service.

F. Supplemental resistance heating in heat pumps may be included on this rate.

G. Central heating systems such as electric furnace and systems that include air

conditioning will not be permitted on this rate; however, Schedule GS-TOD is

available.

8. TAXES AND FEES

The State of Wisconsin, County and local sales taxes, Non-Taxable Program Fees, and any

other legislative or regulatory fees imposed by governmental agencies will be applied to each

billing for electric services as applicable.

9. NON-COMPLIANCE (X1H, X2H, and X3H rate codes)

Members who had load on their electric heat panel that did not comply with the conditions of

this rate were transferred to the X rate until the non-complying load is removed.

11

ADAMS-COLUMBIA ELECTRIC COOPERATIVE Rate Codes H1T, H2T,

Friendship, Wisconsin H3T, H4T, X1T, X2T

Effective: 4/6/18

Rate Schedule: EH-TOD

ELECTRIC SPACE HEATING TIME-OF-DAY (TOD)

1. AVAILABILITY

Available to all members who use separately metered electric energy for heating, conforming

to the specifications set forth hereunder, and who are receiving service at the same location

for other usages. Service is subject to the established rules and regulations of the

Cooperative.

2. TYPE OF SERVICE

Single- and three-phase, 60 cycles at available secondary voltage, separately metered.

3. RATE

Facility Charge: $8.50 per month (second meter charge)

Energy Charges: On-Peak @ 24.6¢ per kWh

On-Peak @ 25.8¢ per kWh for X1T and X2T rate codes

Off-Peak @ 6.8¢ per kWh (September – May billing periods)

Off-Peak @ 15.7¢ per kWh (June – August billing periods)

Off-Peak @ 7.1¢ per kWh all months for X1T and X2T rate codes

On-Peak:

November 1 – April 30: 5:00 p.m. to 8:00 p.m.

Monday through Friday, except Holidays

May 1 – October 31: 1:00 p.m. to 8:00 p.m.

Monday through Friday, except Holidays

Off-Peak: All other hours

4. POWER COST ADJUSTMENT CHARGE

Any adjustment in the Cooperative’s energy cost per kilowatt-hour in accordance with

changes in the Cooperative’s wholesale power cost will be added to or deducted from the

member’s current bill for electric service as appropriate.

5. MINIMUM CHARGE

The minimum monthly charge under above rate shall be the facility charge noted above.

6. TERMS OF PAYMENT

The above rates are net. Bills not paid by the due date are subject to a late payment charge

on the unpaid balance in accordance with the Cooperative’s Service Rules & Regulations.

7. CONDITIONS OF SERVICE

A. The member shall provide the complete service entrance according to the

Cooperative’s specifications necessary for the separate electric heat meter.

B. The member shall permanently install and operate approved type electric heating

equipment.

C. Electric water heaters may not be connected to this service.

12

ADAMS-COLUMBIA ELECTRIC COOPERATIVE Rate Codes H1T, H2T,

Friendship, Wisconsin H3T, H4T, X1T, X2T

Effective: 04-6-18

Rate Schedule: EH-TOD

ELECTRIC SPACE HEATING

TIME-OF-DAY (TOD)

Page 2 of 2

8. TAXES AND FEES

The State of Wisconsin, County and local sales taxes, Non-Taxable Program Fees, and any

other legislative or regulatory fees imposed by governmental agencies will be applied to each

billing for electric services as applicable.

9. NON-COMPLIANCE (X1T and X2T rate codes)

Members who had load on their electric heat panel that did not comply with the conditions of

this rate were transferred to the time-of-day X rate until the non-complying load is removed.

13

ADAMS-COLUMBIA ELECTRIC COOPERATIVE Rate Codes I1H, I4H, J1H,

Friendship, Wisconsin J2H, J3H, J4H

Effective: 4/6/18

Rate Schedule: EH-I

INTERRUPTIBLE - DUAL FUEL ELECTRIC SPACE HEATING

1. AVAILABILITY

Restricted to areas of the Cooperative that have load management capabilities. Available to

all members in these areas who use separately metered electric energy for heating,

conforming to the specifications set forth hereunder, and who are receiving service at the

same location for other usages. Service is subject to the established rules and regulations of

the Cooperative.

2. TYPE OF SERVICE

Single- or three-phase, 60 cycles at available secondary voltage, separately metered.

3. RATE

Facility Charge: $8.50 per month (second meter charge)

Energy Charge: All energy @ 6.8¢ per kWh (September – May billing periods)

Energy Charge: All energy @ 15.7¢ per kWh (June – August billing periods)

4. POWER COST ADJUSTMENT CHARGE

Any adjustment in the Cooperative’s energy cost per kilowatt-hour in accordance with changes

in the Cooperative’s wholesale power cost will be added to or deducted from the member’s

current bill for electric service as appropriate.

5. MINIMUM CHARGE

The minimum monthly charge under above rate shall be the facility charge noted above.

6. TERMS OF PAYMENT

The above rates are net. Bills not paid by the due date are subject to a late payment charge

on the unpaid balance in accordance with the Cooperative’s Service Rules & Regulations.

7. CONDITIONS OF SERVICE

A. The member shall provide the complete service entrance according to the

Cooperative’s specifications necessary for the separate electric heat meter.

