BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Order Instituting Rulemaking to Consider Streamlining Interconnection of Distributed Energy Resources and Improvements to Rule 21. Rulemaking 17-07-007 (Filed July 13, 2017) WORKING GROUP THREE FINAL REPORT JONATHAN J. NEWLANDER Attorney for SAN DIEGO GAS & ELECTRIC COMPANY 8330 Century Park Court, CP32D San Diego, CA 92123 Phone: (858) 654-1652 E-mail: [email protected] ON BEHALF OF ITSELF AND: KEITH T. SAMPSON Attorney for: PACIFIC GAS AND ELECTRIC COMPANY 77 Beale Street San Francisco, California 94105 Telephone: (415) 973-5443 Facsimile: (415) 973-0516 E-mail: keith.sampson@pge.com ALEXA MULLARKY Attorney for SOUTHERN CALIFORNIA EDISON COMPANY 2244 Walnut Grove Avenue Post Office Box 800 Rosemead, California 91770 Telephone: (626) 302-1577 E-mail: alexa.j.mullarky@sce.com June 14, 2019

Transcript of R1707007 Working Group Three Final Report · Working Group One submitted its final report on March...

Page 1: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

Order Instituting Rulemaking to Consider Streamlining Interconnection of Distributed Energy Resources and Improvements to Rule 21.

Rulemaking 17-07-007 (Filed July 13, 2017)

WORKING GROUP THREE FINAL REPORT

JONATHAN J. NEWLANDER Attorney for SAN DIEGO GAS & ELECTRIC COMPANY 8330 Century Park Court, CP32D San Diego, CA 92123 Phone: (858) 654-1652 E-mail: [email protected]

ON BEHALF OF ITSELF AND: KEITH T. SAMPSON Attorney for: PACIFIC GAS AND ELECTRIC COMPANY 77 Beale Street San Francisco, California 94105 Telephone: (415) 973-5443 Facsimile: (415) 973-0516 E-mail: [email protected]

ALEXA MULLARKY Attorney for SOUTHERN CALIFORNIA EDISON COMPANY 2244 Walnut Grove Avenue Post Office Box 800 Rosemead, California 91770 Telephone: (626) 302-1577 E-mail: [email protected]

June 14, 2019

Page 2: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

1

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

Order Instituting Rulemaking to Consider Streamlining Interconnection of Distributed Energy Resources and Improvements to Rule 21.

Rulemaking 17-07-007 (Filed July 13, 2017)

WORKING GROUP THREE FINAL REPORT

Pursuant to the Scoping Memo of Assigned Commissioner and Administrative Law Judge,

dated October 2, 2017, as modified by the Assigned Commissioner’s Amended Scoping Memo

and Joint Administrative Law Judge Ruling, dated November 16, 2018, San Diego Gas &

Electric Company (U 902-E), on behalf of itself and Pacific Gas and Electric Company (U 39-E)

and Southern California Edison Company (U 338-E), hereby submits the Working Group Three

Final Report.

Respectfully submitted,

/s/ Jonathan J. Newlander _______________________ Jonathan J. Newlander Attorney for SAN DIEGO GAS & ELECTRIC COMPANY 8330 Century Park Court, CP32D San Diego, CA 92123 Phone: 858-654-1652 E-mail: [email protected]

On Behalf of San Diego Gas & Electric Company (U 902-E), Pacific Gas and Electric Company (U 39-E), and Southern California Edison Company (U 338-E)

June 14, 2019

Page 3: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

Working Group ThreeFinal Report June 14, 2019

California Public Utilities Commission Interconnection Rulemaking (R.17-07-007)

Page 4: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

2

TableofContentsWorkingGroupThreeBackground.................................................................................................3Issue12,Proposals12-ato12-j....................................................................................................10Issue15,Proposals15-ato15-b..................................................................................................24Issue16,Proposals16-ato16-d..................................................................................................27Issue20,Proposals20-ato20-c...................................................................................................33Issue22,Proposals22-ato22-b..................................................................................................40Issue23,Proposals23-ato23-i....................................................................................................61Issue24,Proposals24-ato24-c...................................................................................................99Issues27and28,Proposals27-ato27-candProposal28-a......................................................110IssuesAandB,ProposalsA-B#1toA-B#4................................................................................125IssueD........................................................................................................................................139AnnexesAnnexA:Issue16,ProposalRefinementbyProponents.............................................................32AnnexB:Issue20,PotentialUseCasesofTransferfromRule21toWDAT................................39AnnexC: Issue22,DetailedDescriptionsofSub-Proposals.........................................................46AnnexD:Issue22,PartyCommentsonSub-Proposals................................................................50AnnexE: Issue23,SurveyonV2G-AC(Mobile)Pilots..................................................................88AnnexF: Issue27,FrameworkofOperationalCategoriesforSmartInverterFunctions..........117AnnexG:Issue27,UseCasesandPartyCommentsonUseCases............................................119

Page 5: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

3

WorkingGroupThreeBackgroundProceduralBackgroundOnJuly13,2017,theCaliforniaPublicUtilitiesCommission(“CPUC”or“Commission”)issuedanOrderInstitutingRulemakingtoconsideravarietyofrefinementstotheinterconnectionofdistributedenergyresourcesunderElectricRule21.OnOctober2,2017,theCommissionissuedascopingrulingforR.17-07-007directingPacificGasandElectric(“PG&E”),SouthernCaliforniaEdison(“SCE”),andSanDiegoGasandElectric(“SDG&E”),ortheinvestor-ownedutilities(“IOUs”or“utilities”),toconveneeightworkinggroupstodevelopproposalstoaddresstheissues.1WorkingGroupOnesubmitteditsfinalreportonMarch15,2018.WorkingGroupTwosubmitteditsfinalreportonOctober31,2018.2AnamendedscopingmemoonNovember16,2018taskedthethirdworkinggroup,“WorkingGroupThree,”tocommenceonDecember1,2018andtodevelopandfileafinalreportbyJune14,2019forrecommendingproposalstoaddresselevenissues.TheamendedscopingmemoscheduledaworkshoponWorkingGroupThreeproposalsforJune21,2019,scheduledanAdministrativeLawJudge(“ALJ”)rulingontheWorkingGroupThreeReportbyJuly19,2019,establishedadue-dateforcommentsonWorkingGroupThreeproposalsbyAugust2,2019,andestablishedadue-dateforreplycommentsbyAugust12,2019.3WorkingGroupScopeWorkingGroupThreedevelopedproposalsaddressingelevenissues(12,15,16,20,22,23,24,27,28,A,andB)fromtheNovember16,2018amendedscopingmemo:

Issue12.HowcantheCommissionimprovecertaintyaroundtimelinesfordistributionupgradeplanning,costestimation,andconstruction?ShouldtheCommissionconsideradoptingenforcementmeasureswithrespecttothesetimelines?Ifso,whatshouldthosemeasuresbe?Issue15.ShouldtheCommissionrequireitemizedbillingfordistributionupgradestoenablecustomercomparisonbetweenestimatedandbilledcostsandverificationofthe

1R.17-07-007ScopingRuling,October2,2017(http://docs.cpuc.ca.gov/PublishedDocs/Efile/G000/M196/K476/196476255.pdf).2InterconnectionRulemaking17-07-007,https://www.cpuc.ca.gov/General.aspx?id=6442455170,pageupdatedJanuary20193R.17-07-007AmendedScopingMemoandJointRuling,November16,2018(http://docs.cpuc.ca.gov/PublishedDocs/Efile/G000/M241/K155/241155616.pdf)

Page 6: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

4

accuracyofbilledcosts?Issue16.ShouldtheCommissionencouragethirdpartyconstructionofupgradestosupportmoretimelyandcost-effectiveinterconnectionand,ifso,how?Issue20.HowshouldtheCommissioncoordinateCommission-jurisdictionalandFederalEnergyRegulatoryCommission-jurisdictionalinterconnectionrulesforbehind-the-meterdistributedenergyresources,includingmodificationofqueuingrulesforRule21andWholesaleDistributionAccessTariff(WDAT)projectsseekingtointerconnectatthesamelocation,clarificationoftherulesforprojectswantingtotransferbetweentheRule21andWDATqueues,andstreamliningofthetransferprocess?Issue22.ShouldtheCommissionrequiretheUtilitiestomakeimprovementstotheirinterconnectionapplicationportals?Ifyes,whatshouldthoseimprovementsbe?Issue23.ShouldtheCommissionconsiderissuesrelatedtotheinterconnectionofelectricvehiclesandrelatedcharginginfrastructureanddevicesand,ifso,how?Issue24.ShouldtheCommissionmodifytheformulaforcalculatingtheCost-of-Ownershipchargeand,ifso,how?Issue27.Whatshouldbetheoperationalrequirementsofsmartinverters?WhatrulesandproceduresshouldtheCommissionadoptforadjustingsmartinverterfunctionsviacommunicationcontrols?Issue28.HowshouldtheCommissioncoordinatewiththeIntegratedDistributedEnergyResourceproceedingtoensureoperationalrequirementsarealignedwithanyrelevantvaluationmechanisms?IssueA.Whatchangesareneededtoclarifytheparametersforapprovalofsystemdesigntoachievenon-exportandlimitedexport.IssueB.Howshouldutilitiestreatgeneratingcapacityforbehindthemeterpairedsolarandstoragesystemsthatarenotcertifiednon-export?

TheNovember16,2018amendedscopingmemoalsoincludedIssueDaspartofIssue12.WorkingGroupThreediscussedIssueD,andthesediscussionsresultedinastatementinthefinalreportthatnoproposalwasnecessaryforIssueD:

IssueD.WhenshouldtheCommissionconsiderresultsofaninitialreviewordetailedstudytobebinding?UnderwhatcircumstancesshouldtheCommissionallowtheresultstobechanged?

Page 7: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

5

WorkingGroupProcessWorkingGroupThreemet18timesbetweenNovember28,2018andMay29,2019todevelopproposalstoaddressIssues12,15,16,20,22,23,24,27,28,A,B,andD.Ninemeetingswereviateleconferenceandlasted2hours,andninemeetingswerein-personmeetingsthatlasted4hours.Mostofthein-personmeetingstookplaceattheCommission’sSanFranciscooffices,andthreemeetingstookplaceatothervenuesinSanFranciscoandOakland.Inaddition,thereweresixjointmeetingsofWorkingGroupThreeandtheSmartInverterWorkingGroupviateleconferencethatlasted1.5hours,todiscussIssues27and28.ThosejointWG3-SIWGmeetingsbeganonDecember19,2018andconcludedonApril4,2019.WorkingGroupmeetingsincludedfourmeetingsspecificallydesignatedtodiscussthefinalreporttowardstheconclusionoftheWorkingGroup,fromMay1,2019throughMay29,2019.Twoofthesemeetingswere2-hourteleconferencesandtwowere4-hourin-personmeetings.Therewerealsoanumberofsub-groupmeetingsthattookplaceoutsideoftheregularWorkingGroupmeetings,forsupplementaldiscussionthatpartiesdeemedusefultomakeprogressonproposalsforanumberofissues.Inparticular,sub-groupsmetonIssues12,22,23,27-28,andA-B.Typically,sub-groupswereformedduringanormalWorkingGroupmeeting,witheitherGridworksasfacilitatororapartysuggestingthatasub-groupmeet,andapollbeingtakenduringthemeetingofpartiesdesiringtoparticipateinthesub-group.Proponentsintheprocessofwritingorrevisingproposalsalsoconsulteddirectlywithoneormoreotherpartiesastheydeemedusefulintheprocessofdevelopingtheirproposals.GridworkswascontractedtofacilitateWorkingGroupThree,whichincludedmaintainingtheWorkingGroupparticipantlist,managingtheWorkingGroupschedule,arrangingmeetinglogistics,settingmeetingagendas,sendingmeetingannouncements,preparingmeetingslidedecks,takingandissuingmeetingnotes,framingissuestofacilitateproductivediscussion,preparingbackgroundissuebriefsforsomeoftheissues,facilitatingtheformationofsub-groupsledbyparties,supportingproponentswhoweredraftingproposals,coordinatingcommentsandcounter-proposalsonproponentproposals,writingfinalreportdraftsforeachissueinthreestagesofrevision(versions“v1”,“v2”,and“v3”),settingthescheduleoffinalreportreviewandrevision,providingguidanceonthescopeofpartycommentsforeachrevisionstage,solicitingandincorporatingpartycommentsonfinalreportdrafts,andpreparingthefinalreport.TheWorkingGroupschedulewasdesignedsuchthattherewouldbeaninitialdiscussionandafinaldiscussiononeachissue(seeTable1).Thismeantthatdiscussionofseveralissueswasoftenproceedinginparallel.Inanygivenmeeting,discussionofaparticularissuemightbescheduledforadurationrangingfrom20to90minutes.Onsomeissues,Gridworkspreparedanissuebrieffortheinitialdiscussion,andonsomeissuesapartyproponentpreparedtheissuebrief.Followingtheinitialdiscussion,partiesdevelopedproposals,whichwerediscussed,developedandcommenteduponinmultipleroundsinthe

Page 8: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

6

courseofmultipleWorkingGroupmeetings.Atvariousstagesoftheprocess,utilitypartieswererequestedtocommentonproponentproposalsbygivendeadlines,andoftensubmittedcounter-proposalsinthecourseoftheircomments.ForIssues22and23,surveyswerealsoemployed,withon-linesurveylinkssentouttoallWorkingGroupThreeparticipants.Theintentionofthisschedulewasthatbythefinaldiscussionforagivenissue,proposalsandpartypositionswouldbefinalized.Followingthefinaldiscussion,anissueproponentwouldfinishwritingtheirfinalproposal,andGridworkswouldthenwritethefirstdraftofthefinalreportforthatissue,basedontheunderstandingsreachedinthefinaldiscussionandonthefinalproponentproposal.(Note:asthisprocesswasdevelopedduringthecourseoftheWorkingGroup,someofthefirstissuestobeaddresseddidnotfollowthisformatascloselyasthelaterissues,notablyIssues12,15,and16.)Completionofthefinalreportforeachissuethenproceededinwritinginthreeiterations(versionsv1,v2,v3),followedbydiscussionandresolutionatfourmeetings(May1,May8,May22,andMay29)dedicatedtothefinalreport,includingreviewofthetext,andeditingandagreementonanyoutstandingpointsrequiringresolutionthatremainedinthetext.Table1:ScheduleofWorkingGroupDiscussionsbyIssueIssue(s) Initial

discussionFinal

discussionNumberofmeetings

12,15 12/12/18 2/13 716 1/10 2/13 520,24 3/6 4/17 522 3/6 3/27 323 1/10 3/27 927,28 12/19/18 4/17 7*A,B 1/23 3/6 5(*)SixofthesevenmeetingsforIssues27and28werejointmeetingswiththeSmartInverterWorkingGroupConsensusandNon-ConsensusProposalsWorkinggroupmembersmadesignificanteffortstoreachconsensusoneachissue.Ofthe41individualproposalsacrossallelevenissues,23ofthesewereconsensusproposalsand18werenon-consensusproposals.Generally,therewasenoughtimeoverthecourseofmultiplemeetings,commentsolicitations,andoff-linediscussionstoreachreasonableunderstandingofwhetherconsensuscouldbeachievedonanygivenproposal.Forproposalswhereconsensuswasnotreached,partieshadfundamentallydifferingviewpointsthatcouldnotberesolved,andmorediscussiontimewouldlikelynothaveresultedinconsensus.

Page 9: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

7

TheexceptionmighthavebeenIssues22,23,24,and27,wheremoretimemighthaveresultedinfurtherprogress,butinthesecasesaverysubstantialamountofadditionaltimewouldhavebeenrequired,muchmorethantheWorkingGroupcoulddevote.GiventhetimeconstraintsoftheWorkingGroup,Issue22containsaconsensusproposalcallingforfurtherCommissionaction,Issue23containsanon-consensusproposalcallingforasub-grouptobeformedtocontinueworkingontechnicalrecommendations,andIssue27containsanon-consensusproposalcallingforaworkshopatalaterdate.Aproposalmarked“consensus”receivedgeneralsupportfromallWorkingGroupmemberswhoparticipatedinmeetingswhenthatproposalwasdiscussed,andnopartyexpressedopposition.Aproposalmarked“non-consensus”receivedbothsupportandoppositionfrommemberswhoparticipatedinmeetingswhenthatproposalwasdiscussed.Forproposalswhereconsensuswasnotreached,theWorkingGroupattemptedtodocumentthevariousviewpointsinfinalreport“Discussion”sectionstoprovidetheCommissionwithsufficientinformationtomakeaninformeddecision.Non-consensusproposalsalsoincludealistofsupportersandopponentstoprovideinformationabouttheextenttowhichtheproposalwassupportedandopposed.AllpartiesweregivenafinalopportunityduringdraftingofthisFinalReporttoindicateorchangetheirsupport/opposepositiononthelistofsupportersandopponentsonanyproposal,basedonthefinalwordingofeachproposal.PartiesweregivenuntilMay31tosoindicate;however,anychangesinsupport/opposepositionafterthefinalMay29WorkingGroupmeetingcouldnotbeaccompaniedbyotherchangestothetextofpartypositionsorproposalDiscussionsections.Substantiveareasofnon-consensus,withoneormorenon-consensusproposalsdevelopedtoaddresstheseareas,included:

Issue12: Timelinesandgoalsfortimelinetracking,reviewofprogresstowardsgoals,andsubstationupgradenotifications

Issue16: Third-partyworkonexistingde-energizeddistributionsystemsIssue23: Formingasub-grouptoaddresstechnicalrequirementsforV2G-AC(mobile

inverter)interconnections,clarifyingapathwayforpilotorexperimentaluseofV2G-ACsystems,andaddingtrackingofV2Ginterconnectionstointerconnectionportals

Issue24: Cost-of-ownership(COO)asappliedtolike-for-likereplacements,

replacementcostscomponentofCOO,andtheconceptofnet-additionalCOOIssue27: ConveningaworkshoponDERMsandconveningtheSmartInverterWorking

GrouptorefinespecificationsfortheSetActivePowerModefunction

Page 10: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

8

IssueA-B:Allowinginvertersettingstovaryseasonallyoverthecourseofayear(to

allowforschedulingunderWorkingGroupTwoIssue9)Anumberofotherareasofnon-consensusaroseinvariousissuesduringdiscussions,buttheseareasdidnotresultinnon-consensusproposals,mainlybecauseeitherproponentswithdrewtheproposals,orbecausecompromisesand/orconsensuswasabletobereachedonotherrelatedproposals.WorkingGroupMaterialsWorkingGroupmaterialswerepostedtoandavailablepubliclythroughouttheWorkingGroupprocessontheGridworksWorkingGroupThreewebsite:https://gridworks.org/initiatives/rule-21-working-group-3.Inaddition,theWorkingGroupmadeactiveuseofaOneDrivesharedfilespace,whichcontainedalltheproposals,counter-proposals,andpartycommentsonallissuesdiscussed,includingmultipleroundsofpartycommentsandeditsondraftversionsofthisFinalReportforeachissueindividually.WorkingGroupParticipants“WorkingGroupThree”(orjust“theWorkingGroup”)referencesallactivepartiesparticipatinginWorkingGroupThreemeetings,whichincludetheutilities,governmentrepresentatives,developers,nonprofits,andindependentadvocatesandconsultants.Thefinalreportistheproductofwrittenandoralcontributionsfromparticipantsrepresentingthefollowingorganizations.CaliforniaEnergyCommission(“CEC”)CaliforniaEnergyStorageAlliance(“CESA”)CaliforniaIndependentSystemOperator(“CAISO”)CaliforniaPublicAdvocatesOfficeCaliforniaPublicUtilitiesCommissionCaliforniaSolar&StorageAssociation(“CALSSA”)CleanCoalitionElectricPowerResearchInstitute(“EPRI”)eMotorWerksEnphaseFiatChryslerGreenPowerInstitute(“GPI”)HondaInterstateRenewableEnergyCouncil(“IREC”)JKBEnergyKituSystems

Page 11: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

9

LPSNuvveOpengridPacificGas&Electric(“PG&E”)SocietyofAutomotiveEngineers(“SAE”)SmallBusinessUtilityAdvocates(“SBUA”)SouthernCaliforniaEdison(“SCE”)SanDiegoGasandElectric(“SDG&E”)SolarEdgeStemSunrunSunworksTechFlowTeslaTheUtilityReformNetwork(“TURN”)WilldanX-Utility

Page 12: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

10

Issue12HowcantheCommissionimprovecertaintyaroundtimelinesfordistributionupgradeplanning,costestimation,andconstruction?ShouldtheCommissionconsideradoptingenforcementmeasureswithrespecttothesetimelines?Ifso,whatshouldthosemeasuresbe?PROPOSALSUMMARIESProposal12-a.ConsensusEstablishaframeworkforquarterlytrackingandreportingontimelinesfortheinterconnectionapplicationreviewprocessandfordesignandconstructionofinterconnection-relateddistributionupgrades.Theframeworkincludestwelvespecifictimelinesfortrackingandreporting.Proposal12-b.Non-consensusIncludesevenadditionaltimelinesintheframeworkfortrackingandreporting.

Supportedby: CALSSA,CleanCoalition,GPI,IREC,JKBEnergyOpposedby: PG&E,SCE,SDG&E

Proposal12-c.ConsensusEstablishstandardtimelinesfordesignandconstructionofinterconnection-relateddistributionupgrades,whichcanbeeither:(i)60businessdaysfordesignand60businessdaysforconstruction;or(ii)designandconstructiontimelinesasagreedwithcustomer.Proposal12-d.Non-consensusEstablishstandardtimelinesforinstallationofNetGenerationOutputMeters(NGOMs),whichareeither:(i)20businessdaysfordesignandinvoicing,and20businessdaysforconstruction;or(ii)designandconstructiontimelinesasagreedwithcustomer.

Supportedby: CALSSA,CleanCoalition,GPI,IREC,JKBEnergy,SDG&E,TeslaOpposedby: PG&E,SCE

Proposal12-e.ConsensusCustomerswillbenotifiedwheneveratimelineisnotmet,andnotificationwillinclude:(a)newexpecteddate;(b)categoryofdelay;and(c)reasonforthedelay.Proposal12-f.Non-consensusSetanoverallgoalthat95-100%ofprojectsmeetalltimelineswithintheframeworkfortrackingandreportingwithintwoyearsafterthestartoftracking.

Supportedby: CALSSA,CleanCoalition,GPI,IREC,JKBEnergy,SCE,TeslaOpposedby: PG&E,SDG&E

Page 13: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

11

Proposal12-g.Non-consensusIfinitialtrackingrevealsthatautilityisnotmeetingthegoalestablishedbyProposal12-f,theutilityshall:(1)setadditionalintermediategoalswithinthefirsttwoyearsafterthestartoftracking,and(2)establishaprocesstoachievecompliancewithintwoyearsofthestartoftracking.

Supportedby: CALSSA,CleanCoalition,GPI,IREC,JKBEnergy,TeslaOpposedby: PG&E,SCE,SDG&E

Proposal12-h.Non-consensusTheoverallgoalfortimelinesfromProposal12-fwouldapplyto:(i)allnon-NEMprojects;and(ii)allNEMprojects>30kW.

Supportedby: CALSSA,CleanCoalition,GPI,IREC,JKBEnergy,SCE,TeslaOpposedby: PG&E,SDG&E

Proposal12-i.Non-consensusAftertwoyearsoftrackingandreportinghavebeencompleted,EnergyDivisionwillreconvenethepartiesforadiscussionofwhetherthegoalshavebeenachievedand,ifnot,whatfurthersteps(ifany,basedonthesituationpresented),wouldbeappropriatetotake.TheCommissionshouldclearlyindicatethatfinancialpenaltieswillbeonthetablefordiscussionifthegoalsarenotmet.

Supportedby: CALSSA,CleanCoalition,GPI,IREC,JKBEnergyOpposedby: PG&E,SCE,SDG&E

Proposal12-j.Non-consensusUtilitiesshouldprovidequarterlyupdatesonsubstationupgradestoapplicantswhoseprojectsaredependentonagivensubstationupgrade.

Supportedby: CALSSA,CleanCoalition,GPI,IREC,JKBEnergyOpposedby: PG&E,SCE,SDG&E

BACKGROUNDIssue12wasdiscussedoverthecourseoffourWorkingGroupmeetingsandthreeconferencecalls.Duringinitialdiscussionsandinproposals,somepartiesclaimedthatdistributionupgradedesignandconstructiontimelinesarenotbeingset,communicated,and/oradheredtoinasufficientlypredictableandconsistentmanner.Somepossibleconsequencesarethat:(a)projectdeveloperscannotgivereliableestimatestotheircustomers;(b)customersmayhavetocarrytheirownfacilitiesloanorleasingcostsforwhatcouldbeconsideredunreasonablyorunpredictablylongperiods,forgoingrevenuetocoverloanorleasecostsuntilfacilitiesareoperational;and(c)utilitiesarenotbeingheldsufficientlyaccountableforcommunicatingandadheringtotimelines.Thesignificance,validity,andseriousnessoftheaboveclaimsvarieddependingonutility,projecttype,andprojectsize.

Page 14: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

12

Somepartiesclaimedthatdelays,uncertainties,andlackofcommunicationareseriousissues,affectingthecommercialviabilityofbusinesses,jobs,andtheverywillingnessofcompaniestooperateinthedistributedenergysector.TheWorkingGroupreviewedsomedataandexamplesrelatedtotimelineissues,butrecognizedthatcomprehensivedataregardingspecificmilestonesdiscussedwithintheIssue12proposaldoesnotcurrentlyexist.Partiesalsocitedspecifictypesofprojectsthatcouldbeassociatedwithsignificantdelaysanduncertainties,againdependingontheutility,suchasNEMaggregationprojects(whichcanrequirereviewofownershipandland),additionalmeteringforsolarandstorage(withexamplesofthistaking6-12months),andsomeresidential5-kW-rangesolarsystems(withexamplesoftaking6-12monthsforatransformer).Fundamentally,partieswishedtoseemeasuresthatwouldcreatehigherlevelsofaccountability,transparency,communication,andconsistencyaroundalltimelines,andtoidentifyareasexperiencingchallengesthatwouldbenefitfromfurtherreview.Timelyandconsistentnotificationsofproject-specificdelaystodevelopersandcustomerswasalsoidentifiedasanareaofconcern.Whilethereissomelimitedreportingavailabletoparties,publicinterconnectionqueues,andindividualIOUNEMdata,therearegapsinthosesourcesthatpreventtheutilities,stakeholdersandCommissionfromhavinganobjectivesourceofdatatofacilitatediscussionsaboutwhatis,andisnot,workingintheprocess.Partiesinthepasthaveproposeddatagathering,andthediscussionrecognizedthattheCPUCisalreadyconductinganindependentstudyreviewofinterconnectiontimelinesduring2019.Nevertheless,PartiesgenerallyagreedthatIssue12proposalscanbeputforthinparallelwiththatindependentreview.Utilitiesprovidedinformationontheircurrentpracticesrelatedtoupgradetimelines.Allutilitiessaidimprovementshadbeenmadeandwerebeingmadeintimelinesetting,communication,andadherence,andthatanecdotesbypartiesmightrelatetopastpracticesandnotthecurrentsituation.Withrespecttotheupgradetimelines,SDG&Enotedthatitagreesonspecifictimelineswiththecustomerforeachproject,andthesetimelinesareincludedininterconnectionagreementsanddiscussedandupdatedwiththecustomerthroughouttheprojectlifecycle.SCEnotedthatitalreadyprovidesbest-practiceupgradetimelines,whichinclude60businessdaysfordesignand60businessdaysforconstruction,andthattimelinesareincludedininterconnectionagreements.PG&Esaidithadbeenworkingonserviceplanningimprovementsforthepastthreeyears,andrecentlysetupadedicatedcentralizedworkgrouptohandleallgenerationinterconnectionrequests,anexpectedimprovementbecausenotallregion-basedcostestimatorsareveryfamiliarwithgenerationinterconnections.Withrespecttothebroaderprocesstimelines,eachoftheutilitiescurrentlyhasadifferentmethodfortrackingtimelines.Forsomeutilities,notallthetimelinesinRule21arecurrentlytrackeddirectlyandthusthepartiesworkedtogethertocomeupwithalistoftimelinestotrackthatcouldbereasonablyachievedbyalltheutilities.Utilitiesalsoexplainedsomeofthefactorsthatcausevariabilityanduncertaintiesintimelines.Forexample,somefactorsthatextendconstructiontimelinesandonlybecomeapparentafterdesigniscompletedare:(a)whenreplacingapoleneedtocoordinatewithotheragenciesandthemechanismforapprovalbyotheragenciescanbea45-dayprocess;(b)theFAAbecomesinvolvedifthereisaneedtoincreaseheightofpoleby1ftormore,andFAAhas45daystorespond;and(c)

Page 15: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

13

landrightsorpermittingissues.Also,constructiontimelinevariabilityoruncertaintiescomefromconstructioncrewsbeingusedforemergencywork,stormduty,orifacustomersiteisnotreadyorcustomerhasn’tdonenecessarypreparationwork.Ingeneral,timelinesdependonscopeofwork,jurisdiction,thetimingofconstruction,thetypeofconstruction,permits,environmentalreviews,environmentalmitigations,trenching,timeofyear(i.e.,cannothavesubstationoutagesduringthesummer),etc.Anotherfactorcitedwastheintroductionofnewtechnologies,especiallyintroductionofnewtypesofbatteriesinhomesystems,whichmeansthatsystemplannersnotfamiliarwiththetechnologieshavetolearnaboutthemfirst.Inaddition,interconnectioncustomersalsohavetoensuretheirportionoftheprojectiscompletedtoallowfortheutilityconnectionwhichisnotwithintheutility'scontrolandcanalsoleadtorelatedutilitydelaysiftheinterconnectioncustomer'sportionoftheprojectisnotready.Non-utilitystakeholdersrespondedtotheseutilityexplanationsoffactorsbysayingthatexceptionswillalwaysbeneededforemergencies,delaysfromotheragencies,andotherreasons,butthatitisstillusefultohavestandardexpectations.Althoughthescopingmemoreferredspecificallytoupgradetimelines,partiesalsodiscussedtheneedforimprovedtrackingandaccountabilityforallRule21timelines,includingspecificallythoseassociatedwiththemajorprocesssteps.ThediscussionalsonotedthelinkageofIssue12withIssue22oninterconnectionportals,inprovidingonlinetimelineinformation,updates,andnotifications.DISCUSSIONProposal12-a.ConsensusEstablishaframeworkforquarterlytrackingandreportingontimelinesfortheinterconnectionapplicationreviewprocessandfordesignandconstructionofinterconnection-relateddistributionupgrades.Theframeworkincludestwelvespecifictimelinesfortrackingandreporting:

1. TimefromsubmissionofInterconnectionRequest(IR)toutility’sacknowledgmentofreceipt2. TimefromsubmissionofIRtotimedeemedcomplete3. TimefromIRdeemedcompletetocompletionofinitialreviewandprovisionofresults4. TimefromSupplementalReviewstartdatetocompletionofSupplementalReview5. TimefromElectricalInterdependenceTest(EIT)startdatetoEITcompletion.6. TimefromEITcompletionuntilEITresultsscopingmeetingisheld.7. Timefromstudyscopingmeetinguntilstudyagreementprovided.8. TimefromSystemImpactStudystartdatetoSystemImpactStudycompletiondate9. TimetoprovideDraftGeneratorInterconnectionAgreementafterapplicablemilestone10. TimefromDraftGeneratorInterconnectionAgreementProvidedorFinalStudyReportdate

forDetailedStudytodateGeneratorInterconnectionAgreementexecuted11. Timefromwhenthecustomerprovidestheutilityithascompletedallofitsobligations

undertheagreements(F.5.b),includingcommissioningtests,towhentheutilityprovidesthecustomerPermissiontoOperate

Page 16: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

14

12. TotaltimefromsubmissionofIRtoPermissiontoOperate(note:notinRule21,trackedforinformationalpurposes)

Utilitiesdidnotwanttoestablishretroactivebaselinedata,sayingtheburdenwastoogreat,butlookedtoestablishfuturebaselines,forexamplewithinsixmonthsaftertrackingbegins.SCEcommentedthatitstrackingandreportingoftimelines#2and#3donotincludereportingongeneratinginitial(non-binding)estimatesofupgradecosts,whenrequired.SCEalsocommentedthattimelines#11and#12bothincludecustomersponsoreditems,andthattrackingofthesetimelinesisbeingproposedforinformationreportingpurposesonly,anddoesnotimplythatatimelinemetricisbeingsuggestedorisnecessary.SCEsaidthattimelinetrackingwillnecessitatesomeconfigurationinexistingsystemstoenablecomprehensivereportingcapability.SCEproposedtomodifyitsexistingsystemstoenabletimelinereportingofaforementionedprocesssegments.TimelinereportingbySCEmaycommenceasearlyasJuly2019;iftimelinereportingisexpectedtonotcommencebythisdate,SCEwillinformWorkingGroupThree.SCEfurthercommentedthatithasanewITplatformcurrentlyunderdevelopmentwhichwillbedesignedtoenableenhancedvisibilityoftimelinetrackingforcustomersinthenearfutureandwhichwillmakereportingofthosemetricstoregulatorsmoreefficient.EachutilityoperateswithitsownITplatformandresourcesandwillhavetomakerespectiveadjustmentsinordertoreportmoreeffectively.PG&Eagreesinprinciplewithestablishingaframeworkfortrackingandreportingontimelinesasameansforidentifyingprocessgapsandmovingbeyondanecdotesfordeterminingareasoftheprocesswiththemostneedforimprovement.Proposal12-b.Non-ConsensusIncludesevenadditionaltimelinesintheframeworkfortrackingandreporting,forpurposesofeitheraccountabilityorinformation.

Supportedby: CALSSA,CleanCoalition,GPI,IREC,JKBEnergyOpposedby: PG&E,SCE,SDG&E

Theproposedsevenadditionaltimelinesare:

TimelinealreadydefinedinRule21(asdefinedstepsinthescreeningprocess),trackedforaccountabilitypurposes:

• Timefromrequesttoconsidermodificationtodeterminationwhethermodificationis

material(F.3.b.v).

TimelinesnotalreadydefinedinRule21,trackedforaccountabilitypurposesusingtimelinesproposedbelow:

Page 17: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

15

• Timeforrespondingtoline-sidetapsvariancerequests(forutilitiesthatrequirea

variancerequest)• Designandinvoiceofnetgenerationoutputmeter• Installationofnetgenerationoutputmeter

TimelinesnotalreadydefinedinRule21,trackedforinformationalpurposes:• Timefromcustomeragreementtoproceedtofinaldesignandissuanceofinvoice• Timefromcustomerpaymentofinvoiceandcompletionofcustomerworktocompletion

ofupgradeconstruction• TimeforschedulingofCommissioningTest.

Proponentpositions:

IRECconsidersthesetimelinesasaninterimstepthatcancommencequickly(bymid-2019)tobegintrackingtheprocessandconstructiontimelinesinRule21.ThisisnotintendedtoreplaceorcircumventtheeffortsoftheoutsidereviewbeingdonebytheEnergyDivisionconsultant.IREC,inparticular,believesthattherearelikelymoretimelinesthatmayneedtobetracked,butagreesthatthelistidentifiedhereisagoodstartfornow.IRECsaysthereisnocleartimelineforschedulingofacommissioningtest,despitethefactthatthisisacriticallyimportantjunctureforprojectstofinallyobtainpermissiontooperate.Itisthusimportanttotrackthissteptoensurethatitishappeningwithinareasonabletimeframe.ThelackofatimelineintheTariffdoesnotmeanthisisnotimportanttotrackforinformationalpurposes.CALSSAcalledthetimelineforrespondingtoline-sidetapsvariancerequestsa“painpoint”fordevelopersandsaidthisshouldbeincludedintheproposaltofosteraccountability.IRECbelievestherearegoodreasonstotracktheRule21timelineforrespondingtomodificationrequests(F.3.b.v),sayingitisanimportantstepintheprocessandhasbeenthesourceofcontroversyandthusshouldbetrackedandreportedon.Teslasaysthatdesignandinvoiceofnetgenerationoutputmeterandinstallationofnetgenerationoutputmeterarestepsthathavehistoricallyposedsignificantchallengesintermsoftheamountoftimetaken,andneedtobetracked.

Utilitypositions:

SCEdoesnotagreetoincludetimelinesforrequestsformodificationsandschedulingofcommissioningtestasrefinedmodificationprocedureswerejustapprovedinMarch2019andarependingupdateinthetariffwithsubsequentAdviceLettersandrelatedreview/approvalforthcoming.Inaddition,theCommissioningtestisnotaonesideutilityobligationandiscontingentontheinterconnectioncustomeragreeingtotestandprovidingaccessandthereforeshouldberemovedasitiscustomercontingentaswell.

Page 18: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

16

SCEandSDG&Esaidothertimelineissuescouldbelookedintointhefuture,giventheoverallframeworkbeingestablishedinProposal12-a.SDG&Ebelievessomeoftheseadditionaltimelinesaremoreofaprocessissueandnotatrackingissue,andthattheInterconnectionDiscussionForumisthepropervenuetofurtherdiscuss.

Proposal12-c.ConsensusEstablishstandardtimelinesfordesignandconstructionofinterconnection-relateddistributionupgrades,whichcanbeeither:(i)60businessdaysfordesignand60businessdaysforconstruction;or(ii)designandconstructiontimelinesasagreedwithcustomer.Therewasconsensusthatthe“60-dayclock”inthecaseofoption(i)wouldcommenceuponpaymentandafterthecustomerhasdoneeverythingnecessaryontheirendtoprepareforconstruction.Proposal12-d.Non-consensusEstablishstandardtimelinesforinstallationofNetGenerationOutputMeters(NGOMs),whichareeither:(i)20businessdaysfordesignandinvoicing,and20businessdaysforconstruction;or(ii)designandconstructiontimelinesasagreedwithcustomer.

Supportedby: CALSSA,CleanCoalition,GPI,IREC,JKBEnergy,SDG&E,TeslaOpposedby: PG&E,SCE

CALSSAidentifiedNGOMstimelinesasanimportantissueinitsoriginalproposal.TherewassomediscussionoftheneedfortimelinesspecifictoNGOMs.CALSSAinitiallyproposedthe20days/20daysforallprojects.Partiesnotedthatitneedstobeveryclearwhatconditionsstartthe20-dayclocks,includingcustomernotificationthatcustomerisready,customerhasprovidedallinformationneededinordertoinvoice,paymenthasbeenmade(invoicepaid),andinspectioniscomplete(alwayswithlocalinspectors).Partiessuggestthatthetimelinesfordesignandestimateshouldbeginuponsubmissionofasignedinterconnectionagreement,andforconstructionthetimelineshouldstartonmeterreleaseorreceiptofpayment.Utilitypositions:

SDG&Eagreestoproposal,andsaiditsupportstheabilitytohavetwo-wayflexibilitywiththecustomerinagreeingtothedurationwiththecustomerupfrontasit’sSDG&E’sgoaltomeetthecustomersinservicedate.

Page 19: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

17

SCEdoesnotagreetotheproposal,andsaysitcurrentlyachieves1-2-monthinstallationforthevastmajorityofNGOMinstallations.However,processimprovementsthatrequireITsystemfunctionimprovementareindevelopmenttoaddresstheminorityofcomplexNGOMinstallationsrequiringlengthiertimeframes.TheseprocessimprovementsarealreadyunderwaywithafocusonadministeringNGOMrequestsinasimilarfashionaswithexistingNEMPairedStorage,whichcurrentlyaverages2monthsforinstallation.SCEalsoofferedtoprovideinterimupdateseitherthroughtheinterconnectionforumorothermeans.SCEnotedduringthediscussionthat20daysfordesignand20daysforconstructionwasnotbasedonaveragetimelinetrackingbutwasanarbitrarytimelineproposedbyCALSSA,althoughSCEsupportsestablishingareasonabletimeline.PG&EisopentodevelopingITinfrastructuretotrackNGOMtimelines,butdoesnotagreewithestablishingatimelineof20businessdaysfordesignand20businessdaysforconstructionasthesetimelinescanvaryacrosstheserviceterritorybasedonlocalneeds.

Proposal12-e.ConsensusCustomerswillbenotifiedwheneveratimelineisnotmet,oratriskofnotbeingmet,andnotificationwillinclude:(a)newexpecteddate;(b)categoryofdelay;and(c)reasonforthedelay.Thereasonfordelaywillbeselectedfromsetcategoriesofreasons.Thecategoryofdelayisneededinordertotrackwhichtypesofdelaysaremostcommon.However,onthequestionoffurtherdetailingofreasonfordelaybeyondasetcategory,therewasnon-consensusamongparties.CALSSAandIRECproposedthatutilitiesprovideproject-specificreasonsfordelaystodemonstratewhyaprojectisdelayed,andthattheutilityhadgivenspecificattentiontothedelayforthatproject.Inotherwords,theobligationneedstobetoprovideareasonastowhytheutilityisnotincompliancewithitsobligationsforthatproject,notjustagenericresponsethatisauto-generated,thatdoesnotaccomplishthegoalofaccountabilityorhelpthecustomerunderstandwhatisactuallygoingonwiththeirproject.PG&Eagreeswithnotifyingcustomerswhenatimelineisnotmetandcurrentlyutilizesanautomatedsystemtodoso.Automaticdelaynoticesprovideanewexpecteddateandpointofcontact.WhenthedelaynoticeisissuedbyaPG&Erepresentative,areasonisenteredandtracked.However,PG&Edoesnotagreewithsite-specificreasoningforeachdelaynoticebecausenotalldelaynotificationsareforconstructiontasks,thereforenotallhaveasite-specificreasoning.Forconstruction-relatedtasks,PG&Edoesitsbesttoprovidesite-specificreasoning,buttheworkflowmanagementdatabasesareseparatebetweenElectricGridInterconnectionandServicePlanningandEGIdoesn’thavealineofsightintothestepbystepconstructionprocess.ForSCE,withtheimplementationoftheGridInterconnectionProcessTool(GIPT),itisexpectedthatprojecttimelineswillbeavailableontheportaltocustomers.Therefore,customer"notice"wouldbeavailabletotheinterconnectioncustomerthroughtheirprojectreviewontheGIPTinterconnectionportal.SCEmakesthispointsoastoclarifySCE'sunderstandingofwhat"notice"

Page 20: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

18

wouldinvolve.Inaddition,itisalsoexpectedthatanautomatednotificationwillbeissuedthroughtheGIPTsystemrequestingtheinterconnectioncustomertochecktheirprojectstatus.AsGIPTiscurrentlygoingthroughtheimplementationprocess,theadditionalnoticesdiscussedunderthisproposalaresubjecttothefunctionalitybecomeavailable.Itwasalsodiscussed,butnoconsensuswasachieved,onwhetherCPUCEnergyDivisionshouldbesimilarlynotified.Partiessaidthisnotificationcouldbeaddressedwhendetailsoftheactualreportingaredeveloped.SDG&EdoesnotsupportnotifyingtheCPUCEnergyDivisioneverytimeatimelinedateisnotmet,asthisprocesswouldbeoverlyburdensome.PG&EisopentonotifyingEnergyDivisionandsuggeststhatifthisispursued,PG&EcanprovideareporttoEnergyDivisionofallnotificationsissuedintheworkmanagementsystem.IfEnergyDivisionwouldratherbenotifiedeachtimeatimelineisnotmet,PG&EcanaddaCPUCemailasabcc.SCEproposestoplacereportingontheirinterconnectionsitethatpartiescanreviewattheirowndirection,asdiscussedabove.Substationupgradesneedtobetreateddifferentlybecausetheyoftenhavemuchlongertimelineswithmoreuncertainty.Ratherthansettingspecifictargetcompletiondatesandputtingthoseininterconnectionagreements,CALSSAproposesthatutilitiesgivequarterlyupdatestoallcustomersthatarewaitingfortheupgradebeforetheycanbeinterconnected.Thisproposalwasnotdiscussedfurther,assubstationupgradesweredeemedout-of-scopeduringthefirstdiscussionforIssue12.Proposal12-f.Non-consensusSetanoverallgoalthat95-100%ofprojectsmeetalltimelineswithintheframeworkfortrackingandreportingwithintwoyearsafterthestartoftracking.

Supportedby: CALSSA,CleanCoalition,GPI,IREC,JKBEnergy,SCE,TeslaOpposedby: PG&E,SDG&E

NotebyWorkingGroupFacilitatorGridworks:PG&EchangeditspositiononProposal12-ffromsupporttoopposeattheendoftheWorkingGroupprocess,whennodiscussiontimeremainedforpartiestorespond,andthediscussionbelowforProposal12-fwasnotchanged.

DuringtheWorkingGroupmeetingsandcalls,therewasconsiderablediscussionofgoals.BothPG&EandSCEsaidtheywouldworktocommencetrackingtimelinesinJuly2019,andsotheoverallgoalwouldbeforJuly2021.PG&EandSCEwillreportontheirprogressquarterlyandagreetoseektocomeintofullcomplianceonalltimelinesbyJuly2021.Utilitypositions:

SCEagreedthatgoalswereusefulforprocessimprovementsandcorrectiveactions.Goalsstemfromabenchmarkofthemutuallyacceptedeffectivenessofaprocessorfunction.Onceagoalisestablished,thegoalservestoinformprocessownersastoprocessefficacy.Thedatacollectedforgoaltrackingisusedforfirst,processorresourceimprovement,and

Page 21: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

19

second,foradministrationofcorrectiveactionorcommendationdependingonresultsofprocessimprovementandoptimization.PG&Edidnotagreethatgoalsshouldbelinkedtoanyfutureenforcementmeasures,butviewstrackingtimelinestowardgoalsasanopportunitythatshouldbeusedtoidentifyprocessgapsandpartiesshouldcollaboratetoaddresstheprocessgaps.PG&Ewantstoleveragecollectivestakeholderexpertisetoanalyzecollecteddata,collaborateonidentifyingandclosinganygapsandkeepimplementationofimprovementsprioritizedtoareaswiththemostneedasdeterminedbythedata.SDG&EwasnotinfavorofbeginningreportinginJuly2019,butwouldbeginreportingasordered.SDG&Eisnotinconsensuswithsettinganoverallgoal.WithSDG&ERule21applicationsaccountingforlessthanapproximately0.1%ofallapplicants,settingrequirementsofestablishingagoalorshorteningdurationofdelaystoreachcompliancethresholdstoincrementallyimproveprogressisnotbeneficialtoSDG&Eratepayers.

Proposal12-g.Non-consensusIfinitialtrackingrevealsthatautilityisnotmeetingthegoalestablishedbyProposal12-f,theutilityshall:(1)setadditionalintermediategoalswithinthefirsttwoyearsafterthestartoftracking,and(2)establishaprocesstoachievecompliancewithintwoyearsofthestartoftracking.

Supportedby: CALSSA,CleanCoalition,GPI,IREC,JKBEnergy,TeslaOpposedby: PG&E,SCE,SDG&E

Inadditiontoproposinganoverallgoalof95-100%ofprojectsmeetingtheirtimelinesbytheendofatwo-yearperiod,whichwasadoptedasProposal12-f,IRECalsoproposesastep-wiseprocessforutilitiestosetintermediategoalstoincrementallyimproveprogressuntilcomplianceisachieved.IRECalsoproposesagoaltoshortenthedurationofindividualprojectdelays.IREC’sproposalisthatincrementalprogressgoalsbeestablishedasfollows.Iflessthan95%ofallprojectsmeettheRule21timeframesforallsteps,theutilityshallsetincrementalprogressgoalsbasedonthebaselineestablishedinJanuary2020.Thegoalsshallestablishincrementalimprovementgoalstobeidentifiedforeachquarter.Thesegoalsshallbepublishedontheutility’swebsite.ThepurposeoftheseincrementalgoalsistogettheutilitiesonthepathtowardsaperiodwhereallprojectsarebeingcompletedwithintheRule21timeline,byensuringthateachstepoftheprocessistimelyachieved.Inaddition,whilethegoalsidentifiedaboveaimtoachieve95-100%compliancewitheachstepofthetimelinesforeveryproject,itisalsoimportanttoensurethatintheinterimnoindividualprojectshastowaitanunreasonablylongperiodoftimeforresults/utilityresponseduringanystep.Thepurposeofthisgoalisthustoensurethatwhentherearedelays,someprojectsarenotheldup

Page 22: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

20

forunreasonableperiodsoftime.Thus,foreachprojectthatexceedstheallottedtimelinebymorethan5daysforincrements15daysorless,orbymorethan10daysforincrementsgreaterthan15days,theutilityshoulddocumentandreporttheuniquereasonsforthedelayinthereportanddiscussspecificstepstakentoaddressorresolvethedelay.Duringeachquarterlyreport,theutilityshallidentifyprogresstowardthesegoals.Iftherearestilloutstandingtimelineswheretheutilityisnotachieving95-100%compliance,theutilityshoulddocumentwhatstepsitistakingtomakeprogresstowardsthegoalsabove.Therewasdiscussionof“improvementpotential”beingdevelopedbytheutilitiesoncebaselinesareestablished,withmorespecificgoalstobedevelopedafterbaselinesareestablished,forexamplestartinginJanuary2020.Utilitypositions:

PG&EandSDG&Edidnotagreetosetintermediategoals,andPG&E,SCE,andSDG&Edidnotagreetoaworkshopaftertwoyearstoconsiderfurtherfinancialaccountabilitymechanismsiftheoverallgoalshavenotbeenmet.

