RadICS Qualification Test PlanRadICS Qualification Test Plan … · 2015. 9. 17. · Regulatory...

12
Non-Proprietary Technical Part 4: RadICS Digital I&C Platform Topical Report RadICS Qualification Test Plan RadICS Qualification Test Plan (Closed Session) July 14, 2015, Rockville, Maryland

Transcript of RadICS Qualification Test PlanRadICS Qualification Test Plan … · 2015. 9. 17. · Regulatory...

Page 1: RadICS Qualification Test PlanRadICS Qualification Test Plan … · 2015. 9. 17. · Regulatory Alignment Non-Proprietary Regulatory Alignment Environmental qqgualification testing

Non-Proprietary

Technical Part 4: RadICS Digital I&C Platform Topical Report

RadICS Qualification Test PlanRadICS Qualification Test Plan

(Closed Session)

July 14, 2015, Rockville, Maryland

Page 2: RadICS Qualification Test PlanRadICS Qualification Test Plan … · 2015. 9. 17. · Regulatory Alignment Non-Proprietary Regulatory Alignment Environmental qqgualification testing

AgendaNon-Proprietary

Agenda

• Foundational Testing During DevelopmentFoundational Testing During Development• US Qualification Test Plan

US Q lifi ti T t El t• US Qualification Test Elements• Regulatory Alignment

2RPC Radiy

Page 3: RadICS Qualification Test PlanRadICS Qualification Test Plan … · 2015. 9. 17. · Regulatory Alignment Non-Proprietary Regulatory Alignment Environmental qqgualification testing

Foundational Testing during DevelopmentNon-Proprietary

Foundational Testing during Development

● RadICS equipment previously qualified to European and US q p p y q pstandards

– Electromagnetic compatibility tests to IEC 61000-4 series standards and EPRI TR-102323 (including MIL-STD-461E) in laboratories certified to ISO/IEC 17025:2005102323 (including MIL STD 461E) in laboratories certified to ISO/IEC 17025:2005

– Radiation exposure testing to EPRI TR-107330 requirements in laboratory certified to ISO/IEC 17025:2005

– Seismic testing to IAEA NS-G-1.2 (3.43), IEC 60780 (5.3.4.1, 5.3.2), and IECSeismic testing to IAEA NS G 1.2 (3.43), IEC 60780 (5.3.4.1, 5.3.2), and IEC60980 (4.1), and IEEE Std 344

– Power fluctuation tolerance requirements testing to IEC 60987 (5.5)

● Previous qualification tests provided good confidence for successful● Previous qualification tests provided good confidence for successful US qualification testing program

3RPC Radiy

Page 4: RadICS Qualification Test PlanRadICS Qualification Test Plan … · 2015. 9. 17. · Regulatory Alignment Non-Proprietary Regulatory Alignment Environmental qqgualification testing

US Qualification Test SpecimenNon-Proprietary

US Qualification Test Specimen

● Equipment to be Testedq p– Chassis and Backplane– Logic Modules (LM)– Analog Input Modules (AIM and AIFM)

– Discrete Output Modules (DOM)– Optical Communication Modules (OCM)– Equipment Protection Modules for

I d t i l d d t i iti t d t t i li ti

Analog Input Modules (AIM and AIFM)– Discrete Input Modules (DIM)– Analog Output Modules (AOM)

Equipment Protection Modules for External Interfaces

– Fan Cooling Hardware

● Industrial-grade data acquisition system and test specimen application program will exercise QTS during qualification testing

– Generate a series of known inputs to the QTS – Monitor the corresponding outputs of the QTS

● Correct correspondence between input and output before, during, and after qualification tests and lack of spurious behavior are key

4RPC Radiy

after qualification tests and lack of spurious behavior are key

Page 5: RadICS Qualification Test PlanRadICS Qualification Test Plan … · 2015. 9. 17. · Regulatory Alignment Non-Proprietary Regulatory Alignment Environmental qqgualification testing

US Qualification Test Plan (1/5)Non-Proprietary

US Qualification Test Plan (1/5)

● QTS Factory Acceptance Testingy p g– Demonstrate compliance of RadICS QTS and Test System with QTS Specification

● Pre-Qualification Acceptance TestingB d EPRI TR 107330 S ti– Based on EPRI TR-107330 Section

● Radiation Exposure Withstand Testing– Based on EPRI TR-107330 Section 4.3.6

● Environmental Testing– Based on EPRI TR-107330 Section 4.3.6

S i i T ti● Seismic Testing– Based on EPRI TR-107330 Section 4.3.9

5RPC Radiy

Page 6: RadICS Qualification Test PlanRadICS Qualification Test Plan … · 2015. 9. 17. · Regulatory Alignment Non-Proprietary Regulatory Alignment Environmental qqgualification testing

US Qualification Test Plan (2/5)Non-Proprietary

US Qualification Test Plan (2/5)

● Electromagnetic Compatibility Testingg p y g– Based on RG 1.180, Revision 1, and EPRI TR-107330 Section 4.3.7– EMC Emissions Tests to MIL-461E Series Tests

