Randy Wade TRB Intercity Passenger Rail Committee Tuesday January 25, 2011 Washington, DC.

13
Randy Wade TRB Intercity Passenger Rail Committee Tuesday January 25, 2011 Washington, DC

Transcript of Randy Wade TRB Intercity Passenger Rail Committee Tuesday January 25, 2011 Washington, DC.

Page 1: Randy Wade TRB Intercity Passenger Rail Committee Tuesday January 25, 2011 Washington, DC.

Randy WadeTRB Intercity Passenger Rail

Committee Tuesday January 25, 2011

Washington, DC

Page 2: Randy Wade TRB Intercity Passenger Rail Committee Tuesday January 25, 2011 Washington, DC.

NCHRP Report 657: A Guidebook for Implementing Passenger Rail Service on Shared Passenger and Freight Corridors -- $500,000

Provides a general overview of all aspects of planning, cost estimating, engineering, modeling, negotiating, and implementing shared use corridor service

http://onlinepubs.trb.org/onlinepubs/nchrp/nchrp_rpt_657.pdf

Page 3: Randy Wade TRB Intercity Passenger Rail Committee Tuesday January 25, 2011 Washington, DC.

NCFRP 30 Web-Based Screening Tool For Shared-Use Rail Corridors - $500,000 Feasibility screening tool

Low cost Publicly available data State and local rail program staff Eliminate from further consideration: infeasible

service proposals

Page 4: Randy Wade TRB Intercity Passenger Rail Committee Tuesday January 25, 2011 Washington, DC.

NCHRP Project 08-86: Understanding Capacity Modeling for Shared-Use Passenger and Freight Rail Operations - $350,000

“How to” guidebook for state and local rail staff

RTC and similar capacity models Goal: informed participation by state and local

staff in capacity modeling

Page 5: Randy Wade TRB Intercity Passenger Rail Committee Tuesday January 25, 2011 Washington, DC.

NCHRP Project 08-85: Comprehensive Economic Effects of Highway-Rail At-Grade Crossing Crashes $350,000

Multi-dimensional cost model for evaluating vehicle-train collisions. Delays to rail and highway shipments Societal costs Hazardous materials impacts Pollution impacts from delays and rerouting.

Improved decision-making

Page 6: Randy Wade TRB Intercity Passenger Rail Committee Tuesday January 25, 2011 Washington, DC.

Authorized in Section 306 of PRIIA $5 million Administered by the Transportation

Research Board (TRB) of the National Academy of Sciences (NAS)

Specific research projects will be selected by an advisory board State transportation agencies; economists,

scientist, and engineers; Amtrak, the Alaska Railroad, freight railroads, transit operating agencies, railway labor organizations, and environmental organizations.

Page 7: Randy Wade TRB Intercity Passenger Rail Committee Tuesday January 25, 2011 Washington, DC.

Modal energy efficiency comparisons Innovative funding Use of abandoned railroad corridors Inter-operability Risk management Environmental Justice Co-location of energy and rail facilities Model validation Data source standardization Intermodal rail connections

Page 8: Randy Wade TRB Intercity Passenger Rail Committee Tuesday January 25, 2011 Washington, DC.

Freight access to HSR Intercity auto data collection Performance measures Project delivery Institutional and organizational structures First and last mile PTC benefits Intergovernmental coordination Residential and commercial density

information

Page 9: Randy Wade TRB Intercity Passenger Rail Committee Tuesday January 25, 2011 Washington, DC.

Emissions analysis and modal comparisons Interline ticketing NEPA Process P3 Safety -- mixed traffic Using existing ROW Alternative energy and efficiency Quantifying public and private benefits Enhanced conventional vs. very high

speed

Page 10: Randy Wade TRB Intercity Passenger Rail Committee Tuesday January 25, 2011 Washington, DC.

Intermodal schedule optimization Grade crossings shared use corridors Signaling and train control Track maintenance standards Effective project oversight Vehicle energy management Car trains Mega and regional planning FRA vs. new agency

Page 11: Randy Wade TRB Intercity Passenger Rail Committee Tuesday January 25, 2011 Washington, DC.

International perspective on rail finance State federal and local MPO roles in IC rail Performance measure criteria Public involvement strategies Passenger rail equipment overview Ridership and revenue forecasting

techniques State capital share financing issues Tier 1 NEPA screening and alternatives

analysis

Page 12: Randy Wade TRB Intercity Passenger Rail Committee Tuesday January 25, 2011 Washington, DC.

Financing techniques - TIFIA and RRIF Estimating operating costs Economic impact analysis Intermodal connectivity Institutional structures for intercity rail

management Station design

Page 13: Randy Wade TRB Intercity Passenger Rail Committee Tuesday January 25, 2011 Washington, DC.

Randy WadePassenger Rail DirectorHNTB Corporation10 West Mifflin Street, Ste. 300Madison, WI 53703Tel: (608) 294-5022Email: [email protected]