SCEwillprovideperiodicupdatesonitsprogressatInterconnectionDiscussionForums,asitcommencestimelinetrackingandquarterlyreporting.UpdatesmayincludestepsSCEmaybetakingtoachieve95%timelineperformance,shoulddatashowthatitfallsoutsidetheperformancebandof95–100%.Trackingeffortsin2019and2020willservetoidentifybaselinedata.PG&Ewantstoleveragecollectivestakeholderexpertisetoanalyzecollecteddataandcollaborateonidentifyingandclosinganygaps,asstatedinProposal12-f.Thedatacanbeusedtoidentifyareasofopportunity,PG&Edoesnotbelievearbitrarilysettingadeadlineforfixesmakessensewithoutknowingthescopeofthesolution.SDG&ERule21interconnectionsaccountforlessthanapproximately0.1%ofallapplications,sosettingrequirementsofestablishingintermediategoalsorshorteningdurationofdelaystoreachcompliancethresholdstoincrementallyimproveprogressisnotbeneficialtoSDG&Eratepayers.

Proposal12-h.Non-consensusTheoverallgoalfortimelinesfromProposal12-fwouldapplyto:(i)allnon-NEMprojects;and(ii)allNEMprojects>30kW.

Supportedby: CALSSA,CleanCoalition,GPI,IREC,JKBEnergy,SCE,TeslaOpposedby: PG&E,SDG&E

Page 23: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

21

Currently,thequarterlyreportstheutilitiesprovidetotheCommissiondonotincludenon-NEMprojects.ThereportingforNEMprojectsdoesnotincludeanydetailonthestepsintheinterconnectionprocess.Thus,IRECproposedthatthereportinghereincoverallprojectsexceptNEMprojects<30kW(StandardNEM).ThereisgeneralagreementthatstandardNEMprojectsgenerallyareinterconnectedquicklyandthevolumeofprojectswouldmakereportingcomplicated.TheapplicationoftheoverallgoalfortimelinestospecifictypesofprojectswasdiscussedandagreedbyallpartiesexceptPG&E.PG&Edidnotagreetoapplyingthisgoalmethodologytoanysubsetofprojectsbasedonsize.AsstatedinProposal12-f,PG&Ewantstokeepimplementationofimprovementsprioritizedtoareaswiththemostneedasdeterminedbythedata.Currently,standardNEMandNEM-pairedstoragehavebeenhighestvolumeprograms,soPG&E’sfocushasbeenonimprovingthose.InitialreportingbySCE,tostartinAugust2019,willincludeRule21non-exportingprojects,withtheremainingRule21interconnectionrequesttypesincludedforreportingandtrackingasSCE’snewdatabaseisbuilttosupportthosenewtypesofinterconnectionrequests.Proponentpositions:

Teslabelievesthatforthegoalstobemeaningful,itwillbeimportanttoassessadherencetothesetimelinesforprojectsofdifferentsizes.Missedtimelinesisprimarilyanissueimpactinglargerprojectssotoassesssuccessbasedonallprojectswillresultinsmallprojects,wherethishasnothistoricallybeenasmuchofanissue,skewingtheresultsandgivingthefalseimpressionthatthereisnotaconcern.Giventhis,importanttoassessadherencefordifferentprojectcohorts,basedonNEMvs.nonNEMandsmall(<30kW)andlarge(>30kW).Additionalgranularitymaybeappropriate.

Utilitypositions:

SCE:TherearecurrentreportingobligationsforRule21submittedonaquarterlybasisalongwithforNEMprojectssentinaccordancewiththeDistributedGenerationRulemaking.ThereportingforNEMprojectsdoesnotincludeanydetailonthestepsintheinterconnectionprocessasitfocusesonthetotalprojectcycle.Thus,IRECproposedthatthereportinghereincoverallprojectsexceptNEMprojects<30kW(akaStandardNEM).ThereisgeneralagreementthatstandardNEMprojectsgenerallyareinterconnectedquicklyandthevolumeofprojectswouldmakereportingcomplicated.

Proposal12-i.Non-consensusAftertwoyearsoftrackingandreportinghavebeencompleted,EnergyDivisionwillreconvenethepartiesforadiscussionofwhetherthegoalshavebeenachievedand,ifnot,whatfurthersteps(ifany,basedonthesituationpresented),wouldbeappropriatetotake.TheCommissionshouldclearlyindicatethatfinancialpenaltieswillbeonthetablefordiscussionifthegoalsarenotmet.

Page 24: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

22

Supportedby: CALSSA,CleanCoalition,GPI,IREC,JKBEnergyOpposedby: PG&E,SCE,SDG&E

Theutilitiesdidnotagreethatdiscussionoffinancialpenaltieswouldbeappropriateaftertwoyearsoftracking,butdidagreetoreconvenefordiscussionofappropriatenextsteps.IRECandotherstakeholdersstronglybelievethatifthereisafailuretolargelycomeintocomplianceaftertheproposedgoalsettingprocess,thatitisreasonable,andindeednecessary,toconsiderwhetherthereneedstobemorerigorousaccountabilitymeasuresadopted,includingthosethatmightimposefinancialpenaltiesontheutilityshareholdersforfailuretocomplywiththetariff.Proponentpositions:

IRECbelievesthatafinancialpenaltymechanismmaybeappropriate,butishopefulthatwithconcretegoals,trackingandreportingthatitwillnotbenecessary.IRECbelievesthegoalssetareconservative,reasonable,andachievable.Thus,IRECbelievesitisreasonabletoconsiderfinancialpenaltiesifthevoluntarygoalsettingprocessfails

TURNposition:

TURNnotesthatifafinancialpenaltyisbeingconsideredorlaterimposed,itneedstobemadeclearthatthepenaltywillbepaidbyshareholderdollars,notratepayerdollars.

Utilitypositions:

PG&E,SCE,andSDG&Edisagreethatapenaltyshouldbepaidbyeithershareholderorratepayersdollars.Consistentwiththeregulatorycompactandcostofserviceregulatoryratemakingprincipals,theIOUsmustbepermittedtorecoverprudent,reasonablecostsassociatedwithgeneratingfacilityinterconnection.SDG&EisnotinconsensuswiththisproposalasSDG&Edoesnotwanttoprejudgetheneedforanotherworkshop.

Proposal12-j.Non-consensusUtilitiesshouldprovidequarterlyupdatesonsubstationupgradestoapplicantswhoseprojectsaredependentonagivensubstationupgrade.

Supportedby: CALSSA,CleanCoalition,GPI,IREC,JKBEnergyOpposedby: PG&E,SCE,SDG&E

Partiesagreedthatsubstationupgrades,althoughsometimesthesourceofcustomer/applicantcomplaintsaboutlongdelaysanduncertainties,cannotbesubjecttobenchmarktimelinesduetotheircomplexnature.

Page 25: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

23

Proponentpositions:

CALSSA:Substationupgradesarethesourceofstrongcustomerdissatisfactionaboutlongdelaysandtimelinesthatchangeovertime.Whenacustomercannotinterconnectuntilsubstationworkiscompletedtheyhaveadifficulttimebalancingthetimingoftakingoutaloan,doingconstruction,usingthefederaltaxcredit,andgettinginterconnectionapproval.Itisgreatlydisruptivewhenautilityindicatesthattheworkwilltakeninemonthsanditendsuptakingtwoyears.However,substationupgradescannotbesubjecttostandardbenchmarktimelinesbecausetheytendtobecomplexandincludemultipleuncertainties.CALSSArecommendsthatutilitiesarenotheldtoastandardforsubstationupgradetimelinesbutthattheysendquarterlycommunicationstocustomersthatarewaitingforsubstationworktobecompletedbeforetheycangetpermissiontooperatetheirsystems.

Utilitypositions:

PG&Ewillentertainprovidingquarterlyupdatesonsubstationupgradesasabusinesspractice,butdoesnotsupportaddingthisrequirementtoRule21.Inaddition,PG&ErecentlyaddedadedicatedsubstationengineertooverseesubstationupgradesrelatedtogenerationinterconnectionprojectsandwillcontinuetoimprovetheRule21processviacollaborationwithstakeholdersanddevelopers.

SCE:Projectmeetingsarearegularpartofthepre-constructionandconstructionactivityforprojectswithlargeupgrades,includingsubstationupgrades.Thefirstkickoffmeetingoftheseregularprojectmeetingsoccurssoonafterexecutionoftheinterconnectionagreement,iftheworkistocommencerightaway,oratamutuallyagreedtimepriortothecommencementof“constructionactivities”.Thecadenceofsubsequentmeetingsisagreedtobyalltheparties,andifanICwantsmorefrequentmeetings,orameetingaboutacertaintopic,thosearereasonablyaccommodated.Duringthesemeetings;schedule,scope,andcostarealwaysattheforefrontofdiscussion.Thus,therealreadyexistsampleopportunityforSCEtohaveregularstatusupdateswithinterconnectioncustomersaboutsubstationupgradesandadditionalprovisionsinRule21arenotnecessary.

SDG&EwillcontinuetoprovideupdatestoitsRule21interconnectionapplicantsviatheprojectschedulesitdevelopsandupdatesthroughoutthedesignandconstructionoftheproject.SDG&EdoesnotsupportaddingthisrequirementaspartoftheRule21tariff,butinsteadwouldcontinuetocreatetwo-waytransparencybasedondesignandconstructionmilestonesasagreedtoandtrackedbyboththedeveloperandSDG&E.

Page 26: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

24

Issue15ShouldtheCommissionrequireitemizedbillingfordistributionupgradestoenablecustomercomparisonbetweenestimatedandbilledcostsandverificationoftheaccuracyofbilledcosts?PROPOSALSUMMARIESProposal15-a.ConsensusUtilitiesshoulddowhatisimmediatelypossibletoprovidecostitemizationbasedonexistingcapabilities.Asutilitiesevolvetheirprocessesinthefuture,eachutilityshouldstrivetoimprovetheiritemizedbillingprocessesforfurtherapplicantandcustomerclarity.

Proposal15-b.ConsensusTheCommissionshouldconsider“billonestimate”costestimatesinthefuture.ThiswouldneedtobescopedintoafutureRule21WorkingGrouporOIR.BACKGROUNDProjectdeveloperstypicallyprovidecostestimatestocustomersbasedontheUnitCostGuide.(NotethattheUnitCostGuideisbasedongeneralcostsbutnotmeanttoreplaceaspecificsystemstudy.Inaccordancewith16-06-052,theUnitCostGuideisforinformationalpurposesonlyanddoesnotgovernactualcosts.)Ifdevelopersknewtheactualcostsincurredforsomeseparatecomponentsoftotalcost,theycouldimprovefutureestimationsfortheircustomers.Partiesemphasizedtheneedforcostestimatesaroundmajorcomponentslikelinerunsandtransformers.UtilitieshighlightedthattherearealreadytoolssuchastheUnitCostGuidementionedabove,thatalsocanguidedevelopercostestimates.However,thereisnoconsistencyacrosstheutilitiesregardingthelevelofdetailprovidedinthefinalaccountinginvoice.Developershaveexpressedconcernregardingthelevelofdetailprovidedinutilityestimatestobetterreconcilecostsfromtheoriginalstudyestimate.Utilitiesinmanycasesprovideinitialcostestimatesthatareitemizedbycomponentbutwhentheysendtheinvoicethereisonlyonecostnumberfortheentireupgradeproject.Thislumpsumbillingdoesnotallowfordeveloperstoimprovefuturecostestimations,itagitatescustomerswhogetlargebillswithoutanysubstantialinformation,leavingthemwonderingwhatthey’veactuallypaidfor.Italsoreducesthefuturepotentialforcostcomparisonswiththird-partycontractorsdoingdistributionupgrades.Partiesdiscussedwhatcouldbeanappropriatelevelofdetailforcostitemization.Severalagreedthatthelevelofdetailrequiredistypicallyjustafewsimplelineitems,atroughlythesamehigh-levelofdetailasgivenintheUnitCostGuide,mostlylineitemsformeters,lineruns,transformer

Page 27: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

25

andSCADA.Therefore,issueproponentsproposedthatthecostcategoriescouldbemodeledfromtheUnitCostGuide.OnequestionfacingtheWorkingGroupwashowonerousisitforutilitiestoprovidetheappropriatelevelofdetailof3-5line-itemsforadistributionupgradeproject,giventheirexistinginformationandmanagementsystems.Iftheamountthecustomerpaysisbasedonatrue-upofactualcosts,itisdifficultforutilitiestoestimatehowmuchofthelaborcostwasfordifferentcomponentsofthework.UtilitieswereopentodiscussingsolutionswithinthecapabilitiesoftheirexistingITandcost-accountingsystems.Thisdiscussionaboutpossiblesolutionsthenledtoafurtherdiscussionaboutdifferenttypesofbilling,specifically“bill-on-estimate”billingandreconciledbilling.Underthebill-on-estimateconstruct,theinterconnectioncustomer’scostresponsibilityisequaltotheestimatedcostprovidedbytheutilitybeforeconstructionbegins.Theutilitydoesnotreconcileandthecostestimateisitemized.Underreconciledbilling,thecustomerpaysadepositatthetimeofthefinalestimateandmaymakefurtherpaymentsatothermilestones.Theutilityreconcilesbasedonactualcostsandthefinalbillisnotitemized.Itisdifficultforutilitiestodoitemizedbillswhentheydoreconciledbilling,partlybecausetheyhavetoestimatehowmuchofthetotallaborcostwenttoeachitem.PG&Ecurrentlydoes“bill-on-estimate”billingforprojectsbelow1MWandreconciledbillingforprojectsabove1MW.SCEdoesreconciledbillingforallprojects.Givenexistingcapabilities,ofallthreeutilities,onlySDG&Esaidtheywouldbeabletoprovidethetypeofcostitemizationbeingdiscussedwithouttheneedtochargecustomersadditionalcosts.DetailsaregivenbelowintheDiscussion.

DISCUSSIONProposal15-a.ConsensusUtilitiesshoulddowhatisimmediatelypossibletoprovidecostitemizationbasedonexistingcapabilities.Asutilitiesevolvetheirprocessesinthefuture,eachutilityshouldstrivetoimprovetheiritemizedbillingprocessesforfurtherapplicantandcustomerclarity.

DuringthecourseoffiveWorkingGroupin-personmeetings,utilitiesinvestigatedtheoptionsforprovidingitemizedbilling,basedontheircurrentITandcostaccountingsystems.OnlySDG&Eisabletoprovideitemizedcostestimatesfromtheirexistingsystem,withnoadditionalcost,basedontheirexistingmanualprocess.PG&EandSCEfoundthatsolutionswerenotsimple,andrequiredthemtoincuradditionalcosts.Utilitypositions: SCEcurrentlypreparestheestimateandfinalaccountinginvoicebaseduponinteractionof

systemsthatprovidetheunderlyingengineeringstudyandthenseparatelyintoanaccountingsystemthatprovidesatotalamountforeachServiceOrder.Giventheseexistingsystems,SCEwouldhavetoperformamanualprocessatanadditionalcosttoprovideitemizationfortheindefinitefuture.Anautomatedversionofthisoptionisnotfeasiblein

Page 28: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

26

theforeseeablefutureduetosystemconstraintsandthatbillingsystemistiedtoothersupportingsystemsandthesystemtopographywouldhavetoberevisedwhichisnotpracticalatthistime.

PG&E’sestimatingtool,likeSCE,wouldrequireITworkinordertoautomaticallydevelopitemizedestimates.Toincreasethelevelofdetailprovidedinestimateswithinexistingcapabilities,PG&E’scurrentestimatingtoolcanprovideanestimatedcostforeachordernumberassociatedwiththeproject.

SDG&EispreparedtoprovideitemizedbillingthatisconsistentwiththecostcategoriessetforthintheUnitCostGuideatnoextracost.

Proposal15-b.ConsensusTheCommissionshouldconsider“billonestimate”costestimatesinthefuture.ThiswouldneedtobescopedintoafutureRule21WorkingGrouporOIR.AsnotedintheBackgroundsection,partiesdiscussed“bill-on-estimate”billingasanapproachthatwouldeliminatetheneedforanitemizedfinalbill.Underthebill-on-estimateconstruct,theinterconnectioncustomer’scostresponsibilityisequaltotheestimatedcostprovidedbytheutilitybeforeconstructionbegins,withnoreconciliation.Thecostestimatewouldbeitemized.Utilitypositions:

SCEcurrentlyislookingintoa"bill-on-estimate'approach.PG&Eproposeda“bill-on-estimate”processtoreplacefinalreconciliation.Initsresearchofprojectsthatcurrentlyundergoreconciliation(WholesaleDistributionandRule21Export),PG&Edeterminedthatonaportfoliolevel,employingbill-on-estimatewouldresultinbilledcoststhatareconsistentlylowerthanactualcosts.Therefore,toaccountforthedifferenceacrosstheportfolio,therewouldneedtobeafixedcost-multiplierappliedtotheestimate.Thiscostmultiplierwouldapplytoallcustomersforallprojectsthattriggercapitalworkormitigations,regardlessofsize.Afteremployingadata-drivenapproachtoreachthisnumber,PG&Ecanofferbill-on-estimatetoallRule21andNEM2projectswitha20%estimatemultiplier.ThisnumbermayvaryacrosstheIOUsbasedonestimatingmethodologyandtools.PG&Eisconductingseparateresearchtoevaluatewhetheranadditionalpercentagemultiplierwouldbenecessaryforlargerprojectstoprovidecostcertaintyforcomplexupgradeswithhighercostvariabilitywhileensuringthattheportfolioismadewhole.DuringtheWorkingGroupdiscussionofPG&E’s“bill-on-estimate”process,questionsofprojectsizelimitationstowhichPG&E’s“bill-on-estimate”wouldapplywereraisedbyparties.PG&E’s“bill-on-estimate”wouldapplynewlyonlytosystemslargerthan1MW,ascurrentlysystemssmallerthan1MWalreadyundergo“bill-on-estimate.”

Page 29: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

27

Issue16ShouldtheCommissionencouragethirdpartyconstructionofupgradestosupportmoretimelyandcost-effectiveinterconnectionand,ifso,how?PROPOSALSUMMARIESProposal16-a.ConsensusIncorporatebyreferencetariffRule15eligibilityrulesintoRule21,specificallyregardingRule15,SectionG.2(R15.G.2)minimumcontractorqualifications,”Rule15,Section15.G.3(R15.G.3)“Othercontractorqualifications,”andRule15,SectionI.1(R15.I.1)“Facilityrelocationorrearrangement.”Proposal16-b.ConsensusHaveRule21refertoapplicableRule15“competitivebidding”language.Proposal16-c.ConsensusRemovethe“discretion”languageinRule21thatstates“SubjecttotheapprovalofDistributionProvider,aProducermay,atitsoption…”providedthatthelanguageischangedfrom“subjecttoapproval”to“subjectto/consistentwithRule15”contractorselectionrulescitedinProposal16-a.Proposal16-d.Non-consensusAllowthird-partiestoworkonexistingde-energizedsystemsunderspecifiedscenarios,suchasondedicatedlinesandinotherspecifiedsituations. Supportedby: CleanCoalition,GPI Opposedby: PG&E,SCE,SDG&EBACKGROUNDIssueproponentspointedtothepotentialbenefitsofallowingandencouragingthird-partydistributionupgrades,includingamelioratingsomeoftheongoingproblemswithcostsandtimelinesassociatedwithvarioustypesofupgrades,creatingamorecompetitiveenvironmentthatcouldovertimeimprovecostsandtimelines,andallowingtheincrementalcostsofacceleratedschedulestobebornebyprojectdevelopersbenefitingfromtheacceleratedschedules.Generallyspeaking,thepresumptionbyissueproponentsisthatthird-partyupgradeswillprovidedeveloperswithmorecontroloverthetiming,costsandchoiceofcontractorsperformingtheupgrades,aswellascreateamorecompetitiveenvironment.Theprimaryconcernsrelatedtothird-partyupgradesaresafetyandreliabilityoftheelectricalgridandcustomersconnectedtotheelectricgrid.Inparticular,Rule21currentlyalreadyallowsforthird-partyconstruction,subjecttoapprovalbytheDistributionProvider,oninterconnectionfacilities.Inaddition,astheongoingoperatingmaintenanceandoperatingcostsarebasedupon

Page 30: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

28

facilityconstructioncost,itshouldnotbeassumedthatuseofthird-partycontractorsalwayswilltranslatetolowercosts,consideringbothinitialandongoingcosts.Itiscriticalthatthetypeoffacilityforwhichthird-partyconstructionisalloweddoesnotposepotentialsafetyorliabilityconcernstootherenergizedcustomersorfacilities.Toenablethird-partyupgrades,partiesdiscussedandconsideredeligibilityrulesandcompetitivebiddinglanguage.InpreparingProposals16-aand16-b,therewasdiscussionaboutqualificationofcontractors,howcontractorscouldbeselected,whetherthereneededtobealistofapprovedcontractors,whowouldmaintainthatlist,andtheroleoftheCPUC.WorkingGroupparticipantsemphasizeditwasacceptabletolimitthird-partyinvolvementtothosecontractorsalreadybeingusedbytheutilities,orbythosethird-partycontractorsthatmeettherequirementssetforthinR15.G.2andR15.G.3.Ultimately,referencetoRule15provisionsintheseproposalsresolvedthosequestions.Partiesemphasizedthatthird-partyupgradeswillstillbetransferredtoandmaintainedbytheutility,asiscurrentlythepractice.Andthatsuchupgradesmustensureutilitydesignspecificationsandsafetystandardsaremet,asdeterminedbytheutility.Utilitiessaidthereisadifferenceinparticularwhenexistingenergizedfacilitiesareinvolved,forbothliabilityandsafetyconcerns.IssueproponentsGPIandCleanCoalitionposedquestionsabouthowthird-partiescanbeselectedandqualified,whatshouldbetheroleoftheCPUC,andwhatlanguagechangesareproposedforRule21.Theseproponentsalsoprovidedanissuebriefandproposalthatincludedexampleswherethird-partydistributionupgradeshavebeenperformed,includingforSMUD,ImperialIrrigationDistrict,andPG&E.However,subsequenttothatissuebrief,SCErespondedthatitcontactedSMUDinMarch2019andSMUDrepresentedthatallowingthird-partyworkonenergizedfacilitiesisnotconsistentwithitspractices.NotebyWorkingGroupFacilitatorGridworks:AfterthefinaldiscussionofIssue16intheWorkingGroup,proponentGPIprovidedarevisedproposalthatincludedfurtherideasnotdiscussedduringtheWorkingGroupmeetingsandnotvettedbyanyutility--seeAnnexA.

Page 31: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

29

DISCUSSIONProposal16-a.ConsensusIncorporatebyreferencetariffRule15eligibilityrulesintoRule21,specificallyregardingR15G.2minimumcontractorqualifications,”R15.G.3“Othercontractorqualifications,”andR15.I.1“Facilityrelocationorrearrangement.”4Eligibilityrulesareneededtoensurethird-partiesaresufficientlyqualifiedforensuringsafetyandreliability.PartiesagreedthattherewasnoneedtoadoptadditionallanguageinRule21giventhatthislanguagealreadyexistsinRule15.Proposal16-b.ConsensusHaveRule21refertoapplicableRule15“competitivebidding”language.Onlyqualifiedcontractorswouldbeabletoparticipateinthebidding,consistentwithexistingbiddingandqualificationpractices.PartiesagreedthatherewasnoneedtoadoptadditionallanguageinRule21giventhatthislanguagealreadyexistsinRule15.Rule21wouldrefertothefollowingspecificlanguageinRule15:

R15.G.1.a.–UponcompletionofApplicant’sinstallationandacceptanceby[utility],ownershipofallsuchfacilitieswilltransferto[utility].R15.G.1.e.(parta)–Applicantshallpayto[utility]theestimatedcostof[utility’s]inspection,whichshallbeafixedamountnotsubjecttoreconciliation.R15.G.1.f.–Onlydulyauthorizedemployeesof[utility]areallowedtoconnectto,disconnectfrom,orperformanyworkupon[utility’s]facilities.

Proposal16-c.ConsensusRemovethe“discretion”languageinRule21thatstates“SubjecttotheapprovalofDistributionProvider,aProducermay,atitsoption…”providedthatthelanguageischangedfrom“subjecttoapproval”to“subjectto/consistentwithRule15”contractorselectionrulescitedinProposal16-a.

4AlongwithincorporatingR15.G.2,R15.G.3,andR15.I.1tariffprovisions,theexistingwarrantyrequirementsthatcurrentlysupporttheseprovisionsshouldbeincludedasfoundinParagraph12ofSCE’sForm14-188,TermsandConditionsAgreementforInstallationofDistributionLineExtensionbyApplicant,thatstates:“Applicantwarrantsthatallworkand/orequipmentfurnishedorinstalledbyApplicantoritscontractorshallbefreeofdefectsinworkmanshipandmaterial.ThewarrantyperiodshallbeginfromthedateoffinalacceptancebySCEandextendforoneyear.Shouldtheworkdevelopdefectsduringthatperiod,SCE,atitselectionshalleither(a)repairorreplacethedefectiveworkand/orequipmentor(b)demandthatApplicantrepairorreplacethedefectiveworkand/orequipment,and,ineitherevent,Applicantshallbeliableforallcostsassociatedwithsuchrepairand/orreplacement.Applicant,upondemandbySCE,shallpromptlycorrecttoSCE’ssatisfactionandthatofanygovernmentalagencyhavingjurisdiction,anybreachofanywarranty.”

Page 32: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

30

ProponentsGPIandCleanCoalitionbelievethatremovingthe“discretion”languagefromRule21isaneededreforminachievingthebenefitsnotedintheBackgroundsection.Somepartiesquestionedtheneedforremovingthe“discretion”language,butintheendWorkingGroupparticipantsagreedthiswasacceptableaslongas“subjectto/consistentwithRule15”isadded.Proposal16-d.Non-consensusAllowthird-partiestoworkonexistingde-energizedsystemsunderspecifiedscenarios,suchasondedicatedlinesandinotherspecifiedsituations. Supportedby: CleanCoalition,GPI Opposedby: PG&E,SCE,SDG&ETherewasmuchdiscussionaboutwhetherandunderwhatcircumstancesthird-partiescouldworkonexistingfacilities.Theutilitieswereaskedtoproducescenarioswherethird-partiescouldworkonexistingde-energizedfacilities.Concernsraisedbytheutilitiesincludedsafety,liability,supervision,utilityresources,managingcustomerimpactsofplannedoutages,coordinationwithotherutilityconstructionwork,andoutageplanning.Stakeholderswellunderstoodtheseconcerns,butpressedforpossiblescenarios.OnescenariowasinitiallyputforwardbyPG&Ethatcoveredthecasewherealinewas“dedicated”toonlyonecustomer,andcouldbede-energizedforthird-partywork.ThisideawasincorporatedbyproponentsGPIandCleanCoalitionintoarevisedproposalfortheWorkingGroup.Butlater,theutilitiessaidthatinpracticesuchdistinctionsbetween“dedicated”and“undedicated”linesarenotrelevantindeterminingscenariosopentothird-partyconstruction.Scenariosofupgradestoexistingfacilitiesbythird-partiesshouldremainconsistentwithRule15.I.1,“wherenewfacilitiescanbeconstructedinaseparatelocation,beforeabandonmentorremovalofanyexistingfacilities…”Also,thereremainedgreatconcernaboutsafetyrisksandunderminingofPublicUtilitiesCode399.2ontheutilityobligationtodesign,engineerandmaintaintheutility'sdistributionsystem.5Intheend,theWorkingGroupwasleftwithnoconsensusonanyscenariosinwhichthirdpartiescouldworkonexistingde-energizedfacilities.Duringthefinaldiscussionofthisissue,stakeholdersraisedanotheralternative—thatprojectdeveloperscouldpayfortheincrementalcostsoftheutilityitselfhiringthird-partiestohaveworkdonefaster,consistentwithcurrentutilitypracticesforhiringsub-contractors.Utilitiesrepliedthattheywantedtoretaintheirdecision-makingpractices,thattheirconstructionpracticesofteninvolvedmultipleprojectsandfacilitiescoordinatedtogether,andthatthehiringofathird-party,shouldremaintheirsoledecision.Utilitiescitedthattheycurrentlyhirethird-partiestoaugment

5PublicUtilitiesCode399.2statesthattheutilitiesmaintaincontroloftheirdistributionfacilitiesandarechargedwithdoingsoinasafe,reliable,efficientandcost-effectivemanner.Itfurtherstatesthateachelectricalcorporationshallcontinuetoberesponsibleforoperatingitsownelectricdistributiongrid,including,butnotlimitedto,owning,controlling,operating,managing,maintaining,planning,engineering,designing,andconstructingitsownelectricdistributiongrid.

Page 33: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

31

resourcesandexpediteconstructionschedules,thereforemakingthecallforadditionalthird-partiesmoot.SDG&EinquiredastowhethertherewereparticularstepsintheconstructionprocessthatposedthemostconcernforGPIandCleanCoalition.Utilitiessharedthattheconstructionprocessinvolvestheutilitiesaswellaspermittingprocesseswithotheroutsideagencies,etc.SDG&Eexpressedconcernthathavingthecustomerhireathirdpartyalonetoassistwithconstructiontoexpeditethescheduleisnothelpfulbecausetheavailabilityofconstructionresourcesoftentimesisnotthesoleproblem.Partiesremaininterestedincontinuingtoexploreincrementalcoststoapplicantsforputtingadditionalconstructionresources(intheformofthirdparties)onaprojectifitcandecreaseconstructiontime,similartoutilitiesbringinginadditionalcontractorsthemselves.Proponentposition:

GPIandCleanCoalitionsaiditappearsthatallthreeutilitieshave“blanket"policies,thatinexercisingtheirdiscretion,theygenerallydisallowthird-partyelectricalupgrades.WhenGPImadethisstatementduringWorkingGroupdiscussions,itwasnotcontradictedbyutilities.

Utilitypositions:PG&E,SCE,andSDG&ErepresentedsupportforusingcurrentfacilitypracticesasallowedunderRules15and16forconstructionofnew(interconnection)non-energizedfacilities.Therewerenoscenariosagreedinwhichathird-partycouldworkonexistingde-energizedfacilities.

Page 34: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

32

AnnexA:Issue16,ProposalRefinementbyProponentsNotebyWorkingGroupFacilitatorGridworks:ThisAnnexcontainsarevisedproposalbyproponentsGPIandCleanCoalition,refinedbeyondtheiroriginalproposaldiscussedbytheWorkingGroup.ThisrevisedproposalhasnotbeendiscussedwithintheWorkingGroupnorvettedbyanyutility.GridworksasWorkingGroupfacilitatorprecludedanyfurtherdiscussionorcommentsonthisrevisedproposal,intheinterestsofhonoringtheagreedWorkingGroupschedule.ThisrevisedproposalcameonFebruary20,2019,afterthescheduledfinaldiscussionofIssue16intheWorkingGrouponFebruary13,2019.GPIandCleanCoalitionsaidthatintheirdiscussionswithutilitiespriortoFebruary13,2019,aswellasduringtheFebruary13,2019WorkingGroupmeeting,theirproposaldevelopmenthadtoundergosignificantandlast-minutechangesandre-thinking,basedonutilitypositions,andthattheywerenotabletoadequatelyrespondwithinthetimeframescheduledforcompletionofIssue16.Thus,theyprovidedarevisedproposalafterdiscussionwasclosed.GPIandCleanCoalitionproposeRule21tariffchangesasfollows:

1) ExtendRule15tothefollowingcircumstances,withIOUoversightandallupgradescompletedaccordingtoIOUspecifications:

a. De-energizedexistingfacilitiesonsingle-customerdedicateddistributionlinesb. Withwrittenconsentfortemporaryde-energizingbyallothercustomersonthe

samedistributionlineastheapplicant,withsuchwrittenconsenttobeobtainedbytheapplicant

2) IOUsmustfullyconsidertheuseofthirdpartiesinnegotiatingGIAmilestones(forIOU-requireddistributionlineupgrades)toshortentimelinesandreducecostsforthesemilestonerequirements

Page 35: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

33

Issue20HowshouldtheCommissioncoordinateCommission-jurisdictionalandFederalEnergyRegulatoryCommission-jurisdictionalinterconnectionrulesforbehind-the-meterdistributedenergyresources,includingmodificationofqueuingrulesforRule21andWholesaleDistributionAccessTariff(WDAT)projectsseekingtointerconnectatthesamelocation,clarificationoftherulesforprojectswantingtotransferbetweentheRule21andWDATqueues,andstreamliningofthetransferprocess?PROPOSALSUMMARIESProposal20-a.ConsensusClarifythroughtheuseofFAQwebpagesthetransferprocessesandpermission-to-operaterulesfor:(i)howprojectsintheRule21interconnectionqueuecantransfertotheWDATinterconnectionqueue;and(ii)howeligibleresourcesunderexistingRule21interconnectionagreementscanbegintheNewResourceImplementation(NRI)processattheCAISO.Proposal20-b.ConsensusNomodificationisnecessarytothequeuingrulesforRule21andWDATprojectsseekingtointerconnectatthesamelocation.Proposal20-c.ConsensusProvidesomereferencelanguageor“softlink”withintheRule21tarifftotheFAQwebpagesandreferenceWDATtariffdocumentationfromProposal20-a.BACKGROUNDCustomer-sitedanddistribution-connectedenergystorageresourcesaregenerallyinterconnectedunderRule21,butproponentsbelievethatotheropportunitiesexistforbehind-the-meterenergystorageresourcestoexportandsellenergytoparticipateinthewholesalemarket.SuchwholesalemarketparticipationmustbeinterconnectedunderWDAT.Thus,foraDERresourcealreadyinterconnectedunderRule21,itmaybecomedesirabletoshifttobeinginterconnectedunderWDAT.Currently,themostreadilyavailablepathwayforDERstoprovidewholesalemarketservicesistoparticipateasaProxyDemandResource(PDR),whichlimitsDERstonon-exportingconfigurationsbecauseofthedemandresponse(DR)constructofload-basedbaselinestomeasureandcompensateperformance.Forgeneratingfacilitiessuchasbehind-the-meter(BTM)non-exportingenergystorage,thePDRmarketparticipationmodelhasallowedittoparticipatereadilyandtheRule21interconnectionprocesseshavebeenstreamlinedtosupporttimelydeploymentandaggregationsintothewholesalemarket.

Page 36: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

34

However,proponentsbelievethattherearesignificantbenefitsinbetterutilizingtheexportcapabilitiesofDERsandinaccessingopportunitiestoprovideadditionalwholesalemarketservicesasaCAISONon-GeneratorResource(NGR),opportunitieswhicharenotavailabletocustomersinterconnectingunderRule21.TobetterenableDERparticipationasNGRs,theWorkingGroupconsideredapproachestoclarifyingandstreamliningtransfersfromRule21toWDAT,andtominimizingre-studies,wherereasonable,iftheoperationalmode(i.e.,exportingornon-exporting)ofaprojectremainsunchanged.SomekeyquestionsandclarificationsthatwereraisedinWorkingGroupdiscussionsincluded:

• UnderwhatconditionsistheWDATinterconnectionprocessrequiredtore-studyresourcesalreadystudiedundertheRule21processes?

• Wherere-studyisrequired,whatarethekeydifferences(e.g.,reliabilitycriteria)thatmustbere-studied?

• Howhavetheinvestor-ownedutilities(IOUs)managedRule21andWDATtransitionsinthepast,ifthereareanysuchexamples?

• IsitpossibletomodifytheCAISOtarifforCPUCResourceAdequacyrequirementssuchthataconsequenceofthatrevisionisthatdeliverabilitycanbeachievedwithoutaWDATinterconnectionrequest?

ForpurposesofafinalproposalforIssue20,proponentCESAfocusedontheusecasewhereRule21-interconnectedBTMenergystorageresourcesandotherDERs(i.e.,vehicle-to-gridsystems)wouldnotbeexpectedtorequireare-studywhenundergoingtransferfromRule21toWDAT.However,CESAnotedthatotherusecasesmightalsobeconsidered,includingaggregationofDERs.DISCUSSIONProposal20-a.ConsensusClarifythroughtheuseofFAQwebpagesthetransferprocessesandpermission-to-operaterulesfor:(i)howprojectsintheRule21interconnectionqueuecantransfertotheWDATinterconnectionqueue;and(ii)howeligibleresourcesunderexistingRule21interconnectionagreementscanbegintheNewResourceImplementation(NRI)processattheCAISO.PG&E,SCE,andSDG&EinformedtheWorkingGroupthattheyeachhaveproceduresalreadyinplacetoenabletransitionsfromRule21toWDATuponrequestfromaninterconnectioncustomer.TheseproceduresaresummarizedinTable1.EachoftheutilitiesinformallycommittedtomakingsuchresourcesavailabletotheirFAQwebpages,andtheremaynotneedtobeanyfurtherCommissionaction.However,toensureconsistencyacrosstheIOUs,theWorkingGrouprecommendsthatutilitiesprovideclarificationsacrosseachoftheareasshowninTable1,andtheirtransferprocessesshouldbemadeconsistentasmuchaspossible.

Page 37: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

35

Table1:ExistingUtilityProcedurestoEnableTransitionsfromRule21toWDAT PG&E SCE SDG&EInitiation TherequestbyaRule21

InterconnectionRequest(IR)totransfertoaWDTGeneratorInterconnectionAgreement(GIA)mustbemadeinwriting.

TherequestbyaRule21IRtotransfertoaWDATGeneratorInterconnectionAgreement(GIA)mustbemadeinwriting.

InterconnectionCustomer(IC)mustsubmitWDATInterconnectionRequest(IR).

StudyProcessTransition

TheIRmustcompletethestudyprocess(e.g.,InitialReview,SupplementalReview)beforethetransferwouldbeallowed.

TheRule21interconnectionrequesthascompleteda“studyprocess”andisreadytoexecuteanInterconnectionAgreement(IA).Thisrequirementisnon-negotiable,asthestudy(orsuccessfulscreening)resultsformthebasisfortheplan-of-servicesystemreviewoutlinedintherequestedWDATGIA.IfaDistributionServiceAgreementwasrequiredundertheRule21IR,theCustomermustalsoapplyforDistributionService,fromtheSCEDistributionSystemtotheCAISO-controlledgrid,bysubmittingaDistributionServiceRequestinaccordancewithWDATrequirements.

PleaserefertoSections6.8.1.1and6.8.1.2underSDG&E’sWDAT.

Eligibility TheRule21IRhasbeenstudiedforexporttothedistributionsystem,whichincludesNEMresources.

TheRule21IRisexportingtothedistributionsystem,whichincludesNEMresources.

Exportingresourceconnectingtothedistributionsystem.

MaterialModifications

InterconnectionCustomer(IC)cannotmakeanymaterialmodificationstothefacility(e.g.,increasingfacilitysize,changingPOI)toqualifyfortransfer.MaterialmodificationsaregovernedbyWDTprovisionsandcanonlybemadeafterWDTGIAissignedandexecuted.

InterconnectionCustomer(IC)cannotmakeanymaterialmodificationstothefacility(e.g.,increasingfacilitysize,changingPOI)toqualifyfortransfer.MaterialmodificationsaregovernedbyWDATprovisionsandcanonlybemadeafterWDATGIAissignedandexecuted.

ICcannotmakeanymaterialmodificationstothefacility(e.g.,increasingfacilitysize,changingPOI)toqualifyfortransfer.MaterialmodificationsaregovernedbyWDATprovisionsandcanonlybemadeafterWDATGIAissignedandexecuted.

Timelines PG&EandICwillagreeinadvancethattheRule21InterconnectionAgreement(IA)willterminateonthedatetheWDTGIAisfully-executed.

Uponconfirmingeligibility,theICwillreceiveadraftWDATIAwithin30CalendarDaysandwilllaunchanegotiationperiodwithin120calendardaysfromthe

PleaserefertoSections6.8.1.1and6.8.1.2underSDG&E’sWDAT.

Page 38: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

36

dateofeligibilitynotification,pertheWDATGIP.

‘U-Turn’Transfers

-- ICmayrequestasingle‘U-turn’transfer–atransferfromonetariffGIAtoanothertariffGIAandthenbacktotheinitialtariffGIA

PleaserefertoSections6.8.1.1and6.8.1.2underSDG&E’sWDAT.

BillingCredits ICmustforgobillingcreditsunderRES-BCTandNEMuponconversiontoWDTGIA.

ICmustforgobillingcreditsunderRES-BCTandNEMuponconversiontoWDATGIA.

CPUCjurisdictionaltariffsdonotapplytoserviceprovidedunderaWDATInterconnectionAgreement(IA).

CostEnvelopeOption(CEO)

IRswaiveanyrequestedCEOtreatmentofitsstudyresultssincethereisnoWDT-equivalentoption.

IRswaiveanyrequestedCEOtreatmentofitsstudyresultssincethereisnoWDAT-equivalentoption.

IRswaiveanyrequestedCEOtreatmentofitsstudyresultssincethereisnoWDAT-equivalentoption.

OtherWDAT-RelevantProcesses

ICmustapplyseparatelytoCAISOforFullCapacityDeliverabilityStatus(FCDS)andmustcomplywithstudyandfeerequirements.

ICmustseparatelyapplyfortheCAISONewResourceImplementation(NRI)process,aswellasQFstatusunderPURPA.SCEisnotresponsibleforassistingtheICinthoseprocesses.

ICmustapplyseparatelytoCAISOforFullCapacityDeliverabilityStatus(FCDS)andmustcomplywithstudyandfeerequirements.

CESAandGreenPowerInstitute(GPI),amongotherstakeholders,believethatpartiesneedingtotransferfromRule21totheWDATinterconnectionqueuecouldbenefitfromclarificationsandguidance.SomeprojectsthathavestarteddownthepathofRule21interconnectionmaysometimesneedtoshifttotheWDATprocess.Thus,partiesseekclarificationsandguidanceonhowutilitieshandletransferstotheWDATprocess.SCEnotedthatthetransferprocesswouldnotcreatetechnicalchallengesasthestudyprocessesemployedbySCEandCAISOarevirtuallyidenticalandthestudiesareperformedbythesameengineeringteams.SCE'sWDAThaslanguageunderSection4.9.1toallowforWDATprojecttotransfertoRule21GIA.PG&EhighlightedSection6.8.1.1ofitsWholesaleDistributionTariff(WDT)GeneratorInterconnectionProcedures(GIP)thatdescribestheone-timeopportunitytotransitionfromRule21toWDATatthestartofgeneratorinterconnectionagreementnegotiationandindicatedthatitwillapplycurrentCPUC-to-FERCcontractconversionprocedures.EachoftheutilitiesreiteratedthatforprojectsalreadygrantedPTOwithproposedprojectchanges(e.g.,non-exportingtoexporting),suchprojectswouldrequireanewinterconnectionrequest,wherestudyprocedurescanbesufficientlydifferent.TheWDATstudyprocesscantakeupto2to3yearsdependingontherouteittakes(e.g.,FastTrack,IndependentStudyProcess,orClusterstudy).ManyprojectschoosetheFastTrackprocess,which

Page 39: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

37

cantakelessthan6months.AsDERsseekWDATinterconnectionstotakeadvantageofdifferentoperationalconfigurations(e.g.,non-exporttofullexport),DERsshouldbeallowedtoremainontheRule21tariffandoperateaccordingtoitsRule21interconnectionagreementastheproject(s)goesthroughtheWDATinterconnectionstudyprocess.Inotherwords,aprojectshouldnotberequiredtobetakenofflineduringtheWDATinterconnectionstudyprocesssolongastheresourcedoesnotviolatethetermsandconditions(e.g.,operationalmode)oftheresource.SCEnotesthatthistransferprocessisalreadyconsistentwithSCE’sexistingtreatmentforQFconversion,wheretheterminationdateoftheRule21InterconnectionAgreementisthesameastheeffectivedateoftheWDATIA.SCEfurthernotesthattheNRIprocessisaCAISOcontrolledprocessthattheutilitiesdonothavecontrolover.PG&E’sprocessislargelysimilartoSCE’s.SDG&Eto-datehasnotseenalargenumberoftransfers.ProponentCESAisunawareofRule21tarifforotheronlinedocumentationdetailingthistransferprocess,otherthancursorymentionsofrequiringseparateagreementsrequiredforotherservicesunderSectionD.2.ofthetariffandhowRule21interconnectionagreementsdonotconferanyrightstowheelelectricpowerthroughthedistributionsystemunderSectionD.3.ofthetariff.InproposingtodocumenttransferprocessesandPTOrules,partiessoughtclarificationoftheNewResourceImplementation(NRI)processandtimeline.NRIsetsaminimum203-daymandatorytimelinefortheCAISOtoestablishwhetheranewresourcecanoperateintheCAISOmarket,asthisprocessiscontrolledandoversightprovidedbytheCAISOwithnoutilityinvolvement.However,thisminimumtimelinewillbecome84daysbasedonchangesbeingmadeduringlate2019.Non-utilitypartiesalsosoughtclarificationfromCAISOonwhetherageneratorinterconnectedunderRule21couldcontinuetooperateunderitsexistingRule21interconnectionagreementuntiltheNRIprocessiscompleted.TheanswerobtainedfromCAISOisthateitheraRule21ExportingorWDATinterconnectionagreementservesforsubmissionduringthefirstphaseofdeliverablesfortheCAISONRIprocess(“Bucket1”).CAISOprovidedtwousecasesbelowinansweringthisquestion:• CustomerunderRule21ExportinginterconnectionagreementseekingNRIundernewWDAT

interconnection:ThecustomercancontinuetooperateundertheirRule21ExportinginterconnectionagreementandsubmitaWDATinterconnectionagreementwhentheinterconnectionagreementtransferiscompleted.TheCAISOstipulatedthatcontinuedoperationofthesystembecomesnullandvoidiftheconditionoftheRule21Exportinginterconnectionagreementchanges(e.g.,thereisanincreaseintheexportlimitationorallowance)andthattheresourcewouldberequiredtostartanotherNRIproject(e.g.,tobemodeledwiththehighermaximumexportcapabilitytoincreasetheresource’smaximumoutputlevel(Pmax).TheresourcecouldcontinuetoparticipateinthemarketswiththelowerPmaxorexportvalueduringtheNRIprocess.Insum,theCAISOindicatedthatresourcesunderRule21ExportinginterconnectionagreementswouldbeabletocontinuetooperateunderexportinglimitationsorallowancesoftheoriginalinterconnectionagreementduringtheNRIprocess,astheNRIprocessiscontrolledandrunbytheCAISO.

• CustomerunderRule21Non-ExportinginterconnectionagreementseekingNRIundernew

WDATinterconnection:TheCAISOstipulatedtoTeslathatfortheNRIprocesscontrolledbythe

Page 40: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

38

CAISO,aresourceundertheusecasewithaRule21Non-ExportinginterconnectionagreementwouldnotbeconsideredintheNRIprocess.Theymay,however,qualifyforparticipationinthedemandresponseparticipationmodel(e.g.,PDR),whichdoesnotrequireNRIbutinsteadusesaregistrationprocesstoobtainaresourceIDandparticipateinthemarketasaneconomicresource.ThePDRcancontinuetoparticipateinthemarketandutilizethePDR’sresourceIDwhileitispursuingaRule21ExportingorWDATinterconnectionagreementandisconvertingtoanotherresourcetype(i.e.,notPDR)intheNRIprocess.OncetheNRIprocessiscompleted,thisresourcewouldhaveitsPDRresourceIDterminatedandthenewlymodeledresourceundertheNRIprocesswouldallowforcontinuationofparticipationunderadifferentparticipationmodelasanon-DRresource.