B. The member shall permanently install and operate electric home heating equipment in

conjunction with an oil or gas-fired central furnace as approved by this Cooperative. If

member wishes to use wood backup or no backup they must supply the Cooperative

with a liability waiver.

C. The electric service to the electric heat shall be interrupted during peak load periods.

D. Electric water heaters may not be connected to this service.

E. Supplemental resistance electric heat in heat pumps may be included on this rate.

14

ADAMS-COLUMBIA ELECTRIC COOPERATIVE Rate Codes I1H, I4H, J1H,

Friendship, Wisconsin J2H, J3H, J4H

Effective: 04-6-18

Rate Schedule: EH-I

INTERRUPTIBLE - DUAL FUEL

ELECTRIC SPACE HEATING

Page 2 of 2

F. Systems that include air conditioning will not be allowed on this rate; however,

schedule GS-TOD is available.

8. TAXES AND FEES

The State of Wisconsin, County and local sales taxes, Non-Taxable Program Fees, and any

other legislative or regulatory fees imposed by governmental agencies will be applied to each

billing for electric services as applicable.

15

ADAMS-COLUMBIA ELECTRIC COOPERATIVE Rate Code 34

Friendship, Wisconsin Effective: 4/6/18

Rate Schedule: PS

COMMERCIAL SERVICE (3ϕ)

1. AVAILABILITY

Available to all three-phase accounts (excluding irrigation pumping) whose measured

maximum demand for eleven (11) of the past twelve (12) months has been less than 40 kW.

Service is subject to the established rules and regulations of the Cooperative.

2. TYPE OF SERVICE

Three-phase, 60 cycles at available secondary voltage

3. RATE

Facility Charge: $2.00 per day

Energy Charge: All energy @ 11.2¢ per kWh

4. MINIMUM MONTHLY BILL

The facility charge specified above, except where multiple units are served. (See ACEC

Policy #11-3)

5. POWER COST ADJUSTMENT CHARGE

Any adjustment in the Cooperative’s energy cost per kilowatt-hour in accordance with

changes in the Cooperative’s wholesale power cost will be added to or deducted from the

member’s current bill for electric service as appropriate.

6. TERMS OF PAYMENT

The above rates are net. Bills not paid by the due date are subject to a late payment charge

on the unpaid balance in accordance with the Cooperative’s Service Rules & Regulations.

7. TAXES AND FEES

The State of Wisconsin, County and local sales taxes, Non-Taxable Program Fees, and any

other legislative or regulatory fees imposed by governmental agencies will be applied to each

billing for electric service as applicable.

8. OTHER FEES

Additional charges may be added to the Facility Charge for members requiring easement

payments, line crossing charges, insurance charges or any other charge that a member may

impose on the Cooperative. These fees will be prorated to a monthly basis and added to the

Basic Facility Charge.

16

ADAMS-COLUMBIA ELECTRIC COOPERATIVE Rate Code 34T

Friendship, Wisconsin Effective: 4/6/18

Rate Schedule: PS-TOD

COMMERCIAL SERVICE (3ϕ) TIME-OF-DAY (TOD)

1. AVAILABILITY

Available to all three-phase accounts (excluding irrigation pumping) whose measured

maximum demand for eleven (11) of the past twelve (12) months has been less than 40 kW.

Service is subject to the established rules and regulations of the Cooperative.

2. TYPE OF SERVICE

Three-phase, 60 cycles at available secondary voltage

3. RATE

Facility Charge: $2.00 per day

Energy Charge: On-Peak @ 33.7¢ per kWh

Off-Peak @ 7.9¢ per kWh

On-Peak:

November 1 – April 30: 5:00 p.m. to 8:00 p.m.

Monday through Friday, except Holidays

May 1 – October 31: 1:00 p.m. to 8:00 p.m.

Monday through Friday, except Holidays

Off-Peak: All other hours

4. MINIMUM MONTHLY BILL

The facility charge specified above, except where multiple units are served.

(See ACEC Policy #11-3)

5. POWER COST ADJUSTMENT CHARGE

Any adjustment in the Cooperative’s energy cost per kilowatt-hour in accordance with

changes in the Cooperative’s wholesale power cost will be added to or deducted from the

member’s current bill for electric service as appropriate.

6. TERMS OF PAYMENT

The above rates are net. Bills not paid by the due date are subject to a late payment charge

on the unpaid balance in accordance with the Cooperative’s Service Rules & Regulations.

7. TAXES AND FEES

The State of Wisconsin, County and local sales taxes, Non-Taxable Program Fees, and any

other legislative or regulatory fees imposed by governmental agencies will be applied to each

billing for electric service as applicable.

8. OTHER FEES

Additional charges may be added to the Facility Charge for members requiring easement

payments, line crossing charges, insurance charges or any other charge that a member may

impose on the Cooperative. These fees will be prorated to a monthly basis and added to the

Basic Facility Charge.

17

ADAMS-COLUMBIA ELECTRIC COOPERATIVE Rate Codes 63, 64

Friendship, Wisconsin Effective: 4/8/19

Rate Schedule: LP-1

LARGE POWER SERVICE

1. AVAILABILITY

For all single and three-phase non-irrigation accounts;

A. Whose measured maximum demands for two (2) or more of the past twelve (12)

months has been equal to or greater than 40 kW.

B. New accounts whose measured demands are estimated to be 40 kW or more shall

be placed on this rate until we have twelve (12) months of historical measured

demand readings.

