RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.
-
Upload
rosamund-watson -
Category
Documents
-
view
220 -
download
0
Transcript of RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.
![Page 1: RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649f155503460f94c2a976/html5/thumbnails/1.jpg)
RAILROAD COMMISSION OF TEXAS
Bruce WatermanT-4 and POPS
September 2015
![Page 2: RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649f155503460f94c2a976/html5/thumbnails/2.jpg)
T-4 Pipeline Permitting Oversight and Safety Division
![Page 3: RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649f155503460f94c2a976/html5/thumbnails/3.jpg)
• RRC Adopts changes to Pipeline Permit Rule 3.70• FIFO- ‘First In & First Out’• 15 Day Acceptance or Rejection Letter • 45 Day T-4 Process & T-4A Approval
Letter• T-4 Forms(Revised)• T-4C (Eliminated)
Presentation Overview
![Page 5: RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649f155503460f94c2a976/html5/thumbnails/5.jpg)
New Adopted Rule Amendments
![Page 6: RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649f155503460f94c2a976/html5/thumbnails/6.jpg)
Effective March 1, 2015:• Permit applications must include additional information:
–Requested classification
–Purpose of the pipeline or pipeline system» Common carrier
» Gas utility
» Private operator
New Adopted Rule Amendments
![Page 7: RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649f155503460f94c2a976/html5/thumbnails/7.jpg)
• Permit applications must include sworn statement
– Operator’s factual basis supporting classification and purpose being sought
• If applicable,
– Documentation such as contract of tariff
– Other information requested by the Commission
• T-4 Permit may be revocable any time after a hearing
• Applicant must acknowledge eminent domain provisions in Texas Landowner’s Bill of Rights
New Adopted Rule Amendments
![Page 8: RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649f155503460f94c2a976/html5/thumbnails/8.jpg)
T-4
F O
RM
Natural Gas
Private
INSTRUCTIONS - Form T-4
![Page 9: RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649f155503460f94c2a976/html5/thumbnails/9.jpg)
T-4
F O
RM INSTRUCTIONS - Form T-4
10.83
![Page 10: RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649f155503460f94c2a976/html5/thumbnails/10.jpg)
Guidance
for
Natural
Gas
Operators
/
Economic
Operators
![Page 11: RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649f155503460f94c2a976/html5/thumbnails/11.jpg)
NON-
UTILITY
C E R
TI F I C A T E
00123
ABC Pipeline Company
Mark Smith
![Page 12: RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649f155503460f94c2a976/html5/thumbnails/12.jpg)
THANK YOU
Contact Information
Permitting: Bruce Waterman Brent Mosby Kristi Schulz For questions, please call 512-463-7058
Email: [email protected]
Mapping: Lori Mireles - 512-463-7032 Colby Broadway - 512-524-6019
Email: [email protected]
![Page 13: RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649f155503460f94c2a976/html5/thumbnails/13.jpg)
POPS
• https://webapps.rrc.state.tx.us/security/login.do
![Page 14: RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649f155503460f94c2a976/html5/thumbnails/14.jpg)
POPS
![Page 15: RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649f155503460f94c2a976/html5/thumbnails/15.jpg)
POPS
![Page 16: RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649f155503460f94c2a976/html5/thumbnails/16.jpg)
POPS
![Page 17: RAILROAD COMMISSION OF TEXAS Bruce Waterman T-4 and POPS September 2015.](https://reader036.fdocuments.us/reader036/viewer/2022062304/56649f155503460f94c2a976/html5/thumbnails/17.jpg)
POPS