Utilitiesfurtherclarifiedthattwoactiveinterconnectionagreementscannotbeallowedatthesametime,soaWDATinterconnectionagreementcannotbevaliduntiltheexistingRule21interconnectionagreementisterminated.Atthesametime,theutilitiesweresympathetictonotterminatingaRule21agreementearly(e.g.,creatingagapinthetransitionprocess),wherearesourcemaynothaveanyagreementatonetimeandthusnotbeallowedtooperate.OneproposalraisedduringtheWorkingGroupdiscussionswastoconsiderallowinginterconnectioncustomerstosubmitafuture-datedWDATinterconnectionagreementtomeettheNRIsubmittalrequirement.However,CAISOtoldtheWorkingGroupthatitwillnotaccepttheseascustomerscouldonlybegintheNRIprocessoncetheinterconnectionagreementiscompleted.ExistingRule21agreementswillbeacceptedtoinitiatetheNRIprocessforapplicableusecases.WDATagreementscanbesubmittedpriortoaCommercialOperationDate(COD)beinggrantedfortheNRIprocess.Proponentposition:

CESA:Theclarificationsproposedherewouldbeveryhelpful,andwouldbenefitinterconnectioncustomersbyhavingtheutilitiesdocumenttheRule21toWDATtransferprocess.Thishigh-leveloverviewshouldbeprovidedwithintheapplicableFAQdocumentationandwebpages.

Proposal20-c.ConsensusProvidesomereferencelanguageor“softlink”withintheRule21tarifftotheFAQwebpagesandreferenceWDATtariffdocumentationfromProposal20-a.Asoftlinkprovidesashortcuttorelevantinformationforcontractorsandinterconnectionapplicants,inordertoexpeditefindinganswersandtominimizetheneedforphoneandemailinquirieswithutilities.Asthevolumeofrequestsincreases,utilitiesmayaddressspecificusecases,examplesofwhicharegiveninAnnexB.

Page 41: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

39

AnnexB:Issue20,PotentialUseCasesofTransferfromRule21toWDATProponentsprovidedatableofpotentialusecases,andagreedthatpostingofthecasesintheapplicablewebsiteFAQsmaynotbenecessaryatthistime,butrathershouldbeconsideredasinquiresofthisnaturebecomemorecommoninthefuture.ImplementationofpostingcasestowebsiteFAQswillbeconsideredandmanagedbytheutilities’internalteamsatthattime.

OriginalRule21Program

NewWDATProgram

Systemoperationtypechanged? Usecaseexamples:

NEMWDATExport No

Example1:Customerhassubstantiallydecreasedtheironsiteloadandsystemisnowsizedfarabovethe100%annualproductionsizinglimitation.Ratherthancurtailingthesystemthecustomerwouldliketomonetizetheproductionviathewholesalemarket.Example2:Customerhasaseasonalload(agricultural/watertreatmentplant,etc.)andwouldliketomonetizeonexcessproductionratherthanhavingthesystemshutoffforlongperiodsoftime.

NEMAWDATExport No

Example3:Customerhas10sitesbenefittingfromtheNEMAbutisclosingdown8ofthesitesandlookingatinstallingonsitegenerationonthe1remainingbenefittingsite.Systemisnowsizedfarabovethe100%annualusagesizinglimitation.Ratherthancurtailingordownsizingthesystemthecustomerwouldliketomonetizetheproductionviathewholesalemarket.

Rule21Export

WDATExport No

Example4:CustomerhasexportonlyPURPAPPAwithIOUforasystematatestingfacilityforelectricalequipment.Customerneedstochargeanddischargeaspartoftheirtestingprocedures.Currentlycustomerdoesnothavetheabilitytousealoadbankorexistingloadstooffsettheusage/dischargeofenergy.Customerwouldliketodisplacedrawnenergytobenefitageneratingmeter.(UnsureifthiscaseisallowedunderWDATbutproponentcan’tprovideadditionalcasesatthistime.)

DemandSurvey

Response

WDATExport Yes

Example5:CustomeriscurrentlyparticipatingindemandresponsebutwouldliketoswitchtoWDAT.(IfthemitigationswillbecompletedpriortotheCODbeinggrantedbyCAISO,canthecustomeroperatethesystempriortoCODbeinggrantedandcantheyreceivePPApaymentspriortoCODbeingreceivedbyCAISO/NRI?)

Rule21Non-Export

WDATExport Yes

Example6:Customerhasanon-exportsystem,however,theyhavedecreasedtheirloadandnowhaveasubstantiallyoversizedsystem.Additionalbatterycapacitytostoreproductionisnotaviableoption.Customerwouldliketopursuechangingtoexportinordertomonetizetheiroverproductioninthewholesalemarket.Exampleformorecontext:Manufacturerhasaplantwitha4MWsystem.Manufacturerupgradesequipmentthatismoreenergyefficientinadditiontomanufacturingaproductthattakeslessenergytomake.Theynowonlyneedtoutilize1MWofthesystemtooffsettheirloadsandwanttodosomethingwiththeremaining3MWofcapacityratherthandownsizeorshutoffalargeportionofthesystem.

Rule21Non-Export

WDATNon-Export

No Noexamples;WDATdoesnotprovidefornon-export.

Page 42: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

40

Issue22ShouldtheCommissionrequiretheUtilitiestomakeimprovementstotheirinterconnectionapplicationportals?Ifyes,whatshouldthoseimprovementsbe?PROPOSALSUMMARIESProposal22-a.ConsensusTheCommissionshouldissuedirectionon18sub-proposalsforspecifictypesofportalimprovementscontainedinthissub-proposal,takingintoaccountexistingutilityplans,utilityandotherpartycomments,utilityandotherpartysupport,andplannedorcurrentlyongoingimprovementsthatmayberelated.Proposal22-b.ConsensusForfunctionsthatrequireimprovementstotheutility’sexistingelectronicprocessingsystems,theCommissionshouldprovidecleardirectionastocostrecoverymechanismsinsupportoffunctionstobeimplementedunderCommissionorderthatdonothaveexistingapprovedrecovery.BACKGROUNDDistributionResourcesPlanning(DRP)ProceedingDecisionD.17-09-026recognizedthatoneofthekeypurposesofthethatproceedingistodramaticallystreamlinetheinterconnectionprocess,echoingtheCommission’sDRPFinalGuidancedocument.Inthespiritofthisprecedentandthestate’sprioritizationofDERasamajormarketsectorformeetingstateclimateandenergygoals,WorkingGroupThreepartieshavegenerallyacknowledgedthatthereareopportunitiesforimmediateandongoingimprovementstotheutilities’interconnectionapplicationportals.Portalsareanimportantaspectoftheinterconnectionprocessandimprovementstothemcanstreamlinetheinterconnectionprocess.ProponentGPIpolledutilitiesandotherstakeholderswithrespecttothecapabilitiesofthecurrentinterconnectionportals,problemswithexistingportals,ongoingeffortsbyutilitiestomakeimprovements,plannedutilityimprovementsinthefuture(perhapspendingfunding),andotherwaysinwhichtheportalscouldbeimprovedthatgobeyondwhatutilitiesarecurrentlyplanning.Inadditiontoonlinepolling,GPIcoordinatedasubgroupthatmetviaconferencecalltwicebeforethefullWorkingGroupdiscussedIssue22.Atotalof18proposedimprovementstotheinterconnectionportalsweremadebyvariousparties.Descriptionsofthesesub-proposalsaregiveninAnnexC.

Page 43: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

41

DISCUSSIONProposal22-a.ConsensusTheCommissionshouldissuedirectionon18sub-proposalsforspecifictypesofportalimprovementscontainedinthissub-proposal,takingintoaccountutilityandotherpartycomments,utilityandotherpartysupport,andplannedorcurrentlyongoingimprovementsthatmayberelated.Thesub-groupandthefullWorkingGroupvettedthe18sub-proposalsandarrivedatsomeprioritizationsandcategorizations,alongwithsolicitingutilitycommentsonwhichsub-proposalstheysupportedand/orwerealreadyundertakinginsomemanner.TheresultsaresummarizedinTables1and2.Table2containsa“priorityscore”developedbyproponentGPIthatiscalculatedfromnumericalscoringbasedonsurveyresponsesbypartiesonthepriorityrankingforeachsub-proposal.Table1groupssub-proposalsintotiers,takingintoaccountboththispriorityscoreandthedegreeofutilitysupportasexpressedthroughcommentsandWorkingGroupdiscussions.Partycommentsoneachofthe18sub-proposalsaregiveninAnnexD.GPIcommentedthattherewasinsufficienttimeduringtheWorkingGroupfordetailedin-persondiscussiononeachofthe18sub-proposals.Accordingly,GPIsaysitmaybeappropriatetocreateastandingsub-grouptoworkthroughthedetailsofthosesub-proposalsthattheCommissionapproves.GPIalsonotesthatcommentsonsub-proposalsbyutilitiesandotherpartiesinsomecasesreflectmisunderstandingsaboutaparticularsub-proposal,orthatsomesub-proposalsevolvedduringdiscussions,suchthatsomepartycommentsaren’taccuratewithrespecttothefinalsub-proposaltext.Forexample,sub-proposal#19isforharmonizingportalsor,attheleast,harmonizingterminology.Commentssubmittedbytwoutilitiesonlyaddressharmonizingportalsandnotharmonizingterminology.GPIcommentsthatthisagainweighsinfavorofadditionalsubstantivediscussionsonthesetechnicaltopics,perhapssimilartothedepthofdiscussionintheSmartInverterWorkingGroup,whichdidrequireastandingworkinggrouptoresolvemanyofthetechnicalissues.Teslacommentedthat,asageneralcommentacrossallsub-proposals,thesub-proposalsarenotofequalprioritytostakeholders.TeslacommentedthatshouldtheCommissiondirecttheutilitiestoimplementthevarioussub-proposals,itwillbecriticallyimportantforthatefforttobeginwithanimplementationplan,tobedevelopedbytheutilitiestoensurethatprioritizeditemsaretreatedassuch.Additionally,accordingtoTesla,thatimplementationplanshouldincludefairlyspecificdetailregardingwhatchangesorprocessimprovementswillbemadeasopposedtospeakinginhighlevelgeneralities.TeslaprovidedtheWorkingGroupwithamark-upalongwithitscommentsthatithopedcouldprovidesomecoloronthisideaandthelevelofgranularityultimatelyrequired.Teslasaiditsupportssub-proposals6,9,12,13,14,and18inparticular.GPIrecommendsthatCommissiondirectionentailadecisiononwhethereachproposedimprovementshouldberequired,andifso,towhatdegreeofspecificity.InTable2,the“Commissionaction”columnshowsGPI’srecommendationsforthekindofCommissionactionthatwouldbeappropriate/beneficialtoimplementeachimprovement.“Principle”meansthattheCommissioncouldissueastatementofprincipleratherthanspecificactions.“Specific”actionmeanstheCommissioncoulddirecttheutilitiestocompletespecificactionstoimplementthesub-proposalatissue.Thedifferenceexistsbecausesomesub-proposalsarenotasamenabletospecificactions

Page 44: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

42

bytheCommissioninadecision,butwillstillbenefitfromCommissiondirectionatthelevelofprincipletosupportthesub-proposalatissue.Anexampleofa“principle”actionwouldbetoorderutilitiestousethesameorsubstantiallysimilarnamingandterminologyconventionsintheirinterconnectionportalsinordertoreduceconfusionacrossplatforms.Anexampleofa“specific”actionwouldbetoorderallutilitiestoincludeV2G-DCasacustomerinterconnectionoptionintheirinterconnectionportals.Commissiondirectionshouldbemorespecificonthosesub-proposalslistedinTable2as“specific,”andshouldbemoregeneral,aboutprinciplesandpolicypreferences,forsub-proposalsthatarenotedas“principle.”

Page 45: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

43

Table1:Sub-ProposalsGroupedbyUtilitySupportandProponentRanking(Fordetailsoneachsub-proposal,seeAnnexC;forpartycommentsoneach,seeAnnexD)

Sub-proposal Utilitysupport

TierA:StrongUtilitySupportandStrongProponentRanking

2 Includeanoptionfortransmissionordistributioninterconnectionintheonlineapplication

PG&E,SCE,SDG&E(distributiononly)

4 AddV2G-DC(vehicle-to-grid)interconnectionoptionstoportal PG&E,SCE7 Onlinesignatureoptionforallrequiredinterconnectionapplicationand

relatedsignaturessuchasGeneratorInterconnectionAgreementsPG&E,SCE,SDG&E

9 Eliminatemanualdataentryasmuchaspossiblebyintegratingwithapplicantdatabasesorallowingbatchuploads

PG&E,SCE,SDG&E(partial,nobatching)

10 Eliminaterequirementtoprovideexistingsysteminfowhenapplyingforadditionalinterconnectioncapacity(eithersolarorstorage)

PG&E,SCE,SDG&E

11 Automateddatavalidationcheckwhensubmittingapplication PG&E,SCE,SDG&E15 Allowapplicantstoaccessupdatedprojectstatusatanytime,makeeditsat

anytime,addsearchandfilterfunctionsbasedoncontractor,customer,etcPG&E,SCE,SDG&E

16 Onlinepaymentsforallpayments,includingstandardpaymentssuchasNGOMsforresidentialstoragesystemsormetersocketadapters

PG&E,SCE

TierB:SomeUtilitySupportandHigherProponentRanking

1 Question-responsefacilitywith24-hourturnaround,oronlinechatbox Forquestion-responseoptiononly:SDG&E1day;PG&E3days;SCE1daystandard

6 Automatethe“deemedcomplete”processforstandardizedortemplate-basedsingle-linediagramprojects

PG&E&SCE(toextentpossible),SDG&E

8 AddlinkinICAmapsthatallowsapplicanttojumpfromtheICAmaptotheonlineinterconnectionportal,location-specificinfoautomaticallypopulated

PG&E,SCE

14 Createone-clickAuthorityHavingJurisdiction(AHJ)approvalprocess,possiblyapp-basedorweb-based

SDG&E

17 AllowcontractorstogenerateformsforstandardagreementslikeIFFOA,NGOM,etc.

SCE

TierC:NoorLittleUtilitySupportandLowerProponentRanking

3 ProvideanApplicationProgrammingInterface(API),harmonizedacrossutilities

---

5 AddautomatedPARoptiontoportals.Thiswouldallowapplicantstoapplyfor,payfor,andreceivePARreportsalmostinstantaneously

PG&EandSCEwillingtoreview/explore

12 Notification-onlyprocessforstandardresidentialinterconnections(certainconfigurationsofpre-defined“standard”residentialsystemsunderacertainsize)

---

13 Removecustomerinteractionrequirementsinfavorofcustomernotificationsonly.Customerisnotrequiredtosignanydocumentsorbeinvolved

---

18 Haveonestate-wideportalforconsistency.Or,haveconsistencyinprojectstatusnames,visibilityofutilityvs.installer’shands,andduedatetracking

---

Page 46: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

44

Table2:Priority-RankedPortalImprovements(BasedonWorkingGroupSurveysconductedbyproponentGPI,whichassignedpriorityscoresandspecifiedCommissionaction,plusWorkingGroupdiscussions)Sub-Proposal Description Priority

ScoreIOUsSeeNeed

CommissionAction?

“MustHave”

11 Automateddatavalidationcheckwhensubmittingapplication 14 Yes Principle

15Allowapplicantstoaccessupdatedprojectstatusatanytime,makeeditsatanytime,addsearchandfilterfunctionsbasedoncontractor,customer,etc.

14 Yes Specific

9 Eliminatemanualdataentryasmuchaspossiblebyintegratingwithapplicantdatabasesorallowingbatchuploads 11 Yes Principle

4 AddDCV2G(vehicletogrid)interconnectionoptionstoportal 10 Yes Specific

"NoBrainers"

7OnlinesignatureoptionforallrequiredinterconnectionapplicationandrelatedsignaturessuchasGeneratorInterconnectionAgreements.

13 Yes Specific

10Eliminaterequirementtoprovideexistingsysteminfowhenapplyingforadditionalinterconnectioncapacity(eithersolarorstorage).

12 Yes Specific

16Onlinepaymentsforcertainpayments,includingstandardpaymentssuchasNGOMsforresidentialstoragesystemsormetersocketadapters

12 Yes Specific

"HighlyDesired"

18Haveonestate-wideportalforconsistency.OR,consistencyinprojectstatusnames,visibilityutilityvs.installer’shands,andduedatetracking

11 No Principle

6 Automatethe“deemedcomplete”processforstandardizedortemplate-basedsingle-linediagramprojects 10 Yes Principle

17 AllowcontractorstogenerateformsforstandardagreementslikeIFFOA,NGOM,etc. 9 Yes Specific

2 Includeanoptionfortransmissionordistributioninterconnectionintheonlineapplication 8 Yes Specific

3 ProvideanApplicationProgrammingInterface(API),harmonizedacrossutilities 8 Yes Principle

8AddlinkinICAmapsthatallowsapplicanttojumpfromtheICAmaptotheonlineinterconnectionportal,location-specificinfoautomaticallypopulated

8 Yes Specific

"GoodtoHave"

14 Createone-clickAuthorityHavingJurisdiction(AHJ)approvalprocess,possiblyapp-basedorweb-based 9 Yes Principle

12Notification-onlyprocessforstandardresidentialinterconnections(certainconfigurationsofpre-defined“standard”residentialsystemsunderacertainsize)

8 No Principle

5AddautomatedPARoptiontoportals.Thiswouldallowapplicantstoapplyfor,payfor,andreceivePARreportsalmostinstantaneously

6 No Principle

1 Question-responsefacilitywith24-hourturnaround,ORchat-box 5 No Principle

13Removecustomerinteractionrequirementsinfavorofcustomernotificationsonly.Customerisnotrequiredtosignanydocumentsorbeinvolved

5 No Principle

Page 47: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

45

Proposal22-b.ConsensusForfunctionsthatrequireimprovementstotheutility’sexistingelectronicprocessingsystems,theCommissionshouldprovidecleardirectionastocostrecoverymechanismsinsupportoffunctionstobeimplementedunderCommissionorderthatdonothaveexistingapprovedrecovery.ProponentGPIposition:

TheCommissionhasprioritizeddramaticstreamliningofinterconnection,alongwithanexpandedfocusonDistributedEnergyResources(DER)moregenerally.WhilecostsshouldalwaysbeconsideredwithrespecttoanynewinitiativesthattheCommissiondirects,thereisnolegislativeorpolicyrequirementinthepresentcaseforcost-benefitanalysis,ashasbeendiscussedextensivelybypartiesintheWorkingGroup.GPIsupportsCommissionconsiderationofcostsbutnotacost-benefitanalysis.TheCommissionhasalsomadeitclearthatutilitiesaretobeproactiveinencouragingDERandimproving,streamliningandautomatingtheinterconnectionportalsispartofthisbroadereffort.

TURNposition:

Ifonlyasmallgroupofdevelopersbenefitfromthesub-proposal,andgeneralratepayersdonotbenefit,thenTURNstronglyopposesrate-basingthecostsassociatedwiththesub-proposal.

Utilitypositions:

PG&Eprefersthatorderedchangestotheutility’sITinfrastructurethatsupportsinterconnectionshouldberecoveredfromtheInterconnectionRequestFee(boththeNEMInterconnectionRequestFeeandnon-NEMInterconnectionRequestFee)suchthatthecostsforimplementingtheorderarerecoveredfromtheparticularsetofcustomerswhobenefit.

SDG&E:Atthepresenttime,theexistingapplicationprocessesareadequatetofacilitatetheinterconnectionrequestsandreviewprocesses.Giventhevolumeofsuchapplications,SDG&Ehasnotobservedaneedforchangesbutisconstantlymonitoringtheinterconnectionprocesstomakesystemimprovementsbasedonidentifiedneedsandbaseduponcarefulcost-benefitanalysis.SDG&EbelievesthattheUtilitiesshouldretainthediscretiontoevaluatethevolumeofinterconnectionapplicationsandareasforimprovementtotheweb-portals,becausemandatinguniformchangesmayrequireapplicantstobearcoststhatarenotnecessary.TheUtilityshouldretainthediscretiontoanalyzeitscustomerfeedbackandwebportaltodetermineandprioritizewaystoimprovethesystem.Costrecoveryiscritical,andtheCommissionshouldalsoevaluatewhetherthebenefitstothepublicoutweighthecosts,andconsiderwhetherthosewhobenefitfromthesub-proposalsareappropriatelypayingforthecostsassociatedwiththesub-proposals.

Page 48: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

46

AnnexC:Issue22,DetailedDescriptionsofSub-ProposalsThefollowingpotentialimprovementswereproposedbyindividualWorkingGroupparticipants:

1. Question-responsefacilitywith24-hourturnaroundorchatbox(proposedbyCALSSA)2. Includeanoptionfortransmissionordistributioninterconnectionintheonlineapplication

(proposedbyJKBEnergy)3. ProvideanApplicationProgrammingInterface(API),harmonizedacrossutilities,tothe

onlineportalsasthiswillbehelpfulwheninterconnectinglargenumbersofDERslikeEVs(proposedbyNuvve)

4. AddDCV2G(vehicletogrid)interconnectionoptionstoportal(proposedbyCESA)5. AddautomatedPARoptiontoportals(proposedbyGPI)

a. Thiswouldallowapplicantstoapplyfor,payfor,andreceivePARreportsalmostinstantaneouslyiftheydeemtheICAmapinformationtobeinsufficient,outdated(becauseofthe30-dayrefreshrate),orunreliableforanyreason

6. Automatethe“deemedcomplete”processforstandardizedortemplate-basedsingle-linediagramprojects(proposedbyGPI)

a. Anapplicationmustbeprocessedbytheutilitywithin10BusinessDays(BDs),applicantnotifiedofreceipt,andiftheInterconnectionRequestisdeemedcompleteornot(Rule21E.5)

b. Ifdeemedcomplete,applicantisnotifiedautomaticallybyemailthatInitialReviewwillbecompletedwithin15BDs(E.5.a,F.2.a)

c. Ifnotdeemedcomplete,applicantisnotifiedautomaticallyofthedeficienciesandthatitwillhave10BDs(perthetariff)tocure(E.5.b).Deficiencieswilloftenresultinmultipleroundsofcorrections,witheachroundrequiring10BDsbytheIOU.Withanautomatedapplicationportal,theneedforcorrectionsshouldbesignificantlydiminishedandtheturnaroundtimefornotifyingapplicantsofdeficienciesmayalsobesignificantlydiminished.

d. Iftheonlineportalapplicationispopulatedcorrectly,thedeemedcompletedprocessisautomatableintwodifferentways:

• Providetemplatesingle-linediagrams(SLDs),thatcanbemodifiedasrequired,forsimplerprojects.SDG&E’sDIISsystemhaslargelyautomatedthisprocessforNEMprojects,includinganautomatedSLDprocesstemplatethatappliestomanystraightforwardprojectsbyallowingthecustomertoselectagenericgeneratorconfigurationfromtheDIIStoolinsteadofsupplyingaproject-specificSLD,andthatgenericconfigurationthenservesastheSLD

• Largerbehind-the-meterandfront-of-meterprojectsrequiremorecomplexSLDsand,forthistypeofproject,dialoguewindowsshouldspecifytheneededinformationinordertosafelyinterconnectsuchprojectswithoutrequiringindividualizedSLDreview

7. OnlinesignatureoptionforallrequiredinterconnectionapplicationandrelatedsignaturessuchasGeneratorInterconnectionAgreements(proposedbyGPI).However,itisalsoimportanttoensurethatthedeveloperalwayshasvisibilityintowhatevermaterialsrelatedtoaprojectarebeingsubmittedtoandsignedbythecustomer(ifthereisacustomer

Page 49: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

47

involvedwhoisnotthedeveloper).Accordingly,ifthedeveloperandthesignatoryaredifferentparties(asinthecaseofmostbehind-the-meterprojects),thedevelopershouldalwaysbenotifiedwiththesignatoryoftheonlinesignatureoption.

8. AddlinkinICAmapsthatallowsapplicanttojumpfromtheICAmaptotheonlineinterconnectionportal,withlocation-specificinformationautomaticallypopulated(proposedbyGPI)

a. ThiswillbeginaprocessoflinkingtheICAdatatotheinterconnectionportal9. Eliminatemanualdataentryasmuchaspossiblebyintegratingwithapplicantdatabasesor

allowingbatchuploads(proposedbyTesla)a. Installerscurrentlymanuallytypedatapointsintotheonlineportals.Thisdatais

oftenstoredininternaldatabases,whichcouldbeaccessedusingsoftwaretools,orexportedintoafile.Theinstallercouldexportadatafilefromtheirsysteminaspecificformat(whereallmeternumbersareinthefirstcolumn,andallaccountnumbersareinthesecondcolumn,etc.)anduploadittotheutility’sportal.Theportalcouldthenautomaticallyinputtherelevantdataintotheutility’sportal.

b. ForNEMAggregationaccounts,thereare14piecesofbasiccustomerinformation,muchofwhichisthesameforallaccountsincludedinanaggregationgroup.Thesefieldsare:AccountType,ParcelNumber,FirstName,LastName,Company,Address,City,State,Zip,AccountNumber,RESBCTAccountNumber,MeterNumber,RateSchedule,AnnualkWh.Entering10-digitIDnumbersmanytimesispronetomanualerrors.Whentheinformationisalreadyinutilitydatabases,itisnotgoodpractice.Theportalusershouldbeabletoentertheaccountnumberandmeternumberandhaveotherinformationauto-filled,thenchoosetousethesameinformationforrelatedaccounts.

c. Alternatively,theinstallerdatabaseandtheutility’ssystemscouldbeintegratedtoeliminateallmanualtouchpoints.

10. Eliminaterequirementtoprovideexistingsysteminfowhenapplyingforadditionalinterconnectioncapacity(eithersolarorstorage)(proposedbyTesla)

a. Ifthisrequirementisretained,thenthisinformationshouldautomaticallypopulateintheonlineportalafterenteringidentifyingcustomerinformation.Forexample,inSCE,ifacustomerisaddingabatterytoanexistingsolarsystemanddoesnothavetheexistingsystemspecifications,theymustendureamonth-longprocesstoaccessthisinformation.First,theymustsignanauthorizationformtoallowtheinstallertorequesttheinformationontheirbehalf.Next,thatformissubmittedtotheinterconnectiondepartmentatSCE.ThatteamthensendsarequesttoanotherSCEdepartmenttoaccessthecustomer’sexistingsysteminformation.Thisinformationisthensentbacktotheinterconnectionteam,whothensendsittotheinstaller.Finally,theinstallerusesthisinformationtofillouttheinterconnectionapplicationfortheutilitytoreview.

11. Automateddatavalidationcheckwhensubmittingapplication(proposedbyTesla)a. Automaticallyperformadatavalidationcheck(onaminimalnumberofdatapoints)

topreventtheapplicationfrombeingsubmittedifthecustomer’sdataisnotaccurate.Auto-populatedatafromutilitysystemsaftertheinstallerentersdatatovalidatethattheyarehavearelationshipwiththecustomer.Forexample,aftertheinstallerinputsthemeternumberandaccountnumber,thecustomer’sinformationwouldautomaticallypopulateinthesystem(i.e.,nameandserviceaddress).PG&E–

Page 50: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

48

theapplicantentersthecustomer’smeternumberandaccountnumber,afterwhichthecustomer’snameandserviceaddressauto-populateintheportal.Ifeitherpieceofdataisincorrect,theportalredflagsthisanddoesnotallowtheapplicanttoproceed.SDG&E–theapplicantentersthecustomer’smeternumber,accountnumber,nameandserviceaddress.IfoneofthepiecesofdatadoesnotmatchSDG&E’ssystem,theportalredflagstheincorrectfield,andwillnotpermittheapplicanttoproceed.Noneoftheinformationauto-populates.SCE–theapplicantentersthecustomer’sserviceID,andtypesinthecustomer’snameandaddress.Thisdataisnotvalidatedunlessadditionalinformationisentered.Theapplicantmaytypeinthecustomer’sserviceIDandaccountnumberinorderforthecustomer’snameandaddresstoauto-populateandtovalidatetheserviceID.

12. Notification-onlyprocessforstandardresidentialinterconnections(proposedbyTesla)a. Implementa“notificationonly”processforcertainconfigurationsofpre-defined

“standard”residentialsystemsunderacertainsize.Ifaprojectmeetscertaincriteria,theinstallerwouldalerttheutilityoftheinstallation,andwouldbeabletoproceedwithturningthesystemonimmediatelyuponpassingthefinalbuildinginspectionwithoutaformalPTOnotificationfromtheutility.Installerscouldbecertifiedorhavetomaintainaspecificsuccessratetoparticipateinthenotification-onlyprocess.Forexample,inNYSERDA’srebateprogram,installersarerequiredtomeetcertainqualitystandardsrelatedtopassedrebateinspectionsandcompleteapplicationsuccessrates.Iftheinstallerisnotabletomeetthestandards,theyareatriskofsuspensionfromtherebateprogram.TheEnergyTrustorOregon(ETO)rebateprogramissuesaninstaller“reportcard”(exampleattached)whichratesinstallersona3-starsystemin3categories.Higherratingscanqualityinstallersforadditionalprogramofferings.

13. Removecustomerinteractionrequirementsinfavorofcustomernotificationsonly(proposedbyTesla)

a. Implementaprocessinwhichthecustomerisnotrequiredtosignanydocumentsorbeinvolvedintheinterconnectionprocess.PrecedenthasbeensetbySacramentoMunicipalUtilityDistrict(SMUD),whichdoesnotrequirecustomerstoengageintheinterconnectionprocess.

14. Createone-clickAuthorityHavingJurisdiction(AHJ)approvalprocess,possiblyapp-basedorweb-based(proposedbyTesla)

a. TheutilityshouldcreateameansbywhichtheAHJcanautomaticallysubmitinspectionapprovaltotheutilityusinganautomated“oneclick”process.Suchaprocesscouldbeimplementedsuchthatadeveloperisnotifiedsimultaneouswithsubmissionofinspectionapprovaltotheutilitythattheprojectcanbeturnedon–providingtheoptionforanautomaticPTOifthatisdesiredbydeveloper.IstherepotentiallyaroleforthecommissionortheutilitiesaspartoftheWorkingGroupprocesstodosomeoutreachtopriorityAHJs?SDG&EonlyacceptsinspectionresultsfromtheAHJsdirectly.SDG&EhasimplementedanapptostreamlinereceiptofnotificationthattheAHJinspectionhaspassed.TheAHJinspectorisabletolookupasiteaddressormeternumberusinganappontheirphone,andsearchfortherelevantutilityapplication.Theinspectorclickstherelevantapplication,andisabletosubmitanotificationofpassedinspectiondirectlytotheutility.Whiletherehasbeensomeadoptionofthisprocess,notallAHJsparticipate.WhenAHJsmanually

Page 51: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

49

sendinspectionnoticestotheutility,thereareissueswithpermitsnotbeingreceivedorhavingtobere-sentmultipletimes.PG&EacceptedinspectionresultsfromeitherAHJsorapplicants,butareplanningtoremovethefeaturewherebyAHJscansubmitinspectionresultsfromtheironlineportal.Theportalpromptstheapplicanttoentertheinitialpermitdate,inspectiondate,permitnumberandthensearchestocheckiftheAHJhassubmittedinspectionresults.IftheAHJhasnotsenttheresultsbuttheapplicanthasacopy,theapplicantisabletouploadacopy.SCEdoesnotaccepttheinspectioncertificatefromtheAHJdirectly.Theapplicantuploadsacopyoftheinspectioncertificate.

15. Allowapplicantstoaccessupdatedprojectstatusatanytime,makeeditsatanytime,andaddsearchandfilterfunctionsbasedoncontractor,customer,etc.(proposedbyTesla)

a. Installersshouldhaveaccesstoprojectstatusesintheportals,includingvisibilityonaprojectsageinstatusor“duedate”tomoveintothenextstep.Theportalshouldgranttheabilitytosearchandfilterforprojectsbasedoncontractor,customerandstatus(e.g.,abilitytosearchforallincompleteapplications,orallprojectscurrentlyundergoingengineeringreview,etc.).Itshouldalsoincludetheabilityto“self-serve”byallowinginstallerstoeditapplicationsaftersubmissionorcancelapplications.Itshouldalsoincludeasimplenoteslogtoallownotesbackandforthtoreplacemanualemails.

16. Onlinepaymentsforallpayments(proposedbyTesla)a. OnlinepaymentisacceptedforNEMsystemsbutnotforotherstandardpayments

suchasNGOMsforresidentialstoragesystemsormetersocketadapters.Onlinepaymentshouldbeacceptedforallpayments.

17. AllowcontractorstogenerateformsforstandardagreementslikeIFFOA,NGOM,etc.(proposedbyTesla)

18. Haveonestate-wideportalforconsistency(proposedbyTesla).Or,iftheportalsremainseparate,thereshouldbeconsistencyinprojectstatusnames,visibilityonwhethertheapplicationisintheutility’shandsortheinstaller’shands,andduedatetracking.Forexample,PG&Edoesnotprovideanystatusupdatesintheirportal,whileSDG&Eprovides3generalstatuses(inprogress,incomplete,andPTO),andSCEprovidesabout10distinctprojectstatuses.

Page 52: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

50

AnnexD:Issue22,PartyCommentsonSub-Proposals1.Question-responsefacilitywith24-hourturnaroundorchatboxTeslawantstoclarifythatwhilewearenotopposedtothechatboxidea,wearemoreinterestedinsimplyensuringtimelyresponses,whetherviaemailorotherchannels.

CALSSAcomments:

CALSSAmaintainsitssub-proposalforachatboxunlesseachoftheutilitiescommitstoa24-hourturnaroundtimeforqueries,especiallythosequeriesrelatedtoinitialapplicationsubmittalandcuringdeficienciesinapplicationsthathavenotbeendeemedcomplete.

Oneofthelargestfrustrationsthatportalusershaveisnotbeingabletogetsimpleanswerstosimplequestions.PG&Einparticularispainfullyslowinrespondingtoinquiries.Theyhavea“teaminbox”astheirsoleopportunityforcontact.Theytakeatleast10businessdaystorespondtoquestions,andtheresponsesnormallycomefromanamelessaccountsothereisnowaytocontinuetheconversationwithasimplefollow-upquestionwiththesamePG&Erepresentative.Afollow-upquestionmustgotothegeneralinboxwiththeapplicationnumbernoted,andthenadifferentPG&Erepresentativewillresearchtheissueandrespond.Thisisanincrediblyinefficientsystemforbothsides.Itisdifficulttohaveaproperrelationshipwithacustomerwhensimplemattersareoftenputonholdforamonthandahalftoaccountforback-and-forthcommunicationwiththeutility.

Customerservicerepresentativeswhoanswerthecustomerinquiryphonelinearenottrainedininterconnectionandregularlygiveincorrectinformationorareunabletoanswerquestions.Basicapplicationprocessingincludestheabilityforuserstoasksimplequestionsabouttheapplication.Thereshouldbefunctionalitywithintheapplicationportaltogetquickanswerstosimplequestions.Achatboxstaffedbytrainedinterconnectionstaffwouldbeeffective.Itwouldensurethatinterconnection-relatedquestionsaredirectedtopeoplewhoaretrainedtoanswerthem.Thiswouldsavetimeforcustomerservicerepresentativeswhoarecurrentlytryingtoanswerquestionstheyarenottrainedtoanswer.Asanalternative,theportalcouldincludeaphonenumberoremailaddressthatpopsupinvariousplacesanddirectsinquiriestoappropriatelytrainedstaff.A24-hourturnaroundtimewouldbeslowerthanachatboxbutwouldstillallowforareasonablerelationshipwithacustomer.

PG&E:Onebusinessdayislikelyunreasonableduetothevaryinglevelsofcomplexitythatinquiriesmayhaveaswellasduringcertaintimesoftheyear(suchastheholidays)havingsubjectmatterexpertsavailabletoanswerquestionsthatmayormaynotcomeinduringthetimeperiodisunreasonable.Assuch,athree-businessdayturnaroundasacompliancetimeline,withagoalofansweringsimplerequestswithinone-businessdaywouldbemorereasonable.

Page 53: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

51

SCE:AlthoughachatfunctionisbeingconsideredforSCE’sGridInterconnectionProcessTool(GIPT),thereisnocurrentdecisiontoimplementthisfunctionuptothispointindevelopmentbecausetheneedhasnotbeensubstantiated,norhasthisfunctionbeenaccountedforinthecurrentprojectscopeandfunding.GIPTisbeingdesignedanddevelopedwith(amongotherthings)agoaltoimproveinterconnectioncustomer’svisibilityastostatusofagivenprojectatanygiventime.Despitethisaddedfunctionalityandutility,theIOUscollectivelyagreethatimprovedresponsetimetocustomerinquiriesisanimportantaspectofcustomerservice.SDG&ECustomerGeneration’sbusinesspolicyistoreturnallemailsandphonecallswithinthesamebusinessday.Customersneedingassistancemaycalladirectphonenumberorsendanemailtoadedicatedemailaddress([email protected]).CallsandemailsaremonitoredthroughoutthedaywithintheCustomerGenerationgroup.Infact,mostcontractorsandcustomerscontactSDG&Eemployeesdirectlywithanyquestions,asemployeessharebusinesscardsatmeetingsinthefield.Thereisnotsufficientneedorstafftomonitorachat-box,whichwouldaddsystemandlaborcoststoimplement.2.IncludeanoptionfortransmissionordistributioninterconnectionintheonlineapplicationPG&Eisnotcurrentlydoingthis(assumingDistributionorTransmissionisrelatedtotheelectricalconnectionandnotgeneratingfacilityjurisdiction).WithregardstoFERCversusCPUCapplications,ourportalsalreadydothatdelineation.SCE:ItisexpectedthattheGIPTsystemwillaccommodateprojectsunderRule21Non-Exportin2019.RequeststointerconnectunderRule21export,NEM,andSCE’sWholesaleDistributionAccessTariff(WDAT)representaddedfunctionalitythatisexpectedtobeimplementedinadditionalphasesofGIPTdevelopment,currentlyslatedfor2020andbeyondsubjecttoPhase1functionalityandfunctionreviewforPhase2(andapprovedCommissionfundingasapplicable).ForprojectsthatrequesttointerconnecttothetransmissionsystemthatisundertheCAISOcontrol,theseprojectswillmostoftenflowthroughCAISOSDG&EmaintainsfullautomationforallNEM-ST,Non-NEM,andRule21generatorsinitsonlineportal.WDATprojectsarenotincluded,asthereisnotsufficientvolumeandthereforeneedyet.Iftheneedchanges,SDG&Ewillbewillingtomakeimprovementstoitsonlineportal.Inconsiderationofensuringjustandreasonableratesandfees,SDG&Eweighstheneedsanddemandsagainstcostimplications.MakingtheproposedsystemupgradetoincludeWDATisoutofscopeofthisproceedingandwilladdsubstantialcostthatisnotwarrantedbythevolumeofapplicationswithinSDG&E’sserviceterritorytodate.3.ProvideanApplicationProgrammingInterface(API),harmonizedacrossutilitiesPG&E:Notdoinganddon’tbelievethiswouldbeanefficientuseofresources.

Page 54: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

52

SCE:Harmonizingsystemsacrossutilitiesisextremelycostlyandcomplexbecausecurrentsystemssupporttheparticularsysteminfrastructureoftheutility,whichareuniquetoeachofthethreeCaliforniaIOUs.SCEdoesnotsupportthisconsiderationaseachutilitymanagesaccordingtoitsownsystemparametersandexistingIToperatingsystems.Withthatsaid,FAQsandothercustomerfocusedmaterialisavailabletoaidthecustomerexperienceforeachparticularsystem.SDG&E:AsreflectedinthespreadsheetcirculatedaftertheMarch27thmeeting,thissub-proposalishighlydesiredbyotherparties.However,SDG&EdoesnotseeaneedforanAPI.AsstatedinSCE’sinitialcommentsonthesub-proposal,“Harmonizingsystemsacrossutilitiesisextremelycostlyandcomplexbecausecurrentsystemssupporttheparticularsysteminfrastructureoftheutility,whichareuniquetoeachofthethreeCaliforniaIOUs.”SDG&Ehasmadesubstantialcapitalinvestmentintothedevelopmentofitsapplicationportal,whichisasunkcost.Thissub-proposalrequiresnewcapitalinvestmentthathassubstantialcostimplications.Nuvvehasnotstatedhowitproposestofinanceauniformapplicationportal–whethersocializedthroughratesandimposedoncaptiveratepayersorthroughinterconnectionfees.Thisisaconvenienceitemthatbenefitslargecompaniesthatprocessapplicationsthroughoutthestate,butthecostofimplementingitwouldbesocialized.SuchanAPIisnotaneedandshouldnotbeadopted.SDG&Ehasnothadthevolumetosupportsuchacapital-intensiveundertaking.Equityisakeyprincipletojustandreasonablerates;noratepayershouldeverfinanceanyotherratepayer,orelsetheratesarenotequitable.SDG&Edoesnotsupportthissub-proposal.4.AddV2G-DC(vehicle-to-grid)interconnectionoptionstoportalTeslaisnotopposedtoincorporatingthisintoportalsbutdoesquestionthedegreeofurgencygiventhenascentstateofV2Gcurrently.GPIdisagreeswithTeslaandurgestheCommissiontoaddressthisnowinordertoprovideaproactiveenvironmentforV2G,ratherthanbeingreactive.

PG&E:OursystemssupporttheinclusionofEVSEinvertersas“inverters”buttherewouldbenodatapointtolinkthemtobeing“EVSEinverters”.Assuch,iftheCommissionwouldliketohavetheadditionalgranularityorexpectstoissuedatarequestsforthiskindofinformation,PG&Ewouldsupportmakingadjustmentsasnecessarytoenablesuchreporting.SCEsupportstheinclusionofEVSEinvertersinGIPT.SCEexpectsthatthisfunctioncanbeincorporatedintotheGenerationInterconnectionProcessingTool(GIPT)dropdownmenufornewapplicationswithinthelaterphasesofplatformdevelopmentsubjecttoPhase1functionalityconfirmationandPhase2functionreview.ExpectsDCV2GinterconnectionswillbeaddedtoSCE’sGIPTsysteminlaterphasesofsystemdevelopment.SDG&Ehasonlyprocessedoneinterconnectionapplicationto-dateforaDC-coupledV2Gfacilitythatwasbehindabillingmeteratacharger.SDG&Edoesnotsupportthissub-proposal.ThescopeandcosttoreviseSDG&E’swebportalhavenotbeendeterminedbecausesofewV2Gapplicationshavebeensubmittedtodate.AsthenumberofV2Gapplicationsincrease,SDG&EwillworkwithitsInformationTechnologygrouptodeterminethedetailedscopeofworkandassociatedcoststo

Page 55: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

53

revisetheportaltoallowstreamlinedapplicationprocessesforV2Gandweighthosecostswiththepotentialbenefits.Atthepresenttime,theexistingapplicationprocessesareadequatetofacilitatetheinterconnectionrequestandreviewprocessforV2Gsystems.Giventhelackofsuchapplications,SDG&Ehasnotobservedaneedbutisconstantlymonitoringtheinterconnectionprocesstomakesystemimprovementsbasedonidentifiedneedsandbaseduponcarefulcost-benefitanalysis.Furthermore,SDG&E’sonlineapplicationportalrequirestheapplicationtobeassociatedwithanaccountnumberandameternumberfortheinterconnectionprocess.SDG&EisnotsurehowV2Gapplicantsaregoingtointerconnectiftheyarenotassociatedwithanaccountandmeternumber.Theapplicationportalwillnotallowapplicantstoproceedpastthefirststepintheonlineprocesswithoutanaccountnumberormeternumber.Step4includestheequipmentlistofapprovedinverters.5.Addautomatedpre-applicationreportoptiontoportals.Thiswouldallowapplicantstoapplyfor,payfor,andreceivepre-applicationreportsalmostinstantaneously.PG&E:Willingtoexplore,butnotcurrentlyworkingon.Pre-Applicationreportsdonotseemtohaveahighvolume,nordotheydirectlyimpacttheinterconnectionprocessperse.SCEiswillingtoreviewtheextenttowhichpre-applicationreportscanbeautomatedbutmakesnocommitmenttoinstituteautomatedPARsuntildeemedpossiblewithintheGIPTplatformsubjecttofinalreview,theoptionalenhancedPARcannotbeautomatedasitrequiresphysicalverificationofutilityinfrastructureSDG&Edoesnotcurrentlyhavesufficientvolumetoaddpre-applicationreportstotheDIISonlineportal.In2018,SDG&EreceivedatotalofelevenPARs,eightofwhichwereforfuelcellsandweresubmittedbythesamecompany.SDG&EonlyreceivedsixPARsin2017and17in2016.Theaverageprocessingtimefortheserequestsislessthanfivebusinessdays.Again,iftheneedarisesinthefuture,SDG&Ewillconsidermodifyingtheonlineportaltoincludetheoptiontorequestapre-applicationreport.However,duethelackofvolume,SDG&Edoesnotsupportadoptionofthissub-proposal,asitwouldimposeunnecessarycostandunwarrantedrequirements.6.Automatethe“deemedcomplete”processforstandardizedortemplate-basedsingle-linediagramprojectsPG&Eutilizesthe“BasicSLD”conceptforStandardNEM(Solar<30kW).WearecurrentlyengagedinapplyingasimilarprocessforStandardNEMPairedwithEnergyStoragesincethatvolumehasincreased.Tothegreatestextentpossible,PG&Esupports“smartapplicationforms”toreducepossibleapplicationdeficiencies.However,therearecomponentstoourapplicationprocessthatdorequiremanualreview(suchascustomersignatures).SCE:Totheextentpossible,SCEwillautomatetheIntakeprocesswhenconditionsaresatisfiedresultsin“DeemedComplete”.However,SCEinsiststhatengineeringinvolvementmustoccurwithverificationofSLDstodeterminesafeandreliableinterconnection.SCEbelievesthataSLDutility

Page 56: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

54

templatecreatesduplicateeffortforinstallersastheauthorityhavingjurisdictionrequirescomprehensiveSLDstobesubmittedandapproved.SDG&Eisalreadydoingthis.SDG&Eutilizesthe“standardSLD”forNEM-STcustomerswithsystemsthatare30kWorlessthatdonotrequireadisconnectoraCT-ratedpanel.SDG&Ehasaveryhighpercentageofcontractorsthatutilizethisoption.SDG&EhasalsoimplementedaFastTrackprocessforthesesamecustomersinwhichthecontractorcanuploadapictureofthecustomer’sservicepanel,meter,andwarningplacardinlieuofafieldinspection.Approximately80percentoftheNEM-STapplicationssubmittedtoSDG&Eutilizethisfeature.7.OnlinesignatureoptionforallrequiredinterconnectionapplicationandrelatedsignaturessuchasGeneratorInterconnectionAgreements.PG&E:notcurrentlydoing,butwillingtoexplore.Ideally,thiswouldberestrictedtotemplate-basedformsthatdonotrequireahighlevelofsophisticationtoautomaticallyproducethecontract.ThisbecomesmoredifficultforcontractsthathavehighlevelsofvariabilitysuchasRule21ExportInterconnectionAgreementsthatspecificallystatethescopeofworkaswellasSpecialFacilitiesAgreements.Forcontractswithoutthoseitems,thiscouldbeexplored.SCEintendstoenableonlinesignaturesviaDocuSignwhichwillworkinconjunctionwithGIPT.ThisfunctionisexpectedtobephasedinasofQ42019.SDG&EacceptselectronicsignaturesforallapplicationsthroughtheDIISportal.ForNEM-STcustomerswithsystemsthatare1-MWorless,assoonastheapplicationissubmitted,thecustomerreceivesalinkviaemailtoelectronicallyaccepttheInterconnectionApplicationanditsTermsandConditions.CustomersarealsoabletoprintacopyofthecompletedapplicationandInterconnectionAgreement.Forconsumerprotection,thecontractorcannotexecutethedocumentonbehalfofacustomer.8.AddlinkinICAmapsthatallowsapplicanttojumpfromtheICAmaptotheonlineinterconnectionportal,location-specificinfoautomaticallypopulatedPG&E:Currentlyexploring,asstatedintheInterconnectionToolsprojectunderourGRC,butnotcurrentlyinflight.SCE:intendstolinkourICAsystemwithGIPTtoenablereviewofsiteandcircuitcapacitybasedonapointintime.ItisexpectedthatthisfunctionalitywillbeavailablebetweenQ42019andQ22020.SDG&E:OurICAmapsarenotintegratedwithourApplicationPortalatthistime,astheyonlywentliveinDecember.Furthermore,thevolumeofRule21applicationsthatwouldrelyonICAmapsisinsufficienttosupportthisfunctionality.In2018,basedonsystemsize,thenumberofRule21applicantsthatmighthavefiledanapplicationfromanICAmapwouldhavebeenlessthan0.1percent,assumingallwouldhaveutilizedtheICAmaps.SDG&Ebelievesthatthissub-proposalisneitherpracticalnorvaluable.ICAvaluesspanlinesegmentsuptoathousandfeetandacross

Page 57: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

55

multipleaddressesorlandparcels.Bycontrast,theinterconnectionpointsarespecifictoalocation.Therefore,SDG&Ebelievesthatthissub-proposalisneitherfeasiblenorpractical.Suchfewapplicantswouldutilizethefunctionswithlittletonobenefitsinreturn.IfadoptedbytheCommission,thissub-proposalwouldrequiretimeandmoneysimplytoaddressthefeasibilityandthecostsassociatedwithimplementation.Furthermore,thevalueaddedtoboththeutilityandthecustomerwouldstillneedtobeevaluated.SDG&Edoesnotbelievethereisadirectvaluetomostcustomers,letalonetoratepayersasawhole.9.EliminatemanualdataentryasmuchaspossiblebyintegratingwithapplicantdatabasesorallowingbatchuploadsTeslawouldliketounderscorethatwethinkthisisanimportantitemasitwoulddramaticallystreamlinetheapplicationprocessandalsoserveasawaytosupportbatchprocessinginthefuturebyreducingthenumberoffieldsthatwouldneedtobeenteredorprovidedbytheapplicant.Teslahasprovidedamark-up(thesamemark-upreferencedinourcommentsabove)toflagthoseitemsintheapplicationthatwethinklendthemselvestoauto-populationoncetheutilitycustomerandapplicantdatabasesareintegrated.CALSSA:WorkingGroupparticipantsagreedthatreducingmanualdataentryisagoodgoal,butnotedthatthesub-proposalisnotspecificenoughtobeactionable.OnespecificimprovementthatwasdiscussedwasfortheportaltoautomaticallyfillincustomerinformationbasedonmeternumberorserviceIDnumber.ThisisespeciallytrueforNEMAapplications,whichcontainmanyrepetitivefieldsthatarepronetoerrors.PG&Ealreadyauto-populatescertaininformationforgeneratingaccounts,buttheydonotdothesameforbenefittingaccounts.CALSSA:UnderPG&E’sNEMAggregationsectionoftheonlineapplication,thereare14inputsofbasiccustomerinformationforeverymeterincludedonaNEMAarrangement.Iftheapplicantissubmittingalargeproject,therecouldeasilybe10+metersonanarrangement.That’s140inputsforanapplicanttofillout.Notonlyistheprocesstimeconsuming,butit’salsoduplicativeandpronetoerrors.ANEMAspreadsheetissubmittedwitheachapplicationwhichhasalloftherequestedinformationincludedonit.Allofthisinformationcouldbeauto-populatedbyPG&Efromtheirdatabasebyintegratingthedatabasetotheapplication.Theyalreadyauto-populatethisdataforthegeneratoraccount.PG&Ealsoalreadyhastheapplicationprogrammedtopulldataandverifyinputsasanapplicationisbeingfilledout(generatoraccountonly).Onthefirstpageoftheapplication,youhavetosubmittheserviceagreement(SA)IDandmeternumber.TheSAIDisuniquetotheservicepoint.Therefore,ifthosetwonumbersdonotcoincidetothecorrectservicepoint,PG&Edoesnotallowyoutocontinuewiththeapplication.Applyingautomationtothisportionoftheapplicationcouldreducethe14inputstooneortwoinputs.PG&E:Alreadydoing/done.Anyadditionaluserinputfromstakeholdersonitemsthatstillneedautomationwithintheapplicationisalwayswelcome.

