SAUDI LAND BRIDGE BLOCK DIAGRAM PRELIMINARY ENGIUNEERING & PROJECT SYSTEM SET UP & INITIAL PLANNING PHASE A DESIGN (DEDC) Requirements, EIRR / IRR model Civil Design MEP Design Arch Rolling Stock, Ops Plan Systems (HAZOP / SA) Costs / Schedule EIA / GEOTECH etc QA & EDMS HSE PMS / PMM Procedures STAKEHOLDERS BASELINE PROGRAMME PROJECT SCHEDULE BOT EVALUATION REPORT REVIEW OF DESIGN SCHEDULE/METHOD LAND ACQUISITION BOT REVIEW ROLLING STOCK REVIEW SYSTEMS ASSURANCE / HAZOP DEDC INTERACTION CONTRACT PACKAGING / CONTRACT TYPES PROCUREMENT REVIEW PROCUREMENT STRATEGY RISK ASSESSMENTS AND APPRECIATION / MITIGATION PROJECT DEVELOPMENT & IMPLEMENTATION STRATEGY INCEPTION REPORT BASELINE PROGRAMME DEVELOPMENT Master Schedule, Design Delivery, Procurement Key Dates Milestones PMC design review & interaction. Monitoring & Control role CHANGE CONTROL / Configuration Interfaces CONSTRUCTION ASPECTS Temporary Works Traffic / Rail diversions Land Take Access Camps / Utilities Constructability sequences / COST / BUDGET ESTIMATE DEVELOPMENT BOQ, Lump Sum Items, Payment conditions INITIAL VALUE ENGINEERING WORKS PQ DATA / PROJECT DATA / MARKET TESTING, EOI, MEETINGS PQ CRITERIA & ELIGIBILITY HURDLE PLANNING DETAILED ENGINEERING & PLANNING PROCUREMENT Contract Requirements for M&C constraints ALIGNMENT / PACKAGES / SCOPE / INTERFACES / RISKS REVIEW OF PHASE A INITIAL VALUE ENGINEERING WORKS INSURANCE /BOND/ WARRANTY NEEDS PQ DATA / PROJECT DATA / SCOPE CONTRACT DOCUMENTATION PREPARATION PQ EVALUATION REFINEMENT OF PROGRAMME & BUDGET, CONTRACT PACKAGING DEVELOPMENT OF ADVACE WORKS PROJECTS PROGRAMME AND COSTS FOR EMPLOYER SUPPLIED ITEMS SYSTEMS ASSURANCE / INTERFACE MANAGEMENT (Physical Interfaces) MONITORING & CONTROL OF DESIGN AND AWARDED CONTRACTS Change & Configuration Management PMC design review & interaction. Monitoring & Control role. ID other design works required. Systems Assurance needs FINALISE VALUE ENGINEERING WORKS REVIEW OF PHASE B PQ PROCESS EVALUATION SHORTLIST TENDER DOCUMENT PREPARATION DOCUMENTS, SELECTION & AWARD OF CSC (Construction Supervision Consultant) ISSUE TENDER DOCUMENTS TENDER REVIEW & EVALUATION PROCESS, RECOMMENDATIONS TO SAR CONTRACT AWARD (Issue drawings Good for Construction) PHASE B DESIGN Civil Design MEP Design Rolling Stock Systems Costs / Schedule V&V, SYSTEMS ASSURANCE PROJECT EXECUTION, MONITORING & CONTROL TESTING & COMMISSIONING CIVIL WORKS / RAILWAY SYSTEMS / MATERIAL SUPPLY / ROLLING STOCK (INTERFACES) HSE PUBLIC RELATIONS STAKEHOLDER MANAGEMENT LAND ACQUISITION SCHEDULE & COST MANAGEMENT Baseline, EV, Variance, Reporting, Claims CONTRACT ADMINISTRATION Variations, Claims, Notifications, Payment PMC as ENGINEER CONSTRUCTION MANAGEMENT Reports, Performance, Metrics, Interfaces, Offshore / Offsite Inspections, Variations, Safety Change / claims / Records Interfaces CONTRACTORS / SUPPLIERS Methods Temporary Works Materials QA/QC Logistics, Labour, Plant & Equipment Contract Admin Reports SYSTEMS ASSURANCE & RAILWAY SAFETY V&V Process, Documentation, Configuration, Changes CONSTRUCTION SUPERVISION CONSULTANT Site Supervision and interaction with Contractor and PMC Reports & Records Approvals / Sign off (Liability & accountability) DESIGN MANAGEMENT Temporary Works RFIs D&B Reviews Variations / Claims Safety Systems / Manuals Change / Configuration COORDINATED INSTALLATION PROGRAMME T&C CERTIFICATION / ASBUILTS / TAKING OVER CERTIFICATION / STATEMENT ON COMPLETION/ ASBUILTS TESTING & COMMISSIONING / MANUALS / OPERATOR INVOLVEMENT ( RAILWAY SAFETY O&M DLP CLOSE OUT COMMISSIONING TRIAL RUNNING / SAFETY CERTICATION DEFECTS LIABILITY PERIOD (Periodic (3 month) Inspections +Actions as req'd) OPERATIONS & MAINTENANCE FINAL ACCEPTANCE AND PAYMENT CERTIFICATION