C. For accounts that have twelve (12) consecutive months where the measured

maximum demand is less than 40 kW the Cooperative may transfer the account to

the GS or PS rate, whichever is appropriate.

D. This rate is available to any single- or three-phase non-irrigation account of less

than 40 kW peak demand, at the member’s request.

E. This rate is not available to accounts requiring 1000 kVA or more of transformer

capacity.

F. Service is subject to the established rules and regulations of the Cooperative.

2. TYPE OF SERVICE

Single-phase and three-phase, 60 cycles at available secondary voltage.

3. RATE

Facility Charge: $68.00 per month

Demand Charge: $21.38 per kW maximum demand

Energy Charge: All kWh @ 4.7¢ per kWh

4. POWER FACTOR CHARGE – At the Option of the Cooperative

20.0¢ per kVAR of maximum monthly reactive demand.

5. MINIMUM CHARGE

The minimum monthly charge is the facility charge.

6. DETERMINATION OF BILLING DEMAND

The billing demand for the month shall be the maximum recorded fifteen (15) minute demand

in kilowatts.

7. POWER COST ADJUSTMENT CHARGE

Any adjustment in the Cooperative’s energy cost per kilowatt-hour in accordance with

changes in the Cooperative’s wholesale power cost will be added to or deducted from the

member’s current bill for electric service as appropriate.

18

ADAMS-COLUMBIA ELECTRIC COOPERATIVE Rate Codes 63, 64

Friendship, Wisconsin Effective: 4/8/19

Rate Schedule: LP-1

LARGE POWER SERVICE

Page 2 of 2

8. TERMS OF PAYMENT

The above rates are net. Bills not paid by the due date are subject to a late payment charge

on the unpaid balance in accordance with the Cooperative’s Service Rules & Regulations.

9. TAXES AND FEES

The State of Wisconsin, County and local sales taxes, Non-Taxable Program Fees, and any

other legislative or regulatory fees imposed by governmental agencies will be applied to each

billing for electric services as applicable.

10. OTHER FEES

Additional charges may be added to the Facility Charge for members requiring easement

payments, line crossing charges, insurance charges or any other charge that a member may

impose on the Cooperative. These fees will be prorated to a monthly basis and added to the

Basic Facility Charge.

19

ADAMS-COLUMBIA ELECTRIC COOPERATIVE Rate Codes: ALS, BRK, ENB, FCI,

Friendship, Wisconsin GLO, HRT, KOC, MCN, UNI & UWGP

Effective: 4/8/19

Rate Schedule: LP-2

LARGE POWER SERVICE (OVER 1000 KVA)

1. AVAILABILITY

Available to all three-phase accounts requiring 1,000 kVA or more of transformer capacity. Service

is subject to the established rules and regulations of the Cooperative.

2. TYPE OF SERVICE

Three-phase, 60 cycles at available secondary voltage

3. RATE

Facility Charge: Based on cost of facilities installed by ACEC on a per

facility basis.

Firm Demand Charge: $ 25.83 per kW per month, measured at the time of

ACEC’s power supply coincident peak

Interruptible Demand Charge: $ 21.38 (special contract required)

Energy Charge: On-peak - all kWh @ 4.7¢ per kWh

Off-peak - all kWh @ 3.3¢ per kWh

On-Peak Period: 8 am – 10 pm Monday-Friday, except Holidays

Off-Peak: All other hours

4. POWER FACTOR CHARGE - At the option of the Cooperative

20.0¢ per kVAR of maximum monthly reactive demand.

5. MINIMUM CHARGE

A. The minimum monthly charge is the facility charge.

B. The minimum annual charge shall be five (5) times the maximum demand charge during the

year.

6. DETERMINATION OF BILLING DEMAND

The billing demand for the month shall be the maximum recorded fifteen (15) minute demand in

kilowatts during the hour of ACEC’s power supply coincident peak.

7. POWER COST ADJUSTMENT CHARGE

Any adjustment in the Cooperative’s energy cost per kilowatt-hour, in accordance with changes in the

Cooperative’s wholesale power cost, will be added to or deducted from the member’s current bill for

electric service as appropriate.

8. TERMS OF PAYMENT

The above rates are net. Bills not paid by the due date are subject to a late payment charge on the

unpaid balance in accordance with the Cooperative’s Service Rules & Regulations.

9. TAXES AND FEES

The State of Wisconsin, County and local sales taxes, Non-Taxable Program Fees, and any other

legislative or regulatory fees imposed by governmental agencies will be applied to each billing for

electric services as applicable.

20

ADAMS-COLUMBIA ELECTRIC COOPERATIVE Rate Code ENB2

Friendship, Wisconsin Effective: 4/8/19

Rate Schedule: LP-ED

LARGE POWER ECONOMIC DEVELOPMENT (OVER 10,000 KVA)

1. AVAILABILITY

Available to all new three-phase accounts requiring 10,000 kVA or more of transformer

capacity for a period of three years from first billing. Service is subject to the established

rules and regulations of the Cooperative.

2. TYPE OF SERVICE

Three-phase, 60 cycles at available secondary voltage

3. RATE

Facility Charge: Based on cost of facilities installed by ACEC on a

per facility basis.