Page 58: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

56

SCE:DataentrywillbeautomatedtotheextentthatbothcustomeranddeveloperinformationarepresentandupdatedinSCE’sdatabase.6Dropdownmenuswillenableautofillofnumerousfieldsandrelateddata.However,incorrectdataenteredbythedeveloperand/orcustomerwillstilltriggeradeficiencyrequiringcorrection.SDG&E’slatestportalupgradepartiallyaddressedthissub-proposal.AftertheaccountandmeternumberisverifiedduringStep1intheapplicationprocess,thesystemautomaticallypopulatesallexistinggenerationonsitefromSDG&E’sdatabasetoeliminatemanualentry.SDG&Edoesnotalloweditstotheinterconnectionapplicationafteritissubmittedunlessthecustomeraskstohavetheapplicationreopenedforcorrectionsbysimplycallingorsendinganemailrequest.SDG&Eisveryresponsivetotheserequests,asstatedpreviously.SDG&Eneedstoknowwhentoprocessanapplication.Lockingtheapplicationtodisalloweditsensuresthattheapplicationisreadyforreview.SDG&Edoesnotcurrentlyallowbatchuploads,astherehasnotbeenarequestintheservicearea.Theaveragetimeittakesaself-installer(e.g.someonenotfamiliarwiththeDIISportal)tosubmitanapplicationislessthantenminutes.Therefore,SDG&Edoesnotseeaneedorjustificationforaninvestmentinportalupgradestoallowbatchuploadsinordertobenefitthefewcompaniesthatwouldutilizetheservice.10.Eliminaterequirementtoprovideexistingsysteminfowhenapplyingforadditionalinterconnectioncapacity(eithersolarorstorage).PG&E:DoneforallbutRule21Exportprojects(sincetheyuseadifferentapplicationportalatthistime).SCE:ExistingsystemmustalwaysbeverifiedincasethecustomerorpredecessorhasmodifiedtheexistingsystemwithoutnotifyingSCEpriortodoingso.SCEengineeringapprovalreliesonaccurateandverifiedsysteminformation.ThisisalsonotanIT/portalissue,butanissuerelatedtoRule21interconnectionprocessrequirements.SDG&E’slatestportalupgradeaddressedthissub-proposal.AftertheaccountandmeternumbersareverifiedduringStep1intheapplicationprocess,thesystemwillautomaticallypopulateallexistinggenerationonsitefromtheSDG&Edatabasetoeliminatemanualentry.11.Automateddatavalidationcheckwhensubmittingapplication.

TeslabelievesthatwhileSDG&E’sportalhassomedatavalidationcapabilities,thereisalotmorethatcouldbedone.Atthistime,theSDG&Eportalvalidatesthattheaccountandmeternumbermatch,butleavesopenthepossibilityofanapplicantsubmittingtheapplicationundertheincorrectnameontheUB.Higherlevelsofsophisticationarounddatavalidationarepresentonotherportals–forexampleauto-populatingrelevantcustomerinformationbasedontheaccount/meternumber.IncontrastSDG&Erequiresmanualentryforthisdata.Wedon’tmentionthistopickonSDG&E–

6Functionsasthisoneandotherswillincludecustomerauthenticationprocessesasdiscussedwithinstakeholdercalls.

Page 59: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

57

wecommendtheutilityforincorporatingsomedatavalidationcapabilitiesintotheirsystem,butrathertohighlighttheneedtohaveamorerigorousunderstandingoftheextentoftheutilitieseffortsforeachofthesub-proposalsunderdiscussionandtoidentifyopportunitiesforadditionalimprovements.

PG&E:LinkedtoItem10.Pre-populationispreferredtovalidationwherepossible.Wherenotpossible,thespecificfieldsinquestionwouldhavetobedefinedbeforePG&Ecouldcommentoneachofthem.SCEisincorporatingthisfunctionintoitsplatformtothedegreethatitistechnicallypossible.Thismeansautomatedanalysismaybeavailableforsomefields,butmaynotbepossibleforallfieldsrequiringvalidation.However,totheextentassociateddataresidesinSCE’sdatabase,orifsimplecalculationscanbegenerated,thenvalidationwillexceedwhatisavailableonSCE’spresentPCI-basedportal.SDG&E:InStep1oftheapplicationprocess,theportalverifiestheactivestatusoftheaccountandthattheaccountandmeternumbersmatch.Thesystemwillflagan“error”inthesefieldstolettheapplicantknowthatthenumbersdonotmatch.ThesystemwillnotmovetoStep2untilthisiscorrect.12.Notification-onlyprocessforstandardresidentialinterconnections(certainconfigurationsofpre-defined“standard”residentialsystemsunderacertainsize).PG&E:Generatorsshouldnotoperateuntilgivenexpresspermissionfromtheutility.SCE:ThisisaprocessquestionandnotspecifictotheIT/portalfunction.ThismatterwasalsoaddressedinWorkingGroupTwoIssue11.SDG&E:Thisisanissuethatshouldbeaddressedinamoretechnicalforumandnottreatedassimplyaportalimprovement.SDG&Eopposesthissub-proposalanddoesnotallownotificationonly.SDG&Ehasanactiveprocessfordetectingandmonitoringcontractorsandcustomerswhohavereversepowerflowfromunauthorized,unpermittedsystems.SDG&Eviewsnotification-onlyasthesamelevelofgeneralpublicandutilityworkersafetyhazardasreversepowerflowfromsuchunauthorizedsystems.Toprotectworksandthepublic,SDG&Edigitizesitsgeographicinformationsystems(GIS)mapsdailytothetransformerleveloftheprojectsthatwereapprovedthatday.In2018,SDG&Eapprovedover24,000customers,withanaverageprocessingandapprovaltimefortheentireyearof2.5calendardays.Ifcustomersarealreadycircumventinga2.5-dayprocess,SDG&Ehasnotconfidencethatanotification-onlyprocesswillofferenoughbenefittojustifytheriskofpublicandutilityworkersafety.SDG&E’sinterconnectionportalgeneratesautomaticemailsthataresenttoboththecustomerandthecontractorthroughallstepsoftheapplicationprocesssothattheyknowimmediatelywhenthestatushaschanged.SDG&Ereceivesmultipleapplicationsfromdifferentcontractorsforthesameaddress.Customersroutinelycallandcomplainthattheydecidedtohirea

Page 60: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

58

differentcontractoranddidnotauthorizeaparticularcontractortosubmitanapplicationontheirbehalf.SDG&Emusthaveaninterconnectionprocessthatensuresthatitcanvalidatetherequests.13.Removecustomerinteractionrequirementsinfavorofcustomernotificationsonly.CustomerisnotrequiredtosignanydocumentsorbeinvolvedPG&E:Thecustomeriswhomtheinterconnectionprocessisforandtheonewhoexecutestheinterconnectionagreement.Therefore,thiscannotandshouldnotbedone.SCEmustverifythatanymodificationtocustomer’sfacilitywithrespecttoelectricalloadorgenerationissanctionedbythecustomer.Therefore,thisisnotaconsiderationforeitherRule21processorIT/portal.SDG&Emustinteractwithcustomersandopposescustomernotificationsonly.SDG&EroutinelyreceivedemailsandphonecallsfromcustomersoncetheyreceiveanautomaticnotificationfromtheDIISportalthatanapplicationwassubmittedontheirbehalfthattheyneverauthorized,oftenbecausetheyswitchedcontractorsandthepreviouscontractorhadprematurelysubmittedanapplication.SDG&Efindsthiscommonamongcontractorsandreceivesduplicateapplicationsfrommultiplecontractorsforthesamecustomer.TheDIISportalrequiresthecontractortolistthecustomeremailaddressandonlythecustomercanaccepttheInterconnectionAgreementandTermsandConditions.Thecustomerandcontractorarebothcopiedonallcorrespondencethroughouttheentireprocess,whichprotectsthecustomerandensuresthatSDG&Eisprocessingthecorrectandauthorizedapplication.14.Createone-clickAuthorityHavingJurisdiction(AHJ)approvalprocess,possiblyapp-basedorweb-based.PG&E:notcurrentlyinscope.SCE:Thiscapabilityisnotinscopeatthistimeandnotconsideredundercurrentfundingassumptions.Furthermore,thereisnoguaranteeconsideringthenumerouscity/countyjurisdictionsSCEservesthatallAHJ’swouldagreetoutilizethecapability,thusmakingtheapplicationinconsistentandnotcosteffective.Inparticular,unlikeotherIOUserviceterritories(ex:SanDiegoismainlycomposedoftheCityofSanDiego),SCE’sserviceterritoryiscomposedofnumerouscities).SDG&EdevelopedandlaunchedanapplicationinJuly2017thattiesdirectlyintotheDIISinterconnectionportalsothattheAHJscanreleaseallgenerationtypeswithoneclickbyphone,tablet,ordesktop.In2017,SDG&Ereceivedover4,800electricalreleaseswiththenewprocess,validatingtheneedandutilityforcustomersandAHJs.In2018,SDG&Ereceivedover23,000electricalreleases,showingsubstantialutilizationwiththeserviceterritory.SDG&Ehasproactivelymetwithover30AHJsintheterritorytoshowthebenefitsofusingtheprocessbyexpeditingthereleaseprocess,enhancingthecustomerexperience,andeliminatingthepotentialerrorsinmanualdataentry.

Page 61: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

59

15.Allowapplicantstoaccessupdatedprojectstatusatanytime,makeeditsatanytime,addsearchandfilterfunctionsbasedoncontractor,customer,etc.PG&E:ProjectStatusisdoneforACE-ITapplications(definedasNon-StandardNEMandNon–Rule21Export)atthistime.WedonothavethecapabilitytoalloweditsorresolvedeficienciesfortheseprojectsthroughtheACE-ITportalatthistime,butareexploringtheoption.StandardNEMdoeshavethecapabilitytouploadcorrectionsfordeficienciesthroughtheportalbutcannotviewprojectstatus.Rule21Exportprojectshaveneitherfunctionalityatthistime.SCE:ItisexpectedthatprojectstatusupdateswillbebuiltintoGIPTwithinPhase1ofplatformdevelopment(Q42019).Customersmaymakeeditsprovidedthattheagreementhasnotbeenexecuted.Thesystemwillbeenabledwithsearchandsortfunctionslimitedtoprojectsunderthecustomer’scontrol.SDG&E’sonlineDIISportalallowsboththeapplicantandcontractortoaccesstheprojectstatusatanytime.Infact,theycanaccessandviewallapplicationsthattheyhavesubmittedandcanincludeasmanycontactsfortheircompanynotificationsastheywouldlike.Theycanupdatethislistatanytimewithintheirownportalpage.Theyhavetheabilitytoviewourportalviaanyportabledevicesuchassmartphone,tablets,laptops,ordesktop.Oncetheapplicationissubmittedtotheutilityitislockedforeditstosignalthattheapplicationisreadyforreview;however,thecontractorcanrequestatanytimeitbeopenedtomakeadditionaleditsorcorrectionswithouthavingtheapplicationcancelledandhavingtoresubmit.16.Onlinepaymentsforallpayments,includingstandardpaymentssuchasNGOMsforresidentialstoragesystemsormetersocketadaptersPG&E:Onlinepaymentfor$145wherethesystemcanconfirmthatitisrequiredisdone.Forotherpayments,notcurrentlyinscope,butmentionedasapotentialiteminour2020GRC.Itwouldhavetoexploredwiththeonlinepaymentvendorshowcontractswouldchangeandwhatdollarlimitsthereareonprocessingpaymentssubmittedonline.SCE:OnlinepaymentwillbeincludedinGIPTPhase1withanexpectedphaseindateofQ42019(subjecttofinalconfirmation).SDG&EdoesallowonlinepaymentsinwithintheDIISportalviaPayPalorBraintreeforNEM-STapplicationsandtheRenewableMeterAdapterfee.SDG&EdoesnothavestandardpaymentsforNGOMsasthereisnostandardcost;thecostvariesbasedonthevoltage,metertype,andifwiringisrequired.SDG&Edoesnotcurrentlyhavethevolumetojustifythecostsforthenon-NEMRule21customersover1MW.Iftheneeddevelops,SDG&Ecanassesssuchanimprovementandevaluatewhetherthecostisjustified.

Page 62: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

60

17.AllowcontractorstogenerateformsforstandardagreementslikeIFFOA,NGOM,etc.PG&E:Dependsonthecomplexityoftheform.Formsareavailablefordownloadfromwww.pge.com/tariffsandcanbefilledoutasneededbyapplicants.SCE:Itisnotclearifthisquestionpertainstoblankformsorfilledforms.However,allformsgeneratedthroughGIPTwillbeavailableforprintbutwillonlybefillableandapprovablethroughtheGIPTportal.SDG&E:NGOMformsarestandardizedforSDG&ERenewableMeteradapter,asitisasetfee.TheotherNGOMformsarenotstandardizedforthesamereasonastheonlinepayment.Thecostsvarydependingonthemetertype,voltage,andwiringrequirements.18.Haveonestate-wideportalforconsistency.OR,consistencyinprojectstatusnames,visibilityutilityvs.installer’shands,andduedatetrackingTeslawouldliketobeclearthatwhilewewouldnotbeopposedtohavingonestatewideportal,wearenotadvocatingforthat.Teslaisoftheviewthatconsistencyintermsoffunctionality/capabilitiesistheobjective,notthattheexactsameinterfaceorsystembeusedacrossallthreeIOUs.SmallBusinessUtilityAdvocates(SBUA)recommendsthattheCommissionorderasingleinterconnectionapplicationportaltobeusedforallapplicationsunderRule21.Forthispurpose,theCommissionshouldmaintainthisportal.HavingasingleportalforallapplicationswouldgivetheCommissionandthecustomers/developersbettervisibilityastothestatusoftheapplications.PG&Eiswillingtoexplorenamingconventionsandterminologytoalignapplicationmaterialtominimizeanyconfusion.SCE:PleasereferenceSCEresponsetosub-proposal#3.SDG&Edoesnotseeaneedforonestatewideportal.Theutilitieshaveeachincurredsignificantcostsinimplementingtheirrespectiveportals,andbothcustomersanddevelopershavebecomefamiliarwiththoseportals.SDG&Edoesnotbelievethatthiswouldbeprudentinvestmentorfairtoratepayersgiventhesunkcostofexistinginvestmentsintheexistingportals.Thissub-proposalmayaddconveniencetolargecompaniesthatprocessapplicationsthroughoutthestate,buttheimplementationcostswouldbesocializedandnotfairtonon-participatingratepayerswithinSDG&E’sserviceterritory.Suchauniformportalisnotaneedandshouldnotbeadopted.Equityisakeyprincipletojustandreasonablerates.SDG&Edoesnotsupportthissub-proposalandtheadditionalinvestmentitentails.

Page 63: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

61

Issue23ShouldtheCommissionconsiderissuesrelatedtotheinterconnectionofelectricvehiclesandrelatedcharginginfrastructureanddevicesand,ifso,how?PROPOSALSUMMARIESProposal23-a.ConsensusRecognizethatinthecaseofunidirectionalcharge-onlyV1Gwithnodischargecapability,Rule21doesnotapply.V1GmustcomplywithRules2,15,and16.Proposal23-b.ConsensusModifyRule21SectionB.4toclarifythatRule21appliestotheinterconnectionofbothstationaryandmobileenergystoragesystems,withlanguageasfollows:

“ForretailcustomersinterconnectingstationaryormobileenergystoragedevicespursuanttothisRule,theloadaspectsofthestoragedeviceswillbetreatedpursuanttoRules2,3,15,and16justlikeotherload,usingtheincrementalnetloadfornon-residentialcustomers,ifany,ofthestoragedevices.”

Proposal23-c.ConsensusRecognizethatV2G-DC/EVSEsystems(ElectricVehicleSupplyEquipmentwithstationaryinverterforDCchargingofvehicles)maybeinterconnectedunderthecurrentRule21language,withnoRule21languagechangesoradditionalauthorizationneeded,providedthattheEVSEmeetsallRule21requirements,includingUL1741SAandotherupdatedsmartinverterstandards.Proposal23-d.ConsensusAllowV2G-DC/EVSEsystems(stationaryinverterforDCchargingofvehicles)toconnectasV1G,load-only,andoperateinunidirectional(charge-only)modeuponsatisfyingpre-definedcriteria.ThesecriteriaincludeULPowerControlSystemsCRD(ULCRD)andUL1741SAcertificationtesting,whichwilldemonstratethat:(1)theEVwillnotdischargeiftheEVSEissettounidirectionalmode;(2)theEVSEwillnotinadvertentlychangetobidirectionalmode;and(3)thatfactorydefaultsettingsaresettounidirectionalmode.Further,requirethattheoperationalmodecannotbechangedwithoututilityauthorization.Proposal23-e.ConsensusAllowbidirectionalmodetobeenabledforaV2G-DC/EVSE(stationaryinverter)systemonlyuponreceivingPermissiontoOperate(PTO)fromtheutility.WhenV2G-DC/EVSEownerswishtoswitchtobidirectionalmode,theymustfirstcompletetheRule21interconnectprocessandreceivePTOfromtheutility.IfPTOhasbeenreceived,themanufacturerorapprovedthird-partyinstallercanthenprogram/enablebidirectionaloperation.

Page 64: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

62

Proposal23-f.Non-consensusModifyinterconnectionportalstoenablesimpletrackingofV2Ginterconnections,suchasbyaddingnewEVSEinvertertypesindrop-downmenusorflagginginterconnectionsasV2G.(ThisitemisalsocoveredinIssue22.)

Supportedby: CESA,CleanCoalition,eMotorWerks,Fiat-Chrysler,GPI,Honda,Nuvve,PG&E,SCE(conditional;seeDiscussionsection)

Opposedby: SDG&EProposal23-g.Non-consensusEstablishasub-groupinvitingstakeholdersfromtheSmartInverterWorkingGroupandSAE,amongothers,todeveloptechnicalrecommendationstoenableV2G-AC(mobileinverter)interconnections.Thissub-groupwouldbeledbyastakeholderincoordinationwiththeCPUCEnergyDivisionandincollaborationwithoneormoreutilities,andwouldprovideaCPUCrecommendationontechnicalrequirementsfortheimplementationofV2G-ACinterconnections.RecommendationstotheCPUCfromthissub-groupwouldbeprovidedsixmonthsaftertheissuanceoftheWorkingGroupThreeFinalReportifconsensuscanbereached,orsixmonthsafteraCPUCdecisionontheWorkingGroupThreeFinalReportifpartiesareinanon-consensusposition.

Supportedby: CESA,CleanCoalition,eMotorWerks,Fiat-Chrysler,GPI,Honda,Nuvve,SCEOpposedby: PG&E,SDG&E

Proposal23-h.Non-consensusModifySectionNtoallowstreamlinedstudyprocessforV2G-DC(stationaryinverter)EVSEinterconnections.

Supportedby:CESA,CleanCoalition,eMotorWerks,Fiat-Chrysler,GPI,Honda,Nuvve,SDG&E(partial;seeDiscussionsection)

Opposedby: PG&E,SCEProposal23-i.Non-consensusClarifyapathwayforpartiestointerconnectV2G-AC(mobileinverter)systemsonatimelybasisforexperimental,pilot,and/ortemporaryuseuntiltheappropriaterulesareupdatedinthefuture.

Supportedby: CEC,CESA,eMotorWerks,EPRI,Fiat-Chrysler,Ford,GPI,Honda,KituSystems,Nuvve

Opposedby: PG&E,SCE,SDG&E

Page 65: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

63

BACKGROUNDCaliforniahasagoalof5millionzero-emissionvehicles(ZEVs)by2030,alongwith250,000electric-vehiclechargingstationsby2025.Giventhesegoals,ZEVdeploymentandbuildoutofelectricvehicle(EV)charginginfrastructureareimportanttopicsforRule21interconnectiontoaddress,includingtheroleofEVsandElectricVehicleSupplyEquipment(EVSEs,alsoknownasEVchargingstations,electricrechargingpointsorjustchargingpoints)insupportingthegridas‘storage-like’resources.TheCaliforniaIndependentSystemOperator(CAISO),CaliforniaPublicUtilitiesCommission(CPUC),andCaliforniaEnergyCommission(CEC)jointlypublishedtheVehicle-GridIntegration(VGI)Roadmapin2014andtheCPUCopenedanAlternativeFuelVehicles(AFV)rulemaking(R.13-11-007)todefinetheVGIusecasesanddefinethebarriersandactivitiesneededtoachievethevisionoftheroadmap.7Sincethen,significanteffortsinCaliforniahavebeenunderwaytoincreaseinvestmentstofurtherdeploymentofEVsandEVSEs,andtodeveloptime-of-use(TOU)ratestoencourageoff-peakcharging.ThepotentialforEVsandEVSEstobeactivatedforgridserviceshasbeenrecognizedmostrecentlyinCalifornia’ssystem-widemodelingeffortsintheIntegratedResourcePlan(IRP)proceeding(R.16-02-007),whichfoundthat“flexibleEVcharging”couldreducetheamountofrenewablegenerationandenergystorageselectedtomeet2030greenhouse-gasplanningtargets.8Moreofthefocustodatehasbeenonthepotentialtomobilizetheone-waymanagedor“smart”charging(V1G)capabilitiesofEVSEs,boththroughdirect(e.g.demandresponse)andindirect(e.g.rates)mechanisms.WhileV1Gcanhelpmanagecustomerbillsandprovideloadresponse,theremaybeinstanceswherebidirectionalEVcapabilitiesmaybeabletoprovideadditionalcustomerandgridservices,especiallyathigherlevelsofEVpenetration.V2Gtechnologiesrepresentanopportunitytotakeadvantageofthe‘storage-like’systemsintegratedinEVs,plug-inhybridelectricvehicles(PHEVs),andEVSEstosupportanumberofuse-casesforeffectivevehicle-gridintegration.Forthepurposesofthisreport,V2Gisdefinedtoencompassarangeofuse-cases,technologies,means,andsolutionsthatinvolvetwo-wayelectricityflowbetweentheEV/EVSEandthegrid.StudieshaveshownthatV2Ghasthebidirectionalcapabilitytoprovideloadshifting,regulationservices,andoperatingreserves.9ThecapabilityofV2GtoexportenergyfromtheEVbattery,throughtheEVSE,toonsiteloadortothegridpresentsnewopportunitieswithpotentialvalue.Manypossiblefutureusecasesareunderdiscussionand/orpiloting,andmayincludethecapabilitytomanageelectricitydemandandcustomerbills,participateintheenergyandancillaryservicesmarketsattheCAISOthroughmechanismssuchasdemandresponse,orprovidedistributiongrid

7CaliforniaVehicle-GridIntegration(VGI)Roadmap:Enablingvehicle-basedgridservices,publishedinFebruary2014.http://www.caiso.com/documents/vehicle-gridintegrationroadmap.pdf8AttachmentA:ProposedReferenceSystemPlan,publishedonSeptember18,2017,p.139.http://docs.cpuc.ca.gov/PublishedDocs/Efile/G000/M195/K910/195910807.PDF9Steward,Darlene.CriticalElementsofVehicle-to-GridEconomics,NationalRenewableEnergyLaboratory,publishedinSeptember2017.https://www.nrel.gov/docs/fy17osti/69017.pdf

Page 66: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

64

servicestotheutility(e.g.,distributiondeferral,voltagesupport).ProponentsarguethatsuchfutureV2Gusecases,evenifstillunproven,mayhavethepotentialtoenhancethenet-benefitofEVsandthusacceleratetheiradoption,particularlyamongcertainEVcustomerclasses.V2Gsystemsfallintotwocategories:(1)thosethatutilizebidirectionalinverterswithintheEVSE(“V2G-DC”);10and(2)thosethatutilizebidirectionalonboardinverterswithintheEV(“V2G-AC”).Foreachcategory,theremaybetradeoffsintermsofoverallcost,pathtocertification,andbest-fitusecases.Ineithercase,theV2Gsystemsneedtobesafeandreliableastheyinterconnecttothegrid.Belowisanadditionalillustrationofthedifferenceofthetwocategories,aspresentedbyNuvveduringWorkingGroupdiscussions.

Currently,thereareanumberofpilotsoperatingaroundtheUnitedStatesandinCaliforniathataimtodemonstratetheviabilityofV2Gusecases.ThefirstV2GsystemdemonstrationwaslaunchedbytheUniversityofDelawareandNRGincollaborationwithautomotiveOEMs,HondaandBMW.InCalifornia,automotiveOEMsHondaandNissanareworkingwithNuvve,asoftwareaggregator,intheElectricVehicleStorageAcceleratorandtheINVENTprojecttotestdifferentusecasesofV2GtechnologiesattheUniversityofCaliforniaSanDiegocampus.Specificusecasesbeingtestedincludewholesalemarketparticipation,demandchargemanagement,frequencyregulation,solarPV

10ThefirstbidirectionalDCEVSEreceivedPermissiontoOperate(PTO)fromatLAAirForceBase.ThenextonewasinSDG&EterritoryonApril24,2018.

Page 67: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

65

optimization,andbackuppower.AttheLosAngelesAirForceBase,Kisensum,andLawrenceBerkeleyNationalLaboratory,usingPrincetonPowerEVSEs,workedwithSouthernCaliforniaEdisontodemonstrateV2GcapabilitiestobidenergyandancillaryservicesdirectlyintotheCAISO’swholesalemarketsandtoevaluatetherevenuepotentialofhavingV2Gresourcesparticipateasdemandresponse.1112Progressisbeingmadeineachofthesepilotsandthetechnologyismaturing,butatthemoment,theremaybeissuesandbarriers,includingthoserelatedtothetechnicalcomponentsofV2G-ACsystemsandinterconnectiontechnicalrequirements,thatlimitpotentialmarketopportunitiesforV2Gsystems.V2GsystemshaveRule21interconnectionimplicationsinspecificusecases,bothasindividualunitsandasanaggregatedresource.Furthermore,whileutilitiessupportthedevelopmentofV2Gthroughpilotssuchasthese,utilitiesalsoemphasizethatitiscriticalnottoviolatesafetyandreliabilityrequirementsthatpreventhazardousevents,suchasthepossibilityofback-feedingpowertotheutilityduringagridoutage.Somepilotshaveencounteredinterconnectionchallengeswhenattemptingtotestnewconfigurationsandusecases.Thetechnicalrequirementsforinterconnection,asspecifiedinRule21,remainsachallengeforV2G-ACsystemsaffectingmarketaccessforV2Gdeployments,andmayinfluenceinvestmentinV2G-ACproductionmodels.DistributionSystemOperatorsareunabletoapproveinterconnectionrequestsforV2G-ACsystemsduetothedifficultiesofV2Gsystemsinmeetingthetechnicalrequirementsforinterconnectionthatensuresafetyandreliability,andexistinginterconnectionstandardsandproceduresdonotprovideaclearpathwayforapprovalofmobileinvertersonboardtheEV.Establishingstandardizedrequirementsandproceduresthataremutuallyagreeabletoallparties,includingtheautomotiveandutilityplayers,isessentialforthisindustrytomoveforwardandtoensurethatinterconnectioncontinuestoaccommodateprogressonmarketaccess,businessmodeltestinganddevelopment,andtheregulatorycertaintyautomanufacturersneedtoinvestinV2Gproductionmodels.IncommentstotheinitialIssue23proposalbyproponentsCESA,Nuvve,andHonda,PG&EemphasizedtheneedtocoordinatetheworkandoutcomesonIssue23withotherstate-agency-ledinitiativesaddressingVGI,includingbutnotlimitedtotheCEC-ledVGIRoadmapUpdateandtheCPUC’sTransportationElectrification(DRIVE)Rulemaking(R.18-12-006).Likewise,PG&EalsocommentedontheneedtoensurealignmentbetweenEVVGIsolutionswithotherinverter-basedDERs–i.e.,findingsandproposalsonIssue23shouldbecoordinatedwiththeIOUs’strategicapproachtosmartinverters.13CESAagreesandnotesthattheCPUCandCECstafffortherespectiveandrelatedproceedingshavebeeninvolvedintheWorkingGroupdiscussions.Duplicativeorconflictingstrategiesandpoliciesshouldbeavoidedasmuchaspossible.11SouthernCaliforniaEdisonCompany’sDepartmentofDefenseVehicle-to-GridFinalReport,submittedonDecember22,2017.www.cpuc.ca.gov/WorkArea/DownloadAsset.aspx?id=644245579312Black,Douglas,etal.,LawrenceBerkeleyNationalLaboratory.2017.LosAngelesAirForceBaseVehicle-to-GridDemonstration.CaliforniaEnergyCommission.PublicationNumber:CEC-500-2018-025.https://www.energy.ca.gov/2018publications/CEC-500-2018-025/CEC-500-2018-025.pdf13EnablingSmartInvertersforDistributionGridServices,JointIOUWhitePaperpublishedonOctober2018.https://www.pge.com/pge_global/common/pdfs/about-pge/environment/what-we-are-doing/electric-program-investment-charge/Joint-IOU-SI-White-Paper.pdf

Page 68: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

66

ISSUESCOPETofulfilltheirprimarymobilityobjective,EVbatteriesandEVSEsarenormallytreatedasend-useloadsthatareconnectedtothegridthroughserviceconnections,andthusarenotsubjecttoRule21interconnectionreview.SuchbasicEVchargingloadshouldcontinuetobetreatedasend-useloads.Inaddition,modulatedandV1G“smartcharging”alsoshouldnotbesubjecttoRule21interconnectionreview,andshouldmaintainserviceconnectionasameanstoconnectthisend-useloadtothegrid.Likeotherdemandresponseandgrid-responsiveloads,Rule21interconnectionreviewisnotapplicableto,andshouldnotberequiredforV1G.ElectrifiedvehiclesorEVSEswithV1Gcapabilitiescanadjusttheirchargingprofilebymodulatingthepowerdrawfromthegridinresponse,directlyorindirectly,toagivenscheduleorasignal.TheEVSEandEVbatteriescanactasdemand-responsiveloadssimilartoothergrid-responsiveloads,suchasair-conditioningunitsandsmartthermostats,whichdonotrequireRule21interconnectionreview.ThisismadeclearinSectionB.1oftheRule21tariffwhereinterconnectiononlyappliestogeneratingfacilities,whichdonotencompassload-sidefacilities:

“ThisRuledescribestheInterconnection,operatingandMeteringrequirementsforthoseGeneratingFacilitiestobeconnectedtoDistributionProvider’sDistributionSystemandTransmissionSystemoverwhichtheCaliforniaPublicUtilitiesCommission(Commission)hasjurisdiction.”[emphasisadded]

However,V2GsystemsdifferfromV1GsystemsinthattheEVbatterycandischargeasabehind-the-meter(BTM)energystorageresource,servingACloads,either(1)toreducecustomerACloadasnon-exportenergystoragesystem(“V2GNon-Export”)orto(2)exportacrossthepointofcommoncoupling[PCC](“V2GExport”).SincebidirectionalinverterscanbeintegratedineithertheEVSE(stationaryinverter)ortheEVitself(mobileinverter),Rule21jurisdictionappliestoV2Gsystemsineitherstationaryormobilesituation,becausethesystemcannowfunctionasageneratingfacility(seeSectionB.1below):

“ThisRuledescribestheInterconnection,operatingandMeteringrequirementsforthoseGeneratingFacilitiestobeconnectedtoDistributionProvider’sDistributionSystemandTransmissionSystemoverwhichtheCaliforniaPublicUtilitiesCommission(Commission)hasjurisdiction.AllGeneratingFacilitiesseekingInterconnectionwithDistributionProvider’sTransmissionSystemshallapplytotheCaliforniaIndependentSystemOperator(CAISO)forInterconnectionandbesubjecttoCAISOTariffexceptfor1)NetEnergyMeteringGeneratingFacilitiesand2)GeneratingFacilitiesthatdonotexporttothegridorsellanyexportssenttothegrid(Non-ExportGeneratingFacilities).NEMGeneratingFacilitiesandNon-ExportGeneratingFacilitiessubjecttoCommissionjurisdictionshallinterconnectunderthisRuleregardlessofwhethertheyinterconnecttoDistributionProvider’sDistributionorTransmissionSystem.SubjecttotherequirementsofthisRule,DistributionProviderwillallowtheInterconnectionofGeneratingFacilitieswithitsDistributionorTransmissionSystem.”[emphasisadded]

WhilebasicEVchargingloadandV1GsystemsarenotRule21applicable,proponentCESAbelievesthatV2GsystemsareallRule21applicable.InTable1,CESAprovidesamoredetailedcategorization

Page 69: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

67

ofV2Gconfigurations,whichdistinguishesbetweenthebidirectionalinverterinstalledwithintheEV(mobileinverter)orwithintheEVSE(stationaryinverter),andalsodistinguishesbetweenNon-ExportandExport.Table1:CategorizationofV2GConfigurationsbyCESAConfiguration DoesRule

21apply?Details

BasicEVChargingLoad No SomeEVownersdonotengageinsmartchargingprogramsandmaysimplyvoluntarilyrespondtowhateverratetheytakeserviceunder.

V1GEVSE+EV No V1GsystemsarestrictlyloadandaresubjecttoRules15/16,whichreviewsloadthresholdstotriggerdistributionupgradesbutotherwiseareserviceconnectionswithoutstudyprocesses.14TheyshouldnotbesubjecttogeneratorstudiesunderRule21,similartotraditionalDRservices,evenasload-responsiveservicescanbeprovided.

V2GNon-ExportEVSE(“V2G-DC”)

Yes Inthiscase,theEVSEisintegratedwithabidirectionalinverterandtheDCEVbatteryservesastheloadandGenerator,similartomostBTMenergystoragesystems.The“Non-ExportGeneratingFacilities”provisionswithinRule21shouldapply.Similarly,theload-sidestudymayinvolveRules2,3,15,and16.

V2GNon-ExportEV(“V2G-AC”)

Yes Inthiscase,theEVisintegratedwithanonboardbidirectionalinverteralongsidetheEVbattery,servingastheloadandGenerator,similartoBTMenergystoragewithintegratedinverterswithinthesamemodule.The“Non-ExportGeneratingFacilities”provisionswithinRule21shouldapply,onlyifthesefunctionsareutilizedorenabled.Similarly,theload-sidestudymayinvolveRules2,3,15,and16.

V2GExportEVSE(“V2G-DC”)

Depends WDATmayapplywhenexportingtotheCAISOgrid,whileRule21mayapplywhenexportingandsellingtothedistributionutility,suchasdistributioncapacityfordeferralpurposes.

V2GExportEV(“V2G-AC”)

Depends WDATmayapplywhenexportingtotheCAISOgrid,whileRule21mayapplywhenexportingandsellingtothedistributionutility,suchasdistributioncapacityfordeferralpurposes.

14CESArecognizesthattheexemptiontoRule15andRule16maynotberenewedpastitscurrentexpirationdateofJune30,2019.

Page 70: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

68

ForallV2GconfigurationsinTable1,Rule21interconnectionreviewisrequiredtosupporttheinterconnectionofanyGeneratingFacilityandutility-interactiveinverter,butthecurrentRule21doesnotincludelanguageforinterconnectionconsiderationsexplicitlyforinvertersformobileenergyresources.Currently,interconnectionrequestsformobileenergyresourceswouldbehandledinthesamemannerasanyotherinterconnectionrequest.InterconnectionofV2Gsystemshavebeendoneonacase-by-casebasistodate.15ThepotentialneedformodificationstoRule21tosetastandardizedinterconnectionreviewprocessspecificallyforV2Gsystemsisbeingdiscussedamongindustrystakeholders.Customerexperienceineachofthesescenariosmayalsobearconsideration.OverthecourseofmultiplemeetingsonIssue23,WorkingGroupparticipantsfocusedonV2GNon-ExportandExportEVSE(stationaryinverter,V2G-DC)configurations,anddeferredconsiderationofV2GNon-ExportandExportEV(mobileinverter,V2G-AC)configurationstoalatertime.ForseveralpotentialV2Gusecases,theWorkingGroupconsideredapplicablecodesandstandardsaswell.TheseincludeinterconnectionrequirementsIEEE1547(StandardforInterconnectionandInteroperabilityofDistributedEnergyResourceswithAssociatedElectricPowerSystemsInterfaces),productcertificationstandardUL1741(StandardforInverters,Converters,ControllersandInterconnectionSystemEquipmentforUsewithDistributedEnergyResources),andSocietyofAutomotiveEngineers(SAE)J-3072(InterconnectionRequirementsforOnboard,Utility-InteractiveInverterSystems).Inaddition,therearetestingstandardsIEEE1547.1(DraftStandardforConformanceTestProceduresforEquipmentInterconnectingDistributedEnergyResourceswithElectricPowerSystemsandAssociatedInterfaces)andUL1741SupplementA(UL1741SA).ThesestandardsarelinkedorbecominglinkedinrelationtoRule21andV2G.AnewSectionHhonsmartinvertercertificationandrequirementshasbeenaddedtoRule21toincorporatetheUL1741SAstandardforallinverter-basedgeneration.Andpursuanttothe2018CPUCResolutionE-4898,Rule21SectionHhmustbeharmonizedwithIEEE1547inthefuture.Forbidirectionalmobile(onboard)invertersusedinV2G-ACapplications,theSAEJ-3072standardwasdevelopedtotakeintoaccountthe2003versionofIEEE1547(IEEE1547-2003),buthasnotbeenupdatedtoaccountfortherequirementsinthemostcurrentversionofIEEE1547(IEEE1547-2018).Further,SAEJ-3072hasnotyetfullytakenintoaccounttherequirementsofcurrentRule21andUL1741,whichisthestandardforsafeinverterinterconnectionstothedistributiongrid.SomediscussiontookplaceintheWorkingGrouponhowmuchSAEstandardsalignwith(and/orhavegapscomparedto)IEEE1547andUL1741,includingsomepreliminaryworkinitiatedbySCEandSAEonhowSAEmayalignwithIEEE1547standards.ThesediscussionsandworkresultedinProposal23-gtoestablishatechnicalsub-groupcomprisedofutilityandindustrystakeholderstoinvestigatethetestingandcertificationrequirementsforV2G-ACsystemsthatwouldsatisfysafetyandreliabilityrequirementsforon-board(mobile)invertersusedinV2G-ACconfigurations.

15AmunicipalutilityinDelawareisaprecedentforconsiderationinthisWorkingGroup.

Page 71: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

69

IntheparticularcaseofV2Gapproachesforcommercialvehiclefleets,theWorkingGroupflaggedbutdidnotdiscusstheissueofhowsub-meteredEVsandEVSEscanaddressRule21technicalrequirementsinaggregateatthecustomermeterwithouthavingtointerconnecteachEVorEVSEindividually.OnceaninterconnectionpathwayforapplicableindividualEVsandEVSEsisclarifiedanddefined,thenextstepmaybefortheCPUC,IOUs,andstakeholderstoworktogetheronenablingfleet-levelinterconnections.PG&Eaddedthat,thoughaggregationandsub-meteringmayberelevanttointerconnection,theyarewide-reachingissuesthatextendwellbeyondinterconnectionandlikelyrequirecoordinationwithotherproceedingsandstakeholders.CESAagreedthatitmaybereasonabletonotincludeaggregationissuesinthescopeofIssue23atthistime,butnotedthatinterconnectionissuesrelatedtoDERaggregations,includingwithV2Gsystems,willincreasinglybecomeaprevalentissuethatmustbeaddressedinthenearfuture.Insummary,thescopeofIssue23andtherelatedproposalswasidentifiedasfollows:

• ClarifyapplicabilityofRule21toV2G-capablesystems• FocusoninterconnectionprocessesandpathwaysforV2GNon-ExportandExportEVSE

(stationaryinverter,V2G-DC)configurations• Focusonsingle-siteV2GNon-ExportinterconnectionsunderRule21• ReviewfortheapplicabilityofUL1741SA,SAEJ-3072,IEEE1547,andother

standards/certificationstoenableV2G-DCandV2G-ACinterconnections• EnsurethatallfindingsandproposalsforIssue#23arecoordinatedwithallrelevant

agencies,stakeholders,andproceedingsDISCUSSIONProposal23-a.ConsensusRecognizethatinthecaseofunidirectionalcharge-onlyV1Gwithnodischargecapability,Rule21doesnotapply.V1GmustcomplywithRules2,15,and16.PartieswantedtoexplicitlyrecognizethatRule21doesnotapplytoV1G,inordertoremoveanyuncertainty.PartiesbroadlyagreedthatV1GdevicesandtechnologiesdonotneedtocomplywithRule21sinceV1Gisconsideredtobe“load”not“generation.”Atthesametime,partiesemphasizedthatV1GstillneedstocomplywithRules2,15,and16loadinterconnectionrequirements.Proposal23-b.ConsensusModifyRule21SectionB.4toclarifythatRule21appliestotheinterconnectionofbothstationaryandmobileenergystoragesystems,withlanguageasfollows:

“ForretailcustomersinterconnectingstationaryormobileenergystoragedevicespursuanttothisRule,theloadaspectsofthestoragedeviceswillbetreatedpursuanttoRules2,3,15,and16justlikeotherload,usingtheincrementalnetloadfornon-residentialcustomers,ifany,ofthestoragedevices.”