Transcript of Railway_work phase and activities

Page 1: Railway_work phase and activities

SAUDI LAND BRIDGE BLOCK DIAGRAM

PRELIMINARY ENGIUNEERING & PROJECT 

SYSTEM SET UP & INITIAL PLANNING

PHASE A DESIGN (DEDC)Requirements, EIRR / IRR modelCivil Design ‐MEP Design ‐ArchRolling Stock, Ops PlanSystems (HAZOP / SA)Costs / ScheduleEIA / GEOTECH etc

QA & EDMS

HSE

PMS / PMM Procedures STAKEHOLDERS

BASELINE PROGRAMME

PROJECT SCHEDULE 

BOT EVALUATION REPORT

REVIEW OF DESIGN SCHEDULE/METHODLAND ACQUISITION

BOT REVIEW

ROLLING STOCK REVIEW

SYSTEMS ASSURANCE / HAZOP

DEDC INTERACTION

CONTRACT PACKAGING / CONTRACT TYPES

PROCUREMENT REVIEW

PROCUREMENT STRATEGY

RISK ASSESSMENTS AND APPRECIATION / MITIGATION

PROJECT DEVELOPMENT & IMPLEMENTATION STRATEGYINCEPTION REPORT

BASELINE PROGRAMME DEVELOPMENTMaster Schedule,Design Delivery,ProcurementKey DatesMilestones

PMC design review & inter‐action. Monitoring & Control roleCHANGE CONTROL / ConfigurationInterfaces

CONSTRUCTION ASPECTSTemporary WorksTraffic / Rail diversionsLand TakeAccessCamps / UtilitiesConstructability ‐ sequences / 

COST / BUDGET ESTIMATE DEVELOPMENT

BOQ, Lump Sum Items, Payment conditions

INITIAL VALUE ENGINEERINGWORKS PQ DATA / PROJECT DATA /

MARKET TESTING, EOI, MEETINGS

PQ CRITERIA & ELIGIBILITY HURDLE

PLANNING

DETAILED ENGINEERING & PLANNING

PROCUREMENT

Contract Requirements for M&C constraints

ALIGNMENT / PACKAGES / SCOPE / INTERFACES / RISKS

REVIEW OF PHASE A

INITIAL VALUE ENGINEERING WORKS

INSURANCE /BOND/ WARRANTY NEEDS

PQ DATA / PROJECT DATA / SCOPE

CONTRACT DOCUMENTATION PREPARATIONPQ EVALUATIONREFINEMENT OF PROGRAMME & BUDGET, CONTRACT PACKAGINGDEVELOPMENT OF ADVACE WORKS PROJECTSPROGRAMME AND COSTS FOR EMPLOYER SUPPLIED ITEMSSYSTEMS ASSURANCE / INTERFACE MANAGEMENT (Physical Interfaces)MONITORING & CONTROL OF DESIGN AND AWARDED CONTRACTS ‐ Change & Configuration Management

PMC design review & inter‐action. Monitoring & Control role.  ID other design works required.Systems Assuranceneeds

FINALISE VALUE ENGINEERING WORKSREVIEW OF PHASE B

PQ PROCESSEVALUATIONSHORTLIST

TENDER DOCUMENT PREPARATION

DOCUMENTS, SELECTION & AWARD OF CSC (Construction Supervision Consultant)

ISSUE TENDER DOCUMENTS ‐ TENDER REVIEW & EVALUATION PROCESS, RECOMMENDATIONS TO SAR

CONTRACT AWARD (Issue drawings Good for Construction)

PHASE B DESIGNCivil DesignMEP DesignRolling StockSystemsCosts / ScheduleV&V, SYSTEMS ASSURANCE

PROJECT EXECUTION, MONITORING & CONTROL

TESTING & COMMISSIONING

CIVIL WORKS / RAILWAY SYSTEMS / MATERIAL SUPPLY / ROLLING STOCK (INTERFACES)

HSE

PUBLIC RELATIONS 

STAKEHOLDER MANAGEMENT

LAND ACQUISITION

SCHEDULE & COST MANAGEMENTBaseline, EV, Variance, Reporting, Claims

CONTRACT ADMINISTRATION ‐Variations, Claims, Notifications, PaymentPMC as ENGINEER

CONSTRUCTION MANAGEMENT

Reports, Performance, Metrics, Interfaces, Offshore / Offsite Inspections, Variations, SafetyChange / claims / RecordsInterfaces

CONTRACTORS / SUPPLIERSMethodsTemporary WorksMaterialsQA/QCLogistics, Labour, Plant & EquipmentContract AdminReports

SYSTEMS ASSURANCE & RAILWAY SAFETY  

V&V Process, Documentation, Configuration, Changes

CONSTRUCTION SUPERVISION CONSULTANT

Site Supervision and interaction with Contractor and PMCReports & Records

Approvals / Sign off (Liability & accountability)

DESIGN MANAGEMENT

Temporary WorksRFIsD&B ReviewsVariations / ClaimsSafetySystems / ManualsChange / Configuration

CO‐ORDINATED INSTALLATION PROGRAMME

T&C CERTIFICATION / AS‐BUILTS / TAKING OVER CERTIFICATION / STATEMENT ON COMPLETION/ AS‐BUILTS 

TESTING & COMMISSIONING / MANUALS / OPERATOR INVOLVEMENT ( RAILWAY SAFETY

O&MDLP

CLOSE OUT

COMMISSIONING

TRIAL RUNNING / SAFETY CERTICATION

DEFECTS LIABILITY PERIOD (Periodic (3 month) Inspections +Actions as req'd) OPERATIONS & MAINTENANCE 

FINAL ACCEPTANCE AND PAYMENT CERTIFICATION