    1. Brick work in lime or cement mortar infoundation and plinth

    1.25cum (45cuft)per mason

    2. Brick work in lime or cement mortar insuperstructure

    1.00cum (35cuft)per mason

    3. Brick work in mud mortar in foundation and

    plinth

    1.50cum (55cuft)pe

    r mason4. Brick work in mud mortar in superstructure 1.25cum (45cuft)pe

    r mason5. Brick in cement or lime mortar in arches 0.55 cum (20cuft)pe

    r mason6. Brick in cement or lime mortar in jack arches 0.55 cum (20cuft)pe

    r mason7. Half brick wall in partition 5.00sqm (50sqft)pe

    r mason8. Coursed rubble stone masonry in lime cement

    mortar including dressing0.80cum (30

    cuft)permason

    9. Random rubble stone masonry in lime or cement mortar

    1.00cum (35cuft)per mason

    10. Ashlars masonry in lime or cement mortar 0.40cum (15cuft)per mason

    11. Stone arch work 0.40cum (15cuft)per mason

    12. Lime concrete in foundation or floor 8.50cum (300cuft)per mason

    13. Lime concrete in roof terracing 6.00cum (200cuft)per mason

    14. Lime concrete 1:2;4 5.00cum (175cuft)per mason

    15. RB work 1.00cum (35cuft)pe

    r mason16. RCC work 3.00cum (125cuft)p

    er mason17. 12mm (1/2) plastering with cement or lime

    mortar 8.00sqm (80sqft)pe

    r mason18. Pointing with cement or lime mortar 10.00sqm (100sqft)p

    er mason19. White washing or colour washing coats 70.00sqm (700sqft)p

    er whitewasher

    20. W hite washing or colour washing coats 200.00sqm

    (2000sqft)per white

    washer 21. Painting or varnishing doors or windows onecoat

    25sqm (250sqft)per painter

    22. Coal tarring or soligum painting one coat 35.00sqm (350sqft)per painter

    23. Painting large surface one coat 35.00sqm (350sqft)per painter

    24. Distempering one coat 35.00sqm (350sqft)per painter

    25. 2.5cm(1) CC floor 7.50sqm (75sqft)per painter

    SNo. Particulars of items Quantity Perday

  • 8/13/2019 Rates for Diff Items

    2/29

    26. Flag store floor laying with lime or cementmortar excluding LC

    10.00sqm (100sqft)per painter

    27. Brick on edge in floor lime or cement mortar excluding LC

    7.00sqm (70sqft)per painter

    28. Brick bat floor as in above 8.00sqm (80sqft)per painter

    29. Timber framing sal or teak wood 0.07cum (2.5cuft)percarpenter

    30. Timber framing sal or country wood 0.15cum (5cuft)percarpenter

    31. Door and window shutters paneled or glazed 0.15sqm (7sqft) per carpenter

    32. Door and window shutters paneled or battened 0.80sqm (0.80sqft)percarpenter

    33. Sawing hard wood 4.00sqm (40sqft)per pair of sawers

    34. Sawing soft wood 6.00sqm (60sqft)per pair of sawers

    35. Single allahabad tiling or mangalore tiling 6.00sqm (60sqft)per tilelayer

    36. Double allahabad tiling 4.00sqm (40sqft)per tilelayer

    37. Breaking of brick ballest 40mm (11/2) gauge 0.75cum (35cuft)per labourer

    or breaker

    38. Breaking of brick ballest 25mm (1) gauge 0.55cum (20cuft)per labourer or breaker

    39. Breaking of stone ballest 40mm (11/2) gauge 0.40cum (10cuft)per labourer or breaker

    40. Breaking of stone ballest 25mm (1) gauge 0.25cum (10cuft)per labourer or breaker

    41. Ashlar stone dressing 0.70cum (25cuft)perstonecutter

    42. Flag stone dressing 1.50sqm (25sqft)perstonecutter

    43. Earthwork in excavation in ordinary soil 3.00cum (100cuft)per belder mazdoor

  • 8/13/2019 Rates for Diff Items

    3/29

    44. Earthwork in excavation in hard soil 2.00cum (75cuft)per belder mazdoor

    45. Excavation in soil 1.00cum (35cuft)per belder mazdoor

    46. Number of bricks laid by a mason in brick workupto a height of 3m(10)

    47. Amount of work done by a mazdoor helper per dayMix 3.00cum (100cuft)m

    ortar per mazdoor

    Deliver brickDeliver mortar 5.5cum (200cuft)

    permazdoor

    48. Scaffolding cost for single storey building Re.0.50per cum

    (Rest.1.5%cuft) of brick work.