Page 72: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

70

Rule21sectionB.4hasbeenappliedtobothstationaryandmobileenergystoragedevicesbecauseitdidnotexplicitlyaddressmobileversusstationaryinitsplainlanguage.IndiscussingIssue23,partiessaidthatclarifyingthatRule21appliestobothmobileandstationaryenergystoragesystemswouldremoveuncertaintyorambiguity.Proposal23-c.ConsensusRecognizethatV2G-DC/EVSEsystems(ElectricVehicleSupplyEquipmentwithstationaryinverterforDCchargingofvehicles)maybeinterconnectedunderthecurrentRule21language,withnoRule21languagechangesoradditionalauthorizationneeded,providedthattheEVSEmeetsallRule21requirements,includingUL1741SAandotherupdatedsmartinverterstandards.AsnotedintheIssueScopesection,interconnectionofV2Gsystemshasbeendoneonacase-by-casebasistodate.PartiessaidthatrecognizingthatV2G-DC/EVSEsystemsmaybeinterconnectedunderthecurrentRule21languagewouldalsoremoveuncertaintyinrelationtosuchsystems.Proposal23-d.ConsensusAllowV2G-DC/EVSEsystems(stationaryinverterforDCchargingofvehicles)toconnectasV1G,load-only,andoperateinunidirectional(charge-only)modeuponsatisfyingpre-definedcriteria.ThesecriteriaincludeULPowerControlSystemsCRD(ULCRD)andUL1741SAcertificationtesting,whichwilldemonstratethat:(1)theEVwillnotdischargeiftheEVSEissettounidirectionalmode;(2)theEVSEwillnotinadvertentlychangetobidirectionalmode;and(3)thatfactorydefaultsettingsaresettounidirectionalmode.Further,requirethattheoperationalmodecannotbechangedwithoututilityauthorization.DuringWorkingGroupdiscussions,utilitieswantedassurancesandconfidencethataV2G-DCsystemincharge-onlymodewouldnotdischarge,andfocusedonthetechnicalrequirementsandtestingneeded.Issueproponentswereconcernedaboutthepotentialcostsofhavingtoproveno-dischargeandthepotentiallyonerousburdenofhavingto“proveanegative”–i.e.,provethatsomethingwon’thappenTheWorkingGroupdiscussedtherisksandpotentialneedfortestingandcertifications,especiallyifV2G-DCinterconnectionsbecomemoreprevalent.Thisledtoinitiatingatechnicalsub-grouptodiscusspotentialtestingandcertificationprocessesthatwouldensureV2G-DC/EVSEwouldbeoperatedasunidirectionalwithoutneedforaninterconnectionrequest.Thesub-groupdiscussedtechnicalrequirements,evaluationsandprocessesthatareneededtoallowconnectingaV2G-DC-capableEVSEtotheelectricgridwhileoperatingitonlyunidirectionallyuntiladesiretochangethemodeto“bidirectional”atwhichtimeaninterconnectionapplicationwouldbesubmittedtotheutility.TheWorkingGroupcametoaconsensusthatallV2G-capableEVSEsusedforV2G-DCshall:

Page 73: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

71

a. BeevaluatedandlistedunderUL1741SAviaanOSHA-approvedNRTLand,inthenear

future,beevaluatedusingUL1741thatreplacestheSupplementAwithIEEEP1547.1-2019,whichisprojectedtobeapprovedbyQ42019

b. Beevaluated,usingtherecentlyapprovedULCRDforPowerControlSystemto:i. DemonstratethatwhentheEVSEissetorprogrammedtounidirectional(charging)

mode,theEVSEwillnotdischargeii. Preventinadvertentchangeinoperationalmode(changefromunidirectionaltob-

directionalmode)c. BeconfiguredsuchthatEVSEfactorydefaultmodeshallbeunidirectional(chargingonly)

WhenanEVSEhasmettheaforementionedrequirementsunder(a),(b),and(c),thentheEVSEmaybeinterconnectedasV1G,loadonly,andmustcomplywithRules2,15,and16inaccordancewithProposal23-a.ThisEVSEhastheoptiontobeevaluatedatafuturedateaspartofRule21iftheEVSEownerdesirestooperatetheV2G-DC/EVSEasabidirectionalsystem.Utilitiesalsoidentified“pendingitems”thattheymayneedtoaddressatsomepoint,includingtheentityresponsibleforreviewing/approvingtestinginformationandmaintainingthelistofapprovedequipment.CESArecommendsthatthelistofapprovedequipmentbemaintainedbytheutilitiesuntilanequivalentCEClistcanbedeveloped.Proposal23-e.ConsensusAllowbidirectionalmodetobeenabledforaV2G-DC/EVSE(stationaryinverter)systemonlyuponreceivingPermissiontoOperate(PTO)fromtheutility.WhenV2G-DC/EVSEownerswishtoswitchtobidirectionalmode,theymustfirstcompletetheRule21interconnectprocessandreceivePTOfromtheutility.IfPTOhasbeenreceived,themanufacturerorapprovedthird-partyinstallercanthenprogram/enablebidirectionaloperation.WhenV2G-DC/EVSEownerswishtoswitchtobidirectionalmode,theymustfirstcompletetheinterconnectprocessandreceivePermissiontoOperate(PTO)fromtheutility.IfPTOhasbeenreceived,themanufacturerorapprovedthird-partyinstallercanthenprogram/enablebidirectionaloperationinaccordancewithEVSEinstructions&ULCRDrequirements.Thereareafewimplementationdetailsthatlikelyneedtobeworkedout,whichcanoccurinfutureWorkingGroupactionsorthroughadviceletterfilings.Forexample,itistobedeterminedontheimplicationsofcustomersinstallingbidirectionalcapableV2G-DC/EVSEsystemsbutnotinitiatingaRule21applicationtoenablebidirectionalmodeforalongtime,potentiallyleadingtotheriskthatmajorcostlyretrofitsareneededtomeetnewstandardsorcertificationsthathavebeenadoptedatamuchlatertime.OnepossibilitywouldbetohaveV2G-DC/EVSEownerstointerconnectascharging-onlymodetofacilitatefastloadconnectionsandtohavetheRule21processbestartedinparallel.TheneedtodefineatimeperiodtoinitiatetheRule21processwasalsodiscussed.Theseimplementationdetailsremainunresolvedatthistime.

Page 74: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

72

SpecificallyasrelatedtothetimeperiodtoinitiateRule21process,PG&Eproposesthefollowing:AsrelevanttotheInterconnectionApplication,iftheInterconnectionApplicationissubmittedwithin6monthsofinspectionapprovalbythelocalAuthorityHavingJurisdiction(AHJ),andtheEVSEownerdesirestooperatetheEVSEinaV2Gmode,inaccordancewithRule21,theEVSEinvertercanbeevaluatedbasedontheapplicableregulatoryrequirementsandstandardsatthetimeofinspectionapproval.Otherwise,theEVSEinvertershallbeevaluatedasV2GbasedontheregulatoryrequirementsapplicableatthedateofApplicationDeemedComplete.Consistentwithcurrentprocess,theinterconnectionstudyforgridimpactwillalwaysbeconductedatthedateofApplicationDeemedComplete.Proposal23-f.Non-consensusModifyinterconnectionportalstoenablesimpletrackingofV2Ginterconnections,suchasbyaddingnewEVSEinvertertypesindrop-downmenusorflagginginterconnectionsasV2G.(ThisitemisalsocoveredinIssue22.)

Supportedby: CESA,CleanCoalition,eMotorWerks,Fiat-Chrysler,GPI,Honda,Nuvve,PG&E,SCE(conditional;seeutilityposition)

Opposedby: SDG&EInWorkingGroupdiscussions,proponentsbelievedthatsimpletrackingofV2GinterconnectionswouldprovidefurtherdataandunderstandingofV2GdevelopmentinCaliforniathatcouldsupportfuturepolicyanddecision-making.Teslaposition:

IncommentsforIssue22,sub-proposal#4onaddingV2Gtointerconnectionportals,TeslacommentedthatitisnotopposedtoincorporatingV2Gintoportals,butitdoesquestionthedegreeofurgencygiventhenascentstateofV2Gcurrently.

GPIposition:

IncommentsforIssue22,sub-proposal#4,GPIdisagreedwithTeslaandurgestheCommissiontoaddressthisnowinordertoprovideaproactiveenvironmentforV2G,ratherthanbeingreactive.

Utilitypositions:

SDG&Edoesnotsupportthisproposal.Todate,SDG&EhasonlyprocessedoneinterconnectionapplicationforaDC-coupledV2Gfacilitythatwasbehindanexistingbillingmeteratacharger.ThescopeandcosttoreviseSDG&E’swebportalhavenotbeendeterminedbecausesofewV2Gapplicationshavebeensubmittedtodate.AsthenumberofV2Gapplicationsincrease,SDG&EwillworkwithitsInformationTechnologygrouptodeterminethedetailedscopeofworkandassociatedcoststorevisetheportaltoallowstreamlinedapplicationprocessesforV2Gandweighthosecostswiththepotentialbenefits.

Page 75: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

73

SDG&Eassertsthatatthepresenttime,theexistingapplicationprocessesareadequatetofacilitatetheinterconnectionrequestandreviewprocessforV2Gsystems.Giventhelackofsuchapplications,SDG&Edoesnotseeaneedatthistimetobegintheengineeringworktodeterminethescopeandcostofimplementingchangestoitsportal.WhileSDG&EdoesnothaveacurrentneedtoimprovetheinterconnectionprocessforV2GDCsystems,itspracticeistomakesystemimprovementsincludingstreamliningchangesthatwillimproveefficienciesandexpeditetheinterconnectionprocessesastheneedarises.

AlthoughSCEhasnotseenanycurrentV2Gprojects,SCEsupportstheinclusionofEVSEinvertersinfutureupdatesofSCE’sGenerationInterconnectionProcessingTool(GIPT)system(asdiscussedwithinIssue22anddiscussionofinterconnectionportals).SCEexpectsthatthisfunctionshouldbeabletobeincorporatedintotheGIPTdropdownmenufornewapplicationswithinthelaterphasesofplatformdevelopmentsubjecttoPhase1GIPTfunctionalityconfirmationandPhase2functioncapabilityreview.

Proposal23-g.Non-consensusEstablishasub-groupinvitingstakeholdersfromtheSmartInverterWorkingGroupandSAE,amongothers,todeveloptechnicalrecommendationstoenableV2G-AC(mobileinverter)interconnections.Thissub-groupwouldbeledbyastakeholderincoordinationwiththeCPUCEnergyDivisionandincollaborationwithoneormoreutilities,andwouldprovideaCPUCrecommendationontechnicalrequirementsfortheimplementationofV2G-ACinterconnections.RecommendationstotheCPUCfromthissub-groupwouldbeprovidedsixmonthsaftertheissuanceoftheWorkingGroupThreeFinalReportifconsensuscanbereached,orsixmonthsafteraCPUCdecisionontheWorkingGroupThreeFinalReportifpartiesareinanon-consensusposition.

Supportedby: CESA,CleanCoalition,eMotorWerks,Fiat-Chrysler,GPI,Honda,Nuvve,SCEOpposedby: PG&E,SDG&E

AttheMarch27,2019,atentative(verbal)consensuswasreachedtohaveatechnicalsub-groupbeestablishedtoaddressV2Ginterconnectionissues.Thissub-groupwouldbe“informal”butwouldbeopentoparticipantsfromtherelevantstakeholdergroups(e.g.,SIWG,SAE,DRIVEOIR,VGIWorkingGroup)toparticipateinthesetechnicaldiscussions.TherewastentativeagreementthatthegroupcoulddeveloprecommendationsthatcouldbelaterintroducedintotheformalproceduralrecordintimefortheadoptionoftheWorkingGroup#3ProposedDecision,whichmayoccursometimeinQ32019.Therearestilluncertaintiesastohowanyconsensusproposalsfromthissub-groupwouldbere-introducedbackintotherecord,whowouldsupervisethesub-group,andbywhattimeframerecommendationswouldbedelivered.Someideasincluded:(a)havingtherecommendationsbeintroducedthroughtheSIWG,whichismeetingonanongoingbasis;(b)havingadedicatedRule21workshop;and/or(c)theVGIWorkingGroupintheDRIVEOIR,whichisslatedtobeginmeetingin

Page 76: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

74

July2019.Thesub-groupitselfmayultimatelydeterminewhereanyproposalswouldenterintotherecord.Notallstakeholderswereinfavorofthisproceduralpathway,asPG&Ereservedjudgment.Proponentpositions:

CESAdoesnotbelievethatthelimitedtimeavailableinWorkingGroupThreededicatedtoIssue#23wassufficienttimetocomprehensivelyandeffectivelyaddressRule21interconnectionissuesforcertainV2G-ACsystemswithmobileonboardinvertersseekinginterconnectionthroughSAEJ3072,orotherlonger-terminterconnectionissuessuchashybridizationofV2Gsystemswithsolarand/orenergystoragesystems.ThereareanumberoftechnicaldetailsthatneedtobediscussedbetweenIOUsandotherstakeholderstounderstandtheconcerns,addressgaps,andproposetheappropriatechanges.CESAunderstandsthatanewproceeding(R.18-12-006)hasbeenopenedtoaddressarangeofissuesrelatedtovehicleelectrificationrates,infrastructure,andVGIissues.Whilethisissuecouldbescopedthere,CESAbelievesthatR.18-12-006isalreadyoverloadedwithawiderangeofissuesandinsteadrecommendsthattheRule21proceedingistheappropriateforumtodiscussthesematters,whichrequiretheinvolvementofIOUinterconnectionengineersandspecifictariffrulechanges.TheSmartInverterWorkingGroup(SIWG)wasalsoraisedasapossiblevenuetoaddresstheseoutstandingorlonger-termissues,butCESAisagainconcernedthattheSIWGisalreadytaskedwithalargeagenda,includingthetimelyimplementationofResolutionE-4898functions,whichhavealreadybeendelayedmultipletimes.Instead,CESAbelievesthatadedicatedV2G-focusedsub-groupinthisproceedingistheappropriatetimeandplacetoaddressthesetechnicalmattersmoredeeply.Insum,CESAbelievesthatmoretimeisneededonvariousV2Ginterconnectionissues.

Utilitypositions:

WhilePG&EsupportstheadvancementofindustryeffortsonthetechnicalaspectsofV2GAC,PG&Emakesthefollowingtwocomments:First,addressingtheregulatoryneedsand/orrequirementsaroundtechnicalaspectsofV2GACshouldnotbedoneinisolationbutratheraspartofabroaderVGIeffortthatclearlyidentifiesandprioritizesVGI’stechnicalchallengesandbarriers.Second,theneedand/orvalueofV2GACshouldbeclearlyarticulated,especiallyrelativetothemoretechnologicallyandcommerciallymatureV2GDC,beforeandinordertojustifylaunchingdedicatedeffortstoaddressthetechnicalaspectsofV2GACthroughratepayer-fundedpolicyandregulatoryproceedings.PG&Esupportsthecontinuationofprivateindustryeffortstoaddresstheseissues.PartofthoseprivateindustryeffortsmaybethroughtheparticipationinSAEactivities.EVmanufacturersshouldplayaleadingroleinthedevelopmentofautomotivestandards,whileutilitiescanadviseandengagevoluntarilyasneeded.Forexample,someautomakershaveexpressedconcernwithULrequirementsbecausetheytakeuptoomuchspaceinthevehicle.ThisautomotivedesignissueaffectingV2GACisbestaddressedbySAEandEVmanufacturersratherthanRule21WorkingGroup.AfterSAEdeveloptheautomotiveequivalentofUL1741SA,utilitiescanreviewitforadequacyand,ifadequate,adoptitinRule21.

Page 77: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

75

PG&EbelievesthatSIWGinitscurrentformmaynothavesufficientEVexpertise,andSAEtechnicalpersonnelmayneedtoleadandproactivelysupportpotentialfutureV2GACstandardsdevelopmenteffort,toensurethatEVtechnicalissuesareproperlyaddressed.PG&EalsonotesthattheproposedtimelineinthisproposalmaybedependentonthetimelineassociatedwithSAEstandardsandlevelofinvolvement.SCEagreedwithCESAontheneedforadditionaltimetoaddressalltheV2G-ACimplementationprocedures.SCErecommendsthatthissub-groupbeacollaborationoftheSIWGincludingtechnicalstandardspersonnel,includingfromSAE,ULandIEEEtoaddressexpectedtechnicaltopics,suchas:• Compliancerequirementunderthevariousstandards(e.g.,SAEJ3072,UL2594,UL1741

SA,SAEJ2836,IEEE1547-2018,IEEE1547.1-2019,IEEE2030.5)• CompliancewithNECcodes• NecessaryRule21modificationsSCE:WhileSIWGhasbeentaskedwithaddressinganumberoftechnicalissues,especiallyforResolutionE-4898,SCEbelievesthattheSIWGhaslargelycompletedwiththosetasksandthuswouldbeavailableforworkingonthesecomplextechnicalissues.However,SAEtechnicalpersonnelmustparticipateintheSIWGtoensurethatalltechnicalissuesareproperlyaddressed.SCE:GiventhecomplexityofthetechnicalandstandardrequirementsrelatedtoV2G-AC,SCEdoesnotsupportaddingthisscopetofutureworkinggroups(i.e.,WorkingGroupFour).Instead,SCEproposedthataworkinggroupoverseenbyIOUsandsupervisedbyCPUCEnergyDivisionbeestablishedtoprovideaCPUCrecommendationontechnicalrequirementsfortheimplementationofV2GACinterconnectionsasoutlinedinProposal23-gandconsistentwithpriorSIWGpractice.SCEproposedthatrecommendationsbasedondiscussionsoccurringinthisforumcouldbeprovided6monthstotheCPUCaftertheissuanceoftheWorkingGroupThreereportifconsensuscanbereachedor6monthsaftertheCPUCdecisiononWorkingGroupThreereportifpartiesareinanon-consensuspositionasoutlinedinProposal23-g.SDG&Eunderstandsthatadraftmotiontocreatethissub-groupisincirculationandmaysoonbefiledproposingtobeginthissubgroupinQ2-Q32019–priortotheCommission’sreviewanddecisionsonproposalscontainedinthisWorkingGroupThreeFinalReport.SDG&Ebelievesthatitisprematureandpotentiallyextremelyinefficienttobeginatechnicalsub-grouppriortotheCommissionissuingadecisionthatholisticallyconsidersalltherecommendationswithinthisWorkingGroupThreeFinalReport.EVindustrystakeholdershavestatedthatV2GACsystemscannotpasstheUL1741SAcompliancetestsbecauseUL1741SAcontainstestcriteriathatmobileinverterscannotmeet.TheEVindustrystakeholdershaveproposedSAEJ3072asanalternativetestingstandardtoUL1741SA.InorderfortheIOUstoacceptSAEJ3072asanacceptablereplacementtoUL1741SA,itwillbenecessaryfortheEVindustrystakeholderstodoacomparativeanalysisbetweenSAEJ3072andUL1741SA(andIEEE1547).EVindustrystakeholderswouldalsoneedtoidentify

Page 78: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

76

changestoSAEJ3072thatwillincorporatetheessentialteststoensureon-boardinvertersinV2GACsystemswilloperatesafelyandreliably.WhenthechangestoSAEJ3072havebeenidentified,thenIOUstakeholderswillneedtoverifytheproposedchangeswillprovidethesamesafetyandreliabilitytestsnowprovidedbyUL1741SA.AfterverificationthatSAEJ3072containsthesameteststoensuresafetyandreliabilitynowprovidedbyUL1741SA,itmaybeappropriateforallstakeholderstocollaborativelydetermineimplementationsteps.SDG&E:TheinitialphasesofworktoperformthecomparativeanalysisbetweentheSAEandUL/IEEEstandardsandtoidentifychangesneededtoSAEJ3072canbeperformedbytheEVindustrystakeholders,andshouldnotrequiresignificantinputfromtheIOUs.TheIOUswillnotneedtoparticipateintheworkeffortuntilthechangestoSAEJ3072havebeenproposed.Therefore,itisnotappropriatetoassembleamandatoryworkinggroupledbyIOUsandEVindustrystakeholders,nortoconductmeetingswithallpartiesuntiltheproposedchangestoSAEJ3072havebeendeveloped.OncetheproposedchangestoSAEJ3072havebeendeveloped,communicationbetweenEVindustryrepresentativesandtheIOUsandotherindustrystakeholdersshouldtakeplacetoverifySAEJ3072adequatelysupplantsUL1741SA,andtodetermineimplementationsteps.

Proposal23-h.Non-consensusModifySectionNtoallowstreamlinedstudyprocessforV2G-DC(stationaryinverter)EVSEinterconnections.

Supportedby:CESA,CleanCoalition,eMotorWerks,Fiat-Chrysler,GPI,Honda,Nuvve,SDG&E(partial;seeutilityposition)

Opposedby: PG&E,SCEProponentpositionbyCESA:

ForV2GNon-ExportEVSEusecases,CESAraisedthepossibilityofconsideringhowRule21interconnectionreviewprocessescouldbeadaptedfromtherecentlyapprovedone-yearpilotforexpeditedinterconnectionreviewofnon-export,standaloneenergystoragesystemsthatmeetspecificeligibilitycriteria.16ExistingSectionNCriteriaandCESA’sproposedchangesaregiveninTable2.UtilitiesfiledadvicelettersonSeptember1,2018reportingonoutcomesofthispilotprocess.CESAbelievesthatitmaybeworthwhiletoconsiderhowthisprocess,perhapsadaptedinsomewaytoV2Gusecases,couldestablishaperformance-basedinterconnectionreviewprocess.

16Rule21SectionN.

Page 79: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

77

Table2:ExistingSectionNCriteriaandCESA’sProposedChangesExistingSectionNCriteria CESA’sProposedChangesCannotexceed0.5MWinaggregateinverterand/orrectifiernameplaterating(butanyenergystoragekWhratingmayapply)

Asimilarthresholdcouldbeset.CESAdoesnotseeanyreasonwhythisthresholdshouldbedifferentiatedforstationaryBTMenergystorageversusstationaryV2GEVSEsthathavesimilarcapabilitiesbutwiththe‘storagereservoir’locatedintheEVbatteriesratherthanintegratedinthesame‘box’wherestoragecontrolsarelocated.Similarly,theloadstudiesshouldfocusontheinverterratingoftheEVSEasopposedtotheEVbatterycapacityandshouldallowforanykWhratingtoapply.PerhapsapolicyquestionfortheCPUCinthefuturecouldbeonreassessingthis500-kWthreshold,whichforEVfleets,couldbeeasilyreached–e.g.,fromfour150-kWDCfastchargers.

Mustbebehindasingle,clearlymarked,andaccessibledisconnect

Nochangesareneeded.ThedisconnectcanbelocatedandmanagedattheEVSE.ThisappearstoalreadybemandatoryforLevel2EVSEs.17

OnlyScreenIProtectionOptions3and4areeligible,aswellaspotentiallyAC/DCconverterspendingtheirlabresults

Nochangesareneeded.

Mustbeatasingleretailmeterpointofinterconnection

Nochangesareneeded.

Musthaveasingleorcoordinatedcontrolsystemforchargingfunctions

Nochangesareneeded.

Mustoperateunder“ChargingMode2”whereinchargingfunctionsdonotincreasethehostfacility’sexistingpeakloaddemand

Nochangesareneeded,butfurtherdiscussionwouldbehelpfultoviewthiscriterion.WithinthecontextofEVchargingload,customerpeakdemandmayincreaseincertainapplications.SomeEVSEsarealsotakingserviceunderseparateratesfromthehostcustomerload.18CESAisopentodiscussiononwhetherthiscriterionwouldneedtobeadjustedforV2GEVSEs.

MusthaveaUL1741certifiedinverter

Nochangesareneeded.V2G-DCsystemsshouldbecertifiableunderUL1741.

Mustincludeasingle-linediagramanddescriptionofoperations

Nochangesareneeded.

MustmeetallElectricServiceRequirements

Nochangesareneeded.

17SeePG&E’scodeathttps://www.pge.com/includes/docs/pdfs/about/environment/pge/electricvehicles/ev5pt3.pdf18CESAnotesthatotherjurisdictions,suchasDistrictofColumbia,aredealingwiththechallengeofdistinguishingbetweenelectricityasafuelversuselectricityasaservice.

Page 80: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

78

Toimplementtheaboveproposedchanges,CESAproposesthefollowingredlinemodificationstotheRule21tariffSectionD(GeneralRules,Rights,andObligations)toextendtheapplicabilityoftheexpeditedinterconnectionreviewprocessfornon-exportingenergystoragesystemstonon-exportingV2G-DCinterconnectionusecases:

14.SpecialProvisionsApplicabletoNon-ExportEnergyStorageGeneratingFacilities

ApplicantswithNon-ExportEnergyStorageGeneratingFacilities,includingdirectcurrentvehicle-to-gridenergystoragesystems,thatmeetthecriterialistedinSectionNshallbeeligibletoelecttohavetheirInterconnectionRequestsprocessedinanexpeditedtimeframe,subjecttothetermsandconditionsofSectionN.

Similarly,theopeningapplicabilityparagraphofSectionNwouldneedtobemodified:

UponimplementationbyDistributionProvider,ApplicantswithInterconnectionRequestsforNon-ExportEnergyStorageGeneratingFacilities,includingdirectcurrentvehicle-to-gridenergystoragesystems,whomeettherequirementsoutlinedbelowareeligibleforexpeditedinterconnection,asprovidedherein,inaccordancewiththeFastTrackProcesstechnicalreviewrequirementsofSectionF.2.ApplicantswithNon-ExportAC/DCConvertersthatmeettherequirementsoutlinedinSectionObelowarealsoeligible.

Alternatively,anewsub-sectionofSectionNcouldbecreatedforV2G-DCsystemsandbroadlyforV2Gsystemsingeneral,thusteeingupfutureconsiderationofV2G-ACinterconnections.Forfleetapplications,languagepreventingmultiplegeneratorsbehindthesamePCCwouldhavetoberemovedormodified.Otherwise,V2G-DCinterconnectionswouldberequiredtofollowthenormalFastTrackproceduresandapplicabletimelines.CESAthereforerecommendsthefollowingredlinemodificationstoSectionN.2.c:

TheGeneratingFacilitymustbelocatedbehindanexistingsingleretailmeterandPointofCommonCouplingwithasingle,clearlymarkedandaccessibledisconnect.NootherGenerators,otherthanisolatedback-upGenerators,maybeatthesamePointofInterconnectionorPointofCommonCoupling.

Additionally,underRule21SectionN.2.e.,CESAraisedthepossibilityofstrikingtheprovisionsaroundcontrolsystemsensuringthatthereisnoincreaseinacustomer’sexistingpeakloaddemand,whichCESAbelievesshouldbeaccommodatedbyRule16.Inmanyapplications,theremaybehigh-capacityEVchargingusecasesthatwilllikelyexceedacustomer’speakload.CESAunderstandsthatSectionNwasestablishedtostreamlineinterconnectionbylimitingoverloadconcernsfromcoincidentcharging,soCESAwishestoexploretheflexibilityofreassessingthiscriterionandwhetheritisappropriate.ThismaybeabroaderpolicymatterthatneedstobeaddressedwithinthecontextofnotonlyV2G-DC

Page 81: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

79

systemsbutwiththebroadersubsetofenergystoragesystems.CESAflagsthisasaconsiderationinsuchfuturediscussions.Finally,CESArequestsclarityonthestatusofthepilotsconductedleveragingtheprocessandconditionssetinSectionN.CESAunderstandstheexpeditedinterconnectionprocessfornon-exportingenergystoragewasapilotthatexpiredonJune30,2018.WhileCESAstronglyrecommendsthecontinuanceofthisprocessandmaintainingSectionNinthetariff,aCPUCdeterminationtodiscontinuethisseparateprocessforenergystoragewouldhaveanimpactonourrecommendations.ForV2GExportEVorV2GExportEVSEconfigurations,CESArecommendsthecreationofexpeditedinterconnectionprocessessimilartowhathasbeenestablishedforNetEnergyMetering(NEM)generatingfacilities.Currently,NEMgeneratingfacilitiesunder1MWareprocessedin30daysorlessaftersubmittingacompletedinterconnectionapplication,19andareeligibleforfast-trackevaluationwhensizednolargerthan3MWona12kV,16kV,or33kVlines.20Asapolicydecision,CESAbelievesitmaybereasonabletoassesswhethersizethresholdscouldbeestablishedsuchthatexpeditedfast-trackprocessesorcertainscreenbypassingcanbeextendedtoV2GDCsystemstofacilitatetheinterconnectionofV2GEVSEsthatsupportthestate’sVGIobjectivesandprovideadditionalgridservices.Forexample,specificprovisionsforNEMgeneratingfacilitiesisgrantedunderScreenKforNEMfacilitiesbelowacertainsizethreshold(500kW).ThisisapolicydecisionthatshouldbeconsideredbytheCPUC.AttheJanuary10,2019workshop,SCEraisedpotentialjurisdictionalissuesforV2Gexportingusecases.CESAisunawareofanyenergystorageprojectsbeingFERCjurisdictionalunderthePublicUtilityRegulatoryPoliciesAct(PURPA)provisions,thoughthereissomerecentactiveconsiderationofthisjurisdictionalissue.21JurisdictionalissueswerealsoraisedintheCommunityEnergyStorageWorkingGroupinR.15-03-011onSeptember13,2017.Whileitislikelythatenergystoragemaybeconsideredaqualifyingfacility(QF)bywhichutilitieswouldberequiredtopurchaseelectricityatavoidedcosts,CESAdoesnotviewthatasapplicable,atthistime,fortheV2Gusecasesdiscussedhere,wherethereisnoeligiblegenerationresourcethatisbeingpairedwithV2Gsystems.Similarconclusions,thoughnotdefinitive,weremadeinthecommunitystoragediscussions.Inthefuture,suchPURPA-relatedquestionsmayneedtobeaddressedasV2Gsystemsarepairedwitheligiblegenerationresources,butatthistime,CESArecommendsthatsuchFERC/PURPAjurisdictionalissuesdonotneedtobeaddressedinthisproceedingatthistime.Additionally,theFERCjurisdictionalissuelikelyappliestoabroadersetofBTMdistributedenergyresourcesaswell,suchasBTMenergystoragethatwishestoexportpower.Thesemacroquestionsshouldbeaddressedintheappropriatepolicyproceedingasopposedtothistechnicalinterconnectionproceeding.

19Rule21SectionD.13.b.20Rule21SectionE.2.b.i.21Bade,Gavin.“MontanacasecouldsetFERCprecedentforpairedstoragetreatmentunderPURPA.”UtilityDive,publishedOctober9,2018.https://www.utilitydive.com/news/montana-case-could-set-ferc-precedent-for-paired-storage-treatment-under-pu/539213/

Page 82: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

80

Instead,thefocusmaymoreappropriatelybeonhowexportingV2Gsystems(aswellasexportingenergystoragesystems)aretreatedforinterconnectionwhenprovidingCPUC-jurisdictionaldistributionservices,suchasintheIDERRFOsbeingconductedannuallygoingforward.CESAbelievesthatsuchprojectsareRule21applicableastheywouldbe“selling”capacity,notenergy,totheutility.ThisistheappropriatefocusforthisWorkingGroupatthistimeinidentifyinginterconnectionpathwaysforexportingV2G-DCsystems.Finally,CESAunderstandsthattherearemeteringprovisionsforinterconnectingenergystoragesystemsandotherGeneratingFacilities.CESArecommendsthatthisWorkingGroupnotaddressthatmatteratthistime,asmeteringandsub-meteringapproachesismoreappropriatelyaddressedinthenewVehicleElectrificationproceeding(18-12-006).

Utilitypositions/general:

UtilitiesagreedthatstationaryinvertersforV2G-DCinterconnectionsshouldberequiredtocomplywithRule21requirementsandtheUL1741SAcertificationprocessorcurrentapprovedcertificationprocess,astheseV2Gsystemswillusenon-mobile(stationary)inverterswhereEVswillhavethestorageonboardbuttheinverterwillbeoff-boardandstationary.TheEVSEmustbecertifiedandlistedbyanOSHA-approvedNRTLandcertificationofcompliancedocumentsshouldbeprovidedtoutilityequivalenttostationaryenergystorageinverter.Inotherwords,V2GDCinterconnectionsshouldfollowthesameRule21SectionHhrequirementsasanyotherinverter-basedDERsubjecttotheRule21tariff,includingforthcomingtransitiontoupdatedIEEE1547-2018andIEEE1547.1-2019/20standardsonceapprovedandadoptedinRule21.

Utilitypositions/SCE:SCEdoesnotagreetothisproposalandrelatedrevisionstoSectionNforinterconnectionofV2G-DC/EVSEsystems.Bywayofbackground,SectionNwasadoptedfortheveryspecificusecaseofexpandingtheinterconnectionofnon-exportenergystorageprojects(theusecaseforthepilotwasverywellestablishedaswell).Tomeetthisveryspecificusecase,stakeholdersinpreviousRule21proceedingsagreedonspecificprojectandtechnicalrequirementsoutlinedinSectionNwhichashighlightedbelow:

1. GeneratingFacilitymustonlybecomprisedofNon-Exportinginverter-basedenergy

storage.Thisisrequiredashavingothertechnologieswouldrequireadditionalengineeringtechnicalreviewwhichwouldpreventtheabilitytoexpeditetheinterconnectionprocessforthisclassofnon-exportenergystorageprojects.

2. GeneratingFacilitymusthaveanaggregateinverternameplatecapacityratingofnomorethan500KW.ThisisnecessaryashavingthislimitwillminimizeanyimpactsbasedonscreensFandGandthusallowexpeditingtheInterconnectionProcess.

3. Controlsystemmustensurethatthereisnoincreaseincustomer’sincreasepeakdemand.Thisisrequiredtopreventtheneedtoperformaloadstudyandthusallowtheexpeditingoftheinterconnectionprocess.

Page 83: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

81

ModifyingSectionNasproposedbyCESAcouldunderminethecurrentSectionNapproachasitwasdevelopedforaspecificgroupofestablishedusecasesinaccordancewithpriorstakeholderdiscussionsandapprovedbytheCommission.

Instead,SCEproposesthatoncecertificationrequirementsaremetfortheEVSE’sasoutlinedinProposal23-d,thenSCEbelievestheFastTrackprocessissufficienttomeettheneedsofV2G-DC/EVSEs.Further,totheextentthatgeneratingfacilitieswithV2G-DC/EVSEsdesiretointerconnectusingtheexistingSectionN,theyareabletodosoaslongastheymeetthecurrentSectionNrequirements.Therefore,SCEdoesnotsupportthered-lineproposedbyCESAonRule21SectionD.14alongwiththeproposedSectionNredline.

1. AsdiscussedwithinWorkingGroupThreediscussions,SCEdidnotagreetomodify

SectionNasproposedbyCESA22onthefollowinggroundsassummarizedbelow:

a. SectionNwasdesignedandapprovedtoallowtheexpeditedinterconnectionofenergystorageprojectswithaspecificsetoftechnicalandproceduralrequirementsinsupportofanestablishedsystemusecase;

b. ModifyingsectionNasproposedbyCESAcouldpotentiallydelaytheinterconnectionprocessforprojectswhicharecurrentlyevaluatedunderSectionNinaccordancewithexistingtariffprovisions.SectionN,ascurrentlyapprovedwithinRule21,hasbeensuccessfulfortheprojectscurrentlyprocessedinaccordancewithSectionNrequirementsandexpansiontogreaterusecasesnotenvisionedcouldcreatenegativeconsequencesfortheprojectsthatarecurrentlyprocessedinaccordancewithSectionN.

c. ForV2G-DCsystemswhichhavemettherequirementsasoutlinedinproposal23-dandwhichmeettherequirementsofSectionN,areabletouseSectionNtodaywithoutadditionalissues.

2. SCEdoesnotagreetomodifysectionD.14asproposedbyCESA.Forpurposesofinterconnection,theenergystoragewithintheV2G-DCelectricvehicleisnotrelevant.Infact,Rule21sectionN.2.bindicatesthat“ThereisnolimitonanEnergystoragedeviceKHWcapacityrating”.Forpurposeofinterconnection,therelevantdeviceisthestationaryEVSEjustlikeforstationarystoragesystemswheretherelevantdeviceistheinverter.Thus,forsectionD.14,theredlinelanguageproposedbyCESAisnotnecessaryandshouldnotbeadded.

3. SCEdisagreeswithCESA’sproposalofestablishingNEMequivalentprocessforEVSEs

(V2G-DCPVEs).SCEnotesthatNEMexpeditedprocessisbasedonmeetingrule21systemreviewscreensA-Handbeingbelow11KVAiswhatcurrentlyallowsNEMeligibleprojectstobereviewedunderthespecificexpeditedprocess.Thus,totheextentthatEVSE’ssatisfytheexistingcertificationrequirementsasstatedinproposal23-d,sizelimitrequirementsasoutlinedinRule21ScreenJ,alongwiththesimplifiedinterconnectionsasgenerallyNEMtypeofprojectspose,thenSCEbelievesthattheseEVSEcanbe

22CESA’sJanuary24,2019proposalonPage16.

Page 84: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

82

interconnectedinanexpeditedmannerequivalenttosmallstorageprojectsandshouldbeabletosatisfySectionNasdiscussedabove.

Therefore,SCEdoesnotsupportcreatingaspecificprocessforEVSEwhichdonothavethesameregulatorystructurerequirementsequivalenttoanNEMprogramtariffrequirementsandprocess.Forexample,underthePUCNEMprogramstructure,NEMprojectswhicharelessthan1MWincapacityarenotrequiredforsystemupgradesorstudies.UntilanequivalentregulatorystructureiscreatedforV2G/EVSEsystems,thesameprocessasNEMshouldnotbeusedforV2G/EVSEsystems.

SCEhasthefollowingspecificcommentsontheSectionNCriteriachangesproposedbyCESA:

Cannotexceed0.5MWinaggregateinverterand/orrectifiernameplateratingSCEagreesthatthereshouldbenodifferencebetweenstationarystorageinterconnections(Inverterandstorageatasite)andmobilestorageinterconnections(stationaryEVSEandstorageonthevehicle).Thus,bothstationaryandmobilestoragesystemsshouldbetreatedequallyforpurposesofthisscreen.Mustbebehindasingle,clearlymarked,andaccessibledisconnectForpurposesofdisconnectingmeansasrequiredinRule21sectionH.1.d,thegeneratingfacilitymustincludethenecessaryaccessibledisconnectingmeanswiththerequirementsspecifiedinRule21SectionH.1.d.TotheextentthatdisconnectingmeansfortheEVSEmeettherequirementsofRule21SectionH.1.d,SCEwouldacceptsuchdisconnectingmeansotherwiseaseparatesetofdisconnectingmeanswillberequired.Mustoperateunder“ChargingMode2”whereinchargingfunctionsdonotincreasethehostfacility’sexistingpeakloaddemandSCEproposestomodifyto:“ThecontrolsystemmustensurethatthereisnoincreaseintheInterconnectingCustomer’sexistingpeakloaddemand.”ThemainintentofRule21SectionNwastoexpeditetheInterconnectionofNon-ExportEnergyStorage.Tobeabletoexpeditethereviewandapprovaloftheinterconnection,itisnecessarytoeliminateasmanyofthetechnicalreviews.Onemajortechnicalreviewistheabilityfortheexistingelectricalservicecomponentstobeabletosupporttheincreasedload.However,ifitcanbeassuredthatthestoragecontrolsystemswillnotallowanincreaseinload,thenthereisnoneedtoperformanengineeringreviewfortheloadportionandthusexpeditingthetechnicalreviewprocess.Ifgeneratingfacilitycannotmeetthiscriterion,thentwotechnicalsetsoftechnicalevaluationswouldberequired:

1. Evaluatethattheexistingelectricalfacilitiesareadequatefortheincreasedload.Thisprocesswouldfollowexistingrules2,15,and16

2. EvaluatethattheexistinggeneratingfacilitiesmeetallRule21requirements.Thus,becausetheintentforSectionNwastoexpeditetheinterconnectionprocessfornon-exportinggenerators,arequirementtohaveacontroltonotincreasedcustomer’s

Page 85: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

83

peakdemandisrequiredotherwisethereisnowaytoexpeditetheinterconnectionprocessfornon-exportingstorage.TotheextentthatV2G-DC/EVSEsystemscanmeettherequirementofthiscriteria,thenthesesystemscouldbetreatedequallyasRule21SectionNnon-exportingstorageotherwise,theseprojectswouldneedtobeevaluatedforloadincreasesandgeneratinginterconnectionrequirementstoinsureDER-Gridinterconnectionissafeundercharginganddischargingoperatingconditions.

Utilitypositions/PG&E:

PG&EsupportsenablingstreamlinedV2G-DCinterconnectionsviaSectionN,whichiswhyitdisagreeswithmodifyingSectionN.AnEVwithenergystoragemeetstheRule21definitionofaGenerator,thereforenochangestoSectionNarerequired.PG&EbelievesthatexistingSectionNisflexibleenoughtoaccommodatevehiclebatteriesalreadyanddoesnotneedtobemodified.TheproposedredlinesarenotneededbecauseRule21istechnologyagnostic.

Utilitypositions/SDG&E:

SDG&Esupportstheproposaltoincludenon-exportingV2G-DCsystemsinSectionN.However,SDG&EdisagreeswithCESA’sproposaltomodifySectionNanddeletethestipulationthat“noothergeneratorsotherthanisolatedback-upgenerators,maybeatthesamepointofinterconnectionorpointofcommoncoupling.”IfaV2G-DCsystemseekstointerconnectbehindameterwherethereareothergenerators,thentheutilitieswillneedthefullreviewtimeprovidedunderthenormalFastTracktimelines,andnottheexpeditedtimelinesprescribedinSectionN.Thisisbecausethepresenceofothergeneratorswillrequireengineeringreviewtodeterminethetypegenerationandconnectivityofthegenerator,andadeterminationofwhetheradditionalmeteringisnecessaryifthatgenerationreceivesNEMtreatment.

Proposal23-i.Non-consensusClarifyapathwayforpartiestointerconnectV2G-AC(mobileinverter)systemsonatimelybasisforexperimentaland/ortemporaryuseuntiltheappropriaterulesareupdatedinthefuture.

Supportedby: CEC,CESA,eMotorWerks,EPRI,Fiat-Chrysler,Ford,GPI,Honda,KituSystems,Nuvve

Opposedby: PG&E,SCE,SDG&EProponentpositionbyCESA:

AstheCPUC,utilities,andstakeholdersworkthroughV2G-ACinterconnectionissues,CESArecommendsthatapathforsometimelyinterconnectionanddeploymentofV2G-AC

Page 86: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

84

systemsforpilotsand/ortemporaryusebeallowed.R.18-02-006,thenewlyopenedproceeding,maydirectpilotsforV2Gsystemsthatwouldfacebarrierstooperateandlearnifinterconnectionstandsasabarrier.Intheselimitedinstances,theutilitiesshouldclarifyapathforsometemporaryallowanceforpilotsandexperimentationandnothinderpilotdeploymentsduetointerconnectionissues,whichmayhavedeminimisimpactsandarenecessarytogeneratelessonslearnedforfulldeploymentandachievementofVGIpolicyobjectives.Thedetailsoftheinterconnectionstudyprocesscancontinuetobedevelopedinthemeantime.Therearecurrentlyafewknownexistingpilotsthatareseekingthistypeofinterconnection,showninTable3.

Table3:ExistingPilotsSeekingV2G-ACInterconnection

ProjectName FundingSource FundingTotal

CAIOUTerritory

Timeline

ElectricVehicleStorageAccelerator(EVSA)

NRG-EVgoSettlement

$1million SDG&E 2015-June2019

IntelligentElectricVehicleIntegration(INVENT)

CaliforniaEnergyCommission

$4million SDG&E/Others

Oct2017-Dec2020

RialtoV2GElectricSchoolBus

USDOE,SCAQMD $6.8million

SCE Jun2017-2021

MarineCorpsAirStation(MCAS)MiramarV2GMicrogrid

CaliforniaEnergyCommission

$2.9million

SDG&E Jul2017-Jun2020

Currently,therearenonon-pilotdeploymentsofV2GsystemsonCalifornia’sdistributiongrid,andnearlyallhavebeenpursuedundereitherdirectsponsorshiporoversightbyregulatoryagenciesincludingtheCPUCandCEC.Thus,atemporaryexemptionfromRule21smartinverterrequirementsappearstobeworthyofconsiderationatthistimewhilebeingsupplementedbySAEJ3072certification.Atthesametime,CESArecognizestheimportanceofsmartinverterrequirementsandpreferstoworktowardlong-termsustainablesolutionswheresmartinverterrequirementscanbeappropriatelyappliedtoV2GACinterconnections.Issueproponentsholdtheviewthatasmallnumberofalreadyapprovedandfundedpilotprojectsshouldbeallowedtointerconnect,whichcanprovidedataandreal-worldusecasestoinformfuturepolicymaking.

Page 87: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

85

Utilitypositions:

SDG&EdoesnotsupportanyexemptionsordeviationsfromRule21thatcouldcompromisesafetyordeprivetheIOU’sofadequatetimeneededtocompletelyreviewprojectstoensuresafetyrequirementsaremetandthatprojectscausenoadverseimpactstothegrid.ThesafetyrequirementscurrentlyprescribedinRule21protectutilityworkersandthepublic.Theprescribedstudyprocessesandassociatedtimelinesensurethatinterconnectingprojectapplicantsareadequatelystudiedandthatapplicablesafetyrequirementsarecompliedwithtopreventsafetyorreliabilityissues.

SCEdoesnotsupportanytypeoftemporaryorexperimentalinterconnectionforinterconnectionsystems,whichhasnotbeendeemedtobesafebycertificationunderUL1741.DoingsowouldbeagainstSCE’sprincipleof“safetyfirst”giventhesafetyrisksassociatedwiththeproposal.Thus,totheextentthatcertificationcompliancetoUL1741standardispartoftheexperimental“pilot”interconnectionrequest,SCEcanworkwithinterestedstakeholdersonhowtopotentiallystructurea“temporaryinterconnection.”Inthisvein,SCEvoicedsupporttotemporarilyexemptV2Gsystemsfromsmartinverterrequirements,Rule21SectionHh,astofacilitatepilots,buttheNRTLcertificationwouldberequiredunderSectionLforinvertersusingSectionH(pre“SmartInverters”).ThisexemptionwouldbesupporteduntiltherevisionofIEEE1547.1isupdatedandadoptedunderRule21.

PG&Ebelievesthatthisproposalispremature,sincetheSAEstandardisnotreadyforthisapplicationatthistime.AndPG&Edoesnotsupportthisproposal.Amongotherreasons,similartothosehighlightedbySCEandSDG&E,theUL1741SAistheprimarysafetymechanismthatutilitiesrelyon.

SurveyofpartiesonV2G-AC(mobileinverter)pilotsandresponses:

OnMarch29,2019,theWorkingGroupissuedafive-questionsurveytostakeholdersintheRule21andDRIVEproceedingstosolicitresponsesonwhetherandwhatthecriteriashouldbetostreamlineinterconnectionsforV2G-AC(mobileinverter)pilots.Elevenpartiesrespondedtothesurvey.AcompleterecordofsurveyanswersisprovidedinAnnexEandasummaryofresponsesisgivenbelow.Question1.ShouldtheprocessforgrantinginterconnectionapprovalstopilotprojectsinvolvingAC-coupledEVsbestreamlined?“Yes”:CEC,EPRI,Honda,Ford,Fiat,GPI,KituSystems“No”:SDG&E,PG&E“Conditional”:SCEQuestion2.Whatexistingpilotsareseekingthistypeofinterconnectionandwhatistheircurrentstatus?

Page 88: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

86

Anumberofpilotprojectswerecitedinresponses,includinganEPICpilotbySCE,pilotsunderdevelopmentbyHondaandFord,Miramarfleetmanagement,UCSanDiego,NationalStrategieselectricschoolbuses,LAAirForceBase,andDepartmentofEnergyEASEproject.Question3.Shouldspecificeligibilitycriteriaforsuchastreamlinedprocessbedeveloped?CriteriaandconsiderationscitedinresponsesincludestandardssuchasIEEE1547,UL1741,andSAEJ-3072,maximumdischargecapacityspecification,electricalcompatibility,chargingconformanceandinteroperabilityrequirements(J2953),aclearlydefinedV2G-ACuse-casethatisdistinctfromandcannotbefulfilledbyaV2G-DCusecase,andEPICstandardsformakingdataandfindingspubliclyavailable.Also,allowtheon-boardinvertertobetreatedasa[single][isolated]componentforsafetystandardsandallowparticipantstosubmitareportshowingcomplianceforthecomponentandnotthevehicle.

UtilityresponsestoQuestion3were:

SCEdoesnotseetheneedtodevelopeligibilitycriteriaforafewpilotprojectswhicharetemporaryinnature.ItisbesttolookateachprojectindividuallyanddeterminewhattypeofexpeditedprocessesunderRule21couldbeutilizedtostreamlinetheinterconnectionforeachofthepilots.PG&EdoesnotbelievethattheprocessforgrantinginterconnectionapprovalsshouldbestreamlinedatthistimeforV2G-ACpilots.Streamliningtheprocessmaybeaddressedafterthecertificationstandardsareapproved.Atthistime,itisnotclearwhetherthereareadditionalvehiclelimitationsorwhethertheSAEstandardwillincorporatethefullUL1741SArequirements.Itisalsonotclearwhetheradditionalmitigationsmayberequiredtoensurethesafetyoftheinterconnection.SDG&E:Itisprematuretoconsidereligibilitycriteriaforastreamlinedinterconnectionprocessuntilsuchastreamlinedinterconnectionprocessitselfhasbeendeveloped.Todate,therehasbeenconsiderationwithinRule21WorkingGroupThreethatanadditionaltechnicalworkinggroupwouldbeappropriatetoconsiderwhat,ifany,automobile-specificstandardsforV2GcouldbeestablishedforRule21interconnections.Suchaworkinggroupwouldbeagoodplacetoconsidersucheligibilitycriteriaforastreamlinedprocess.

Question4.ShouldtheCommissionestablishatargetnumberofpilotsoralimitonhowmanypilotsmayqualifyforthestreamlinedprocess?Shouldonlypilotsbeeligibleforthisstreamlinedprocess?CECresponded:“TheCommissionshouldestablishaminimumtargetofatleasttwoOBACCbidirectionalinverterpilots(definedbythenumberofuniquecustomersoraddresses)perutilityterritory.Twowillallowfordatatobegatheredfrommultiplevendors’approaches.TheCommission’sauditofexistingpilots(describedabove)couldaccounttowardthis

Page 89: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

87

minimumpilotrequirement.Inaddition,theCommissionshouldimposeamaximumlimitonthenumberofpilotsthatmayqualifyforthestreamlinedprocess.”EPRIrespondedaboutthetypesofpilots:“Thepilotsthatwillhelpinformtheprocessincludeassessmentoftechnologyreadinessonvehicle,utilityandEVinterconnectionside,valueofapplyingsuchtechnologyatscaleandthebarrierstoscaledeploymentaswellasspecificscenarioswherethevalueismaximized,andmechanismsthatmaximizecustomerparticipationthatleadtotechnologyadoptioninlargenumbers.”Honda,Ford,Fiat,andKituSystemsrespondedthatpilotsshouldnotbelimited.UtilityresponsestoQuestion4were:

PG&EdoesnotbelievethattheprocessforgrantinginterconnectionapprovalsshouldbestreamlinedatthispointforV2G-ACpilots.However,shouldsuchstreamliningberequested,PG&Ebelievesthat:(1)onlypilotsshouldbeeligibleforthisstreamlinedprocess,and(2)thenumberofpilotsshouldbelimitedtooneactivepilotperyearperIOUserviceterritory.Onepilotmaybeactiveandextendformorethanoneyear.SCEdoesnotseetheneedforhavingaparticularcountandaslongasrequirementsunderquestion#1aremet,thenSCEcouldsupportavarietyofpilotprojectsastheyaredeveloped.SDG&E:Itisimprudenttomakeexceptionsforpilotsthatcouldcompromisesafety.However,ifstreamlinedprocedurescanbedevelopedthatwouldnotcompromisesafety,thenitmaybedesirablefromaresourcerequirementandtrackingperspectivetolimitthepilotstoonepilotperservicearea.Thereisconcernthatwithoutsuchalimittherecouldbeariskofcompaniesrushingpilotsthroughawindowofopportunity.

