Transcript of RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.
RAILROAD COMMISSION OF TEXAS
Bruce WatermanT-4 and POPS
September 2015
T-4 Pipeline Permitting Oversight and Safety Division
• RRC Adopts changes to Pipeline Permit Rule 3.70• FIFO- ‘First In & First Out’• 15 Day Acceptance or Rejection Letter • 45 Day T-4 Process & T-4A Approval
Letter• T-4 Forms(Revised)• T-4C (Eliminated)
Presentation Overview
New Adopted Rule Amendments
Effective March 1, 2015:• Permit applications must include additional information:
–Requested classification
–Purpose of the pipeline or pipeline system» Common carrier
» Gas utility
» Private operator
New Adopted Rule Amendments
• Permit applications must include sworn statement
– Operator’s factual basis supporting classification and purpose being sought
• If applicable,
– Documentation such as contract of tariff
– Other information requested by the Commission
• T-4 Permit may be revocable any time after a hearing
• Applicant must acknowledge eminent domain provisions in Texas Landowner’s Bill of Rights
New Adopted Rule Amendments
T-4
F O
RM
Natural Gas
Private
INSTRUCTIONS - Form T-4
T-4
F O
RM INSTRUCTIONS - Form T-4
10.83
Guidance
for
Natural
Gas
Operators
/
Economic
Operators
NON-
UTILITY
C E R
TI F I C A T E
00123
ABC Pipeline Company
Mark Smith
THANK YOU
Contact Information
Permitting: Bruce Waterman Brent Mosby Kristi Schulz For questions, please call 512-463-7058
Email: [email protected]
Mapping: Lori Mireles - 512-463-7032 Colby Broadway - 512-524-6019
Email: [email protected]
POPS
• https://webapps.rrc.state.tx.us/security/login.do
POPS
POPS
POPS
POPS