    Items 46,47 and 48 are based on the committee report on rates and cost government of India.

    LABOUR (MAZDOOR) REQUIRED FOR DIFFERENT WORKS

    Extracts from the report on productivity projects in building industries issued by National Building Organis

    aEarthwor k per 28.30cum(12000cuf t)

    600 bricks per mason

    4000 nos to a

  • 8/13/2019 Rates for Diff Items

    4/29

    1) Excavation infoundations,trenchesetc., inordinarysoilincludingdisposalup to 30m(100) andlift of 1.5m(5ft)

    5 beldarsand 4

    mazdoorscan do28.30 cum(1000cuft)per day.2) Refillingexcavatedearth infoundations, pointhetc,

    includingconsolidation in15cm(6)layers-3beldars, 2mazdoorsand bhisti cando 28.30cum(1000cuft)per day.

  • 8/13/2019 Rates for Diff Items

    5/29

    3) Disposalof surplusearthwithin alead of 30m (100)1 mazdoor can do2.83cum(100 cuft)per day.

    Cementconcretework per 2.83 cum(100cuft)layingcementconcrete 2 beldars,3mazdoors, bhistiand mason,can do2.83 cum(100 cuft)

    per day.

    c) R C Cwork:-

    1) Layingreinforcedconcrete 3 beldars,3mazdoors,1 Bhistiand masoncan do2.83 cum(100cuft)per day.

  • 8/13/2019 Rates for Diff Items

    6/29

    2)Centeringandshutteringfor flatsurfaces 4 beldarsand 4carpenters(II class)can do9.6sqm(96sqft) per day.

    3)Reinforcementwork for R

    C C 1blacksmithor fitter and 1beldar canbend andplace inposition 1quintal (2cwt) of steel per day.

    tonework per 2.83 cum(100cuft)-

  • 8/13/2019 Rates for Diff Items

    7/29

    Randomrubblemasonrywith bluestone infoundations-3masons, 3beldars, 2mazdoorsand1/4bhistican do2.83 cum(100cuft0per day

    e r cwork per 2.83 cum(100cuft)-

    First classbrick workin 1:4cementmortar insuperstructurepartitionwalls,

    junctionsof roof,parapetwalls andstringcourse 2masons,4mazdoorsand 1/2

    bhisti cando 2.83cum(100cuft)per day.

    F) Woodwork :-

  • 8/13/2019 Rates for Diff Items

    8/29

    1) For theframes of doors andwindows

    2carpentersand 1beldar canwork 0.18cum(6.40cuft)of woodequivalentto door frames7.5cm x10m of 1.2m x2.1m

    (3x4of3x11x7)size per day.

    2) Forpaneled,glazed,etc,shutters-15carpenters

    and 4beldarscan makeand fix 4shutters40 mmthick of size2.00m x1.15m (1 thick of size of 6-9x 3-9)per day.Quantity of wood per shutter 0.075cum,ie2.66cuft.g) Ironwork :-

  • 8/13/2019 Rates for Diff Items

    9/29

    1) Fixing40mm x3mm=38cm(1 x

    x 150flat ironholdfasts-1blacksmith(II class), Imasonand Ibeldar canfix 36holdfastsper day.

    2) Fixing16mm dia.5/3 dia) MS rods 1blacksmith(II class),2carpenters(II class)and 3mazdoors

    can fix16.5m(54rft) per day.

    h)Flooring: -

  • 8/13/2019 Rates for Diff Items

    10/29

    4cm thick(1 1/2)thickcementconcreteflooring of 40sqm(400sqft)require 5masons, 4beldars, 3mazdoorsand 1bhisti per day for mixinglaying andfinishing.

    I)Finishing:-

    1)Plasteringwith anymortar12mm (5)thick 3masons, 3mazdoorsand 1bhisti canplaster40sqm(400a ft) per day.

  • 8/13/2019 Rates for Diff Items

    11/29

    2)Whitewashing orcolourwashing (3coats) 1whitewasherand 1mazdoorcan do60sqm(600sqft)per day.