Question5.Anyothercomments?

AnumberofresponsesaregiveninAnnexE.

Page 90: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

88

AnnexE:Issue23,SurveyonV2G-AC(Mobile)PilotsResponseoftheCaliforniaEnergyCommissionQuestion1.ShouldtheprocessforgrantinginterconnectionapprovalstopilotprojectsinvolvingAC-coupledEVsbestreamlined?Yes,approvalforon-boardAC-coupledelectricvehicle(EV)interconnectionpilotprojectsneedastreamlinedpathtosupporteffortsundertakenbyprivatestakeholdersandotherstateagenciesdemonstratingpre-commercialvehicle-gridintegration(VGI)technologies.ThesepilotsallowallstakeholderstogainagreaterunderstandingofthepotentialmodificationstoelectricalandsafetyrequirementsforaccommodatingEVswithdischargecapabilities.Forexample,attheCEC’sVGISymposiuminOctober2018,HondastatedtheirobjectivetoproduceanddeploymassmarketEVscapableofACvehicle-to-grid(V2G)intheearly2020s.Giventheproposed3to5-yeartimelineneededtoproducenewvehicleproducts,Hondaismakingelectricaldesignandmanufacturingdecisionsimminently.Inaddition,proposedlegislationinSenateBill(SB)676statesanintenttorequireloadservingentitiestoachieveaVGItarget,whichincludescharginganddischarging,ofatleast10percentofannualtotalEVloadby2025andincreasesto25percentby2030.Bystreamliningtheinterconnectionapprovalprocessforon-boardAC-coupled(OBACC)bidirectionalinverterpilotprojects,itwillreducethebarriertoleveragealargernumberofmass-producedV2GvehiclesintheStatetoachievesuchtargetsinatimelymanner,andenablehigherlevelsoftransportationde-carbonization.Question2.Whatexistingpilotsareseekingthistypeofinterconnectionandwhatistheircurrentstatus?SanDiegoGas&Electric–LawrenceBerkeleyNationalLaboratory(CEC600-13-009)-MiramarTheCECagreement,600-13-009,withLawrenceBerkeleyNationalLaboratory(LBNL)isapilotprojectactivelydeployingEVsandserviceequipmentcapableofbidirectionalpowertransfer.Theproject,OptimizedElectricVehicleFleetManagementandGridTransaction,withouttheguidanceoftheCaliforniaPublicUtilitiesCommission(Commission)willbestalledwithoutadefinedpathforwardbetweentheprojectpartnersandSDG&E.Theprojectisa$4.7Mtotalinvestmentwith$3MfromtheCEC’sAlternativeandRenewableFuelandVehicleTechnologyProgram(ARFVTP)fundingforEVinfrastructuredeployment.ThispilotincludessixEV’sutilizingOBACCbidirectionalinverters.Inconjunctionwiththeagreement,anon-sitebatterystoragesystemisbeingdeployedforintegrationwiththegrid.TheV2Gsystemwillhaveanenergycapacityof140kW.Adrawn-outinterconnectionprocesswilljeopardizetheavailabilityofthealready-encumberedpublicfundsanduseofprocuredequipment.SanDiegoGas&Electric–ElectricPowerResearchInstitute(CECEPC-14-086)–UniversityofCalifornia,SanDiegoTheCECagreement,EPC-14-086,withElectricPowerResearchInstitute,Inc.(EPRI)hascompletedapilotprojectattheUniversityofCalifornia,SanDiegocampus,DistributionSystemAwareVehicletoGridServicesforImprovedGridStabilityandReliability.Theprojectwasa$2.3Mtotalinvestmentwith$1.5McomingfromtheCEC’sElectricProgramInvestmentCharge(EPIC)Programfunding.TheV2Gsystemhasacapacityof~20kW.ProjecthurdlesincludedSDG&Erejectingpermissionforinterconnection.Theprojectpartner’sperspectiveisthatthereisnointerconnection“screening”guidelineforV2GcapableEVsfortheutilities.ThisissueiscompoundedbythedifferenceinthestandardsacceptedbetweentheautomobilemanufacturesandIOUs.ThemanufactureswillnotcertifytheirhardwaretoUL1741,whereastheutilitiesmayrequireUL1741forgridintegrationofOBACC

Page 91: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

89

bidirectionalinverters.SouthernCaliforniaEdison–NationalStrategies,LLC(CECARV-13-011)–ElectricSchoolBusTheCECagreement,ARV-13-011,withNationalStrategies,LLCisdeploying2electricschoolbusesintheTorranceUnifiedSchoolDistrictscapableofV2GwithOBACCbidirectionalinverters.Theprojectisa$3.8Mtotalinvestmentwith$1.5McomingfromtheCEC’sARFVTPfundingforEVinfrastructuredeployment.Theprojecthasinterconnectedwiththegrid,andeconomicmodelingonvehicle-to-buildingdataiscurrentlyunderway,withdatagleanedinMarch2019.AprojectreportisanticipatedApril2019.Thebuseswillbeabletodemonstratefullstandardoperationdefinedaschargingatbase,transportingstudents,andtheadditionofV2Gcapabilitydischargingtothebuilding.SouthernCaliforniaEdison–LBNL(CEC500-11-025)–LosAngelesAirForceBaseTheCECagreementwhichbeganin2012,500-11-025,withLBNLattheLosAngelesAirForceBase(LAAFB),hascompletedapilotprojectwherebothACandDCcoupledbidirectionalinvertersaredeployed.Theprojectwasa$1.5MtotalinvestmentfromtheARFVTP.Thisprojectwascompletedin2017andactivelydemonstratedtheabilitytoachieveV2GcapabilityandtransactionswiththeCaliforniaIndependentSystemOperatorearlyoninEVtechnology.TheAC-coupledinvertersweredeployedacross11EVlightdutyvanshavingacombinedenergycapacityof230kW.PacificGas&Electric–NationalStrategies,LLC.–ElectricSchoolBus(CECARV-13-011)TheCECagreement,ARV-13-011,withNationalStrategies,LLCisdeploying2electricschoolbusesintheNapaValleyDistrictscapableofV2GwithOBACCbidirectionalinverters.Aftera2-yearrecallperiodduetoreliabilityissueswiththeinstalledelectricdrivetrain;theprojecthasnotyetdemonstratedexportsfromthevehicle.KingsCanyonUnifiedschoolisnolongerparticipating,andthe2buseswillbereturningtothevendor.Projectmanagerscontinuetogaugeinterestfromotherschooldistrictsforredeploymentofthesebuses.Thereisnotimetableonanticipatedfutureparticipationfortheremainingbusesorwithinwhichutilityterritory.Theprojectisa$3.8Mtotalinvestmentwith$1.5MfromtheCEC’sARFVTPfundingforEVinfrastructuredeployment.Question3.Shouldspecificeligibilitycriteriaforsuchastreamlinedprocessbedeveloped?Yes,eligibilitycriteriashouldbeconsideredontwodistinctlevelsforanapprovalofpilotprojectsandre-assessedwhentheinterconnectionprocessisreadyforcommercialdeployment.Thefirstlevelofeligibilityshouldrequirehardwarestandardsthatfosterproductapplicationdevelopment.Suchrequirementsshouldincludehardwaretobedeployedinapilotprojectiftheymeetindustrystandard(s)forinvertersacceptabletostakeholdersinboththeautomotiveandelectricutilityindustriessuchasIEEE1547(StandardforInterconnectionandInteroperabilityofDistributedEnergyResourceswithAssociatedElectricPowerSystemsInterfaces),UnderwritersLaboratories(UL)1741(StandardforInverters,Converters,ControllersandInterconnectionSystemEquipmentforUseWithDistributedEnergyResources),orSAEJ-3072(InterconnectionRequirementsforOnboard,Utility-InteractiveInverterSystems).Note:TheUL-1741-SAisanadditionalcapabilitytoUL-1741,butmaynotnecessarilyberequiredforsafeoperationontheelectricalgrid.ThesecondlevelofeligibilitycouldbebasedondefiningthemaximumamountofV2Gdischargecapabilitywhencomparedtoacustomer’sother(non-V2G)demandmeasuredattheirprimaryelectricmeter.SuchaproposalmayallowtheinstallationofsufficientV2GcapacityforratearbitrageordemandmitigationwhilealsopreventingV2Genergydischargefromback-feedingintotheutilitydistributiongrid.Forexample,tobalancetheseobjectivestheCommissioncouldconsiderpilotprojectsforstreamlined

Page 92: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

90

approvalifthetotalvehicleV2Gdischargecapacityislessthanorequalto50percentofthecustomer’sminimumdailyloads(kW),averagedoveroneyear.Question4.ShouldtheCommissionestablishatargetnumberofpilotsoralimitonhowmanypilotsmayqualifyforthestreamlinedprocess?Shouldonlypilotsbeeligibleforthisstreamlinedprocess?TheCommissionshouldestablishaminimumtargetofatleasttwoOBACCbidirectionalinverterpilots(definedbythenumberofuniquecustomersoraddresses)perutilityterritory.Twowillallowfordatatobegatheredfrommultiplevendors’approaches.TheCommission’sauditofexistingpilots(describedabove)couldaccounttowardthisminimumpilotrequirement.Inaddition,theCommissionshouldimposeamaximumlimitonthenumberofpilotsthatmayqualifyforthestreamlinedprocess.Theintentofthismaximumwouldservenotonlytominimizeanypotentialnegativeutilitygridimpacts,butshouldalsodemonstrateanintentiontoencouragetheutilities’timelydeploymentofV2Gtechnologies,whichasdescribedabove,areanticipatedformassmarketdeploymentinthenearfuture.Onceanindividualutilityhasestablishedfivepilotswithinthecompletedprojectscope,lessonsshouldbeincorporatedintoamoreconsistentinterconnectionprocessforcommercialdeploymentinawaythatiscoordinatedstatewide,amongstutilitiestechnologyproviders,researchers,andpolicymakersliketheCEC.Forthesecondpartofthisquestion,theCommissionmightconsideranyprojectthatmeetsthecriteriaoutlinedin#3aseligibletouseOBACCbidirectionalinvertersinanon-pilotsetting.BasedonthebriefdiscussionsattheRule21workinggroupthusfaraboutthosestandards,J-3072andtheIEEEstandardsappeartobethemostcommonlytestedbystakeholdersforOBACCV2Gimplementation.Question5.Anyothercomments?TheMiramarandUCSDpilots,outlinedintheresponsetoquestion#2above,areeachlocatedwithintheSDG&Eterritory.TheUCSDpilotcompleteditsinterconnectioninearly2018,priortotheMiramarpilotbeingdeniedpermissionforinterconnectioninlate2018.SDG&E’sreasonfordenyinginterconnectionatMiramaristhattheOBACCbidirectionalinverterisnotcompliantwiththeadditionalrequirementsfromtheUL1741-SAstandard.TheMiramarvehicles’OBACCareUL1741compliant,sincetheywereprocuredpriortotheintroductionofUL1741-SA.TheUCSDpilotoperatedusingtheSAEJ-3072standardtodemonstrateV2GcapabilitieswiththeOBACCbidirectionalinverters.TheintentoftheSAEJ-3072standardissimilartoSDG&E’simpositionoftheUL1741-SArequirementinsofarasbothstandardsdefineinverterinteractionswiththeutilitygrid.Additionally,theMiramarpilotisoperatingonaseparateFederally-ownedandoperateddistributiongrid,whichisunderthepurviewoftheDepartmentofDefensefornationalsecurity.TheMiramarandUCSDprojectsaresimilarinthattheyareinstallingV2GequipmentonlargeelectricalsystemsthatareinterconnectedtoSDG&E’sdistributiongrid,butoperatedbyotherentities.TheCommissionshouldconsideradvisingtheutilitiestograntpermissionforpilotsbeingdeployedonalikemicro-gridsthataresufficientlylargesuchthattheimpactontheSDG&Egridmaybeconsidereddeminimis.Overall,theLAAFBandSchoolBuspilots,outlinedintheresponsetoquestion#2above,inthePG&EandSCEterritorieshavebeengrantedapprovalforOBACCbidirectionalinverterinterconnectionspriortoandinlieuoftheRule21WorkingGroupdiscussionofIssue23.Incontrast,tostaff’sknowledge,SDG&EhasnotinterconnectedavehiclewithOBACCbidirectionalinverterforV2Ginitsterritory.Whilethe

Page 93: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

91

workinggrouphasnotachievedaconsensusoninterconnectionrequirements,theinterconnectionprocessesfortheV2Gprocessestodatehavebeenlengthyandinconsistent.TheCommissionshouldconsiderreviewingandconfirmingtheutilities’methodologiesforprojectapprovalsordenialsthatoccurredpriortotheRule21discussions.Thisauditshouldhaveaspecificgoaltoreducethenumberofuniqueprocessesacrosstheutilities.ResponseofHondaQuestion1.ShouldtheprocessforgrantinginterconnectionapprovalstopilotprojectsinvolvingAC-coupledEVsbestreamlined?YesQuestion2.Whatexistingpilotsareseekingthistypeofinterconnectionandwhatistheircurrentstatus?HondapilotsareunderdevelopmentQuestion3.Shouldspecificeligibilitycriteriaforsuchastreamlinedprocessbedeveloped?Yes.Thecriteriashouldapplytoallvehiclesegments-light,medium,andheavyduty.Additionally,vehiclesshouldberequiredtomeetFederalMotorVehicleSafetyStandardsandIEEE1547.Question4.ShouldtheCommissionestablishatargetnumberofpilotsoralimitonhowmanypilotsmayqualifyforthestreamlinedprocess?Shouldonlypilotsbeeligibleforthisstreamlinedprocess?No;pilotsshouldnotbelimited.Aslongastheeligibilitycriteriaaremet,theprojectshouldbeapproved,whethercalled/titleda"pilot"ornot.Question5.Anyothercomments?HondaapplaudsthisefforttoallowV2GACpilotsparticipateinastreamlinedinterconnectionprocess.However,requiringUL1741willlimitthescopeandparticipationofanyresultingpilotbecauseitprecludesautomakerparticipationwithV2GACenabledlight-dutyvehicles.HondahasrolledoutacustomerprogramforV1GcalledHondaSmartCharge(https://cleantechnica.com/2018/08/02/emotorwerks-honda-southern-california-edison-offer-nations-first-smart-charging-program/).Bythistimenextyear(April2020),HondaplanstoenableV2Gviasmall-scalepilotprojectunderthisprogram,seekingtoexpandpilotprojectenrollmenttocurrentHondaSmartChargecustomersthroughout2020-2022.HondawouldliketoplantheseV2Gpilotsandseeksappropriateutilitypartnerstoproveouttheprogram.ResponseoftheElectricPowerResearchInstitute(EPRI)Question1.ShouldtheprocessforgrantinginterconnectionapprovalstopilotprojectsinvolvingAC-coupledEVsbestreamlined?

Page 94: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

92

Yes.EPRI,KituSystemsandAeroVironmentaswellasFiatChryslerAutomobilescollaboratedonCECEPC14-086On-VehicleV2GprojectwithNuvve/Honda'sEVSAproject,andtheteamwascompelledtoseekassistanceandwaiverfrominterconnectionrequirementsfromUCSDMicrogridasthelocalIOUwasunabletoapproveinterconnection.V2Gtechnologywasdemonstratedtobereadybothon-vehicleandoff-vehicle(i.e.,EVSE).ThestandardsetverifiedisconsistentwithSAEJ2847/3andSAEJ3072aswellasIEEE2030.5,meaningthatonceinterconnectionrequirementsareclarified,on-vehicle,grid-tiedV2Gconvertersshouldbeabletobetreatedinthesamemannerassmartinvertersgiventheirfunctionalandoperationalsimilarity.TheinterconnectionrequirementsdevelopedbySmartInverterWorkingGrouparedirectlyapplicabletoon-vehicleV2Gsystems.Question2.Whatexistingpilotsareseekingthistypeofinterconnectionandwhatistheircurrentstatus?Asmentionedin#1above,therecentlyconcludedpilotatUCSDmicrogridjointlyamongNuvve/HondaandEPRI/FCAGroup/Kitu/AeroVironmentwouldhavegreatlybenefited.Additionalpilotscanbeestablishedtojointlyassessinterconnectionreadiness,requirementeffectiveness,gridimpacts,customerbenefits,cybersecurity,andvalueassessmentatscale.Question3.Shouldspecificeligibilitycriteriaforsuchastreamlinedprocessbedeveloped?SpecificeligibilitycriteriathatwillbeextremelyhelpfultoEVmanufacturers,equipmentmanufacturers,utilitiesandthird-partyintegratorswouldbeelectricalcompatibility(EMI,EMC,harmonicdistortion,powerfactor,isolation,voltagesurge/sag,etc),communications/dispatchsimplicity(authorization,authentication,servicediscovery,endtoendcybersecurity,circuitcapacityandgridconditionidentification,weatherdataandDSO/ISOcontrolanddatamessaging,customerinterfaces).EmphasisonopenstandardsthatareapartoftheNISTcatalogofstandardswouldbethecorrectapproachtoscalingthetechnologydeployment.Question4.ShouldtheCommissionestablishatargetnumberofpilotsoralimitonhowmanypilotsmayqualifyforthestreamlinedprocess?Shouldonlypilotsbeeligibleforthisstreamlinedprocess?Thepilotsthatwillhelpinformtheprocessincludeassessmentoftechnologyreadinessonvehicle,utilityandEVinterconnectionside,valueofapplyingsuchtechnologyatscaleandthebarrierstoscaledeploymentaswellasspecificscenarioswherethevalueismaximized,andmechanismsthatmaximizecustomerparticipationthatleadtotechnologyadoptioninlargenumbers.Thesepilotscandeploythestreamlinedinterconnectionprocesswhichcanbeassessedintermsofeffectivenessandintegrationofsuchdataintodistributionresourceplanningandlong-termprocurementplanningprocesses.Question5.Anyothercomments?V2Gtechnologytoday,especiallyon-vehicle,hasthepotentialtoprovidesignificantgridbenefitsdocumentedintherecentlypublishedCECreport(https://www.energy.ca.gov/2019publications/CEC-500-2019-027/index.html[energy.ca.gov]).Inorderforthesebenefitstoberealized,streamlinedinterconnectionscreeningrequirementshavebeenidentifiedasakeytechnicalbarrier.SmartInverterWorkingGroupisalreadytakingaproactivestancetoallowtheoff-vehicleV2Ginverterstobetreatedassmartinvertersforinterconnectionscreeningrequirements.Sameispossibletodowithon-vehicleV2Gsystemswhichcarryadditionaladvantagesofbeingamobileresource.Oncetherequirementshavebeendefined,scaledpilotscanbeausefulpathwaytovalidatingandconfirmingtherequirementsamongmultiplestakeholders(OEMs,equipmentmanufacturers,third-partyintegrators,utilities,andcustomers)

Page 95: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

93

ResponseofSDG&EQuestion1.ShouldtheprocessforgrantinginterconnectionapprovalstopilotprojectsinvolvingAC-coupledEVsbestreamlined?Itisnotappropriatetomakeexceptionsforpilotsthatcouldcompromisesafety.SDG&EisanactiveparticipantinworkinggroupsanddiscussionstoconsideralternativeorstreamlinedinterconnectionrequirementsthatwillensurethesafetyandreliabilityofAC-basedV2Gunits.Untilconclusionsarereachedwithconsensusonthecontentandapplicabilityofalternativeorstreamlinedprocesses,allAC-coupledV2G’sshouldadheretotheinterconnectionrequirementsinRule21withoutexception.Thisrequirementisnecessarytoensurethatallinverters,mobileorstationary,havebeentestedandcertifiedtoconformtotherequirementsofUL1741SA,especiallysafetyrelatedmeasuressuchaspreventingageneratorfromback-feedingintotheelectricgridduringanoutage,whichwouldcreatesignificanthazardsforutilitypersonnelworkingonthelinesandthepublic.Question2.Whatexistingpilotsareseekingthistypeofinterconnectionandwhatistheircurrentstatus?SDG&EhasreceivedseveralapplicationsforV2Gprojects,andonlyonehasbeenapproved:aDC-basedV2GprojectsubmittedbyNuvveatUCSD.SDG&EhasfiledaV2GschoolbuspilotwiththeCPUCandanticipatesadecisionduringthesecondquarterof2019.Thepreliminarilyselectedprojectpartnershaveindicatedadesiretodeployasolutioninwhichtheinverterisontheschoolbus(AC-basedinverter).Question3.Shouldspecificeligibilitycriteriaforsuchastreamlinedprocessbedeveloped?Itisprematuretoconsidereligibilitycriteriaforastreamlinedinterconnectionprocessuntilsuchastreamlinedinterconnectionprocessitselfhasbeendeveloped.Todate,therehasbeenconsiderationwithinRule21WorkingGroup3thatanadditionaltechnicalworkinggroupwouldbeappropriatetoconsiderwhat,ifany,automobile-specificstandardsforV2GcouldbeestablishedforRule21interconnections.Suchaworkinggroupwouldbeagoodplacetoconsidersucheligibilitycriteriaforastreamlinedprocess.Question4.ShouldtheCommissionestablishatargetnumberofpilotsoralimitonhowmanypilotsmayqualifyforthestreamlinedprocess?Shouldonlypilotsbeeligibleforthisstreamlinedprocess?Asstatedabove,itisimprudenttomakeexceptionsforpilotsthatcouldcompromisesafety.However,ifstreamlinedprocedurescanbedevelopedthatwouldnotcompromisesafety,thenitmaybedesirablefromaresourcerequirementandtrackingperspectivetolimitthepilotstoonepilotperservicearea.Thereisconcernthatwithoutsuchalimittherecouldbeariskofcompaniesrushingpilotsthroughawindowofopportunity.Question5.Anyothercomments?SDG&EisastrongsupporteroftheelectricvehicleindustryandisproudtohavetheopportunitytoenableelectricvehicleadoptionthroughitsmanyCPUC-approvedprograms.SDG&EalsosupportsV2GtechnologyandishopefulforapprovalonitsV2Gpilotreferencedabove.Assuch,SDG&Esupportsthis

Page 96: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

94

workinggroupandthecollaborativepushtofindasolutionforAC-coupledV2G.However,wemustfindatechnicalsolutionthatensuressafetyandreliabilityfirstandforemost.ResponseofFordMotorCompanyQuestion1.ShouldtheprocessforgrantinginterconnectionapprovalstopilotprojectsinvolvingAC-coupledEVsbestreamlined?Yes,theinterconnectionapprovalprocessshouldbestreamlinedallowingOEMsandUtilitiestolaunchtheirpilotswithoutdelaytonormaltiming.Question2.Whatexistingpilotsareseekingthistypeofinterconnectionandwhatistheircurrentstatus?PilotsfromFordareunderdevelopmenthencenospecificsareavailableatthistime.Question3.Shouldspecificeligibilitycriteriaforsuchastreamlinedprocessbedeveloped? ThestreamlinedprocessshouldapplytoLD/MD/HDvehiclesegments.Toensuresafeoperation,vehiclesshouldcomplywith:a.FMVSSandSAEforon-vehiclerequirements/standardsin-lieuofUL-1741/NFPA70E/NECb.IEEE-1547StandardforInterconnectionandInteroperabilityofDERs.On&OffboardinvertersshouldcomplywithSAEJ-3072.Question4.ShouldtheCommissionestablishatargetnumberofpilotsoralimitonhowmanypilotsmayqualifyforthestreamlinedprocess?Shouldonlypilotsbeeligibleforthisstreamlinedprocess?TheCPUCshouldnotlimitthenumberofpilotsnorrestricttheparticipationofanypilotnotoriginallynotedasapilotfrombenefitingfromthestreamlinedprocess.Question5.Anyothercomments?CPUCshouldtemporarilyexemptV2GsystemsfrommeetingtheUL-1741SAoranyothersmartinverterrequirementswhilebeingsupplementedbySAEJ3072certification.Endusercustomerexperienceshouldbeanimportantfactorforconsiderationofastreamlinedprocess.V2GDCandsomeV2GACsystemsshouldbeauthorizedviafast-trackapprovalprocesstoenablekeylearnings.CPUCshouldassistwithdevelopinganddefiningthevaluepropositionforV2GDC/ACthatwouldenablerapidadoption.ResponseofPG&EQuestion1.ShouldtheprocessforgrantinginterconnectionapprovalstopilotprojectsinvolvingAC-coupledEVsbestreamlined?No,pendingthefeedbackandlessonslearnedfromthepilotprojects.OneofthemainobjectivesofpotentialfutureV2G-ACpilotswouldbetoidentifypotentialchallenges,bottlenecks,andlearningsinrelationtointerconnection.Anyproposedstreamliningforgrantinginterconnectionapprovalsshouldbedoneafterthepilotsareexecuted,notbefore,inordertoensureaninformedapproachtoimprovingtheinterconnectionprocess.Giventheverynascentnatureofthemarket,anyproposedstreamliningofthe

Page 97: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

95

interconnectionprocessforV2G-ACprojectsshouldbeinformedbyandbasedon:(1)clearoutcomesandfindingsfromimplementedV2G-ACpilots,and(2)thestate’soverallVGIgoalsandobjectivesthatarestillasubjectofdiscussionthroughthePUC’sVGIWorkingGroupaspartoftheTEOIR.Additionally,anyimprovementsimplementedshouldbegeneralizedtootherinterconnectionapplicationtypestothegreatestextentpossible.Question3.Shouldspecificeligibilitycriteriaforsuchastreamlinedprocessbedeveloped?Perouranswertoquestion1,PG&EdoesnotbelievethattheprocessforgrantinginterconnectionapprovalsshouldbestreamlinedatthistimeforV2G-ACpilots.However,shouldsuchstreamliningberequested,PG&Ebelievesthatthefollowingminimumeligibilitycriteriashouldbedeveloped:(a)theproposedpilotshouldaimtotestaclearlydefinedVGIuse-case,withclearlyidentifiablevalue;thepilotshouldalsodemonstratehowthesaidVGIuse-caseisdistinctfrom,andcannotbeotherwisefulfilledthrough,anEVSE-coupledDCinverter;(b)thepilotshouldcomplywithallrelevantandapplicableinterconnectionrequirementsrelevanttogridsafetyandcybersecurity;(c)theproposedpilotshouldadheretoEPICstandardsintermsofmakingitsdata,findings,andlearningsavailableforpublicuse.Question4.ShouldtheCommissionestablishatargetnumberofpilotsoralimitonhowmanypilotsmayqualifyforthestreamlinedprocess?Shouldonlypilotsbeeligibleforthisstreamlinedprocess?Perouranswertoquestion2,PG&EdoesnotbelievethattheprocessforgrantinginterconnectionapprovalsshouldbestreamlinedatthispointforV2G-ACpilots.However,shouldsuchstreamliningberequested,PG&Ebelievesthat:(1)onlypilotsshouldbeeligibleforthisstreamlinedprocess,and(2)thenumberofpilotsshouldbelimitedtooneactivepilotperyearperIOUserviceterritory.Onepilotmaybeactiveandextendformorethanoneyear.Question5.Anyothercomments?WhilePG&EsupportstheadvancementofindustryeffortsonthetechnicalaspectsofV2GAC,PG&Emakesthefollowingtwocomments.First,addressingtheregulatoryneedsand/orrequirementsaroundtechnicalaspectsofV2GACshouldnotbedoneinisolationbutratheraspartofabroaderVGIeffortthatclearlyidentifiesandprioritizesVGI’stechnicalchallengesandbarriers.Second,theneedand/orvalueofV2GACshouldbeclearlyarticulated,especiallyrelativetothemoretechnologicallyandcommerciallymatureV2GDC,beforeandinordertojustifydedicatedeffortstoaddressthetechnicalaspectsofV2GACthroughratepayer-fundedpolicyandregulatoryproceedings.PG&Esupportsthecontinuationofprivateindustryeffortstoaddresstheseissues.PartofthoseprivateindustryeffortsmaybethroughtheparticipationinSAEactivities.Forexample,someautomakershaveexpressedconcernwithULrequirementsbecausetheytakeuptoomuchspaceinthevehicle.ThisautomotivedesignissueaffectingV2GACisbestaddressedbySAEratherthanRule21WorkingGroup.AfterSAEdeveloptheautomotiveequivalentofUL-1741SA,IOUscanreviewitforadequacyand,ifadequate,adoptitinRule21.ResponseoftheGreenPowerInstituteQuestion1.ShouldtheprocessforgrantinginterconnectionapprovalstopilotprojectsinvolvingAC-coupledEVsbestreamlined?Yes,theCommissionhasmadeitclearthatitwants"dramaticstreamlining"ofallinterconnection(asit

Page 98: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

96

hasdescribedintheDRPFinalGuidanceandvariousotherCommissiondecisionsanddocuments).Question3.Shouldspecificeligibilitycriteriaforsuchastreamlinedprocessbedeveloped?ThelargemajorityofEVinterconnectionsshouldbestreamlined,butan"offramp"shouldalsobeprovidedformoreunusualorcomplicatedcases.Question4.ShouldtheCommissionestablishatargetnumberofpilotsoralimitonhowmanypilotsmayqualifyforthestreamlinedprocess?Shouldonlypilotsbeeligibleforthisstreamlinedprocess?GPIfeelsthatweareatapointinthedevelopmentofinterconnectionprocessesandrelatedtechnologiesthatwedon'tneedpilotsforEVinterconnection.Rather,EVinterconnectionshouldbeincorporatedintoportalsatthistimeonatestbasisandIOUsshouldreportbackevery3monthsonhowthenewprocedures,oncedevelopedanddeployed,areworking.Question5.Anyothercomments?Wemayneedtodiscussfundingoftheseimprovementsb/cIOUsaretryingingeneraltorate-basesuchupgradesratherthanexpensethem.GPIsupportsreasonablerate-basingofthesecosts.ResponseofFiatChryslerQuestion1.ShouldtheprocessforgrantinginterconnectionapprovalstopilotprojectsinvolvingAC-coupledEVsbestreamlined?YesQuestion2.Whatexistingpilotsareseekingthistypeofinterconnectionandwhatistheircurrentstatus?DoEEASEprojectwithSCEQuestion3.Shouldspecificeligibilitycriteriaforsuchastreamlinedprocessbedeveloped?Yes.ThevehicleOEMcansubmitareportoftheonboardchargingsystembeingcomplianttotherequirementsandincludethesafetyaspects.ULandIEEEstandardsdonotapplytovehiclesbutSAEstandardsusedthesetoidentifytheinverterrequirementsinJ3072andconformancerequirementscanbeaddedtoJ2953thatincludeschargingconformanceandinteroperabilityrequirements.Question4.ShouldtheCommissionestablishatargetnumberofpilotsoralimitonhowmanypilotsmayqualifyforthestreamlinedprocess?Shouldonlypilotsbeeligibleforthisstreamlinedprocess?ThereshouldnotbelimitssincetheindustryiscontinuingtoimplementmoreRule21featuresandthenupdatetheSAEautomotivestandardsaccordingly.AswecontinuetomatchvehicleV2Gwithsolarandstationarystorage,itisclearthatwecancontinuetoimprovethesystemtomakethegridmorerobustandallowCAtomeetitsPEVtargets.Question5.Anyothercomments?

Page 99: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

97

VehiclesareusingTelematicstoconnectwithutilityserverspriortoreachingachargingsiteandcanprovideadvancedplanninginformationfortheutilityandvehicle.OncethevehicleconnectseitherWiFiorPLCcanbeusedformorerefinedcommunicationatthesite.Thecustomersareconnectedviatheirphonesandcangetalertsortextcommunicationforanyadjustmentsthatmayarisewhileconnectedandabletocontinuallyadjustthecharging/dischargingsessiontomatchthegridrequirements.PilotsneedtoembracethiseveradjustinganddynamicapproachforadvancedplanningthrumicromanagementstagestoutilizethePEVresourceswhilestillmeetingthecustomer'sdesiretohavetheirvehiclechargedtoanadequatelevelwhenusedagainforthenextroute.ResponseofGeorgeBellino,ConsultantQuestion1.ShouldtheprocessforgrantinginterconnectionapprovalstopilotprojectsinvolvingAC-coupledEVsbestreamlined?YesQuestion2.Whatexistingpilotsareseekingthistypeofinterconnectionandwhatistheircurrentstatus?Nuvve/EDFPrograminUK,recentlycompletedCEC14-086Project(finalreportpublished),SCEDOEEASEProjectQuestion3.Shouldspecificeligibilitycriteriaforsuchastreamlinedprocessbedeveloped?Yes,therearesignificantpotentialapplicationsforamobilestorageresourceincludingtheDODmilitarybasesandemergencyresiliencyneeds.Question4.ShouldtheCommissionestablishatargetnumberofpilotsoralimitonhowmanypilotsmayqualifyforthestreamlinedprocess?Shouldonlypilotsbeeligibleforthisstreamlinedprocess?Nolimitshouldbeestablished.Needtohaveopeneligibilityforpilotstomaximizestakeholderinvestmentintechnologydevelopmentandsafetyvalidation.Pilotlearningsneedtoinformregulatory/policydevelopmentandstandardsdevelopmentbasedonlearnings.CollaborationwillbecriticalbetweenOEMs,EVSEmanufacturers,utilities,andthestandardsbodies.TheremaybeneedtoaddressV2HandV2BapplicationstoinformutilityconnectionsafetyrequirementsandintegrationrequirementsofV2GwithlocalDERassetsResponseofKituSystemsQuestion1.ShouldtheprocessforgrantinginterconnectionapprovalstopilotprojectsinvolvingAC-coupledEVsbestreamlined?YesQuestion2.Whatexistingpilotsareseekingthistypeofinterconnectionandwhatistheircurrentstatus?

Page 100: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

98

SCEDoEEASEprojectQuestion3.Shouldspecificeligibilitycriteriaforsuchastreamlinedprocessbedeveloped?Yes.Specifically,allowtheon-boardinvertertobetreatedasacomponentforsafetystandardsandallowparticipantstosubmitreportshowingcomplianceforthecomponentandnotthevehicle.Question4.ShouldtheCommissionestablishatargetnumberofpilotsoralimitonhowmanypilotsmayqualifyforthestreamlinedprocess?Shouldonlypilotsbeeligibleforthisstreamlinedprocess?NolimitsasthereisalotofdevelopmentrequiredbyManufacturespriortointerconnection.ThemorethepilotswillencouragemoreinvestmentandallowCAtomeetitsEVtargetsResponseofSCEQuestion1.ShouldtheprocessforgrantinginterconnectionapprovalstopilotprojectsinvolvingAC-coupledEVsbestreamlined?TotheextentthepilotsDERprojectsmeettheRule21interconnectionrequirementswhichpertaintosafetyandreliability,SCEwouldexploreprocessestoevaluatepilotsduringtechnicalevaluationandoverallinterconnectionprocess.Asdiscussedinrecentworkinggroupdiscussions,SCEemphasizesagainthatDERpilotsthatdonotmeetsafetyrequirementsasprovidedunderRule21willnotbesupported.SCE’sexperiencewithpastprojectsshowedthatthedelayintheinterconnectionprocesswasmostlyonDERinabilitytomeetsafetyrequirements(inparticular,certification).Question2.Whatexistingpilotsareseekingthistypeofinterconnectionandwhatistheircurrentstatus?DiscussionsattheteamlevelconfirmedthatwehavecurrentlyintheinitiationphaseanEPICPilotVehicletoGridUtilizinganOnboardInverterintendingtodemonstrateJ3072interconnectionsamongotheritems.Inaddition,SCEhasprocessedanAC-coupledV2Gprojectutilizingnon-exportingprovisionofRule21soastosupporton-siteload.Question3.Shouldspecificeligibilitycriteriaforsuchastreamlinedprocessbedeveloped?SCEdoesnotseetheneedtodevelopeligibilitycriteriaforafewpilotprojectswhicharetemporaryinnature.ForSCE,itisbesttolookateachprojectindividuallyanddeterminewhattypeofexpeditedprocessesunderRule21couldbeutilizedtostreamlinetheinterconnectionforeachofthepilots.Question4.ShouldtheCommissionestablishatargetnumberofpilotsoralimitonhowmanypilotsmayqualifyforthestreamlinedprocess?Shouldonlypilotsbeeligibleforthisstreamlinedprocess?SCEdoesnotseetheneedforhavingaparticularcountandaslongasrequirementsunderquestion#1aremet,thenSCEcouldsupportavarietyofpilotprojectsastheyaredeveloped.Question5.Anyothercomments?NoneatthistimeandSCEappreciatesbeingallowedtosubmitfeedbacktothequestionsabove.

Page 101: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

99

Issue24ShouldtheCommissionmodifytheformulaforcalculatingtheCost-of-Ownershipchargeand,ifso,how?PROPOSALSUMMARIESProposal24-a.Non-consensusInapplyingCost-of-Ownership(COO)tonewfacilities,theutilityandratepayerswillneitherbesubjecttoadditionalcostsresultingfromthenewgeneratorinterconnectionnorinappropriatelytransfercoststothegenerationapplicantthattheutilitywouldhaveotherwisenormallyincurred.Utilitiesmay,attheirdiscretion,determinethatthefacilityreplacementis“like-for-like”intermsofCOOimplicationsandnoCOOwouldbeallocatedtotheapplicant.

Supportedby: CALSSA,CleanCoalition,GPI,TeslaOpposedby: PG&E,SCE,SDG&E,TURN

Proposal24-b.Non-consensusThefollowingthreeCOOreplacementcostsoptionsshouldbemadeavailabletotheinterconnectionapplicantwhilemaintainingratepayerindifference:(1)ChargeforReplacementinperpetuity,(2)ChargeforReplacementforfixedtermin10-yearincrements,and(3)Customerresponsibilityforactualcostofreplacementifandwhenneeded(withcustomerpre-authorizationofemergencyreplacementofupgradedfacilitiesforatermagreedintheGIA).

Supportedby: CALSSA,CleanCoalition,GPIOpposedby: PG&E,SCE,SDG&E,TURN

Proposal24-c.Non-consensusWhenreplacingexistingfacilitieswithnewfacilitiesthatarenotdesignatedas“like-for-like”replacementsbytheutility,theinterconnectionapplicantwillbecreditedfortheutilitycostofownershipoftheequipmentthatwasreplacedandonlybechargedanynet-additionalCOO.Net-additionalCOOisdefinedastheCOOthatwouldnothaveotherwiseoccurred,ifnointerconnectionrequesthadbeenmade.Thatis,net-additionalCOOexcludestheportionofCOOofthereplacementequipmentthatrepresentsthecontinuedshareorobligationofratepayersforthatequipment,undertheprincipleofrate-payerindifference.

Supportedby: CALSSA,CleanCoalition,JKBEnergy,TeslaOpposedby: PG&E,SCE,SDG&E,TURN

Page 102: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

100

BACKGROUNDBasedonthescopeofIssue24asscopedinthisproceedingandtheissuebriefprovidedbyCleanCoalition,partiessoughtduringtheWorkingGrouptodeterminewhetherCost-of-Ownership(COO)chargesarebeingappropriatelyappliedtogeneratorinterconnectionapplicants,identifybestpracticesandinconsistenciesbetweenutilities,andrecommendorproposechangestoconsistentlyreflectbestorpreferredpracticesregardingCOOapplicationinRule21.PartiesagreedthatthepurposeandintentofCOOchargesoninterconnectionapplicantsistopreventshiftingcostsfromonecustomerclasstothebroaderclassofcaptiveratepayers,suchthattheutilityandratepayerswillneitherbesubjecttoadditionalcostsresultingfromthenewgeneratorinterconnectionnorinappropriatelytransfercoststothegenerationapplicantthattheutilitywouldhaveotherwisenormallyincurred.Partiesacknowledgedthataccountingpracticesmaynotallowprecisedeterminationofactualindividualcosts,andsuchdeterminationswouldbeimpracticaltoattempt.Assuch,theuseofstandardizedratesforCOOappliedbasedonthecapitalcostoffacilitiesisareasonableandacceptablepracticesupportingconsistencyandeaseofapplication,andavoidsanyaggregatecostshiftsbetweenratepayersandgenerationapplicants.PartiesfurtheracknowledgedandagreedthatthestandardizedCOOratesthemselves,aspercentagesofcapitalcosts,arenotwithinthescopeofthisproceeding,andaredeterminedindividuallyforeachutility.Instead,partiessoughttodeterminewhattypesofcostsandcostcomponentsare,orshouldbe,subjecttothestandardizedCOOrates.ThisincludestheallocationofCOOtocustomer-financedcapitalcostsversusutility-financedcapitalcosts,andhowandwhetherthecorrectandappropriateportionsofthosecostsaresubjecttothestandardizedCOOratesundervariousscenarios.TwootherissuesthatwerediscussedbytheWorkingGroupweredeterminedtobecurrentutilitypractices,sotheyarenotincludedasproposalsbutthisreportincludesthemtomemorializerelevantdiscussionpoints.First,depreciationandrateofreturnaretwoelementswithintheCOO.TherewasuncertaintyduringWorkingGroupdiscussionswhetherutilitieschargefordepreciationandrateofreturnforfacilitiesthatarepaidforbycustomers.Intheend,theutilitiesconfirmedthattheydonotchargetheseitemsforfacilitiestheydidnotfinance.Second,COOshouldnotbechargedfornon-capitalexpenses.TheWorkingGroupdiscussedexamplesofsuchchargesbeingerroneouslychargedinthepast,butitwasagreedthatitshouldnothappen.Changestosettingsofexistingutilityequipment,engineeringreviews,inspections,andprojectmanagementarenotsubjecttoCOO.

Page 103: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

101

DISCUSSIONProposal24-a.Non-consensusInapplyingCost-of-Ownership(COO)tonewfacilities,theutilityandratepayerswillneitherbesubjecttoadditionalcostsresultingfromthenewgeneratorinterconnectionnorinappropriatelytransfercoststothegenerationapplicantthattheutilitywouldhaveotherwisenormallyincurred.Utilitiesmay,attheirdiscretion,determinethatthefacilityreplacementis“like-for-like”intermsofCOOimplicationsandnoCOOwouldbeallocatedtotheapplicant.

Supportedby: CALSSA,CleanCoalition,GPI,TeslaOpposedby: PG&E,SCE,SDG&E,TURN

Proponentsprovidedindicativescenarioexamplesofcommondistributionfacilitiesupgradeswherelike-for-likecomparabilityusuallyexists:

• Existingpoleorequipmentnotupgradedbutrelocatedandcontinuedinuseforsamecustomers(andnewcustomer)

• Minorpoleupgrade-existingsinglewoodpolereplacedwithnextsizelargerwoodpoleProponentsalsoprovidedindicativescenarioexamplesofcommondistributionfacilitiesupgradeswherelike-for-likecomparabilitycouldexist,dependingoncircumstances:

• Majorpoleupgrade-existingfourwoodpolesreplacedwithtwosteelpoles• Transformerupgrade-existingtransformer,upgradedtohighercapacitytoservesame

customersplusanewgeneration/storageapplication• Singlecustomerupgrade--existingdistributionsystemlineextensionandtransformer

providingloadservicetoasinglecustomer,upgradedtoaccommodateanewgenerationinterconnectionrequest

• Singlecustomerupgrade--existingcustomerservicelinedropprovidingloadservice(loadsideofpointofcommoncouplingwithutilitygrid,utilitysideofmeter),upgradedtoaccommodateanewgenerationinterconnectionrequest

PG&Eposition:

“Like-for-like”shouldbedefinedasequivalentfacilities–incostandfunction–suchthattheutilityandratepayerswillneitherbesubjecttoadditionalcostsresultingfromthenewgeneratorinterconnectionnorinappropriatelytransfercoststothegenerationapplicantthattheutilitywouldhaveotherwisenormallyincurred.Basedonthisdefinition,therearenocasesininterconnectionwhereageneratorwouldbeassignedalike-for-likeupgrade.

Additionally,theremovalofequipmentdoesnotreducethenetplantcomponentofratebasesincetheoriginalcostoftheassetisdeductedfromboththegrossplant-in-serviceandtheaccumulateddepreciation,sonetplantisnotreduced,andourrevenuerequirementisnotreducedwhenplantandequipmentisremoved.(Indeed,thecostofremovingequipmentischargedtothedepreciationreserveandincreasesratebase.)Theinstallation

Page 104: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

102

ofnewequipmentincreasesplantandratebaseandthusincreaseourrevenuerequirement.Assumingtheinterconnectioncustomerpaidforthenewequipment,therewouldbenoincreaseinnetplant.

Thescenarioslistedinthisproposalarenottrulylike-for-likebecausethereisacostincreaseassociatedwithrelocationorupgrade.EachofthesescenariosisanexampleofanupgradedfacilitythatisrequiredtoaccommodateaninterconnectionrequestandshouldbesubjecttoCOO.Inthecaseofthetransformerupgradeexample,ifCOOwasn’tapplied,ratepayerswouldthenbepayingfortheCOOoftwotransformers(theexistingtransformerandthenewtransformerrequiredtoservetheinterconnectionrequest)

SCEposition:

AsdiscussedthroughoutworkshopdiscussionsonthistopicandalsorepresentedinSCE’sresponsedatedApril9,2019toaCommissionDataRequestalongwithwrittenresponsetostakeholderquestionsdatedApril24,2019,sincepracticesandgoverningrulesrelatedtotheCostofOwnershipimpactcustomerclassesbeyond“interconnectingcustomers,”reviewofCOOrelatedissuesarebettersuitedforreviewwithinaGeneralRateCase.Bywayofbackground,COOrulesareestablishedunderRule2andapplytoallfacilitiesrequestedbyanapplicantwhichareinadditiontoorsubstitutionforstandardfacilities.Theyinclude,butarenotlimitedto,alltypesofequipmentnormallyinstalledbySCEinthedevelopmentofitsservicetoacustomeroracustomer’sreceiptorutilizationofelectricalservice.Fundamentally,theCOOoffsetsSCE’srevenuerequirementforoperatingandmaintaining(alongwiththecapitalrelatedrevenuerequirementwhenapplicable)fortheunderlyingasset.InparticularforIssue24-a,SCEdisagreesthereisconsensusonthisissue.SCEdoesnotchargeongoingO&Mforlike-for-likereplacements,forexample,whenreplacinga35-footwoodpolewitha45-footwoodpole.Itisbecauseequipmentismoresimilarthandifferentthan,forexample,replacingthewoodpolewithasteeltower.(Inthelattercase,forexample,SCEdoeschargeongoingO&M.)SCEpointedoutduringWorkingGroupdiscussionsthatnon-utilitystakeholderswantedtokeepthelike-for-likepolicy,butreceivepartialcreditforthepreviousO&Mcostsinthecaseofanon-like-for-likereplacement.Thetwocasescannotbelookedatinisolation.Ifadditionalgranularityisdesiredtocalculatetheincremental/decrementalcostofO&Mwhenanassetisreplaced,thisshouldbelookedatinthecontextofaGeneralRateCaseasfurtherdiscussedabove.Bydefinition,ifongoingO&Mcostsarereducedforinterconnectioncustomersfromthecurrentpractice,thosecostswouldflowthroughtoratepayers,whoarenotallrepresentedintheWorkingGroup,whichimplicatesrate-makingissuesthatareoutofscopeforthisportionoftheproceeding.