Firm Demand Charge: $ 25.83 per kW per month, measured at the time of

ACEC’s power supply coincident peak

Interruptible Demand Charge: $ 21.38 (special contract required)

Energy Charge: On-peak - all kWh @ 4.2¢ per kWh

Off-peak - all kWh @ 3.0¢ per kWh

On-Peak Period: 8 am – 10 pm Monday-Friday, except Holidays

Off-Peak: All other hours

4. POWER FACTOR CHARGE - At the option of the Cooperative

20.0¢ per kVAR of maximum monthly reactive demand.

5. MINIMUM CHARGE - The minimum monthly charge is the facility charge.

6. DETERMINATION OF BILLING DEMAND

The billing demand for the month shall be the maximum recorded fifteen (15) minute

demand in kilowatts during the hour of ACEC’s power supply coincident peak.

7. HIGH LOAD FACTOR CREDIT

A credit of $0.015 per kWhr will be provided for energy greater than 40% load factor (based on

the maximum 15-minute non-coincident peak demand of that month) in each month

8. POWER COST ADJUSTMENT CHARGE

Any adjustment in the Cooperative’s energy cost per kilowatt-hour, in accordance with

changes in the Cooperative’s wholesale power cost, will be added to or deducted from the

member’s current bill for electric service as appropriate.

9. TERMS OF PAYMENT

The above rates are net. Bills not paid by the due date are subject to a late payment charge

on the unpaid balance in accordance with the Cooperative’s Service Rules & Regulations.

10. TAXES AND FEES

The State of Wisconsin, County and local sales taxes, Non-Taxable Program Fees, and any

other legislative or regulatory fees imposed by governmental agencies will be applied to each

billing for electric services as applicable.

21

ADAMS-COLUMBIA ELECTRIC COOPERATIVE Rate Code EBR

Friendship, Wisconsin Effective: 4/8/19

Rate Schedule: LP – TOD

LARGE POWER SERVICE – TIME-OF-DAY (TOD)

1. AVAILABILITY

For all single and three-phase non-irrigation accounts requesting a Time-of-Day rate;

A. Whose measured maximum demands for two (2) or more of the past twelve (12)

months has been equal to or greater than 40 kW.

B. New accounts whose measured demands are estimated to be 40 kW or more shall

be placed on this rate until twelve (12) months of historical measured demand

readings are available.

C. For accounts that have twelve (12) consecutive months where the measured

maximum demand is less than 40 kW the Cooperative may transfer the account to

the GS or PS rate, whichever is appropriate.

D. This rate is not available to accounts requiring 1000 kVA or more of transformer

capacity.

E. Service is subject to the established rules and regulations of the Cooperative.

2. TYPE OF SERVICE

Single-phase and three-phase 60 cycles at available secondary voltage.

3. RATE

Facility Charge: $85.00 per month

Demand Charge: $ 25.83 per kW per month on-peak

$ 9.19 per kW per month off-peak

Energy Charge: On-peak - all kWh @ 4.95¢ per kWh

Off-peak - all kWh @ 3.13¢ per kWh

On-Peak Period:

November 1 – April 30: 5:00 p.m. to 8:00 p.m.

Monday through Friday, except Holidays

May 1 – October 31: 10:00 a.m. to 8:00 p.m.

Monday through Friday, except Holidays

Off-Peak:

All other hours

4. POWER FACTOR CHARGE – At the option of the Cooperative

20.0¢ per kVAR of maximum monthly reactive demand.

5. MINIMUM CHARGE

The minimum monthly charge is the facility charge.

22

ADAMS-COLUMBIA ELECTRIC COOPERATIVE Rate Code EBR

Friendship, Wisconsin Effective: 4/8/19

Rate Schedule: LP - TOD

LARGE POWER SERVICE – TIME-OF-DAY (TOD)

Page 2 of 2

6. DETERMINATION OF BILLING DEMAND

This shall be the maximum kilowatt demand established for any fifteen (15) consecutive

minutes recorded during the established on-peak period and off-peak period during the

month for which the bill is rendered, as indicated or recorded by a time-of-day demand

meter.

7. POWER COST ADJUSTMENT CHARGE

Any adjustment in the Cooperative’s energy cost per kilowatt-hour in accordance with

changes in the Cooperative’s wholesale power cost will be added to or deducted from the

member’s current bill for electric service as appropriate.

8. TERMS OF PAYMENT

The above rates are net. Bills not paid by the due date are subject to a late payment

charge on the unpaid balance in accordance with the Cooperative’s Service Rules &

Regulations.

9. TAXES AND FEES

The State of Wisconsin, County and local sales taxes, Non-Taxable Program Fees, and

any other legislative or regulatory fees imposed by governmental agencies will be applied

to each billing for electric services as applicable.

10. OTHER FEES

Additional charges may be added to the Facility Charge for members requiring easement

payments, line crossing charges, insurance charges or any other charge that a member

may impose on the Cooperative. These fees will be prorated to a monthly basis and

added to the Basic Facility Charge.

23

ADAMS-COLUMBIA ELECTRIC COOPERATIVE Rate Codes M6, M66

Friendship, Wisconsin Effective: 4/8/19

Rate Schedule: I-1

IRRIGATION SERVICE - NO ACEC CONTROL

1. AVAILABILITY

For all services serving irrigation pumps 15 HP and over, subject to the established rules and

regulations of the Cooperative including requirements for load management controls.

2. TYPE OF SERVICE

Three-phase three-wire, three-phase four-wire, and single-phase, at available secondary

voltages.

