Railway-Highway Crossings Program (Section 130)...Railway Highway Crossings Program (Sec 130) 3....
Transcript of Railway-Highway Crossings Program (Section 130)...Railway Highway Crossings Program (Sec 130) 3....
![Page 1: Railway-Highway Crossings Program (Section 130)...Railway Highway Crossings Program (Sec 130) 3. Statewide RR Crossing Inventory Utility & Railroad Engineering 3 Railroad 2 Major Railroads](https://reader033.fdocuments.us/reader033/viewer/2022042309/5ed708ec62136e72fb7bb620/html5/thumbnails/1.jpg)
Utility & Railroad Engineering 1
UTILITY AND RAILROAD ENGINEERING (URR)
Railway-Highway Crossings Program
(Section 130)
Mohamed Ali Noun, PE Statewide Utility Engineer
![Page 2: Railway-Highway Crossings Program (Section 130)...Railway Highway Crossings Program (Sec 130) 3. Statewide RR Crossing Inventory Utility & Railroad Engineering 3 Railroad 2 Major Railroads](https://reader033.fdocuments.us/reader033/viewer/2022042309/5ed708ec62136e72fb7bb620/html5/thumbnails/2.jpg)
Utility & Railroad Engineering 2
Railroad
URR handles 3 primary RR functions:
1. Liaison between ADOT and the Railroads
2. Railway Highway Crossings Program (Sec 130)
3. Statewide RR Crossing Inventory
![Page 3: Railway-Highway Crossings Program (Section 130)...Railway Highway Crossings Program (Sec 130) 3. Statewide RR Crossing Inventory Utility & Railroad Engineering 3 Railroad 2 Major Railroads](https://reader033.fdocuments.us/reader033/viewer/2022042309/5ed708ec62136e72fb7bb620/html5/thumbnails/3.jpg)
Utility & Railroad Engineering 3
Railroad
2 Major Railroads and 10 short-line railroads in Arizona, including Passenger/ Tourist Railroads
Railroad operations governed by Federal Railroad Administration (FRA) and Arizona Corporation Commission (ACC)
Railroads have their own utilities or lease their land for 3rd party
utilities. These utilities may not show up on Arizona Blue Stake
Railroad perform all track and signal work, responsible for maintenance of this work
Local Agency constructs roads, approach or sidewalk work
![Page 4: Railway-Highway Crossings Program (Section 130)...Railway Highway Crossings Program (Sec 130) 3. Statewide RR Crossing Inventory Utility & Railroad Engineering 3 Railroad 2 Major Railroads](https://reader033.fdocuments.us/reader033/viewer/2022042309/5ed708ec62136e72fb7bb620/html5/thumbnails/4.jpg)
Utility & Railroad Engineering 4
Railway Crossings Program (Section 130)
“Look both ways …or DIE!”
![Page 5: Railway-Highway Crossings Program (Section 130)...Railway Highway Crossings Program (Sec 130) 3. Statewide RR Crossing Inventory Utility & Railroad Engineering 3 Railroad 2 Major Railroads](https://reader033.fdocuments.us/reader033/viewer/2022042309/5ed708ec62136e72fb7bb620/html5/thumbnails/5.jpg)
Utility & Railroad Engineering 5
Passive Railroad Crossings
Fatal accident due to limited sight distance
Project needs installing flashing lights and gates
![Page 6: Railway-Highway Crossings Program (Section 130)...Railway Highway Crossings Program (Sec 130) 3. Statewide RR Crossing Inventory Utility & Railroad Engineering 3 Railroad 2 Major Railroads](https://reader033.fdocuments.us/reader033/viewer/2022042309/5ed708ec62136e72fb7bb620/html5/thumbnails/6.jpg)
Utility & Railroad Engineering 6
That is Why Railroads do not like at-grade crossings
Passive Railroad Crossings
![Page 7: Railway-Highway Crossings Program (Section 130)...Railway Highway Crossings Program (Sec 130) 3. Statewide RR Crossing Inventory Utility & Railroad Engineering 3 Railroad 2 Major Railroads](https://reader033.fdocuments.us/reader033/viewer/2022042309/5ed708ec62136e72fb7bb620/html5/thumbnails/7.jpg)
PASSIVE vs ACTIVE Crossing
Joint Efforts (LPA/URR Section 130)
Utility & Railroad Engineering
BEFORE
AFTER
![Page 8: Railway-Highway Crossings Program (Section 130)...Railway Highway Crossings Program (Sec 130) 3. Statewide RR Crossing Inventory Utility & Railroad Engineering 3 Railroad 2 Major Railroads](https://reader033.fdocuments.us/reader033/viewer/2022042309/5ed708ec62136e72fb7bb620/html5/thumbnails/8.jpg)
Utility & Railroad Engineering 8
Active Railroad Crossing
Train Activated gates and lights improve safety
![Page 9: Railway-Highway Crossings Program (Section 130)...Railway Highway Crossings Program (Sec 130) 3. Statewide RR Crossing Inventory Utility & Railroad Engineering 3 Railroad 2 Major Railroads](https://reader033.fdocuments.us/reader033/viewer/2022042309/5ed708ec62136e72fb7bb620/html5/thumbnails/9.jpg)
Utility & Railroad Engineering 9
SEC 130 HIGHLIGHTS
Highway Safety act of 1973 first established the program to reduce the number and severity of RR-Hwy crashes.
Title 23 USC; Section 130 provided a
Nationwide program to improve safety at RR-Hwy crossings (aka Sec. 130 Prog.)
