Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1

Transcript of Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September...

Page 1: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Railroad Commission of Texas Injection Well Permitting

Oil and Gas Regulatory ConferenceSeptember 24-25, 2013 - Austin, Texas

Rick Behal

1

Page 2: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Introduction•Filing a complete and correct application initially is the most effective way to expedite an application.

•Injection/Disposal Well Permit Testing and Monitoring Seminar Manual

http://www.rrc.state.tx.us/forms/publications/HTML/index.php

•Filing Requirements: Forms and attachments

•Technical Review: What are we looking for?

2

Page 3: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

RRC – ESTABLISHED 1891 TO REGULATE RAILROADS, ACQUIRED JURISDITION OVER OIL & GAS IN 1917 TO PREVENT MONOPOLIES, UNFAIR PRICING, PIPELINE DISCRIMINATION

• POWERS EXPANDED IN 1919 TO REGULATE PRODUCTION TO PREVENT WASTE• NOW HAS AUTHORITY OVER O&G, PIPELINES, GAS UTILITIES, & SURFACE MINING,• NO LONGER HAS ANY AUTHORITY OVER RAILROADS

“Crossing the Pecos River”

Page 4: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

• There are over 409,000 oil and gas industry wells in Texas

• First injection well in Texas permitted in 1936

• There have been about 107,000 wells permitted for injection

• Over 55,000 have current permits, approximately 33,000 are active

4

Page 5: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Objectives

•Protect surface and groundwater, public health and safety

•Prevent waste and promote conservation

•Protect correlative rights to develop mineral resources

5

Page 6: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Statutory Authority(Oil and Gas Division)

•Safe Water Drinking Act (1974):- RRC primacy on April 23, 1982.

•Chapter 27 of the Texas Water Code:- Well is in the public interest- No harm to oil, gas or other mineral formation- Both ground and surface water protected- Financial responsibility

•Title 3 of the Texas Natural Resource Code

6

Page 7: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Railroad Commission Rules -Permitting

•16 TAC § 3.8 – Water Protection (pits, discharges, waste haulers)

•16 TAC § 3.9 – Oil and Gas Waste Disposal into Non-productive Formations (Chapter 27 of the Water Code)

- About 15,000 permitted (approx. 5000 active)

•16 TAC § 3.46 – Fluid Injection into Productive Formations (Natural Resources Code)

- About 40,000 permitted (approx. 28,000 active)

7

Page 8: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Permitting Forms: Which to file?•Is the injection formation productive or non-productive?

•“productive” = current or past production within a 2 mile radius of the proposed injection well

•File original application to Austin office

•Mail a copy to the district office

8

Page 9: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Forms•Form W-14

– To apply for Disposal into a Non-Productive Formation– Statewide Rule 9

•Form H1 and H1A– To apply for Injection /Disposal into a Productive

Formation– Multiple Zones: If a mix of Productive and Non-

Productive– Statewide Rule 46

Injection Well Permitting

9

Page 10: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Fees

•Rule 9 (Forms W-14) – non-productive formations$100 permit application fee (per wellbore)

•Rule 46 (Form H-1/H-1A)– productive formations $500 permit application fee (per wellbore)

•Exception Request$375 (additional) each exception request

•These filing fees are non-refundable

10

Page 11: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Administrative Staff:

•Juanita Jimenez (512) [email protected]

•Molly Edwards (512) [email protected]

11

Page 12: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Preliminary Review•Check Organization Report (Form P-5)

- Must have active P-5 before application is reviewed

•Check Certificate of Compliance (Form P-4)- Verify that applicant is operator of lease

- Check for any outstanding violations•Check UIC (Underground Injection Control)well Inventory

- Is this application for a new or amended permit?