3. RATE

Facility Charge: $1,440 per year @ $120 per month for 12 months OR $240 per

month April through September.

Demand Charges: $36.83 per kW maximum demand

Energy Charges: All energy @ 4.0¢ per kWh

4. POWER COST ADJUSTMENT CHARGE

Any adjustment in the Cooperative’s energy cost per kilowatt-hour in accordance with

changes in the Cooperative’s wholesale power cost will be added to or deducted from the

member’s current bill for electric service as appropriate.

5. MINIMUM ANNUAL CHARGE

A. The minimum annual charge shall be the facility charge.

B. Where a system or land is leased and credit with the Cooperative has not been

established, a deposit equivalent to $25.00/kW of established demand shall be paid in

advance and applied to the October bill or refunded at the end of the season.

The maximum demand used by the system for prior years is to be used for this charge;

otherwise 80% of the installed horsepower will be considered the demand in kW.

C. Any balance due on the annual facility charge will be applied to the final bill if service

is discontinued prior to the end of the billing year.

6. POWER FACTOR

The member agrees to maintain unity power factor as nearly as practicable. Power factors

may be measured at any time. Should such measurements indicate that the power factor at

the time of the member’s maximum demand is less than 85%, the demand for billing

purposes shall be the demand as indicated or recorded by the demand meter, multiplied by

85%, and divided by the percent power factor.

24

ADAMS-COLUMBIA ELECTRIC COOPERATIVE Rate Codes M6, M66

Friendship, Wisconsin Effective: 4/8/19

Rate Schedule: I-1

IRRIGATION SERVICE – NO ACEC CONTROL

Page 2 of 2

7. BILLING YEAR AND COMBINED READINGS

Energy billing will continue throughout the year under the terms and conditions of this rate.

Facility charges shall be billed each month, or if the member chooses the facility charge can

be billed over six billing periods from April through September. In the case of cranberry

marshes and where facilities other than irrigation pumps are used, facility charges shall be

billed each month from April through March. Demand charges shall be billed whenever a

demand is recorded, except as noted herein.

8. MAXIMUM DEMAND

The maximum demand shall be the maximum kilowatt demand (subject to power factor

adjustment) established for any period of fifteen (15) consecutive minutes during the month

for which the bill is rendered as indicated or recorded by a demand meter.

9. TERMS OF PAYMENT

The above rates are net. Bills not paid by the due date are subject to a late payment charge

on the unpaid balance in accordance with the Cooperative’s Service Rules & Regulations.

10. TAXES AND FEES

The State of Wisconsin, County and local sales taxes, Non-Taxable Program Fees, and any

other legislative or regulatory fees imposed by governmental agencies will be added to each

monthly bill for electric service as applicable.

25

ADAMS-COLUMBIA ELECTRIC COOPERATIVE Rate Codes MC6, MC66

Friendship, Wisconsin Effective: 4/8/19

Rate Schedule: I-2

IRRIGATION SERVICE NO ACEC CONTROL - COINCIDENT

1. AVAILABILITY – EXPERIMENTAL RATE ONLY – NOT OPEN

For all services serving irrigation pumps 15 HP and over, subject to the established rules and

regulations of the Cooperative including requirements for load management controls.

2. TYPE OF SERVICE

Three-phase three-wire, three-phase four-wire, and single-phase, at available secondary

voltages.

3. RATE

Facility Charge: $1,440 per year @ $120 per month for 12 months OR $240 per

month April through September.

Demand Charges: $25.83 per kW demand measured at the time of ACEC’s power

supply coincident peak, and

$10.70 per kW maximum demand for distribution

Energy Charges: All energy @ 4.0¢ per kWh

4. POWER COST ADJUSTMENT CHARGE

Any adjustment in the Cooperative’s energy cost per kilowatt-hour in accordance with

changes in the Cooperative’s wholesale power cost will be added to or deducted from the

member’s current bill for electric service as appropriate.

5. MINIMUM ANNUAL CHARGE

A. The minimum annual charge shall be the facility charge.

B. Where a system or land is leased and credit with the Cooperative has not been

established, a deposit equivalent to $25.00/kW of established demand shall be paid in

advance and applied to the October bill or refunded at the end of the season.

The maximum demand used by the system for prior years is to be used for this charge;

otherwise 80% of the installed horsepower will be considered the demand in kW.

C. Any balance due on the annual facility charge will be applied to the final bill if service

is discontinued prior to the end of the billing year.

6. POWER FACTOR

The member agrees to maintain unity power factor as nearly as practicable. Power factors

may be measured at any time. Should such measurements indicate that the power factor at

the time of the member’s maximum demand is less than 85%, the demand for billing

purposes shall be the demand as indicated or recorded by the demand meter, multiplied by

85%, and divided by the percent power factor.

26

ADAMS-COLUMBIA ELECTRIC COOPERATIVE Rate Codes MC6, MC66

Friendship, Wisconsin Effective: 4/8/19

Rate Schedule: I-2

IRRIGATION SERVICE NO ACEC CONTROL - COINCIDENT

Page 2 of 2

7. BILLING YEAR AND COMBINED READINGS

Energy billing will continue throughout the year under the terms and conditions of this rate.