    3) Paintingtwo coatssuch aschocolate,red, grey,etc onwood aresteel 3Paintersand 2mazdoorscan paint10sqm(100sqft)per day.

    TWO BULLOCKS CART

    Sl# Particulars of materials OnKachchaRoad

    On PuccaRoad

    2. Brick ballast 0.85 cum(30cuft)

    1.10 cum(40cuft)

    Quantity or Number

    1. Brick 19 cm x 9cm x 9cm 275nos 400nos

    3. Stone ballast 0.70 cum(25 cuft)

    1.00 cum(35cuft)

    4. Kankar 0.85 cum(30cuft)

    1.10 cum(40cuft)

    5. Sand surkhi 0.85 cum(30cuft)

    1.10 cum(40cuft)

    6. Lime 1.10 cum(40cuft)

    1.40 cum(50cuft)

    7. Tiles Allahabad or Mangalore 275nos 400nos

  • 8/13/2019 Rates for Diff Items

    12/29

    Note; Abullock..carryabout onetonneload. Theaveragespeed for a bullockcart maybe takenas 3.20km(2 units)per hour and hour maybe allowedfor loadingandunloading.Taking 8hoursworking

    per day,thenumber of trips per day, canbecalculated.

    LOAD FOR TRUCKS

    ONPUCCAMETALLED ROAD

    Trucks 3 tonners 5 tonners

    9. Steel 0.75 tonne 1 tonne

    8. Cement 15bags 20 bags

  • 8/13/2019 Rates for Diff Items

    13/29

    Brick or Allahbadtiles orMangaloretiles 1000nos 1500nos 2000nos

    Cement,

    steel andotherHeavymaterials 3 tonne 5 tonne 8 tonne

    Othermaterials

    Ballast,Kankar,grit

    Sand coal,etc., 2.8cum 4.20cum 5.6cum(100cuft) (150cuft)

    Onkachchaearthenroad theload willbe less by33 per cent.

    MATERIALS FOR DIFFERENT ITEMS OF WORKS

    Therequirement of materialsfordifferentitems of works isas givenbelow:-

    Sl# Particulars Quantity

  • 8/13/2019 Rates for Diff Items

    14/29

    1. Bricks (9 x 4 x3 or 20 cm x 10cm x 10cmnominal size) for brick work

    1350 nosfor 100cuft

    50000 nosper % cum(500nos.per cum)

    2. Dry mortar for brick work 30% 30cuft for 100 cuft

    30cum for 100 cum

    3.

    Stone for rubble stone masonry 125% 125cuft for 100 cuft 125cumfor 100cum

    4. Dry mortar for rubble stone masonry 42% 42cuft for 100 cuft

    42cum for 100 cum

    5. Bricks for brick ballast for lime concrete 1050cuftfor 100cuft

    37000cumfor 100cum

    6. Brick bats or brick ballast for lime concrete 150cuft for 100 cuft

    150cumfor 100cum

    7. Brick ballast for lime concrete 100cuft for 100 cuft

    100cumfor 100cum

    Sl# Particulars Quantity8. Dry mortar for lime concrete I foundation and

    floor 35%35cuft for 100cuft

    35cum for 100 cum

    9. Dry mortar for lime concrete in roof terracing45%

    45cuft for 100cuft

    45cum for 100 cum

    10. Materials for cement concrete 1:2:4

    Ballast or grit 88% 88cuft for 100cuft

    88cum for 100 cum

    Sand 44% 44cuft for

    100cuft

    44cum for

    100 cumCement 22% 22cuft for

    100cuft22cum (60bags)for100 cum

    11. Materials for 2.5cm (1)cc 1:2:4 floor

    Stone grit 8cuft for 100sqft

    2.40cumfor 100cum

    Sand 4cuft for 100sqft

    1.20cumfor 100cum

    Cement 2 cuft (2bags) for 100cuft

    0.08cum(24bags)for100 cum

    12. Bricks for R B work 1200 nosfor 100cuft

    42000nos/%cum(420mps.[erci,)