● Electrical Fast Transient Testing● Electrical Fast Transient Testing– Based on RG 1.180, Revision 1, and EPRI TR-107330 Sections 4.6.2 and 4.3.7

● Surge Withstand Testingg g– Based on RG 1.180, Revision 1, and EPRI TR-107330 Sections 4.6.2 and 4.3.7

6RPC Radiy

Page 7: RadICS Qualification Test PlanRadICS Qualification Test Plan … · 2015. 9. 17. · Regulatory Alignment Non-Proprietary Regulatory Alignment Environmental qqgualification testing

US Qualification Test Plan (3/5)Non-Proprietary

US Qualification Test Plan (3/5)

● Electrostatic Discharge (ESD) Testingg ( ) g– Based on Part 4-2 of IEC 61000-4-2

● Class 1E to Non-Class 1E Isolation TestingB d IEEE St d d 384 1992 d EPRI TR 107330 S ti 4 6 4 d 6 3 6– Based on IEEE Standard 384-1992 and EPRI TR-107330 Sections 4.6.4 and 6.3.6

● Performance Proof Testing– Following completion of all hardware qualification testing based on EPRI TR-107330,

Section 5.5

7RPC Radiy

Page 8: RadICS Qualification Test PlanRadICS Qualification Test Plan … · 2015. 9. 17. · Regulatory Alignment Non-Proprietary Regulatory Alignment Environmental qqgualification testing

US Qualification Test Plan (4/5)Non-Proprietary

US Qualification Test Plan (4/5)

● Operability Testingp y g– Based on EPRI TR-107330 Sections 5.3 and 5.5– Operability testing is performed at the following : With Pre-Qualification Acceptance Testing With Pre Qualification Acceptance Testing At completion of Radiation Exposure Withstand Testing At completion of the high temperature, high humidity phase of Environmental Testing At completion of the low temperature phase of Environmental Testing At completion of the low temperature phase of Environmental Testing At completion of the low humidity phase of Environmental Testing At completion of Environmental Testing During Seismic Testing During Seismic Testing During EMC Testing (except accuracy test portion) With Performance Proof Testing

8RPC Radiy

Page 9: RadICS Qualification Test PlanRadICS Qualification Test Plan … · 2015. 9. 17. · Regulatory Alignment Non-Proprietary Regulatory Alignment Environmental qqgualification testing

US Qualification Test Plan (5/5)Non-Proprietary

US Qualification Test Plan (5/5)

● Prudency Testingy g– Based on EPRI TR-107330 Sections 5.4 and 5.5– Prudency testing is performed at the following: With Pre-Qualification Acceptance Testing With Pre Qualification Acceptance Testing At completion of Radiation Exposure Withstand Testing At completion of the high temperature, high humidity phase of Environmental Testing During Seismic Testing During Seismic Testing During EMC Testing (Burst of Event test portion only) With Performance Proof Testing

9RPC Radiy

Page 10: RadICS Qualification Test PlanRadICS Qualification Test Plan … · 2015. 9. 17. · Regulatory Alignment Non-Proprietary Regulatory Alignment Environmental qqgualification testing

US Qualification Test ScheduleNon-Proprietary

US Qualification Test Schedule

● Radiy will use a qualified US laboratory for US RadICS qualification test y q y qprogram

● Testing will supervised by Radiy to ensure proper handling and● Testing will supervised by Radiy to ensure proper handling and operation of the RadICS equipment

● Testing is planned for the g p

10RPC Radiy

Page 11: RadICS Qualification Test PlanRadICS Qualification Test Plan … · 2015. 9. 17. · Regulatory Alignment Non-Proprietary Regulatory Alignment Environmental qqgualification testing

Regulatory AlignmentNon-Proprietary

Regulatory Alignment

● Environmental qualification testing of the RadICS QTS will be performed q g pin accordance with

– Regulatory Guide 1.209 and IEEE Standard 323-2003– Regulatory Guide 1 152 Revision 3 and IEEE Standard 7-4 3 2-2003– Regulatory Guide 1.152, Revision 3, and IEEE Standard 7-4.3.2-2003– EPRI TR-107330

● Seismic qualification testing will be performed in accordance with Regulatory Guide 1.100 and IEEE Standard 344-1987 to the generic seismic spectra provided in TR-107330

● Electromagnetic compatibility (EMC) qualification testing will be● Electromagnetic compatibility (EMC) qualification testing will be performed in accordance with Regulatory Guide RG 1.180, Revision 1

11RPC Radiy

Page 12: RadICS Qualification Test PlanRadICS Qualification Test Plan … · 2015. 9. 17. · Regulatory Alignment Non-Proprietary Regulatory Alignment Environmental qqgualification testing

Non-Proprietary

Thank you for your attention!Research & Production Corporation Radiy29, Geroyiv Stalingrada Street, Kirovograd 25006, Ukrainee-mail: [email protected]://www.radiy.com