Facility charges shall be billed each month, or if the member chooses the facility charge can

be billed over six billing periods from April through September. In the case of cranberry

marshes and where facilities other than irrigation pumps are used, facility charges shall be

billed each month from April through March. Demand charges shall be billed whenever a

demand is recorded, except as noted herein.

8. DETERMINATION OF BILLING DEMANDS

The power supply portion of the billing demand for the month shall be the average of the

four fifteen (15) minute demands in kilowatts during the hour of ACEC’s power supply

coincident peak and the distribution portion of the billing demand shall be the maximum

kilowatt demand established for any period of fifteen (15) consecutive minutes during the

month for which the bill is rendered, as indicated or recorded by a demand meter. Both

demands are subject to power factor adjustment.

9. TERMS OF PAYMENT

The above rates are net. Bills not paid by the due date are subject to a late payment charge

on the unpaid balance in accordance with the Cooperative’s Service Rules & Regulations.

10. TAXES AND FEES

The State of Wisconsin, County and local sales taxes, Non-Taxable Program Fees, and any

other legislative or regulatory fees imposed by governmental agencies will be added to each

monthly bill for electric service as applicable.

27

ADAMS-COLUMBIA ELECTRIC COOPERATIVE Rate Codes N6, N66, P6, P66

Friendship, Wisconsin Effective: 4/6/18

Rate Schedule: I-3

IRRIGATION SERVICE OFF PEAK – ACEC CONTROLLED

1. AVAILABILITY

For all services serving irrigation pumps 15 HP and over, subject to the established rules and

regulations of the Cooperative including requirements for load management controls.

2. TYPE OF SERVICE

Three-phase three-wire, three-phase four wire, and single-phase, at available secondary

voltages.

3. RATE

Facility Charge: $1,440 per year @ $120 per month for 12 months, OR $240 per

month April through September.

Demand Charges: $10.70 per kW billed for distribution.

Energy Charges: All energy @ 4.0¢ per kWh

4. CONDITIONS OF SERVICE

ACEC may interrupt (control) load Monday through Friday, between 8:00 a.m. to 8:00 p.m.

5. POWER COST ADJUSTMENT CHARGE

Any adjustment in the Cooperative’s energy cost per kilowatt-hour, in accordance with the

changes in the Cooperative’s wholesale power cost, will be added to or deducted

from the member’s current bill for electric service as appropriate.

6. MINIMUM ANNUAL CHARGE

A. The minimum annual charge shall be the facility charge.

B. Where a system or land is leased, and credit with the Cooperative has not been

established, a deposit equivalent to $25.00/kW of established demand shall be paid in

advance and applied to the October bill or refunded at the end of the season. .

The maximum demand used by the system for prior years is to be used for this charge;

otherwise 80% of the installed horsepower will be considered the demand in kW.

C. Any balance due on the annual facility charge will be applied to the final bill if service is

discontinued prior to the end of the billing year.

28

ADAMS-COLUMBIA ELECTRIC COOPERATIVE Rate Codes N6, N66, P6, P66

Friendship, Wisconsin Effective: 4/6/18

Rate Schedule: I-3

IRRIGATION SERVICE RATE – ACEC CONTROLLED

Page 2 of 2

7. POWER FACTOR

The member agrees to maintain unity power factor as nearly as practicable. Power factors

may be measured at any time. Should such measurements indicate that the power factor at

the time of the member’s maximum demand is less than 85%, the demand for billing

purposes shall be the demand as indicated or recorded by the demand meter, multiplied by

85%, and divided by the percent power factor.

8. BILLING YEAR AND COMBINED READINGS

Energy billing will continue throughout the year under the terms and conditions of this rate.

Facility charges shall be billed each month, or if the member chooses the facility charge can

be billed over six billing periods from April through September. In the case of cranberry

marshes and where facilities other than irrigation pumps are used, facility charges shall be

billed each month from April through March. Demand charges shall be billed whenever a

demand is recorded, except as noted herein.

9. TERMS OF PAYMENT

The above rates are net. Bills not paid by the due date are subject to a late payment charge

on the unpaid balance in accordance with the Cooperative’s Service Rules & Regulations.

10. TAXES AND FEES

The State of Wisconsin, County and local sales taxes, Non-Taxable Program Fees, and any

other legislative or regulatory fees imposed by governmental agencies will be added to each

monthly bill for electric service as applicable.

29

ADAMS-COLUMBIA ELECTRIC COOPERATIVE Rate Code: YL

Friendship, Wisconsin Effective: 4/6/18

Rate Schedule: YL

YARD LIGHT RENTAL FACILITIES

1. AVAILABILITY

Available for all members on a monthly basis upon acceptance by the Cooperative of a

signed Yard Light Lease Agreement. Service is subject to the established rules and

regulations of the Cooperative.

2. RATE

A. $11.00 per month for a lamp controlled with an electric eye and installed on an existing

Cooperative pole.

B. Other charges and conditions according to the Cooperative’s Service Rules & Regulations

i. An additional monthly charge will be applied for a pole set solely for the yard

light ($1.75 – 30’ pole, $2.00 – 35’ pole).

ii. Service over 100 feet will be installed at an additional monthly charge for each

50-foot increment ($0.50 per extra 50 feet). Closed to installations after 4-6-18

iii. An additional monthly charge shall be made where secondary voltage is not

available and a transformer must be provided ($8.00).

iv. Non-standard units (i.e., longer pole or mast arm) may be installed at additional

cost ($0.50 – 6-10’ arm, $1.00 – 12-16’ arm, $1.00 – secondary ped). Closed to

installations after 4-6-18

v. Charges for wire and pole installation, road bores, secondary pedestals, primary

(12.5kV) facilities, tree trimming, star gazer shields, guy wires or any non-

standard units including longer mast arms will be billed up front, with payment

received prior to installation. Lights are installed on the ACEC side of the meter

only. Energy charges are included in the base rate.