SDG&Eposition:

SpecialFacilitiescoveredundertheRule2tariffarenewfacilitiesordedicationsofexistingfacilities,requestedbyanapplicant,whichareaddedtoorsubstitutedforthestandard

Page 105: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

103

facilitiesthattheutilitywouldnormallyinstall,maintain,anduse.SpecialFacilitiesarethepropertyoftheutility,whichisresponsiblefortheiroperation,maintenance,andreplacement.However,theyarenotfundedthroughtheGRCprocess,noraretheypaidforbyrates.Asaresult,COOassessmentsshouldnotshiftcostsbetweenpartiesandshouldthusbebasedontheconceptofratepayerindifference.SDG&Ebelievesintheprincipleofequitythathaslongbeenembeddedinutilityregulation;ratepayerindifferencethusmeansthatnocustomerclassshouldsubsidizeanothercustomerclass.SuchequityiswellestablishedandfoundedupontheseminalworksofAlfredKahnandJamesBonbright.DistributedenergyresourcesinterconnectingunderRule21shouldbetreatedthesamewaythatanyothertypeofbusinessorcustomerclassrequiringSpecialFacilitiesunderRule2aboveandbeyondstandardloadserviceunderRules15and16.AllSDG&EcostsnotrequiredtoserveutilityratepayerloadrequirementsandincludedinaGRCauthorizationprocessshouldbeappropriatelychargedtotherequestingapplicant.CustomerrequeststhatrequirefacilitiesbeyondnormalservicefacilitiesalreadyprovidedbySDG&EunderRule15“DistributionLineExtensions”andRule16“ServiceLineExtensions”areconsideredSpecialFacilities,whicharedefinedandgovernedundertheRule2tariff.Rule2SpecialFacilitiesisnotexclusivetoGenerationFacilitiesbutratherencompassestheentirerangeofcustomerclassesinanon-discriminatorymanner.WhenacustomerrequestsaSpecialFacilityundertheRule2tariffrequirements,thecostsprovidedtothecustomerareafinancialestimatewhichisdesignedtocoverthefullcostofownership,whichincludestheconstruction,designandinstallationofthedesignatedequipmentandtherelatedexpensesincurredthroughitsuse.IfthespecialfacilityreplacesequipmentthathadbeenpreviouslyinstalledtoservetheutilityratepayersandwasapprovedthroughitsGRCprocess,SDG&Ewouldcontinuetorecoverthecostoftheassetfromratepayers.SDG&Edoesnotrecoveritsfixedassetscostupfrontfromratepayers,therecoverymechanismoccursovertimethroughdepreciationexpenseovertheaverageservicelifeoftheasset.Whenafixedassetisremovedfromservice,SDG&EfollowstheFERCregulatoryguidelinestoretiretheasset,consistentwithitsgeneralpractices.Asstatedinthisdiscussion,“like-for-like”replacementsonlyachieveratepayerindifferenceiftheexistingassetsareattheveryendoflifeandfullydepreciated.Iftheassetbeingreplacedhasremainingundepreciatedcosts,thentheratepayercontinuespayingfortheremovedassetandalsopayingforthenewreplacementassetiftheDERcustomersareallowedtoavoidtheCOOandshifttheirimpactoncoststootherexistingratepayers.COOrelativetotheoperatingandmaintenancecomponentsisnotspecificallyknownassetbyassetbutratherasanaverageforallassetsintheclass.ThisproposalifadoptedasproposedbytheDERcustomerswouldnothaveanegativeimpactonSDG&E’sshareholdersitwouldonlyshiftcostsfromthemtoalltheotherexistingratepayers.Thisproposalaspresentedunfairlybenefitsonegroup,theDERcustomerasallothercustomerandratepayersbearadditionalcosts.

Page 106: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

104

Proposal24-b.Non-consensusThefollowingthreeCOOreplacementcostsoptionsshouldbemadeavailabletotheinterconnectionapplicantwhilemaintainingratepayerindifference:(1)ChargeforReplacementinperpetuity,(2)ChargeforReplacementforfixedtermin10-yearincrements,and(3)Customerresponsibilityforactualcostofreplacementifandwhenneeded(withcustomerpre-authorizationofemergencyreplacementofupgradedfacilitiesforatermagreedintheGIA).

Supportedby: CALSSA,CleanCoalition,GPIOpposedby: PG&E,SCE,SDG&E,TURN

ThefollowingCOOreplacementcostsoptionsshouldbemadeavailabletotheinterconnectionapplicantwhilemaintainingratepayerindifference:

• Chargeforreplacementinperpetuity-withcustomeroptionofamonthlyorlumpsumassessment(noadditionalcosttocustomerifreplacementoccurs)

• Chargeforreplacementforfixedtermin10-yearincrements(i.e.,10,20,30years)-withcustomeroptionofamonthlyorlump-sumassessment(noadditionalcosttocustomerifreplacementoccursduringthefixedterm,andcustomerresponsibleforactualcoststhereafter)

• Customerresponsibilityforactualcostofreplacementifandwhenneeded(withcustomerpre-authorizationofemergencyreplacementofupgradedfacilitiesforatermagreedintheGIA)

ProponentCleanCoalitionposedthequestion:towhatextentdoesreplacementcostfactorintoCOOcharges?Togaininsightintothisquestion,theWorkingGroupreviewedanexampleprovidedbySCEofaddedfacilitiesratecomponents.Inthisexample,forannually-paidCOOonacustomer-financedfacility,annualreplacementcostaccountsfor22%oftotalCOOwhenreplacementiscoveredinperpetuity,5%oftotalCOOwhenreplacementiscoveredfor20years,and0%whenthecustomerassumesfullresponsibilityforreplacementcostwhenandifreplacementisrequired.CleanCoalitionconcludedthatreplacementcoverageoptionscangreatlyaffectinterconnectioncustomercosts,withoutaffectingratepayers.SCEpointedoutthatongoingO&Misrelativelysteadyfromyeartoyear,butreplacementcostischargedonaconstantrecurringannualbasis(straight-linebasis),eventhoughonewouldexpectthereplacementstocomelaterintheasset’slife.

ProponentCleanCoalitionalsoposedthequestion:IftheservicelifeoftheequipmentexceedsthetermoftheGIA,isitappropriatetoassessreplacementcosts?TheWorkingGrouplearnedthataGenerationInterconnectionAgreements(GIA)remainsineffectinperpetuity,untilcanceledbycustomer(althoughSCEGIA’sprovidefor30-yearterms).However,CleanCoalitionconcludedthatwherechargestocovertheriskofreplacementaredefinedforalimitedperiodalignedwiththeoperationallifeofthecustomer’sgenerationfacility,thereplacementcostcomponentofCOOisgreatlyreduced,andtheremainingcomponentsofCOOmaybesignificantlyreduced.Thiscansignificantlyreducethecustomercostofaddingdistributedgenerationorstoragewhenupgrades

Page 107: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

105

areneeded,withouttransferringriskorburdentootherratepayers.Forexample,acustomerelecting20-yearreplacementcoveragepaidasaone-timepaymentwouldseemorethana40%reductionintotalCOOcosts(reducedfrom$82,000to$48,000ona$100,000distributionupgrade).CleanCoalitionassertedthatifreplacementcostchargesarenotalignedwithactualreplacementcosts,thiswillresultinapositiveornegativecostshiftbetweentheinterconnectioncustomerandotherratepayers.SCEpointedoutthatthiswouldbeaveragereplacementcostsoveranumberofyears,andthereisastandardratethatisadjudicatedintheGRC.Asnotedpreviously,PartiesacknowledgedthattheuseofstandardizedratesforCOOappliedbasedonthecapitalcostoffacilitiesisreasonableandacceptablepracticesupportingconsistency,easeofapplication,andavoidsoverallshiftsincosts.UtilitiesdifferinhowtheyaddressCOOreplacementcharges.SCEputforwardtheopportunityforreplacementcoveragetobeacustomerelectiveassociatedwithmonthlyCOOpayments,butdidnotofferthiswiththeone-timepayment,andlimitedtermcoveragehasnotbeenimplemented.PG&Edoesrequirecoveragecalculatedwithouttermlimit(inperpetuity),butstatesthatthattheyrefundunusedone-timepaymentreplacementcostsbasedonannualizedinsurance/riskassessmentwheneverthecustomerterminatestheGIA.SDG&Eincludesreplacementcostasafactorinthecostofownershipthatispaidbytheapplicant,baseduponthespecificequipmentrequestedbytheapplicant.Thesepracticesavoidunder-collectionfrominterconnectioncustomers,butdonotallavoidover-collection,potentiallyburdeninginterconnectioncustomerswithexcesscharges,especiallyifpaidasalumpsum.Utilitypositions:

PG&Edoesnotsupportaprovisiontoseparatelyidentifyreplacementfacilitiesinthespecialfacilitycostofownership.ThereplacementcomponentinPG&E’sspecialfacilitycostofownershipisdeterminedinratecaseproceedings,includingourGRC,andhavingseparatecomponentsforreplacementcreatesexcessiveadministrationburden.SDG&E’spositionisconsistentwiththeviewsexpressedbySCE,thegoverningrulesrelatedtotheCostofOwnership,whichincludesreplacementcost,impactcustomerclassesbeyond“interconnectingcustomers,”reviewofCOOrelatedissuesarebettersuitedforreviewwithinaGeneralRateCase.OverallCOOassessmentsshouldnotshiftcostsbetweenpartiesandshouldthusbebasedontheconceptofratepayerindifference.SDG&Ebelievesintheprincipleofequitythathaslongbeenembeddedinutilityregulation;ratepayerindifferencethusmeansthatnocustomerclassshouldsubsidizeanothercustomerclass.Totheextent,thatGenerationInterconnectionAgreementsremainineffectinperpetuityallcostsnotrequiredtoserveutilityratepayerloadrequirements(includingreplacementofthespecialfacilities)shouldbeappropriatelychargedtotherequestingapplicantandnotbebornebyratepayers.

Page 108: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

106

SDG&Eincludesreplacementcostasafactorinthecostofownershipthatispaidbytheapplicant,baseduponthespecificequipmentrequestedbytheapplicant.SDG&EdoesnotsupportaspecialorpreferentialaccountingmechanismforDERcustomers.SDG&E’spositionisthattheservice-lifeofreplacementequipmenthasnobearingontherequirementoftheratepayertobeartheburdenofthecostofupgradedequipmentasrequestedbyanapplicant.Thisreplacementequipmentisinstalledfortheapplicant’sbenefitandattheapplicant’srequest,andtheolder,replacedequipmentsupportedtheratepayers’needswithnoadditionalcostsrequired.TotheextentthataGIAcontinuesinperpetuity,SDG&Eexpectsthatitwillberequiredtoreplacetheupgradedequipmentatsomepointwithoutanyadditionalcosttotheapplicant(e.g.withratepayerfunds).SCE:AsdiscussedwithProposal24-a,throughoutworkshopdiscussionsonthistopicandalsorepresentedinSCE’sresponsedatedApril9,2019toaCommissionDataRequestalongwithwrittenresponsetostakeholderquestionsdatedApril24,2019,sincepracticesandgoverningrulesrelatedtotheCostofOwnershipimpactcustomerclassesbeyond“interconnectingcustomers,”reviewofCOOrelatedissuesarebettersuitedforreviewwithinaGeneralRateCase.Bywayofbackground,COOrulesareestablishedunderRule2andapplytoallfacilitiesrequestedbyanapplicantwhichareinadditiontoorsubstitutionforstandardfacilities.Theyinclude,butarenotlimitedto,alltypesofequipmentnormallyinstalledbySCEinthedevelopmentofitsservicetoacustomeroracustomer’sreceiptorutilizationofelectricalservice.Fundamentally,theCOOoffsetsSCE’srevenuerequirementforoperatingandmaintaining(alongwiththecapitalrelatedrevenuerequirementwhenapplicable)theunderlyingassetsupportingratepayerindifference.Therefore,COOrefinementsarebettersuitedforreviewwithinaGeneralRateCaseduetothecomprehensivenatureandpotentialrateimpactsoftheissuealongwiththegoverningrulesthatarehousedoutsideofRule21itself.Inaddition,SCE’scurrentpracticesallowfortheoptionofreplacementcoverageunderSCE’sexistingRule2tariff,andwhilecustomersmayappreciatelowercostsassociatedwithreplacementsintheearlyyearsofacontract(assumingthatareplacementoptionwouldbeallowedpostcontract),whenthoseyearsexpire,thecostofpurchasingreplacementcoverageforadditionalyearswilllikelybeprohibitive.Also,again,establishingnewrateoptionsisbettersuitedforreviewwithinaGeneralRateCasewherebothaffectedcustomersandpotentialratepayerimpactscouldbereviewed.

Proposal24-c.Non-consensusWhenreplacingexistingfacilitieswithnewfacilitiesthatarenotdesignatedas“like-for-like”replacementsbytheutility,theinterconnectionapplicantwillbecreditedfortheutilitycostofownershipoftheequipmentthatwasreplacedandonlybechargedanynet-additionalCOO.Net-additionalCOOisdefinedastheCOOthatwouldnothaveotherwiseoccurred,ifnointerconnectionrequesthadbeenmade.Thatis,net-additionalCOOexcludestheportionofCOOofthereplacementequipmentthatrepresentsthecontinuedshareorobligationofratepayersforthatequipment,undertheprincipleofrate-payerindifference.

Page 109: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

107

Supportedby: CALSSA,CleanCoalition,JKBEnergy,TeslaOpposedby: PG&E,SCE,SDG&E,TURN

DuringWorkingGroupdiscussions,therewascontinueduncertaintyaboutwhethersomeformofnet-additionalaccountingofCOOiscurrentlyemployedinpractice,underwhatcircumstances,andtheaccountingmethodologiesinvolved.Ingeneral,partiesrecognizedthatutilityaccountingofCOOactualcostsisnotprojectspecificbutaggregatedandaddressedinGeneralRateCases,andthatCOOaccountingisnotspecifictoRule21only,asCOOtreatmentappliestoallSpecialFacilitiesgovernedunderRule2andhasimpactsbeyondonlyinterconnectingcustomers.

ThereareanumberofpotentialmethodologiesbywhichtocalculateCOOwhenexistingfacilitiesarebeingreplaced.Forexample,referencewasmadetoamethodologyusedbyPG&EforRules15and16,inwhichadummyscenarioiscreatedtoreflectthewholesystemwithouttheupgrade,andthencosts(includingO&M)arecomparedtothesystemwiththeupgrade,andthedifference(capitalandO&Mseparately)iscalculated.Thismethodology,ifappliedtoRule21interconnections,wouldproducesomethingsimilartonet-additionalCOO.Proponentsprovidedindicativescenarioexamplesofcommondistributionfacilitiesupgradeswheresometypeofnet-additionalmethodologycouldbeusedforRule21:

• Majorpoleupgrade-existingfourwoodpolesreplacedwithtwosteelpoles• Transformerupgrade-existingtransformer,upgradedtohighercapacitytoservesame

customersplusanewgeneration/storageapplication• Single-customerupgrade--existingdistributionsystemlineextensionandtransformer

providingloadservicetoasinglecustomer,upgradedtoaccommodateanewgenerationinterconnectionrequest

• Single-customerupgrade--existingcustomerservicelinedropprovidingloadservice(loadsideofpointofcommoncouplingwithutilitygrid,utilitysideofmeter),upgradedtoaccommodateanewgenerationinterconnectionrequest

Proponentpositions:

CALSSA:Rule21practicesshouldallocatetheCOOcoststotheinterconnectioncustomerinkeepingwiththeprinciplethattheutilityandratepayerswillneitherbesubjecttoadditionalcostsresultingfromthenewgeneratorinterconnectionnorinappropriatelytransfercoststothegenerationapplicantthattheutilitywouldhaveotherwisenormallyincurred.Forexample,ifa500-kVAtransformerthatservesmultiplecustomersisreplacedwitha750-kVAtransformerbecauseoneofthecustomersinstallssolar,thenewtransformerstillprovidesservicesforthenon-solarcustomers.TheCommissionhadpreviouslycommittedallofthecustomerstopayingCOOforthelifeofthe500-kVAtransformer.Thattransformerisnowbeingretiredearly,buttheservicesarestillbeingperformedandcustomersshouldcontinuepayingforthem.Thenewsolarcustomershouldpayfortheincrementalincreaseincostsforoperationsandmaintenanceofthelargertransformer.

Page 110: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

108

CleanCoalition:UtilitieshaveindicatedthatcurrentaccountingpracticesmayremovethereplacedfacilitiesfromtheirCOOandthiswouldresultinanundercollectionifthegenerationcustomerisonlychargedforthenetadditionalCOOresultingfromtheirinterconnectionrelativetotheCOOthatwouldhaveoccurredbutforthatcustomer. Ifthisisthecasethenthisaccountingpracticeandshortfallshouldbeaddressedintheappropriateproceeding,butitisnotappropriatetoallocatecoststotheinterconnectioncustomerunderRule21tariffpracticesifthesecostswouldhavebeenincurredbytheutilityanywayandwouldthereforecreateacostshiftthatimproperlyhinderscustomerDERdeployment.

TURNposition:

TURNstronglyopposesanypotentialsubsidyoftheinterconnectingprojectbyratepayers.Anymethodologythatcouldpotentiallyresultinacostshiftorsubsidy,whetherduetodifferencesinaccountingpractice,indirectcoststhatareoccurred,orotherpotentialreasonsshouldbeclearlyrejectedbytheCommission.TURNagreeswiththestandardproposedbySDG&EthatallcostsnotrequiredtoserveutilityloadrequirementsandincludedinaGRCauthorizationprocessshouldbechargedtotherequestingapplicant.

Collectiveutilityposition:

UtilitiesindicatedthatincaseswheretheircurrentaccountingpracticesremovereplacedfacilitiesfromtheirCOO,anunder-collectionofCOOwouldresultiftheinterconnectioncustomerisonlychargedforthenet-additionalCOOresultingfromtheinterconnectionrequest,ratherthanbeingchargedthefullCOOofthereplacementfacilities.

SDG&Eposition:

Theutilitiesdonothavethedetailedvisibilitytothegranularityofindividualassetcoststoachievethisproposalaspresented.ThisproposalwouldshiftmorecoststoexistingratepayersandunfairlybenefitonlytheDERcustomer–thus,notachievingratepayerindifference.Theexistingasset,ifnotfullydepreciated,continuestobepaidforbyexistingratepayersandthisnewassetifnotfullypaidforbytheDERcustomerunfairlyshiftsadditionalcoststotheexistingratepayers.Forthisreason,whenacustomerrequestsaSpecialFacilityundertheRule2tariffrequirementstoreplaceequipmentthathadbeenpreviouslyinstalledtoservetheutilityratepayersandwasapprovedthroughitsGRCprocess,SDG&Ewouldcontinuetorecoverthecostoftheassetfromratepayers.SDG&Edoesnotrecoveritsfixedassetscostupfrontfromratepayers,therecoverymechanismoccursovertimethroughdepreciationexpenseovertheaverageservicelifeoftheasset.Whenafixedassetisremovedfromservice,SDG&EfollowstheFERCregulatoryguidelines1toretiretheasset,consistentwithitsgeneralpractices.

Page 111: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

109

SCEposition:AsdiscussedwithProposals24-aand24-b,andthroughoutworkshopdiscussionsonthistopicalongwithbeingrepresentedinSCE’sresponsedatedApril9,2019toaCommissionDataRequestalongwithwrittenresponsetostakeholderquestionsdatedApril24,2019,sincepracticesandgoverningrulesrelatedtotheCostofOwnershipimpactcustomerclassesbeyond“interconnectingcustomers,”reviewofCOOrelatedissuesarebettersuitedforreviewwithinaGeneralRateCase.Bywayofbackground,COOrulesareestablishedunderRule2andapplytoallfacilitiesrequestedbyanapplicantwhichareinadditiontoorsubstitutionforstandardfacilities.Theyinclude,butarenotlimitedto,alltypesofequipmentnormallyinstalledbySCEinthedevelopmentofitsservicetoacustomeroracustomer’sreceiptorutilizationofelectricalservice.Fundamentally,theCOOoffsetsSCE’srevenuerequirementforoperatingandmaintaining(alongwiththecapitalrelatedrevenuerequirementwhenapplicable)theunderlyingassetsupportingratepayerindifference

PG&Eposition:InterconnectionCustomersmustberesponsibleforthecoststheycauseandchangesinCOOassessmentshouldnotshiftcostsfromgeneratorstoratepayers:AllPG&EcostsnotrequiredtoserveutilityratepayerloadrequirementsandincludedinaGRCauthorizationprocessshouldbeappropriatelychargedtotherequestingapplicant.Duetocostcausationprinciples,theentitythatinitiatestherequiredupgradewillberesponsibleforCOOonthatpieceofequipment.ApplicantswillpayfortheaddedfacilitiesnecessarytoaccommodatetheDER.Typically,therevenuesupportforanupgradeor“allowance”isdeterminedbycalculatingthecosttoservealoadandcomparingittothenewcostofservingadditionalload.Asanexamplescenario,acustomerplanstooffsetallloadwithgeneration.Byoffsettingtheload(andtherevenuesupport/allowance),thenewspecialfacility(transformerupgrade,linereconductor,etc.)thatisneededtoaccommodatethegenerationisnowthefullresponsibilityoftheinterconnectioncustomer.Ifthecustomeronlyoffsetsaportionoftheload,therewouldbeanallowanceavailabletooffsetthecostofthespecialfacility.

Page 112: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

110

Issues27and28Issue27:Whatshouldbetheoperationalrequirementsofsmartinverters?WhatrulesandproceduresshouldtheCommissionadoptforadjustingsmartinverterfunctionsviacommunicationcontrols?Issue28:HowshouldtheCommissioncoordinatewiththeIntegratedDistributedEnergyResourceproceedingtoensureoperationalrequirementsarealignedwithanyrelevantvaluationmechanisms?PROPOSALSUMMARIESProposal27-a.ConsensusAddwithinRule21SectionHhlanguagethatstates“withmutualagreement,changestodefaultsettingsareallowed.”AndwithinsixmonthsafterreleaseofanupdatedUL1741standardthatincludesIEEE1547.1-2019,takethefollowingtwoactions:(1)updateRule21toaccountforIEEE1547andIEEE1547.1requirements;and(2)determinetheprocessforrequestingandapprovinginvertersettingsthataredifferentfromthedefaultsettings,includingmodificationstogeneratingfacilityinvertersettingsrequestedbyeitherthedistributionproviderorbytheGeneratingFacilityowneroroperator.23Proposal27-b.Non-consensusTheCommissionshouldconveneaworkshopwithin90daysoftheWorkingGroupThreeFinalDecision,inwhichutilitieswillpresenttheirDERMSroadmaps,followedbycommentsfromparties.Roadmapsbyutilitiesshouldincludevisions,tentativemilestones,andmajorchallenges.

Supportedby: CALSSA,CleanCoalition,GPI,JKBEnergy,PG&E,SCE(conditional;seeDiscussionsection),Sunrun,Tesla

Opposedby: SDG&E,TURNProposal27-c.Non-consensusConvenetheSmartInverterWorkingGrouptorefinetechnicalspecificationsfortheSetActivePowerModefunction.

Supportedby: CALSSA,CleanCoalition,GPI,Nuvve,SCEOpposedby: PG&E,SDG&E

Proposal28-a.ConsensusAfterthedecisionontheIDERproceeding,theEnergyDivisionshoulddecideontheneedtoconveneTheSmartInverterWorkingGrouptodetermineifanytechnicalworkisneeded.

23ReferenceismadetoIEEE1547.1-2019inProposal27-aduetotheexpectationthattheforthcomingupdatetoIEEE1547.1willbereleasedin2019.Shouldthereleasebedelayedinto2020,thisproposalshouldbeadjustedtostate,“AndwithinsixmonthsafterreleaseofanupdatedUL1741standardthatincludesIEEE1547.1-2020…”

Page 113: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

111

BACKGROUNDTheWorkingGroupconsideredthefunctionalcapabilitiesofsmartinvertersasapprovedduringPhasesI-IIIoftheSmartInverterWorkingGroup(SIWG).ThesefunctionalcapabilitiesincludePhaseIAutonomousFunctions(approvedApril2015),PhaseIICommunicationCapabilities(approvedApril2017),andPhaseIIIAdvancedFunctions.ThePhaseIFunctionsbecamemandatoryforallnewinterconnectionrequestsasof2017.ThePhaseIICommunicationsCapabilitiesarecurrentlyscheduledtobecomemandatoryinAugust2019,buttheCommissionisconsideringproposalstodelaythatcompliancedeadline.ThePhaseIIIFunctionshavearangeofdeadlines.TwoPhaseIIIfunctionsbecameeffectiveonFebruary22,2019:FrequencyWattModeandVolt-WattMode.TwoPhaseIIIfunctions,MonitorKeyDERDataandSchedulingPowerValuesandModes,arecurrentlyscheduledtobecomemandatorybeginningonAugust22,2019,althoughtheCommissionisconsideringproposalstodelaythatcompliancedeadline.TwoPhaseIIIfunctionswillbecomeeffective12monthsafterapprovalofanationallyrecognizedstandardthatincludesthefunction:SetActivePowerModeandDynamicReactiveSupport.TwomorePhaseIIIfunctionswillbecomeeffectiveinDecember2019:DERDisconnectandReconnectCommand(CeasetoEnergizeandReturntoService)andLimitMaximumActivePowerMode.TheWorkingGroup,overaseriesofsixjointcallswithinterestedpartiesfromtheSIWG,consideredavarietyofsmartinverterusecaseswithpotentialeconomicand/orsafetyandreliabilitybenefitsthatcouldmakeuseofthesefunctionalcapabilities,andwhethertechnicalstandardsorfunctionsareexistingorforthcomingthatareneededtoenablethoseusecases.Basedondiscussionofthecapabilitiesandusecases,aswellassafetyandreliabilityrequirements,theWorkingGroupandSIWGthensetouttoassess,prioritize,categorizeandrecognizetheoperationalrequirementsofsmartinvertersandproceduresforchangingsettings,intermsofwhatshouldbeconsideredfirstbytheCommission,intermsofwhatadditionaltechnicalworkorstandardsareneededbeforeoperationalizationispossible,intermsoffuturedevelopmentofDERMSsystemsbytheutilities,andintermsofwhatisexpectedtohavethemostbenefittobothgenerationcustomersandutilities.PartiesnotedthatitisalreadyestablishedinRule21thatcustomersmustmaintainthedefaultsettingsforsmartinverterfunctionsunlessdifferentsettingsareapproved.DuringWorkingGroupdiscussions,partiesconsideredproposalsrelatedtonon-defaultsettings.TheWorkingGroupdeveloped,togetherwiththeSIWG,aframeworkofthreeOperationalCategories#1-#3,withinwhichchangestosmartinverterdefaultsettingscanbeconsidered.SeeAnnexFfordetailsofthisframework.OperationalCategory#1pertainstodefaultoperationsandmaintenanceofRule21requirements.OperationalCategory#2pertainstointerconnectionusecases.AndOperationalCategory#3pertainstogridservices.PartiesrecognizedthatchangestodefaultsettingsforOperationalCategories#2and#3canbemadewithmutualagreement,providedthemodificationisevaluatedtoensurethatsafetyandreliabilityrequirementsarenotcompromisedandifthemodificationdoesnotnegativelyaffecttheinterconnectionrequirementsprovidedunderOperationalCategory#1oranypreviouslyimplementedOperationalCategory#2and#3requirements.Withinthisframework,theWorkingGroupandSIWGalsodefinedandconsideredaseriesofusecasesthataredetailedinAnnexG.Inparticular,eightusecaseswereseenasimportantto

Page 114: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

112

harnessingthegridbenefitsofdistributedresourcesinthefuture:(a)scheduledpowerreduction;(b)dynamicpowerreduction;(c)scheduledvoltagecorrection;(d)dynamicvoltagecorrection;(e)operationalflexibility;(f)capacity;(g)constantvoltageboost;(h)voltagereduction.Theseusecasesareincludedinthisreporttosignalthetypesofusecasesthatstakeholdersthinkshouldbeoperationalizedinthefuture,whilerecognizingthatexistingutilitytechnologycannotsupportmanyofthematpresent.Withregardtotheusecases,theWorkingGroupisnotrecommendinganyspecificCommissionactionatthistime.SomepartiesalsonotedthattheexistinglanguageofRule21canbeinterpretedtoallowamitigationpathusingalternativesmartinvertersettingsinresponsetotheresultsofinterconnectionreview.Iftheutilityofferstheoptiontousealternativesettingsasaconditionofinterconnectionapproval,thecustomercanacceptthatoptionandtheutilitywillincludethealternatesettingsintheinterconnectionagreement.Thecustomerwillbeobligatedtomaintainthosesettingsunlesstheyreceivelaterapprovalfromtheutilitytochangethem.Afterthecustomerhasreceivedapprovalforsettingschanges,thecustomermustdocumentthesettingsfortheutility.InrelationtothesecondquestionofIssue27onrulesandproceduresforadjustingsmartinverterfunctionsviacommunicationcontrols,theWorkingGrouprecognizedthatmanyoftheOperationalCategory#2andOperationalCategory#3usecaseswouldrequireutilitiestosendsignalstoDERsbasedongridconditionsandreacttodatareceivedfromDERsthroughthedevelopmentof“DERMS”communicationandcontrolsystems.DERMSaresoftwareplatformsthatcancontrolorsendsignalstoDERsoveravarietyofdifferenttimeintervals,toperformactionsforgridreliabilitymanagementand/orgridservices.DERMScanworkinconcertwithAdvancedDistributionManagementSystems(ADMS),whichmonitorDERsandgridconditionsforautomatedgridmanagementdecisionmaking.Someoftheuse-casedescriptionsinAnnexGelaborateonhowDERMScouldbeused.EachoftheutilitieshasperformedmultipletestsandpilotsofDERMS,butongoinguseofDERMSisstilllimited.DERprovidershavepartneredwithutilitiesforthosepilots,someofwhichhaveusedcommunicationstechnologythathadnotyetbeenwidelyintroducedintothemarketplace.IthasbeenalearningprocessforutilitiesandDERprovidersalike.MoststakeholdersshareavisionofDERMSbecomingwidespread,butthereareconflictinginterpretationsofhowquicklythatcanbeachieved.InrelationtoIssue28,partiesalsoconsideredwhichusecaseswouldberelevanttoIDERsourcingandvaluationmechanismsbeingdeveloped,andhowandwhentheWorkingGroupandSIWGcouldprovidetechnicalassistancetoIDERinsettingoperationalrequirementsforthosesourcingandvaluationmechanisms.ThisincludedprovidinginformationtoIDERonwhatusecasesandfunctionswouldbeassociatedwithdifferentmechanisms,andthepracticalconstraintsorneedsinoperationalizingthoseusecasesandfunctions.

Page 115: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

113

DISCUSSIONProposal27-a.ConsensusAddwithinRule21SectionHhlanguagethatstates“withmutualagreement,changestodefaultsettingsareallowed.”AndwithinsixmonthsafterreleaseofanupdatedUL1741standardthatincludesIEEE1547.1-2019,takethefollowingtwoactions:(1)updateRule21toaccountforIEEE1547andIEEE1547.1requirements;and(2)determinetheprocessforrequestingandapprovinginvertersettingsthataredifferentfromthedefaultsettings,includingmodificationstogeneratingfacilityinvertersettingsrequestedbyeitherthedistributionproviderorbytheGeneratingFacilityowneroroperator.Rule21containsspecificdetailsonthedefaultsettingsofsmartinvertersettings.ForsomeofthefunctionsRule21statesthatcertaintypesofalternativesettingsmaybeallowed.However,thereisnogeneralstatementthatalternativesettingsmaybeapprovedbymutualconsentiftheyareusefulforfacilitatinginterconnectionorprovidinggridservices.ThiscreatesalackofclaritywhetherthecurrentRule21languageallowsutilitiestoapprovethefullrangeofalternativesmartinvertersettingsthatcouldbeusefulforthesepurposes.Thereisalsonoprocessspecifiedforcustomerstorequestpermissionfordifferentsettingsforpurposesofprovidinggridservices.Utilitiescan,atleastinsomecases,reviewandapproveproposalsforalternativesettings,butadefinedprocesscouldimprovefairnessandtransparency.Athirdpotentialneedisaspecifiedrequirementforcustomerstochangesettingswithinacertaintimeframeifautilitydeterminesitisnecessaryforimmediatesafetyandreliabilityconcernscausedbythecustomer.Proposal27-b.Non-consensusTheCommissionshouldconveneaworkshopwithin90daysoftheWorkingGroupThreeFinalDecision,inwhichutilitieswillpresenttheirDERMSroadmaps,followedbycommentsfromparties.Roadmapsbyutilitiesshouldincludevisions,tentativemilestones,andmajorchallenges.

Supportedby: CALSSA,CleanCoalition,GPI,JKBEnergy,PG&E,SCE(conditional;seeDiscussionsection),Sunrun,Tesla

Opposedby: SDG&E,TURNProponentpositionbyCALSSA:

SeveralofthesmartinverterusecasesrequireutilityDERMS.Customershavebeenrequiredtoinstallinverterswithadvancedfunctionality,butinordertomakefulluseofthosefunctionsutilitiesneedtoworkontheirportionofthecapabilities.Issue27considerswhatisnecessarytomakeuseofsmartinvertercapabilities,andtheutilitysideoftheequationisanimportantelement.

Page 116: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

114

TheutilitieshaveconductedpilotstotestDERMScapabilitiesandplantoconductfurtherpilots.Thesepilotsareimportantforutilitiestogainexperienceandconfidence.However,theyshouldbepartofalargerplan,anddevelopmentofthatplanshouldinvolveapublicprocess.

TURNposition:

Ashowingneedstobemade,whethercostbenefitorotherwise,toshowthatiftheutilitiesneedtobuildcommunicationssystemstoutilizePhase3functions,thebenefitstoratepayerswillmorethanoffsetthecoststoratepayers.Theanalysisalsoneedstoshowthatthebenefitswon’tdisproportionallybereceivedbyasmallpercentageofcustomerswhileotherratepayersarepayingforthecommunicationssystems.

Utilitypositions:

PG&EisoptimisticthatcertaindirectcontrolusecasesrelatedtoSmartInvertervoltagefunctionsandadvancedfunctionscouldprovidedistributiongridservicesbeyondautonomoususecases.However,PG&E’scurrentutilityoperationalsystemsarenotyetcapableofusingtheseadvancedSIfunctionstotheirfullestextent.UtilityinvestmentinanAdvancedDistributionManagementSystem(ADMS)andDERMSsoftwarewouldprovidevisibilityandcontrolofSI-enabledDERstotheutilityandcouldallowDERstofullyrealizetheirvaluethroughdynamicmanagementfordistributiongridservices.PG&EhasfileditsplansforADMS/DERMStechnologydevelopmentinitsGridModernizationChapterinits2020GeneralRateCase.However,duetotheupcoming1/29/19bankruptcyfilingandthecompany’sfocusonprojectsrelatedtosafety,compliance,andriskmitigationfollowingthe2017and2018wildfires,itispossiblethatcertainaspectsofADMS/DERMSimplementationmaybedelayedand/orpushedintothefuture.PG&E:AdditionalDERMSdemonstrationworkisneededbytheIOUs(PG&EDERMS2.0project,whichiscurrentlyonholdduetoworkreprioritizationactivitiesfollowingthe2017and2018wildfireseasons).ExampleusecasesthatcouldbepursuedthroughadditionalDERMSdemonstrationworkinclude:

• Constrainedgenerationprofileusecase(i.e.alternativeinterconnectionmitigation)• Cybersecuritystandarddevelopment/demonstrationofend-to-endcybersecurity

testingandimplementation• MeasurementandverificationofDERs’abilitytoprovideadistributiongridservice

beyondsimplymitigatingtheadverseimpactsofhighDERpenetrationSCEissupportiveofaninformativeworkshopthatoutlinesSCE’svision,tentativemilestones,andmajorchallenges.However,becauseDERMshasbeenreviewedwithinSCE'slastGRC,itwouldbeoutofscopeforthisdiscussiontoaddressfurtherstakeholdermodifications,proprietarytools,vendorcontracts,Cybersecurityspecificationsandothersensitiveinformation.SCEissupportiveofanopendialogwithstakeholderstoshareDERMSoperationalplansandmaximizeitscapabilitywithDERoperationsboundedbyGRCapprovallimitation.SCEdoesnotsupportTURN’spositionasjustificationforDERMSandotherrelated

Page 117: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

115

toolstobereviewedoutsidetheGRCduetotheirprojectnatureascomparedtoonlyreviewedunderaninterconnectionrulemaking.

SDG&Eisopposedtothisproposal,butrathersuggeststhataworkshopbeconvenedtoactuallyassessthematurityoftheDERMScommercialsoftwarevendorstosupportnecessaryusecasesatscale,whileprovidingrobustnessandsecurity.Perthe“SmartInverters&DERMS:AnOverviewofOngoingResearchEffortsatEPRI”presentationconvenedbytheEnergyDivisiononApril11,2019,itisobviousthatthestateofDERMSisnascentandundergoingsignificantresearchanddevelopment,makinganysubstantivedevelopmenttimelinesfortheIOUsproblematic.Additionally,DERMSdeploymentispredicateduponthesesamevendors’roadmaps,whichtheCaliforniaIOUshaveminimalinfluence.SDG&E’spointsolutionvendorforDERMS/microgridproducthaveactuallychangedtheirbusinessmodeltoreflectthelackofarobustmarketforDERMSsoftware.SDG&EbelievesthattheCommissionshouldprovideclarityontheroleofDERSinhelpingtoachieveStatepolicygoals.ThisclaritywillprovidethenecessaryguidanceforSDG&EtoeffectivelyimplementitsDistributedEnergyResourceManagementSystem(DERMS)towardthosegoals.ThisclaritywillalsoprovideguidanceontherolesandresponsibilitiesofDERmarketparticipants.Inallcases,SDG&EbelievesthattheCommissionshouldmandateend-to-endtestingproceduresforsmartinvertercommunicationsandfunctionality,suchthatanyinterconnectedsystemdeliversasexpectedforthebenefitofconsumersandforoverallgridreliability.

Proposal27-c.Non-consensusConvenetheSmartInverterWorkingGrouptorefinetechnicalspecificationsfortheSetActivePowerModefunction.

Supportedby: CALSSA,CleanCoalition,GPI,Nuvve,SCEOpposedby: PG&E,SDG&E

ProponentpositionbyCALSSA:

TheSmartInverterWorkingGrouprecommendedthatFunction4(SetActivePowerMode)andFunction7(DynamicReactiveSupport)beincludedinthePhaseIIIfunctions,butduringdiscussionsonimplementingPhaseIIIitwasagreedthattherewasnotsufficienttechnicalspecification.FurtherdevelopmentofthesefunctionshasbeendelayedatleastuntilafterimplementationofIEEE1547-2018.ItisnowclearthatFunction4willlikelybevaluableforenablingcustomerstoprovidecapacityasagridserviceandshouldbereprioritized.

Utilitypositions:

PG&Eseeslimitedusefulnessforthisfunctionuntilthegridseeshigherstoragepenetrationlevels.Also,thisfunctioncannotbeusedeffectivelyuntilPG&E’sexistinggridcontrolsystemsareupgradedwithDERcommunicationandcontrolcapabilities.ForPG&E,the

Page 118: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

116

communicationandcontrolupgradesmaynothappenforafewmoreyearsuntilADMS/DERMSisavailable.

SDG&E:ThesefunctionsareneithercurrentlyneedednoristheSIWGcurrentlyanofficialentityempoweredbytheCPUCtotakeonthesetasks.WhileareconciliationofIEEE1547andRule21needstooccur,thereconciliationshouldoccuroncetheIEEEstandardisapproved.Previously,theSIWGhadagreedtopostponeadditionaladvancedfunctionstoawaitarevisionofIEEE1547,asreflectedinResolutionE-4898.AnyadditionalworkonthesefunctionsshouldwaituntilcompensationissueshavebeenaddressedintheIDERproceeding.Furthermore,thereisnojustificationorvaluetoincrementallymodifythetarifftoincorporateIEEE1547-2018ifthereisnouseforthisfunctionatthistime.Thetechnologyandindustryaretooundevelopedforanyproposedtariffchanges.SDG&Ecansupportthisproposalwithredlinelanguageadded.SDG&EsupportsoneprocessforupdatingRule21toalignwithIEEE1547.1,justlikethetimingofthetariffchangesinProposal27-b.SDG&Ecanonlysupportproposal27-cifthetimingofsuchthatweendupwithasingleprocesstoupdateRule21withUL1741andwhichfunctionsgetincorporatedintoRule21.Itwouldbemoreefficientandprovidecertaintytotheinvertermanufacturerstoonlyhaveoneupdatethatwouldoccur.ThereneedstobetheIEEE1547andIEEE1547.1alignmentofRule21andUL1741teststandardneedstobeupdated.AddingthesetactivepowermodefunctioninconjunctionwiththiscomprehensivereformwillfacilitateasingleupdateofRule21.

Proposal28-a.ConsensusAfterthedecisionontheIDERproceeding,theEnergyDivisionshoulddecideontheneedtoconveneTheSmartInverterWorkingGrouptodetermineifanytechnicalworkisneeded.ProponentpositionbyCALSSA:

TheIssue27proposalcontainsrulesandproceduresfortariffsthatareanticipatedfromtheIDERproceedingatthistime.IfnewtechnicalneedsariseforsmartinverterfunctionsasaresultofIDERtariffdevelopment,theSmartInverterWorkingGroupremainscommittedtobeingavailable.

Utilitypositions:

PG&EsupportstheaboveproposalforSIWGtoevaluatetheneedforadditionaltechnicalworkthatmaybeneededasrequiredbyanyupcomingIDERtariffs,butonlyafterthosetariffsareapproved.SDG&EbelievesthatfutureSmartInverterWorkingGroupmeetingsshouldbepredicatedontheapprovaloftariffsintheIDERproceedingifitisdeterminedthatanytechnicalworkisneeded.Additionally,aregulatorypathwayforimplementationofanySIWGworkmustbeavailable.

Page 119: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

117

AnnexF:Issue27,FrameworkofOperationalCategoriesforSmartInverterFunctionsTheWorkingGroupandSIWGdevelopedaframeworkofthreeOperationalCategories#1-#3.Thepurposeofthisframeworkwastothinkabouthowusecasescanfallintodifferentoperationalcategories,andtonotethattherearesomefunctionsstilltobedeveloped.Changestosmartinverterdefaultsettingscanbeconsideredwithinthisframework.PartiesrecognizedthatchangestodefaultsettingsforOperationalCategories#2and#3canbemadewithmutualagreement,providedthemodificationisevaluatedtoensurethatsafetyandreliabilityrequirementsarenotcompromisedandifthemodificationdoesnotnegativelyaffecttheinterconnectionrequirementsprovidedunderOperationalCategory#1oranypreviouslyimplementedOperationalCategory#2and#3requirements.OperationalCategory#1(DefaultOperations;MaintenanceofRule21Requirements).SmartinverteroperationalrequirementsshouldbetomaintainrequiredRule21defaultoperationalparametersunlessalternateparametersareapproved.ThemostimportantprincipleisthatsmartinverteroperationsmustcomplywiththesafetyandreliabilityrequirementssetforthinRule21.Aslongassafetyandreliabilityrequirementsaremet,thentheexpandeduseofsmartinvertercapabilitiestoprovideavarietyofinterconnectionandgridservicesmaybeallowed.ThesearetheOperationalCategory#1requirements:

a. Anti-Islandingactivatedb. Low/HighVoltageRideThroughactivatedwithdefaultsettingsc. Low/HighFrequencyRideThroughactivatedwithdefaultsettingsd. DynamicVolt/VarOperationsactivatedwithdefaultvolt/varsettingse. RampRatesactivatedwithdefaultnormalsettingsf. FixedPowerFactordeactivatedg. Reconnectby“soft-start”activatedwithdefaultsettingsh. Frequency/Wattactivatedwithdefaultfrequency/wattsettingsi. Volt/Wattactivatedwithdefaultvolt/wattsettings

OperationalCategory#2(InterconnectionUseCases).ModificationofdefaultOperationalCategory#1settingstosupportanInterconnectionUseCaseattheinterconnectioncustomer'srequestforpurposesofavoidingtheneedforgridupgrades.ThedefaultOperationalCategory#1settingcanbemodifiedtomeettheneedsoftheOperationalCategory#2usecase.ThemodificationofthedefaultOperationalCategory#1settingsmustbeevaluatedtoensurethatsafetyandreliabilityrequirementsarenotcompromised.Fornewdistributedenergyresources(DERs)withsmartinvertersthathavenotreceivedpermissiontooperate,alternativedefaultsettings:(1)maybeevaluatedasrequestedwithintheDERInterconnectionRequest;and/or(2)alternativesmartinverterfunctionsorsettingscanbespecifiedbytheutilitytomitigateDERimpactstothegrid;and/or(3)alternativesettingscouldbeagreedtobymutualconsentforanyreason.

Page 120: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

118

Forexistinginverter-basedDERswithpermissiontooperate,toallowthesmartinverterthecapabilitytoprovideservicesbymodifyingthesmartinverterdefaultsettings,changestothesmartinvertershouldbeconsideredasproposedbelowbasedontheOperationalCategory(i.e.,interconnectionorgridservices).

a. UtilizealternativesetpointsfortheVolt/Varcurveb. ActivatetheFixedPowerFactorfunctionataspecificpowerfactorinlieuoftheVolt/Var

functionc. UtilizealternativeparametersfortheVolt/Wattfunctiond. LimitsmartinverteroutputatgivenstaticvalueusingsmartinverterPhaseIIIFunction3

(fixedoutput,shorttermapplicationvision)e. LimitsmartinverteroutputdynamicallyusingPhaseIIIFunction3whenDERandutility

communicationsystemshavebeendevelopedandactivatedthroughutilityDERMSsystems(longtermapplicationvision)

OperationalCategory#3(GridServices).Whenacustomerrequestsalternatesettingsforagridserviceusecase,theDistributionProviderwillreviewproposedsettingstoensurethatthemodificationstotheSmartInverterdefaultsettingsdonotnegativelyaffecttheinterconnectionrequirementsprovidedunderOperationalCategory#1oranypreviouslyimplementedOperationalCategory#2requirements.AdditionalfunctionalitymaybedevelopedandactivatedtomorefullyachievethevisionofutilizingsmartinvertersforOperationalCategories#2and#3functionality.TheSmartInverterWorkingGroupcanbethevenueforthesediscussionswithdiscussioncommencingaftertheWorkingGroupThreefinaldecisionhasbeenissued.Theseadditionalfunctionsincludethefollowing:

a. IEEE1547ConstantReactivePowershouldbeadoptedandavailableforactivationinRule21

whentheCommissionincorporatestheupdatedIEEE1547standardintoRule21.ThisfunctionwillallowSmartInverterstoprovidereactivepowercapacity.WhilethecurrentcapabilitiesofSmartInvertershavefunctionstoprovidereactivepower,namelythevolt/varandfixedpowerfactor,thevolt/varandfixedpowerfactorfunctions,thesefunctionsaremostappropriateforOperationalCategory#1applications.ConstantReactivePowermorecloselymatchesthereactivepowersupportprovidedbycapacitorbanksandwouldbeabetterfitfortheConstantVoltageBoostusecaseinAnnexG.

b. TheSIWGmaychoosetoconsidertheWatt/Varfunction,developedunderIEEE1547-2018,foractivationinRule21whenitconsidersincorporationofthebroaderIEEE1547standard.Thisfunctionmaybeabletoprovideadditionalvoltagecontrolcapabilities.ThiswillgiveCaliforniastakeholdersanopportunitytodebatethefunctionsinaCaliforniacontext.

c. PhaseIIIFunction#4(SetRealPowerMode)orequivalentshouldbedevelopedandbe

availableforactivationfortheCapacityusecaseinAnnexG,whichmaybethemostnear-termandimportantgrid-servicesusecase.WhilearecentCommissionresolution,ResolutionE-4898,hasdirectedFunction#4tobedevelopedaspartoffuturenationalstandards,itmaybepossibletodevelopthisfunctionearlierthanthecurrentschedule.