12

Page 13: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Dual Authorities

•Only one permit may be valid on an injection/disposal well at any given time

- An amended permit supersedes the old permit

•Plan re-permitting to coincide with workover

•Whenever a dual authority is discovered, the older permit is cancelled

13

Page 14: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Attachments •Electric Log

•“Water Board Letter”

•¼ mile Area of Review (AOR) plot and table

•Notice: ½-mile AOR, notice list and signed/dated certification statement

•Publication clipping and affidavit

•Fresh Water H-7, questionnaire, analysis and plat

14

Page 15: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Attachments: Electric Log

•A complete electric log or similar log of the proposed injection/disposal well

•If well log is not available for proposed well, a log from a nearby well may be submitted.

•If multiple wells covered by one Form H-1, only one representative well log is required.

15

Page 16: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Attachments: “Water Board letter”

•RRC Groundwater Advisory Unit (GAU) formerly TCEQ Surface Casing Unit.

•Commonly referred to as the “Water Board letter”, “surface casing letter”, “No Harm letter”, “TCEQ letter” and now “GAU letter”

•Two different types of depending of whether application is H-1 or W-14

•http://www.rrc.state.tx.us/environmental/environsupport/gau/index.php 16

Page 17: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Attachments: “Water Board letter” •Form H-1: States the Base of Usable Quality Water (BUQW – TDS 3,000 ppm) that must be protected. May be for area well and no more than 5 years old.

•Form H-1 submitted for the purpose of disposal: Must also include the depth to the Usable Source of Drinking Water (USDW – TDS 10,000 ppm)

•Form W-14: Well specific and includes BUQW, USDW and disposal interval.

17

Page 18: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

18

H-1 “Water Board” letter

Page 19: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

19

W-14 “no-harm letter”

Must cover proposed injection interval

States BUQW and USDW

Page 20: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Attachments: Area of Review (1/4-mile AOR)•Provide the data of record for wells that penetrate the proposed injection interval within one quarter (1/4) mile. (expanded when appropriate).

•Confirm wells have been plugged (or cased and cemented) in a manner that will prevent the movement of fluids into strata other than the authorized injection or disposal interval.

20

Page 21: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Attachments: Area of Review (1/4-mile AOR)Submit:•Plot showing well location and operator of AOR wells

•Tabulated data keyed to AOR plot: - Lease name and number, well number, API number ,

total depth, date drilled, current status, plug date (if applicable)

- Note: Providing copies of plugging reports may expedite processing

21

Page 22: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

GIS Map

22

Page 23: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

(Insert Graph Here)

Delete if un-needed

Add API#Then >

23

Page 24: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Map Tools:Select ¼ or ½ mileThen click on well location to generate AOR

24

Page 25: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection and Disposal Well Permitting

Map tools: Identify Wells

Then click on well

25

Page 26: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Click link for wellbore record and current status

26

Page 27: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well PermittingType Well = Status

“On Schedule” = Producing, Injecting, Shut-In.

“Unknown Status”(maybe?) = Dry, blank, Historic

If well status unknown, will require either: •plugging record;•completion report (W-2/G-1) to add well to schedule; •Pressure Front Calculation•Plug well before injection.

Submit Summary Table and not this printout for every well!27

Page 28: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

28

Page 29: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

29

Page 30: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Attachments: Notice

•Mail or deliver a copy of the application form (W-14 or H1/H-1A, front and back) to:

– The surface owner – Adjoining surface owners (Commercial Disposal)– Operators of wells within a ½ - mile – The county clerk– The city clerk if well is located within corporate city

limits

•Recommend including a cover letter briefly explaining the nature of the application.

30

Page 31: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Attachments: Notice

Submit:•Plot (½-mile AOR) showing well location & operator •A table of the names and addresses of those parties required to be notified along with a signed and dated statement indicating the date that notice was mailed or delivered.•A plat showing clearly the owner of record of the surface and adjoining surface tracts and tract boundaries (Commercial Disposal)

31

Page 32: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Example:Adjoining or “offset”surface owner plat

32

Page 33: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Example:Signed and dated notice certification page

33

Offset operator and surface/ adjacent surface owner names identified on AOR plot/adjoining surface owner plat must be consistent with names on notice table

Page 34: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Attachments: Publication•Publish

- notice for one day in a newspaper with general circulation in the county.