3. TERMS OF PAYMENT

The above rates are net. Bills not paid by the due date are subject to a late payment charge

on the unpaid balance in accordance with the Cooperative’s Service Rules & Regulations.

4. TERMS OF CONTRACT

Three-year minimum, unless otherwise specified.

5. TAXES AND FEES

The State of Wisconsin, County and local sales taxes, Non-Taxable Program Fees, and any

other legislative or regulatory fees imposed by governmental agencies will be applied to each

billing for electric services as applicable.

6. REFERENCE

Yard Light Lease Agreement - ACEC Form 3.

30

ADAMS-COLUMBIA ELECTRIC COOPERATIVE Rate Code: SL

Friendship, Wisconsin Effective: 4/6/18

Rate Schedule: SL

STREET LIGHT RENTAL FACILITIES

1. AVAILABILITY

Available for townships, unincorporated municipalities and select members on a monthly

basis upon acceptance by the Cooperative of a signed Street Light Lease Agreement. Service

is subject to the established rules and regulations of the Cooperative.

2. RATE

A. All street lights will have lamps controlled with an electric eye and installed on an

existing Cooperative pole.

100 watt $11.00 per month

150 watt $11.75 per month

250 watt $12.75 per month

400 watt $17.75 per month

B. Other charges and conditions according to the Cooperative’s Service Rules & Regulations

i. An additional monthly charge will be applied for a pole set solely for the yard

light ($1.75 – 30’ pole, $2.00 – 35’ pole).

ii. Service over 100 feet will be installed at an additional monthly charge for each

50-foot increment ($0.50 per extra 50 feet). Closed to installations after 4-6-18

iii. An additional monthly charge shall be made where secondary voltage is not

available and a transformer must be provided ($8.00).

iv. Non-standard units (i.e., longer pole or mast arm) may be installed at additional

cost ($0.50 – 6-10’ arm, $1.00 – 12-16’ arm, $1.00 – secondary ped). Closed to

installations after 4-6-18

v. Charges for wire and pole installation, road bores, secondary pedestals, primary

(12.5kV) facilities, tree trimming, star gazer shields, guy wires or any non-

standard units including longer mast arms will be billed up front, with payment

received prior to installation.

vi. Lights are installed on the ACEC side of the meter only. Energy charges are

included in the base rate.

3. TERMS OF PAYMENT

The above rates are net. Bills not paid by the due date are subject to a late payment charge

on the unpaid balance in accordance with the Cooperative’s Service Rules & Regulations.

4. TERMS OF CONTRACT

Three-year minimum, unless otherwise specified.

5. TAXES AND FEES

The State of Wisconsin, County and local sales taxes, Non-Taxable Program Fees, and any

other legislative or regulatory fees imposed by governmental agencies will be applied to each

billing for electric services as applicable.

6. REFERENCE

Street Light Lease Agreement - ACEC Form 314

31

ADAMS-COLUMBIA ELECTRIC COOPERATIVE Rate Codes RGS21, RGS23, RGS42

Friendship, Wisconsin Effective: 4/1/16

Rate Schedule: RGS

RENEWABLE GENERATION RATE – CLOSED RATE

1. AVAILABILITY

This rate is closed. No new connects will be allowed under this rate; existing accounts may

remain under this rate until 3/31/26. See rate schedule RG. A member under this rate may

transfer to rate schedule RG at any time but may not return to this rate.

2. SERVICE CHARACTERISTICS

Alternating current, 60 Hertz at available voltages and standards of the Cooperative.

3. MONTHLY SALES RATE

The facility charge and energy rate for sales to the member shall be in accordance with the

rate schedule applicable to the class of service provided.

4. MONTHLY PURCHASE RATE – SMALL DISTRIBUTED RENEWABLES (S)

Total generating capacity not to exceed 20kW single-phase or three-phase.

Net energy billing may be used with reverse registration permitted - direct metering only.

The following rate shall apply when member generation exceeds use:

Energy Credit (payment to member): Shall be in accordance with the rate the member is

charged for the connected service. For generation connected to residential services the

general service rate schedule (GS) would apply.

5. FACILITY CHARGE

If a second meter or special metering is required to properly register renewable generation a

facility charge not less than the standard second meter charge, but sufficient to cover costs

will be applied.

6. TERMS OF PAYMENT

Payment of the fixed charge and for sales to the member will be in accordance with the rate

schedule applicable to the class of service provided. Routine payment to the member for sales

to the Cooperative will be made separately, except the Cooperative may credit payment for

purchases against any past due amounts owed the Cooperative

32

ADAMS-COLUMBIA ELECTRIC COOPERATIVE Rate Code RGL23, RGL64

Friendship, Wisconsin Effective: 4/1/16

Rate Schedule: RGL

RENEWABLE GENERATION RATE – CLOSED RATE

1. AVAILABILITY

This rate is closed. No new connects will be allowed under this rate; existing accounts may

remain under this rate until 3/31/26. See rate schedule RG1. A member under this rate may

transfer to rate schedule RG1 at any time but may not return to this rate.