Section 130 can be used on any public
crossing in the State of Arizona
….
![Page 10: Railway-Highway Crossings Program (Section 130)...Railway Highway Crossings Program (Sec 130) 3. Statewide RR Crossing Inventory Utility & Railroad Engineering 3 Railroad 2 Major Railroads](https://reader033.fdocuments.us/reader033/viewer/2022042309/5ed708ec62136e72fb7bb620/html5/thumbnails/10.jpg)
SECTION 130 HIGHLIGHTS (cont.)
Section 130 is currently authorized under MAP-21
Section 130 projects consist of Safety
(Active railroad signal) or Hazard Elimination (crossing surface) projects.
ADOT currently receives approximately
$2.3 Million per year for projects
Utility & Railroad Engineering 10
![Page 11: Railway-Highway Crossings Program (Section 130)...Railway Highway Crossings Program (Sec 130) 3. Statewide RR Crossing Inventory Utility & Railroad Engineering 3 Railroad 2 Major Railroads](https://reader033.fdocuments.us/reader033/viewer/2022042309/5ed708ec62136e72fb7bb620/html5/thumbnails/11.jpg)
Project selection is based on input from the ADOT Railroad crossing database:
Exposure index computed for each crossing based on several factors
Index created for Hazard Elimination (surface work) and Protective Devices (Railroad signals)
Crossings in the top 1/3 of their respective index are eligible for upgrades
Selection is also based on input from Local Agencies, Az. Corporation Commission, FHWA, Railroad
Utility & Railroad Engineering 11
Section 130 Project Selection
![Page 12: Railway-Highway Crossings Program (Section 130)...Railway Highway Crossings Program (Sec 130) 3. Statewide RR Crossing Inventory Utility & Railroad Engineering 3 Railroad 2 Major Railroads](https://reader033.fdocuments.us/reader033/viewer/2022042309/5ed708ec62136e72fb7bb620/html5/thumbnails/12.jpg)
Installation of concrete crossing surface Installation of train activated lights/
gates Installation of sidewalks Signing and striping updates Updating traffic signal preemption
Utility & Railroad Engineering 12
Typical Projects
![Page 13: Railway-Highway Crossings Program (Section 130)...Railway Highway Crossings Program (Sec 130) 3. Statewide RR Crossing Inventory Utility & Railroad Engineering 3 Railroad 2 Major Railroads](https://reader033.fdocuments.us/reader033/viewer/2022042309/5ed708ec62136e72fb7bb620/html5/thumbnails/13.jpg)
Typical work NOT covered unless authorized by Federal Highway Administration: Installing a new crossing Relocating existing crossing Widening existing crossing
Utility & Railroad Engineering 13
Typical Projects
![Page 14: Railway-Highway Crossings Program (Section 130)...Railway Highway Crossings Program (Sec 130) 3. Statewide RR Crossing Inventory Utility & Railroad Engineering 3 Railroad 2 Major Railroads](https://reader033.fdocuments.us/reader033/viewer/2022042309/5ed708ec62136e72fb7bb620/html5/thumbnails/14.jpg)
Utility & Railroad Engineering 14
Section 130 Project Development
Project selection and management done by URR
Involves onsite meetings and contract preparation Kickoff to project completion is approx. 2-3 years URR is responsible for agreements with affected
railroad, and obtaining FHWA, ACC authorization
![Page 15: Railway-Highway Crossings Program (Section 130)...Railway Highway Crossings Program (Sec 130) 3. Statewide RR Crossing Inventory Utility & Railroad Engineering 3 Railroad 2 Major Railroads](https://reader033.fdocuments.us/reader033/viewer/2022042309/5ed708ec62136e72fb7bb620/html5/thumbnails/15.jpg)
Utility & Railroad Engineering 15
Section 130 Project Development
Local Public Agency Work (approaches, medians, sidewalks, etc.) Certification Acceptance – Local agency follow
their CA, URR will still request all authorizations and obtain railroad agreement
Non-CA. ADOT Local Government will administer
the design and construction of the improvements
![Page 16: Railway-Highway Crossings Program (Section 130)...Railway Highway Crossings Program (Sec 130) 3. Statewide RR Crossing Inventory Utility & Railroad Engineering 3 Railroad 2 Major Railroads](https://reader033.fdocuments.us/reader033/viewer/2022042309/5ed708ec62136e72fb7bb620/html5/thumbnails/16.jpg)
SECTION 130 Project Process Flow
Project Identified Onsite Diagnostic Meeting JPA executed FHWA Preliminary Engineering Authorization Project Design, Clearances and Agreements executed FHWA Construction Authorization Railroad work authorized Local Agency work authorized (as needed) ACC Opinion & Order issued (as needed) Local Agency perform final signing/striping Project closeout
Utility & Railroad Engineering 16
![Page 17: Railway-Highway Crossings Program (Section 130)...Railway Highway Crossings Program (Sec 130) 3. Statewide RR Crossing Inventory Utility & Railroad Engineering 3 Railroad 2 Major Railroads](https://reader033.fdocuments.us/reader033/viewer/2022042309/5ed708ec62136e72fb7bb620/html5/thumbnails/17.jpg)
Utility & Railroad Engineering 17
For more RR info:
ADOT UTILITY AND RAILROAD ENGINEERING 205 S 17TH AVE, RM 357, PHOENIX, AZ 85007
www.azdot.gov
Sayeed Hani, ADOT Railroad Liaison 602-712-7555 [email protected]
Jane Gauger, ADOT Railroad Section 130 Coordinator
602-712-4052 [email protected]