•Submit - Notarized affidavit of publication- Newspaper clipping

•Publication and affidavit shells available on Injection/Disposal Well Permitting Manual

•15 day waiting period after notice and publication34

Page 35: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Publication Guidelines •The newspaper need not be in the same county as the well, but must have general circulation in that county.

•The affidavit must state that the newspaper is of general circulation in the county where the proposed injection/disposal well is to be located.•The legal authority, notice of opportunity/instructions to protest application, and RRC contact information must be included in publication.•The newspaper publication must state that the application is for a “commercial” disposal well.

35

Page 36: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Attachments: Fresh Water Injection

•If application to inject fresh water, the following attachments are required:

– Fresh water questionnaire– Form H-7

• Required unless fresh water is purchased commercially

• Include plat of fresh water rights– Chemical analysis of the fresh water

36

Page 37: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Permit Amendments

•Filing requirements vary with type and magnitude of amendment.•Filing fee (per well) is required in all cases.•Well log, groundwater letter, AOR map and table are usually required when amending injection interval up-hole or permits issued prior to April 1982.•Refer to Guidelines for Permit Amendments in the Injection/Disposal Well Permitting Manual.

37

Page 38: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

38

Page 39: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Technical Review: Surface Casing

•Commercial and new injection wells must set and cement surface casing through the BUQW

•Applications for wells with “short surface casing” converted from production to lease injection/disposal are reviewed on a case by case basis. If permitted, requires more frequent testing and monitoring (annual mechanical integrity (MIT) testing and weekly tubing-casing annulus monitoring (TCAM) vs. 5-year MIT and monthly TCAM if well is constructed to current standards.

39

Page 40: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Technical Review: Casing Cement •Cement must be adequate to confine fluids to the injection interval

•Top of Cement (TOC) Requirements:- At least 600 feet if TOC is based on volume calc- 250 feet if TOC is determined by temperature survey run at time of cementing- 100 feet if TOC is determined by cement bond log

•RRC rules have required 600 feet of cement above casing shoe, or shallowest productive interval since 1932

40

Page 41: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Technical Review: Geological Requirements

•Proposed injection interval must be isolated from overlying usable quality water by a sufficient thickness of relatively impermeable strata (accumulative total of at least 250 feet of clay or shale).

•Verify that the proposed injection zone is adequately isolated by relatively impermeable strata to confine injected fluids to the proposed injection interval.

41

Page 42: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Technical Review: Area of Review•Amendments to SWR 13(a)(4)(C) effective 1-14-2014: Casing of AOR wells must be cemented across and above all formations permitted under SWR 9 or cemented immediately above all formations permitted for injection under SWR46

•All abandoned wells within the ¼ - mile AOR must be adequately plugged (cement plug between top injection formation and BUQW). (May add as condition of permit).

•Pressure Front Calculation (PFC): The applicant may calculate the actual affected radius to justify a lesser radius than ¼ -mile. PFC must be prepared by a Texas Registered Professional Engineer.

42

Page 43: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Technical Review: Packer setting depth

•Rule 9:– The packer must be set within 100 feet

•Rule 46:– While Rule 46 allows for flexibility in the packer setting

depth (150 feet below deepest groundwater and 200 feet below TOC), staff recommends the packer be set within 100 feet of the permitted zone

– There may be no potential injection/disposal zones between the packer and the top of the permitted zone

43

Page 44: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Technical Review: Injection Pressures

•The maximum injection pressure limited to 0.5 psi/ft.•In some areas injection pressure is limited to ¼ psi/ft (ex: shallow coastal wells, Barnett Shale).•Applicant may perform a fracture step-rate test to measure the actual fracture pressure and to justify a higher permit pressure.

44

Page 45: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Technical Review: Injected Fluids

• Limited to the injection of produced salt water unless other fluids are specified

• Injection of Hydrogen Sulfide (H2S) requires “well-specific” authority. Contact the H2S Statewide Coordinator in Midland or San Antonio District Offices (SWR 36)

45

Page 46: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Technical Review: Commercial Facilities

• Surface facility requirements are added to deal with spill prevention, containment, pit permitting and security issues

• A well is commercial if:–Salt water or waste is partially or wholly trucked in, or–A fee or other compensation is charge for disposal

46

Page 47: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

• All collecting pits, skimming pits, or washout pits must be permitted under the requirements of Statewide Rule 8.