2. SERVICE CHARACTERISTICS

Alternating current, 60 Hertz at available voltages and standards of the Cooperative.

3. MONTHLY SALES RATE

The energy rate for sales to the member shall be in accordance with the rate schedule

applicable to the class of service provided.

4. MONTHLY PURCHASE RATE – LARGE DISTRIBUTED RENEWABLES (L)

Total generating capacity greater than 20kW.

The following rate shall apply when member generation exceeds use:

Energy Credit (payment to member): Generation supply cost

Capacity Credit (payment to member meeting qualification): LP-2 demand charge (coincident)

5. FACILITY CHARGE

Any interconnection and special metering costs not paid as aid-to-construction will be

recovered through a facility charge sufficient to cover Cooperative’s costs.

6. CAPACITY CREDIT QUALIFICATION

The monthly capacity factor of the member’s generator exceeds 70% during the Cooperative

power supplier on-peak energy periods over each of the prior 12 months.

7. TERMS OF PAYMENT

Payment of the fixed charge and for sales to the member will be in accordance with the rate

schedule applicable to the class of service provided. Routine payment to the member for sales

to the Cooperative will be made separately, except the Cooperative may credit payment for

purchases against any past due amounts owed the Cooperative

33

ADAMS-COLUMBIA ELECTRIC COOPERATIVE Rate Codes RG21, RG23, RG42, RG64

Friendship, Wisconsin Effective: 4/8/19

Rate Schedule: RG

RENEWABLE GENERATION RATE – CLOSED RATE

1. AVAILABILITY

Available to all members with qualified renewable energy conversion system facilities

connected in parallel with the Cooperative’s electric system.

2. SERVICE CHARACTERISTICS

Alternating current, 60 Hertz at available voltages and standards of the Cooperative.

3. MONTHLY RATE FOR SALES TO MEMBER

Facility Charge See below (for first meter on site)

See below (for second meter on site)

Power Supply Demand Charge: $25.83 per kW per month, measured for the hour of

ACEC’s power supply coincident peak

Distribution Demand Charge: $6.70 per kW per month of measured maximum

hourly demand.

Energy Charge: On-peak - all kWh @ 4.7¢ per kWh

Off-peak - all kWh @ 3.3¢ per kWh

4. MONTHLY PURCHASE RATE

The following rates shall apply when member supplies renewable generation to ACEC:

Facility Charge: See below

Power Supply Capacity (Credit): $25.83 per kW per month, measured for the hour of

ACEC’s power supply coincident peak

Distribution Capacity (Credit): $6.70 per kW per month of measured hourly demand

at the time ACEC’s distribution system peaks for

kW amount consistently available (currently 0 for solar).

Energy (Credit): On-peak - all kWh @ 4.7¢ per kWh

Off-peak - all kWh @ 3.3¢ per kWh

5. FACILITY CHARGE

A two meter installation will typically be required (when member has load to be served that is

separate from the requirements of the generation facility such as for a home or other building

on the property). If the member has only one meter at the energy conversion system service

point, however, the facility charge shall be the same as the first meter charge for the

residential rate class, unless such metering is insufficient and commercial service metering is

required, in which case the facility charge will be equal to the commercial or large power rate

class, as appropriate. When a second meter is used at a member location it shall be used for

the generation facility, and the facility charge for the second meter will be not less than the

standard second meter charge, but sufficient to cover the Cooperative’s costs.

6. TERMS OF PAYMENT

Payment of the fixed charge and for sales to the member will be in accordance with the rate

schedule shown above. Payment to the member for sales to the Cooperative will be identified

separately on the bill on the same bill cycle as for the load; the Cooperative may credit

payment for purchases against use by member at other locations or against any past due

amounts owed the Cooperative.

34

ADAMS-COLUMBIA ELECTRIC COOPERATIVE Rate Code RG121, RG123, RG142, RG164

Friendship, Wisconsin Effective: 4/6/18

Rate Schedule: RG1

RENEWABLE GENERATION RATE

1. AVAILABILITY

Available to all members with qualified renewable energy conversion system facilities

connected in parallel with the Cooperative’s electric system.

2. SERVICE CHARACTERISTICS

Alternating current, 60 Hertz at available voltages and standards of the Cooperative.

3. MONTHLY SALES RATE

The facility charge and energy rate for sales to the member shall be in accordance with the

rate schedule applicable to the class of service provided.

4. MONTHLY PURCHASE RATE

The following rate shall apply at any time member generation exceeds use:

Energy Credit (payment to member): Generation Supply Cost * 1.2

The Generation Supply Cost is the average cost of energy that ACEC paid to Alliant Energy

over the period of October 1 – September 30th of the prior year as shown in Attachment 4 of

ACEC’s Rules and Regulations.

5. FACILITY CHARGE

Any interconnection and special metering costs above the standard for the appropriate rate

schedule applicable to the class of service provided will be charged to the member as aid-to-

construction.

6. TERMS OF PAYMENT

Payment of the fixed charge and for sales to the member will be in accordance with the rate

schedule applicable to the class of service provided. Routine payment to the member for sales

to the Cooperative will be made separately, except the Cooperative may credit payment for

purchases against any past due amounts owed the Cooperative.