  • 8/13/2019 Rates for Diff Items

    15/29

    13. Dry mortar for R B work 45% 45cuft for 100cuft

    45cum for 100 cum

    14. Dry mortar for 12mm (1/2) plastering 6cuft for 100sqft

    2.00cumfor 100sqm

    15. Dry mortar for pointing in brickwork 2cuft for 100sqft

    0.60cumfor 100

    sqm16. Lime for white washing one coat 1kg for 100sqft

    10kg for 100 sqm

    17. Dry distemper for ist coat 0.65 kg for 100sqft

    6 kg for 100 sqm

    18. Dry distemper for 2 nd coat 0.50 kg for 100sqft

    5kg for 100 sqm

    19. Snow-Cem for Ist coat 3kg for 100sqft

    30kg for 100 sqm

    20. Snow-Cem for 2 nd coat 2kg for 100sqft

    20kg for 100 sqm

    21. Paint ready mixed for painting one coat 1/3gl.for100sqft

    10ltr for 100 sqm

    22. Paint (stiff) for painting one coat 1kg for 100sqft

    10kg for 100 sqm

    23. Bricks (20 x 10 x 10cm) for brick floor or half brick wall

    500 nosfor 100sqft

    5000nos.f or 100sqm

    24. Dry mortar for brick floor or half brick wall 12cuft for 100sqft

    3.20 cumfor 100sqm

    25. Bricks (9 x 4 x3) for brick flat work 350 nosfor 100sqft

    3500nos.f or 100sqm

    26. Dry mortar for brick flat floor 8cuft for 100sqft

    2.25cumfor 100cum

    27. Bricks (9 x 4 x3) required for honey combwall

    325 nosfor 100sqft

    3250nos.for100sqm

    28. Dry mortar for honey comb wall 8cuft for 100sqft

    2.5cum for 100 cum

    29. Materials for 2cm (3/4)thick damp proof courseof 1:2 cement mortarCement 3cuft

    (2.5bags)for 100sqft

    0.90cum(27bags)for100 cum

    Sand 6cuft for 100sqft

    1.80cumfor 100cum

    Compound or impermo @ 1kg per bag of cement

    2.5kg for 100sqft

    27kg for 100 sqm

  • 8/13/2019 Rates for Diff Items

    16/29

    30. Materials for 2.5cm (1)cc 1:1 :3 damp proof courseStone grit 8cuft for

    100sqft2.25cumfor 100cum

    Sand coarse 4cuft for 100sqft

    1.13cumfor 100

    cumCement 2 cuft (2 bags)for 100sqft

    0.75cumfor(221/2bags)for100cum

    Compound or impermo @ 1kg per bag of cement

    21/2 kg for 100sqft

    22 kgfor 100sqm

    31. Bitumen or asphalt for painting on D P C or onroof 1 st coat

    15 kg for 100sqft

    150 kg for 100 sqm

    2nd coat 10 kg for

    100sqft

    100 kg for

    100 sqm32. G G I sheet for roof 128sqft for 100sqft

    128sqmfor100sqm

    33. A G corrugated sheet for roof 115sqft for 100sqft

    115sqmfor100sqm

    34. Timber for paneled door shutter 4cm (1 ) thick 15cuft for 100sqft

    4.5 cumfor 100cum

    35. Timber for battend door shutter 4cm (1 ) thick 13cuft for 100sqft

    4.0 cumfor 100cum

    36. Timber for paneled & glazed shutter 4cm (1 ) 11cuft for 3.0 cum Timber for fully glazed shutter 4cm (1 ) thick 8cuft for

    100sqft2.0 cumfor 100cum

  • 8/13/2019 Rates for Diff Items

    17/29

  • 8/13/2019 Rates for Diff Items

    18/29

  • 8/13/2019 Rates for Diff Items

    19/29

    ation are given below:-

  • 8/13/2019 Rates for Diff Items

    20/29

  • 8/13/2019 Rates for Diff Items

    21/29

  • 8/13/2019 Rates for Diff Items

    22/29

  • 8/13/2019 Rates for Diff Items

    23/29

  • 8/13/2019 Rates for Diff Items

    24/29

  • 8/13/2019 Rates for Diff Items

    25/29

  • 8/13/2019 Rates for Diff Items

    26/29

  • 8/13/2019 Rates for Diff Items

    27/29

  • 8/13/2019 Rates for Diff Items

    28/29

    8 tonnersdieseltruck

  • 8/13/2019 Rates for Diff Items

    29/29

    (200cuft)