• Catch basin(s) catch oil and gas waste which may spill as a result of connecting and disconnecting hoses or other apparatus while transferring oil and gas waste from tank trucks.

• Waste storage and pretreatment facilities (tanks, separators, or flow lines) shall be constructed of steel, concrete, fiberglass, maintained so as to prevent discharges.

• Dikes shall be placed around all waste storage, pretreatment, or disposal facilities.   The dikes shall be designed so as to be able to contain a volume equal to the maximum holding capacity of all such facilities.   Any liquids or wastes that do accumulate in the containment area shall be removed within 24 hours and disposed of in an authorized disposal facility.  

• Must have security to prevent unauthorized access.   Access shall be secured by a 24-hour attendant, a fence and locked gate when unattended, or a key-controlled access system.   For a facility without a 24-hour attendant, fencing shall be required unless terrain or vegetation prevents truck access except through entrances with lockable gates.

• Storage tank(s) equipped with a device (visual gauge or alarm) to alert drivers when each tank is within 130 barrels from being full.

COMMERCIAL DISPOSALSURFACE FACILITY REQUIREMENTS

47

Page 48: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Permit ProcessingPermit Denials•Application is still incomplete after two additional filings•Denial based on unsatisfactory completion or operating proposal

– The applicant may modify the application to allow for administrative approval, or

– Request a hearing before the Commission. The application must be administratively complete before a hearing date can be set.

48

Page 49: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Protested Applications

•Staff may administratively issue a permit only in the absence of a protest

•A protest may be filed anytime before a permit is issued

49

Page 50: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Protested ApplicationsWho can protest?•Affected parties

– Operators of wells within ½ mile– Surface owner of record– Adjoining surface owners for commercial well

•Local government (such as city or water district)•Other parties must demonstrate that they will be affected reviewed on a case-by case basis

– Offset surface or mineral owners– Other government agencies– Members of the general public

•Staff does not evaluate the validity of the protest

50

Page 51: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Protested ApplicationsOptions for applicant:•Withdraw the application•Obtain a letter from the protestant withdrawing the protest•Request a hearing

– The application must be administratively complete before a hearing may be scheduled

51

Page 52: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Post Permitting - MIT

•A mechanical integrity test (MIT) must be performed before any fluids are injected into the well.

•Once the well is converted to injection, an MIT must be performed periodically (1 or 5 year test schedule), after workover, or whenever mechanical integrity is in doubt.

52

Page 53: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Post Permitting – Completion Report (W2/G-1)

•File a completion report (Form W-2/G-1) within 30 days (SWR 16) to reflect the actual completion of the well.

•Filing a completion report on-line greatly reduces processing time.

•Lease numbers for new leases (Form P-4) are assigned after final processing/approval of completion report.

53

Page 54: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Well Permitting

Application vs. Construction

•The well must be constructed and operated as proposed in the application and permit

•Permit required remedial action (i.e., permit special conditions) must be done before injection begins.

•Operation not in accordance with the application and the permit may result in permit modification, suspension or revocation

54

Page 55: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

55

EDMS – Search all Permit Apps since 9/2000

Imaged Records: W-14, H-1/H-1A:

Injection/Disposal Permit Query

H-10 Query

Page 56: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection/DisposalPermits

56

Page 57: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Enter:Tracking# orOper#CountyDate rangeDoc type(W-14/H-1)

57

Page 58: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

Injection Permitting Technical Staff:

Section 463-6792Dave Hill, Manager [email protected] Moore [email protected] (Bob) Freymuller [email protected] Mabruk [email protected] Davis [email protected] Burns [email protected] Ashley Johnston [email protected]

58

Page 59: Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, 2013 - Austin, Texas Rick Behal 1.

THE END