Page 121: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

119

AnnexG:Issue27,UseCasesandPartyCommentsonUseCasesTheWorkingGroupisnotrecommendinganyCommissionactiontoapprovespecificusecasesforsmartinverterfunctionsinthisproceeding.ThefollowingusecasesareincludedinthisreporttoindicatepotentialusecasesidentifiedbystakeholdersthattheCommissionmaywishtoconsiderforfurtherdevelopment.InterconnectionUseCases:

a) ScheduledPowerReduction–Toaddressthermalhostingcapacityconstraintsduringcertainhoursoftheyear,acustomercanschedulereducedpoweroutputduringthosehours.Themaximumoutputvalueswillbeintheinterconnectionagreement.o Function3(LimitMaximumActivePower)andpotentiallyFunction2(Curtailment)o Function8(Scheduling)

b) DynamicPowerReduction–Toaddressthermalhostingcapacityconstraintsasthey

approachlevelsofconcern,theutilitycansendacommandtoreducepoweroutputduringthosetimes.Curtailmentpermissionandannuallimitationsonamountofcurtailmentwillbeintheinterconnectionagreement.o Function3(LimitMaximumActivePower)andpotentiallyFunction2(Curtailment)o Function8(Scheduling)o Real-timecommunicationsmustbeenabledo RequiresutilityDERMS

c) ScheduledVoltageCorrection–Toaddressvoltagehostingcapacityconstraintsduring

certainhoursoftheyear,acustomercanscheduleincreasedreactivepowerproductionorabsorptionduringthosetimes.o AlternativesettingsforVolt-VarandVolt-Watto PotentiallyenablingtheFixedPowerFactorfunctiono PotentiallywithWatt-Var

d) DynamicVoltageCorrection–Toaddressvoltagehostingcapacityconstraintsasthey

approachlevelsofconcern,theutilitycansendacommandtoincreaseproductionorabsorptionofreactivepowerduringthosetimes.AuthorizationtochangetheVolt-VarandVolt-Wattsettingsandannuallimitationsonthenumberofeventswillbeintheinterconnectionagreement.o AlternativesettingsforVolt-VarandVolt-Watto PotentiallyenablingtheFixedPowerFactorfunctiono PotentiallywithWatt-Varo Real-timecommunicationsmustbeenabledo RequiresutilityDERMS

e) OperationalFlexibility–Inalocationthatisconstrainedbyoperationalflexibility,acustomer

canagreetoreduceorcurtailpowerduringsystemmaintenanceorgridoutagesthatinvolvethesystemreconfigurationthatcausedtheoperationalflexibilityconstraint.Therangeof

Page 122: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

120

adjustabilityandlimitsonthenumberofeventswillbedeterminedbymutualconsentandincludedintheinterconnectionagreement.o Function3andpotentiallyFunction2o Real-timecommunicationsmustbeenabledo RequiresutilityDERMS

GridServicesUseCases

f) Capacity–Coordinateddispatchableorscheduledelectricityproductioninaccordancewithsolicitationrequirementsorgridservicetariffrules.Thiswillmostlybethedischargeofstoredenergy.Customeragreestodeliverabilityobligation.Communicationsmustbeenabled,whichmaybelessthanreal-timeifthedischargeisscheduledaheadoftime.o ReliabilitywillbegreatlyincreasedwithFunction4.

g) ConstantVoltageBoost–Increasevoltagethathasbecomeloweralongafeederdueto

distancefromasubstationandtheexistenceofmachineloads.Thisisachievedwithconstantorperiodicproductionofreactivepower.o RequirestheConstantReactivePowerfunctiondevelopedunderIEEE1547-2018.o CanbescheduledwithFunction8.

h) VoltageReduction–Reducevoltageinlocationsthathaveregularoccurrencesofhigh

voltageduetoreasonsbeyondthespecificcustomersite.o AlternativesettingsforVolt-VarandVolt-Watt.

Proponentcommentsonusecases:

CALSSA:Becausesolarsystemscancauseanincreaseinvoltageonthegridnearthepointofinterconnection,utilitieshaveoftenrequiredgridupgradestoaddresspotentialvoltageproblemscausedbyanewgeneratingfacility.OnebasicusecaseforsmartinverterfunctionswouldbeadjustmentofthesettingsofVolt-VarandVolt-Wattifthedefaultsettingsarenotsufficienttocounteracttheimpactsthatanewgeneratingfacilityisexpectedtocause.However,sincetheactivationofVolt-VarwithreactivepowerpriorityandVolt-Watt,itappearsthatthedefaultsettingsforthosefunctionsaresufficienttoaddressvoltageconcerns.Ifthisisnotthecaseforsomecustomers,utilitiesshouldconsideralternatesettingstoavoidtheneedformitigations.Ifitcontinuestobethecaseforallcustomers,theCommissioncanfocusitsattentiononthemoreadvancedusecasesbelow.

Utilitycommentsonusecases:

SCEresponsetothevoltage-relatedusecases(c),(d),(g)and(h):

Inregardstovoltagecontrolusecasesc),SCEpointsoutundervoltageorovervoltageconditionsthataredrivenbyabnormalconditionsaregenerallysevere,suchthatonlyequipmentdesignedtoregulatevoltage(VoltageRegulators,Loadtapchangers)aretheappropriatemeanstoregulatevoltage.Whileabsorbingreactivepowercan

Page 123: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

121

haveasideeffectofslightreductionofvoltage(duetovoltagedropcausedbyincreasereactiveloadingontheline)orinjectingreactivepowercanhaveaslightsideeffectofvoltagerise,theseslightincreasesordecreasesaregenerallyafew%(0.5%-3%)dependingonthelocationoftheDERS,thelevelofreactivepowertheDERScaninject/absorbedandstrengthofthelocalgridandDERsettings.Further,itshouldbeaccountedthatDERsarerequiredintheinterconnectionagreementtohavearangeofoperation+/-.9PFtomitigatetheissuesthatarecreatedbytheDERsandthusanyadditionalreactivepowersupportwouldhavetobebehindwhatisrequiredtheinterconnectionrequirements.Inmostcases,itisthepresenceofDERswhichmaythehighvoltageissues.Forexample,ifthesystemisconfiguredinawaythattheDERsarefarawayfromthesubstation,thenbecauseoftheirlocation,DERswouldnowbemorepronetocreatehighvoltageissues.Additionally,areactivepower(VARs)source(suchadditionalcapacitorbanks)mustbeavailabletoprovidereactivepowertotheinverters(Inverterdonotlowervoltage,theyrelyonvoltagedropcausedthereactivepowerflowonthegridlowlower/increasevoltage).Incasesofreactivepowerinjection,sufficientreactivepowerloadmustalsobeavailabletomaintainthelocalgridatanearunitypowerfactorotherwisereactivepowerwouldhavetoflowfromthedistributionsystemtowardsthetransmissionsystemwhichanon-desirablecondition.Lastly,thevolt/varandPFfunctiondoesnotguaranteethattheinverterwillprovidethereactivesupport.Inthecaseofvolt/var,ifthelocalvoltageiswithinthedead-band,thentheinverterwilloperateatunitypowerfactorandwillnotprovidereactivepowersupport.InthecaseofPFcontrol,iftheinverterisnotproducingrealpower,thenitwillnotproducereactivepowerasPFisafunctionofrealpowerproductioninthismode.FuturefunctionsunderIEEEmayprovideadditionalcapability(suchastheConstantReactivePowerMode)butuntilthoseareadoptedandimplementedinR21,theymaynotbeavailableforuse.Forallthereasonsabove,Volt/varandPFfunctionsarenotanappropriatefunctiontosupportvoltagesupportasindicatedbytheproponent.

SCEprovidedsixusecases,alongwithtechnicalrequirementsanddiscussions,initsproposalsduringtheWorkingGroupthataresimilartotheeightproposedabove.ThesixusecasesproposedbySCEarereactivepowercapacity,realpowercapacity,highvoltagecontrol,lowvoltagecontrol,interconnection/overload,andinterconnection/overvoltage.PG&Ewouldliketoclarifythatwhiletheseinterconnectionusecasesmaybepossibleinthefuture,PG&E’sexistingtechnologycannotsupporttheseusecasesatthepresenttime.

Forexample,therangeofactualday-to-dayvariabilityofsystemconditionshasnotbeentestedforsuchanoperationalapplicationoftheIntegrationCapacityAnalysis(ICA)tool.ThegeographicalandtemporalalignmentofICAtospecificgeneratorshasnotbeenfullycharacterizedorquantified.Itisthustooearlyinthetechnology

Page 124: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

122

developmentcycleofactiveDERmanagementtorelyonICA.Actualfieldtestingisneededtodemonstratemethodsfordevelopingsafe,reliable,andusablegeneratorconstraintsthatstanduptothedynamicrealityofthepowersystem.Forthedynamiccontrolusecases,PG&EwouldalsoneedaDERMSand/orADMStocoordinateDERconstraintswithfeederconditionsandtoaccountforabnormally-switchedfeederstates.Examplesystems/requirementsthatdonotexisttodayinclude:

• Utilitydatabasetostore,retrieve,andcommunicatethenewcomplexityofgeneratorinformationdefiningaconstrainedgenerationprofile

• DERSmartInverterheadendtoexchangeinformationwithsmartinvertersatacompleteoperationalscale,i.e.allgeneratorsqualifyingforsuchasolution

• Reliableandcyber-secureend-to-endcommunicationsystems,betheyprovidedbyinterconnectioncustomers,aggregators,orutilities

• Utilitysystemstocompareandvalidateprofilesforspecificgenerationfacilitiesbytwo-waycommunicationwiththeactualsmartinvertersorsitecontrollertovalidatesettingsandconstraintprofileconfiguration,bothupfrontandanon-goingbasis

• Adequatemonitoring(i.e.telemetryonanadequatelyresponsivetimescale)forutilitysystemstodetectexcursionsfromoperatingprofilesandalertgridoperatorsasneeded

Formoredetailrelatedtotechnologyrequirementstoenabledynamicoperationalconstraintsforinterconnection,seethefollowingcommentsfiledFeb1st,2019:“SurveyResponsesofPacificGasandElectricCompany(U39-E)toQuestionsonWorkingGroupTwoReport.”

PG&Erecommendsthefollowingpointsbeconsideredasgeneralpre-requisitesforenablementoftheSmartInverterusecasessuggestedbySCE:

• ThePhase2communicationcapabilitydeadlineneedstobeshiftedoutperIOUrecommendationsinresponsetotheCALSSAPFM

o TestingstandardsforSmartInvertercommunicationsshouldbeupdatedandalignedwithIEEE1547.1,afterthe1547.1revisionisissuedbyIEEE.

• TheutilitiesshouldupdatetheirSmartInverterimplementationplanstoreflectincorporationoftheIEEE1547.1standardupdates,oncetheIEEE1547.1standardrevisionisissued.

PG&E:Toenablegridservicesusecases,achangetoSmartInvertersettingswouldberequired.Suchachangetosettingswouldbeamaterialmodificationsinceitwouldberelieduponforpropergridoperation.IfapprovedbytheDistributionPlanningengineer,itwouldneedtobememorializedintheInterconnectionAgreementasanoperatingparameter.ThematerialmodificationprocesswillbeimplementedaspartoftheWorkingGroup1ProposedDecision.

Page 125: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

123

PG&EsaysthatpriortoincorporatingadditionalIEEE1547functionsConstantRealPowerandWatt/VARintoRule21,thesefunctionsshouldbeevaluatedthroughmodeling,labandfield-testingbytheutilitiestodetermineiftheyaretrulynecessaryandaddvaluerelativetothealready-definedRule21SIfunctions.Ifimplementation/modificationofRule21iswarrantedperthisevaluation,theapplicableinvertercertificationandtestingstandardssuchasUL1741SAshouldbeupdatedtocertifythesenewfunctionsviaaNRTL.PG&Ealsoelaboratesonfurtherneeds:

• AdditionalDERMSdemonstrationworkisneededbytheIOUs(PG&EDERMS2.0project,whichiscurrentlyonholdduetoworkreprioritizationactivitiesfollowingthe2017and2018wildfireseasons).ExampleusecasesthatcouldbepursuedthroughadditionalDERMSdemonstrationworkinclude:

o Constrainedgenerationprofileusecase(i.e.alternativeinterconnectionmitigation)

o Cybersecuritystandarddevelopment/demonstrationofend-to-endcybersecuritytestingandimplementation

o MeasurementandverificationofDERs’abilitytoprovideadistributiongridservicebeyondsimplymitigatingtheadverseimpactsofhighDERpenetration

• GridModernizationeffortsshouldbeallowedtoproceed(PG&EIntegratedGridPlatformeffort).

• AdditionaleconomicmodelingisneededtodeterminethegridvalueofDERstoprovidegridservices.24

SDG&EconcurswithPG&E’scommentsabove.Furthermore,SDG&Eisingeneralconcurrencewiththecharacterizationofthesixusecasesandnotestheprematurenatureoftheseusecasestoday.InorderfortheSCE-identifiedusecasestobeimplemented,thePhaseIIcommunicationsneedtoexistandbeactivated,PhaseIIIFunctions1and8needtobeactivated,aDERMSneedstobeavailableandbeusedtomanageDER,andtheIOUsmusthaveidentifiedapplicableneedsforDERandsmartinverterservices.Atthetimeofinterconnection,defaultsettingcanbeprovidedtotheinvertersaspartoftheinterconnectionreviewprocess.Changesinthesettingswillrequireprocessesandprocedures,andcommunicationsinplace.AnynewfunctionstobedevelopedandimplementedshouldwaitforthenextrevisionofIEEE1547.ThiswillavoidtheincrementalupdatestoRule21andtherecertificationofinvertermodels.ThisisconsistentwithCALSSA’sargumentswhentheCommissionsoughttoimplementthePhase2andPhase3smartinverterfunctionality.Modifyinginverterset-pointswillrequirecommunicationsthattodayarenotavailable.Furthermore,bytheendof2019,allSDG&Eresidentialcustomerswillbedefaultedontoaresidentialtime-of-use(TOU)rate,andtheimpactofimplementingthisTOUrateoncircuitloadingisunclear.

24SeePG&ESmartInverterModelingReportforanexampleofeconomicanalysisneeded:https://www.pge.com/pge_global/common/pdfs/about-pge/environment/what-we-are-doing/electric-program-investment-charge/PGE-EPIC-Project-2.03A_Modeling-Report.pdf

Page 126: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

124

Still,SDG&Ebelievesthat,beforeanycommunications-relatedusecasescanbeachieved,thefollowingroadmapwillneedtotakeplaceonasystem-widebasis:

• IOUdevelopscommunicationsinfrastructuretocommunicatewithbothinverters,energymanagementsystems,andaggregators.

• IOUdevelopsrequiredDERMScapabilitiesforPhaseIIcommunicationsandPhaseIIIFunctions1and8additionalsmartinverterrequirements.

• AllpartiesestablishandimplementcommunicationsapplicationsthatcomplywithRule21forintegratinginverters,EMS,andaggregatorswithDERMS.

• IOUupdatesinterconnectionportalstocollectnecessarycommunicationsinformationfornewlyconnectedsmartinverters.

• Standardsbodiesapproveanyapplicablenationalstandardsforsmartinverters(functionalityandcommunications).

• NationallyRecognizedTestingLaboratories(NRTL)establishend-to-endtestenvironmentforsmartinvertercommunicationsbasedonnationalstandards.

• IOUsobtainapprovalfromCPUCthroughthegeneralratecase(GRC)processtoimplementDERMSandcommunicationsnetworksforsmartinverters.

• Developcompensationmechanismsbasedonoutcomeofotherproceedings(e.g.IDER,DRP,NEM).

• Developapplicablecontracts.

Page 127: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

125

IssuesAandBIssueA:Whatchangesareneededtoclarifytheparametersforapprovalofsystemdesigntoachievenon-exportandlimitedexport?IssueB:Howshouldutilitiestreatgeneratingcapacityforbehindthemeterpairedsolarandstoragesystemsthatarenotcertifiednon-export?PROPOSALSUMMARIESThetwoissuesAandBareinterrelatedandtheproposalsaddressthemjointly.ProposalA-B#1.ConsensusGeneratingfacilitiesthatmeetthefollowingfivespecificationswillbetreatedasnon-exportorlimitedexportininterconnectionreview:(1)theGeneratingFacilityusesapowercontrolsystem(PCS)thatpassedtestinginconformancewiththeUnderwritersLaboratoryPowerControlSystemsCertificationRequirementsDecision(ULCRD);(2)thecontrolsystemhasanopen-loopresponsetimeofnomorethan2secondsasprovidedinthecontrolsystemsspecificationdata-sheets,andthePCSisrequiredtoreduceexportpowertotheapprovedexportlimitwithin2secondsofexceedingtheapprovedexportlimit;(3)theGeneratingFacilitymustutilizeonlyUL1741certifiedand/orUL1741SAlistedgrid-supportnon-islandinginverters;(4)theGeneratingFacilitycontrolissettozero-exportorsomenon-zerocontrolledmaximumexportvalue;and(5)theGeneratingFacilityisrequiredtomaintainvoltagefluctuationstothelimitsspecifiedinRule2.Inaddition,updateRule21languagetoincludetheuseofaPCSfornon-exportandlimitedexportinterconnectionapplications.ProposalA-B#2.ConsensusGeneratingfacilitiesthatmeetthefollowingsixspecificationswillbetreatedasinadvertentexportininterconnectionreview:(1)theGeneratingFacilityusesapowercontrolsystem(PCS)thatpassedtestinginconformancewithULCRD;(2)thecontrolsystemhasanopen-loopresponsetimeofnomorethan10secondsasprovidedinthecontrolsystemsspecificationdata-sheets,andthePCSisrequiredtoreduceexportpowertotheapprovedexportlimitwithin10secondsofexceedingtheapprovedexportlimit;(3)theGeneratingFacilitymustutilizeonlyUL1741certifiedand/orUL1741SAlistedgrid-supportnon-islandinginverters;(4)theGeneratingFacilitycontrolissettozero-exportorsomenon-zerocontrolledmaximumexportvalue;(5)theGeneratingFacilityisrequiredtomaintainvoltagefluctuationstothelimitsspecifiedinRule2;and(6)theGeneratingFacilityinstallednameplatecapacityisequaltoorlessthan1000kVA.Inaddition,updateRule21languagetoincludetheuseofaPCSfornon-exportandlimited-exportinterconnectionapplications.

Page 128: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

126

ProposalA-B#3.Non-consensusAninverterapprovedfornon-exportandlimited-exportcanbesetusingdifferentmaximumexportvaluesettingsatdifferenttimesoftheyear,ifitqualifiesunderProposalA-B#1(responsetimelessthan2seconds)orProposalA-B#2(responsetimebetween2-10seconds),andatthediscretionoftheutilityuntilafutureschedulingstandardisreleased.

Supportedby:CALSSA,CleanCoalition,GPI,IREC,Nuvve,TeslaOpposedby: PG&E,SCE,SDG&E

ProposalA-B#4.ConsensusForSCEcustomersonly,beginning6monthsaftertheapprovaloftheAdviceLetterimplementingthefinaldecisiononWorkingGroupThree,customersapplyingforinterconnectionwithaPCSmustuseaPCSalreadyontheapprovedlist.Interconnectionapplicationformsaretobeupdatedwithnewrequiredfieldsincludingcontrolinformationandlimitedexportsetting.BACKGROUNDBackgroundonIssueAforNon-ExportInterconnectioncustomerscanhavegoodreasonsforchoosingnon-exportsystems.Forexample,theymayachievegreaterbillsavingsbyusingon-siteenergydirectlytopoweron-siteload.Or,ifthesystemincludesstorage,customerscanbenefitfromtime-of-useperiodsandrates,andstoreon-sitegenerationand/orpowerpurchasedduringperiodsoflowrates,foruseduringperiodswithhigherrates.Non-exportstrategiescanalsoavoidrelianceonnetenergymeteringcreditsthatarelowerthanretailratesduetonon-bypassablecharges.Insomecircumstances,non-exportsystemscouldenableacustomertochoosetointerconnectwithinexistinggridcapacityandnotincurthecostordelayofdistributionsystemupgrades,atalocationwhereinterconnectionofanexportingsystemmightotherwiserequiredistributionsystemupgrades.However,eventhoughacustomermaychoosetooperateasnon-export,utilitiesmustdeterminewhetherasystemhasthepotentialtoexportand,ifso,utilitiesmustdeterminethemagnitudeofpotentialsafetyandreliabilityimpactstothegrid.Rule21containsprovisionstohandlesuchdeterminations,suchasSectionNandSectionG.i,inrecognitionthatsystemsthatdonotexportpowerhavedifferentgridimpactsthanfullexportprojects.OthersectionsofRule21,suchasSectionsMandMm,coversituationsinwhichgeneratingfacilitiesmayinadvertentlyexport,whichevenifinfrequentandforshortdurations,mayhavehighpotentialsafetyandreliabilityimpactsonthegrid.

Page 129: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

127

Currently,Rule21identifiesfourOptionsbywhichaprojectmayqualifyasanon-exportingsystemandtwoOptionsbywhichaprojectmayqualifyasinadvertentexport(seeSectionG.1.i).Rule21doesnot,atthistime,explicitlyrecognizetheconceptoflimitedexport.

Non-Exporting:• Option1.ReversePowerRelay• Option2.MinimumPowerRelay(ContinuousImport)• Option3.CertifiedNon-IslandingProtection(SmallSystemComparedtoService)• Option4.RelativeGeneratingFacilityRating(SmallSystemComparedtoLoad)

InadvertentExport:

• Option5.InadvertentExport(SectionM)• Option6.InadvertentExport(SectionMm)–DesignedforsmallUL1741SAinverter-

basedgeneratingfacilitiesCustomerswhochooseOption1arerequiredtoinstallarelaywhichcausestheGeneratingFacilitytodisconnectiftherelaysensesreversepower(0.1%oftransformerrating)foratimegreaterthan2seconds.ItshouldbenotedthatcustomerswhooperatetheirgenerationsystemunderOption1wouldnotbeexpectedtooperateinsuchamannerthattheirrelayistrippedonafrequentbasis,asituationwhichmightcausetheutilitytodisconnectthegeneratingfacility,andposeotheroperationsissues.Thus,therelayusedforthisapplicationisconsideredtobeasafetybackupandnotpartofnormaloperation.Ifacustomerinstallsaphysicalnon-exportrelayitisrelativelysimplefortheutilitytovalidatethatthesystemwillnotexport.However,non-exportrelayscanbeprohibitivelyexpensive.Inaddition,proponentsIRECandCALSSAarguethatifaPCSiscapableofprovidingthesamefunctionality,thenanyadditionalcostforarelayisunnecessaryregardlessofwhetheritis“affordable.”IRECandCALSSAciteanexamplerelaycostof$60,000forasitewith1MWPVand500kWenergystorage,andassertthatifthecombinedinverternameplateofthesystemislessthan750kW,aphysicalrelayislikelytobeunaffordable.Theotheravailablenon-exportingoptionsarechallengingorimpracticalforavarietyofdifferenttypesofprojectsandapplications.TheULPowerControlSystemsCRD(ULCRD)testprotocolwasrecentlyapprovedandprovidesawayforinvertersandpowercontrolsystemstobetestedandqualifiedfornon-exportandlimitedexport.TheprotocolisaULCertificationRequirementsDecisiondevelopedtosupport2020NationalElectricalCodeSection705.13andtocreateaframeworkforlimitedexportsystems.25ItisanaddendumtoUL1741.ApowercontrolsystemcertifiedtotheULCRDallowsadevicetodemonstratethatitiscapableofpreventingorlimitingexport,withinatime-delayofupto30seconds.Thedocumentedtestresultsofthepowercontrolsystemwillidentifythe

25ThelanguageoftheCRDisdownloadablefreeofchargeathttps://www.shopulstandards.com/ProductDetail.aspx?UniqueKey=35560.Thisversionisthefinalproposalthatwaslaterapproved.

Page 130: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

128

responsetime-delayofthesystem.PartiesagreedthattheULCRDmaybeusedtotestpowercontrolsystemsintheinterim,untilsuchtimeasULincorporatesthetestprotocolsintotheunderlyingUL1741standard.TobecompliantwiththeULCRD,aninverterorgeneratingfacilitypowercontrolsystemmust,amongotherrequirements,respondtochangesincurrentatareferencepoint(suchasthePCC)andincludethatfunctionalityinitsconfigurationfileorotherwisehaveitembeddedinanon-volatilefile.TheULCRDstandardrequiresthatparameters,oncesetbytheinstalleratthetimeofinstallation,canonlybechangedbycontactingtheinverterorpowercontrolsystemmanufacturer,andcannotbechangedbythecustomerortheinstaller.

TechnicalInsert1:PhysicalNon-ExportRelaysandULCRDDevicesProposalsA-B#1andA-B#2accepttheuseoftheULCRDstandardfornon-exportandlimited-exportpowercontrolsystems(“ULCRDdevices”)inplaceofaphysicalnon-exportrelay,undertheconditionsspecifiedintheproposalstoensuresafetyandreliability.However,therearestilldifferencesbetweennon-exportrelaysandULCRDdevices.AULCRDdevicemeasuresasingleparameter(currentflow)atagivenpointofreference(suchasatthePCC)andrespondsbasedonthatsinglemeasurement.Arelayalsomeasuresthisparameter,butcanalsomeasure,amongotherthings,systemfrequency,voltageandphaserotation—measurementswhichcanbeusedtosatisfyotherinterconnectionprotectionrequirements.Ifsomeoftheseothermeasurementsarerequiredforsafeinterconnectiontothegrid,aULCRDdevicewouldnotbesufficientbyitself.Arelayisabackstoptopowercontrolsystems.Itonlyactsinunexpectedcircumstances,whengeneratingfacilitycontrolsdeviatefromnormal.AULCRDdevice,incontrast,mayoperatemuchmorefrequently,orevencontinuously,toregulatesystemoutputundernormalconditions.Afurtherdifferenceisthelevelofhistoricalutilityexperience.Relayshavebeenusedformanydecades,whileverylittleexperienceyetexistswithcontrolsystemsapprovedundertheULCRD.Whilepowercontrolsystemshavebeenusedhistorically,theyhavenotbeenrelieduponhistoricallyinthesamewaythatULCRDdeviceswithoutaphysicalnon-exportrelayarenowbeingreliedupon.ManufacturersandNationalRecognizedTestingLaboratories(NRTLs)arecurrentlyintheprocessofdevelopingcapabilitiestotestpowercontrolsystemsundertheULCRD,soutilitieshavestillnotseentheresultsofthattesting.

Page 131: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

129

TechnicalInsert2:InadvertentExportandOpen-LoopSurveyResponseTimeTheexampleofaload-followinggeneratingfacilitywithbothsolarandstoragecanillustratetheconceptsofopen-loopresponsetimeandinadvertentexport.Whenloadincreases,thestoragesystemdischargestomeetthatload.Whentheloaddecreases,thesystemreducesoutputorstopsdischargingbutwillinadvertentlyexporttothegridforaperiodoftimetotheextentthatinstantaneousgenerationexceedsinstantaneousload.Thistimeperiodisreferredtoastheopenloopresponsetimeofthecontrolsystem.Whenloadreducesquickly,powermaybeinadvertentlyexportedtothegridduringthetimeittakesforthesystemtosensetheloadreductionandtellthebatterytostopdischarging.IfasystemhasbeentestedandcertifiedundertheULCRDforlimitedexport,thegeneratingfacilitycanexportpoweruptonameplatecapacityuntilthecontrolsystemmakesacorrectionwithinitscertifiedopen-loopresponsetime.Utilitiesmustaccountforthisinadvertentexportwhilealsorecognizingthatitisshort-livedandnon-coincidentalamongcustomersonacircuitsegmentbecausetheloadofneighboringcustomersdoesnotgoupanddowninunison.Further,itshouldbenotedthatthesecontrolsystemsdonotlimitthenumberofexportoccurrences,andtheinstancesofexportarebasedonthecustomer’soperatingcharacteristics.Customerswhohaveverycyclicloadswillundergoinadvertentexportmanytimes,whilecustomerswhohaverelativesteadyloadpatternwillhaveveryfewinstancesofinadvertentexport.BackgroundonIssueAforLimitedExportAlimitedexportsystemisonethatisdesignedandsettolimitthelevelofexporttosomespecifiedamountlessthanthenameplatecapacity.AULCRDpowercontrolsystem(PCS)canalsoprovidelimitedexportinadditiontonon-export,dependingonitssettings.APCSwillalsolimitexporttoavaluebelownameplatecapacityandwithinsometimeintervalcharacteristicofthatspecificdevice,suchaslessthan2seconds,lessthan10seconds,orlessthan30seconds.TheULCRDstandarddoesnotprovidetherecommendedsettingsforagivenapplication,however.TheutilityandcustomerneedtoagreeonthesettingsforeachapplicationtoensurethePCSwillperformproperlyforthegivenapplication.ThereisnotcurrentlyanyprovisioninRule21thatrecognizestheconceptoflimitedexportexplicitly,thoughnothingpreventsaprojectfromlimitingexport.Projectsmaychoosetolimittheirexportsforvariouseconomicandtechnicalreasons.IftheproposalforIssue9aspartofWorkingGroupTwoisadopted,aformalrecognitionoflimitedexportcapabilitywillbeneeded.Exportingsystemsarecommonlydesignedandoperatedinwaysthatdonotallowthefullcapacitytobeexportedtothegrid.Inordertostudylimitedexportprojectsdifferently(i.e.tonotassumefullexport),forgridreliabilityandforthesafetyofutilitycustomersandemployees,utilitiesneedassurancesthatintendedlimitswillnotbeexceeded.Technicalevaluationmust

Page 132: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

130

accountforthePCSresponsetime(seeBox2).AndtheoperatingprofilemustbelimitedbysystemconstraintsthatcanonlybechangedasprovidedintheULCRDstandard.BackgroundonIssueBCurrently,asystemthatdoesnotqualifyfornon-exportgetsstudiedininterconnectionreviewusingthemaximumnameplaterating.UntiltherecentapprovaloftheULCRD,nostandardsexistedgoverningthecontrolofpoweroutputfornon-exportorlimited-exportcasesforinvertersandpowercontrolsystems.“Maximumnameplaterating”isinterpreteddifferentlyindifferentsituationsandbydifferentutilities.ForAC-coupledsolar-plus-storagesystems,PG&EandSCEequatethemaximumnameplateratingofthecombinedsystemwiththesumoftheindividualnameplateratingsofthesolar-connected-inverterandthestorage-connected-inverter.SDG&E’spracticesdiffer,asSDG&Eonlyconsidersthesolar(inverter)nameplate,andnotthestoragedevicenameplate.ForDC-coupledsystems,thenameplateratingisjustthatoftheinverter.ProponentsCALSSAandIRECcallthe“nameplateplusnameplate”methodologyunrealistic,becauseitassumesthatthesolarsystemisgeneratingatfullcapacityandthebatteryisdischargingatfullcapacityeverydaytimehouroftheyear.CALSSAandIRECrecognize,however,thatintheabsenceofanULCRDcertifiedandapprovedpowercontrolsystem,utilitiesoftenchoosetostudyitinthismannerasaworst-casescenario.Morerealistically,customerstypicallyoperatesolarplusstoragesystemstosatisfytheirownloadandminimizetheamountofpowertheyimportfromtheutility,nottointentionallyexportatmaximumlevels.Assumingintechnicalreviewthataprojectwillalwaysbeexportingthefullnameplateplusnameplateamount(forAC-coupledsystems)couldhavesignificantfinancialconsequences.Forexample,assumingnameplate-plus-nameplatemighttriggeradistributionupgraderequirement,whileinactualoperationaccordingtoapprovedsettingsnosuchupgradewouldactuallybeneeded(i.e.,solarandstorageneverconcurrentlyexportatmaximumlevels).Togiveassurancetotheutilitythatasystemwillalwaysoperatewithinsetparametersacustomercanusepowercontrolsthatarecertifiedtoanationalstandard,withanappropriateresponsetimeandwhileinsuringpowerqualityforothercustomersisnotnegativelyaffected.

Page 133: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

131

DISCUSSIONProposalA-B#1.ConsensusGeneratingfacilitiesthatmeetthefollowingfivespecificationswillbetreatedasnon-exportorlimitedexportininterconnectionreview:(1)theGeneratingFacilityusesapowercontrolsystem(PCS)thatpassedtestinginconformancewiththeUnderwritersLaboratoryPowerControlSystemsCertificationRequirementsDecision(ULCRD);(2)thecontrolsystemhasanopen-loopresponsetimeofnomorethan2secondsasprovidedinthecontrolsystemsspecificationdata-sheets,andthePCSisrequiredtoreduceexportpowertotheapprovedexportlimitwithin2secondsofexceedingtheapprovedexportlimit;(3)theGeneratingFacilitymustutilizeonlyUL1741certifiedand/orUL1741SAlistedgrid-supportnon-islandinginverters;(4)theGeneratingFacilitycontrolissettozero-exportorsomenon-zerocontrolledmaximumexportvalue;and(5)theGeneratingFacilityisrequiredtomaintainvoltagefluctuationstothelimitsspecifiedinRule2.Inaddition,updateRule21languagetoincludetheuseofaPCSfornon-exportandlimitedexportinterconnectionapplications.UpdateRule21languagetoincludetheuseofaPCSfornon-exportandlimited-exportapplications:Rule21mustincludeoptionsforallthefollowingconfigurations:non-exportwithrelay(alreadyexistingwithinRule21),non-exportwithPCS,limitedexportwithPCS,andlimitedexportwithrelay.Rule21alreadyhasprovisionsfortheuseofrelaysfornon-exportInterconnectionApplications,sonoupdatestoexistingRule21provisionsarenecessaryforuseofrelaysfornon-export.WhenaGeneratingFacilitymeetsthesixspecificationsinthisproposal,technicalevaluationsshouldfollowthefollowingprocess:I.Non-ExportInterconnectionApplications

1. Apowercontrolsystem(PCS)canbeusedtodemonstratenon-exportoperationunderScreenI.

2. InterconnectionprojectsarenotevaluatedforScreenD.3. Shortcircuitrelatedanalyses(ScreensFandG)arebasedontheGeneratingFacility’s

GrossNameplateRating.II.Limited-ExportInterconnectionApplications

1. ThelimitedexportvalueisusedtodeterminetheimpactstothegridinaccordancewithRule21tariffprocedures.ThelimitedexportvaluewillbeusedinscreensD,I,J,K,M,N,O,andP.Otherscreens,includingA,E,andH,willstillbeappliedasrelevant.

2. Shortcircuitrelatedanalysis(ScreensFandG)arebasedonGeneratingFacility’sNameplaterating.

Page 134: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

132

ProponentpositionbyCALSSA:

Azero-exportsystemusespowercontrolsinlieuofaphysicalnon-exportrelaybutoperatesinanequivalentfashiontoasystemwithaphysicalnon-exportrelay.Rule21currentlyincludesamaximumresponsetimeoftwosecondsforrelays.Ifapowercontrolsystemrespondswithinthesametimeframetheresourceshouldbetreatedthesameasaresourceusingarelay.Also,limitedexportisnodifferent.Ifitwillnotexportbeyondthesetamountformorethantwoseconds,thecontrolledmaximumexportshouldbetreatedasthesystemcapacity.

Utilitypositions:

SDG&Eagreeswiththisproposal,basedontheassumptionthatitonlyappliestocertifiedinverter-basedgenerationdevices.PG&Egivesqualifiedsupporttothisproposal.TheCRDshouldbeabletoreplacetheneedfordiscretedirectionalpowerrelaysandstreamlinetheprocess.Thetwosecondtriptimeisfastenoughtoavoidtheneedforotherrelays.PG&E:TheULCRDdoesprovidepotentialbenefitsifusedproperly.Itprovidesalotofflexibility.So,theULCRDcertifiedPCSmaybetreatedlikeaprogrammabledevicethatneededtobesetappropriatelyforthedesiredapplication.TheguidanceandspecificcertificationforeachapplicationwerenotprovidedintheULCRDitselfdespitePG&Esuggestionstothetaskgroup.TheULCRDtaskgroupwantedtomaketheULCRDmoregeneralforuseinotherjurisdictionsaswell.So,thespecificguidancewaslefttotheutilities.Currently,theULCRDdoesnothavethespecificsettingsforeachapplication.So,PG&EstillneedtoprovideguidancedocumentsintheDIHonhowtosetthecertifiedPCStocomplywiththedifferentapplicationsbeforewecanimplementthisULCRDmethod.PG&EprovidedanalternativewordingofIssueBintheinterestsofclarification.Thisalternativewordingis:“Howshouldutilitiestreatgeneratingcapacityforbehindthemeterpairedsolarandstoragesystemsthatarecertifiednottoexportmorethanapresetvalue?”IfthisalternativewordingbyPG&EcorrectlyinterpretstheintentofIssueB,thenwiththisunderstanding,PG&EproposestousethecertifiedpresetexportvalueinitsloadflowinterconnectionstudiesinsteadofthenameplateratingofthePCS.SincefaultcurrentcontributionisafunctionofthePCSnameplate,andnotthecontrolledexportvalue,thePCSnameplatewillcontinuetobeusedforfaultstudies.

Page 135: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

133

ProposalA-B#2.ConsensusGeneratingfacilitiesthatmeetthefollowingsixspecificationswillbetreatedasinadvertentexportininterconnectionreview:(1)theGeneratingFacilityusesapowercontrolsystem(PCS)thatpassedtestinginconformancewithULCRD;(2)thecontrolsystemhasanopen-loopresponsetimeofnomorethan10secondsasprovidedinthecontrolsystemsspecificationdata-sheets,andthePCSisrequiredtoreduceexportpowertotheapprovedexportlimitwithin10secondsofexceedingtheapprovedexportlimit;(3)theGeneratingFacilitymustutilizeonlyUL1741certifiedand/orUL1741SAlistedgrid-supportnon-islandinginverters;(4)theGeneratingFacilitycontrolissettozero-exportorsomenon-zerocontrolledmaximumexportvalue;(5)theGeneratingFacilityisrequiredtomaintainvoltagefluctuationstothelimitsspecifiedinRule2;and(6)theGeneratingFacilityinstallednameplatecapacityisequaltoorlessthan1000kVA.Inaddition,updateRule21languagetoincludetheuseofaPCSfornon-exportandlimited-exportinterconnectionapplications.UpdateRule21languagetoincludetheuseofaPCSforlimited-exportinterconnectionapplications.ScreenPwillincludeanadditionalnotethattheutilitywillconsider,totheextentfeasible,thecustomer’soperatingprofileandthemagnitude,duration,andfrequencyofanticipatedexport.WhenaGeneratingFacilitymeetsthesixspecificationsinthisproposal,technicalevaluationsshouldfollowthefollowingprocess:

1.ScreensA-Mareappliedusingtheaggregatenameplateinverterrating,ornameplateratingutilizedunderexistingutilitypracticeifdifferent.2.WhenrequiredtoproceedtosupplementalreviewandDistributionSystemupgradesareidentifiedformitigationofthermaland/orvoltagedeviations,theDistributionProviderwillrequestfromthecustomerthegeneratingfacilityprojectedloadingtoidentifythefollowing:(a)thefrequencyofinadvertentexport;(b)therealpower(watts)levelofinadvertentexport;and(c)thelengthofinadvertentexport.Thecustomerwillhave15businessdaysfromthetimeoftherequesttoprovidetheinformation,butwillalsobegiventheoptionofprovidingtheinformationwiththeirapplicationand/oratthetimethatSupplementalReviewcommences(tofacilitatefasterreview).3.WhenDistributionupgradesareidentifiedformitigationofthermaland/orvoltagedeviationsandcustomerhasprovidedtheinformationasoutlinedin(2),thenTechnicalReviewunderScreenPrecognizespowercontrolparameterstotheextentfeasibletakingintoaccountlocalfeederconditions.4.ForExistingGeneratingFacilitiesthatmeettherequirementsunderthisproposal,onlythelargestgeneratingfacilityinthelinesectionwouldbeusedforaggregateevaluationforsubsequentinterconnectionrequests.

Page 136: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

134

ProponentpositionbyCALSSA:

NowthattheULCRDisavailabletotestpowercontrolsystemperformance,itprovidesanopportunitytoalterthereviewprocesstoutilizeamorepragmaticassessmentofthepotentialimpactsthatnon-exportandlimitedexportprojectsmayhaveonthesystem.ProposalA-B#1addresseshowthiscouldbedoneforprojectswitharesponsetimelessthan2seconds.Forprojectswitharesponsetimelessthan10seconds,theproponentsrecognizethatthesesystemshavereducedgridimpactascomparedtothosethatconstantlyexporttheirmaximumcapacity.Itisalsotrue,however,thathavingprojectsinadvertentlyexportwithanuncontrolledfrequencycouldimpactthegridinanequivalentmannertothosethatconstantlyexport.Continuingtoassumeinthereviewprocessthatprojectswithresponsetimesgreaterthan2secondsbutlessthan10secondswillbeexportingatthefullaggregatenameplateamountforalltypesofsystemimpactassessments,canresultinunnecessaryupgradesandtherebyincreasethecostsofDERdevelopmentforbothDERcustomersandotherratepayers.Thus,becausetherearenotyetacceptedpracticesorstandardstoguidehowtoscreenorotherwiseevaluatehowuncontrolledexportsupto10secondswillimpactthesystem,thisproposalisdesignedtoallowtheutilitiestoexercisetheirengineeringjudgmentinevaluatingwhethertheybelievetheuncontrolledinadvertentupto10secondsislikelytocauseequipmentoverloadorothersignificantnegativesystemimpacts.ProjectsmeetingthecriteriaidentifiedintheproposalwouldbeevaluatedattheirnameplatecapacityundertheinitialFastTrackscreens.IfinSupplementalReviewtheutilitiesidentifythatanupgrademaybenecessarywhenassumingthefullnameplatevalueisexported,theycanthenutilizeinformationprovidedbythecustomeraboutexpectedsystemperformancetoevaluatewhetherupgradesarenecessaryifaprojectislimitingitsexport.Forexample,ifacustomerhassteadyload,apowercontrolsystemmaybeabletomanagedischargingwithminimalinstancesofinadvertentexport.Whereasifthecustomerhaslargemachinesthatfrequentlyturnonandoff,thefrequencyofinadvertentexportwillbehigher.Theutilitywillbeprovidedinformationthatenablesittoweighthesefactorsinassessingpotentialimpacts.

Inthelongterm,gridengineersmaybeabletodevelopanalysistoolstoincorporatenewcustomercapabilities.Inaddition,theDERindustrymayalsobeabletoimprovetheirabilitytolimittheresponsetimeandfrequency.Inthemeantime,thisproposalseekstoimplementaninterimsolutionthatrecognizesthatstudyingprojectsatfullnameplatecapacitymaynotbeappropriateinallcasesandallowstheutilitiestoutilizeinformationaboutthesystemsexpectedperformance,andknowledgeaboutthelocalgridconditions,tomakethatassessment.

Page 137: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

135

ProponentpositionbyTesla:Teslabelievesthisproposalisundulyconservativegiventhescenarioofprojectsthatexportbetween2and10seconds.Essentiallythisapproachtreatsaprojectthatexportsbetween2and10secondsthesameasiftheprojectexhibitedunconstrainedandcontinuousexport.Theinadvertentexportsinthisscenariodonotraisethesamesafety/reliabilityconcernsasunconstrainedsimultaneousexportandshouldnotbetreatedassuch.Alsotothedegreetheconcernisthatinadvertentexporteventsacrossmultipleinstallationswouldhappensimultaneously,webelievetheoddsofthatareextremelylowandwouldbeonparwiththepresumedlevelofcoincidencethatutilitiesassumewhendoingloadstudieswheretheydonotbuildouttheirsystemassumingallcustomersusealloftheirloadsatthesametime.

Utilitypositions:

PG&EsupportsSCE’sgeneralcommentsonIssuesA&B,dated3/21/19.PG&Ebelievesthatthe2secondlimitcanhelpstreamlinethecurrentno-exportandin-advertentexportrequirementssubstantially.Unlikethegovernorcontrolofthesynchronousmachinesthattheexistinginadvertentexportprovision(30seconddelay)wasdesignedfor,thePCSisanelectronicallycontroldeviceandmayoperateinmilliseconds,ratherthanseconds,andweshouldtrytocaptureitsfullcapabilityandminimizepotentialsystemimpactswheneverpossible.PG&Eacknowledgesthatchangingthetimedelayfrom30secondsto10seconddelayshouldlowerpotentialsystemimpactandmayhelptoreducetheamountofreviewtimeneeded.ButPG&EbelievesthattheexistingSecMmprovisionsprovideadequateflexibilitytoenableULCRDcertifiedPCSpowersystemtointerconnectalready.ThewordingintheexistingRule21accountsforthepossibilityofPCSusagealready.PG&EisopentoconsideringminoradjustmentstoRule21iftherearespecificgapsthatneedtobeaddressed.

ProposalA-B#3.Non-consensusAninverterapprovedfornon-exportandlimited-exportcanbesetusingdifferentmaximumexportvaluesettingsatdifferenttimesoftheyear,ifitqualifiesunderProposalA-B#1(responsetimelessthan2seconds)orProposalA-B#2-a(responsetimebetween2-10seconds),andatthediscretionoftheutilityuntilafutureschedulingstandardisreleased.

Supportedby:CALSSA,CleanCoalition,GPI,IREC,Nuvve,TeslaOpposedby: PG&E,SCE,SDG&E

Page 138: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

136

Conditions:• CertifiedtotheULCRD• Settodifferentexportvaluesatdifferenttimesoftheyear• Inverter-basedandcertifiedtoUL1741SA• AtthediscretionoftheutilityuntilafutureSchedulingstandardisreleased

ReviewProcess:

• SameasProposalA-B#1,usingtemporalprofile,iftheresponsetimeislessthantwoseconds

• SameasProposalA-B#2-a,usingtemporalprofile,iftheresponsetimeisbetweentwosecondsandtenseconds

ProponentpositionbyCALSSA:

SmartinverterPhaseIIIFunction8(Scheduling)willenablesystemstohavedifferentmaximumexportvaluesatdifferentpartsoftheyear.Theexportvaluescouldvaryseasonally,monthly,orhourly.AlthoughtheWorkingGroupTworeporthasnotbeenruledupon,thisoptionwouldbeusedtoimplementtheIssue9proposal,andpotentiallyforotherpurposesassociatedwithtimeofuseratesorothereconomicconditions.DistributedenergyresourceswillberequiredtohavethisfunctionalityasofAugust2019.Untilastandardisdevelopedtotestperformanceofthefunction,utilitieswillhavethediscretiontoacceptequipmentfunctionalityandwillestablishamechanismforvalidatingproposedprofiles.Theschedulingproposedheredoesnotrequirereal-timecommunication,contrarytoutilityclaims.

Utilitypositions:

SCE:Thisproposalisprematuregiventhatnostandardshavebeendevelopedtotestcontrolsystems,asindicatedinCALSSAandIREC’sproposal.Thus,inconcept,SCEisnotagainstthisproposal,butinordertoimplementthisproposal,testingstandardsandrequirementsneedtobeimplemented.FurtherSCEnotesthatseveraladvancedfunctions,includingSmartInverterFunction#8(Scheduling)andFunction#3(LimitRealMaximumRealPowerMode)maybedelayedbeyond2020.Further,theULCRDmustbeupdatedtoincludethetemporaltestingproceduresforwhichworkhasnotcommenced.Forthesereasons,SCEbelievesthatitisprematuretorequirethesecapabilities.Insteadofaddressingthisproposalatthistime,theCPUCshouldrequirethat9monthsafterthesetechnicalspecificationsandstandardshavebeenapprovedbythestandardsapprovingbodies,utilitiesshallmakethiscapabilityavailableforuse.ThistimewillbeneededbySCEtoadopttools,forms,andtechnicalevaluationmethodsintheinterconnectionprocessandwillallowtheindustrytimetomanufacturecontrol

Page 139: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

137

equipmentwiththiscapability.ThisprocesshasworkedwellaspartofSmartInverterimplementationphases,andthus,shouldbefollowedhereaswell.SDG&Edoesnotsupportthisproposal,sinceitispremature.TestingstandardsandrequirementsfirstneedtobecreatedbeforeimplementingsmartinverterPhaseIIfunction8.SDG&Edoesnotsupporthavingthediscretiontoacceptequipmentfunctionalityandestablishingamechanismforvalidatingprofiles.SDG&E’smechanismistoutilizeatestingstandardtovalidatetheperformanceandestablishuniversalstandards.SDG&E:DistributedenergyresourcesarescheduledtoberequiredtohavethisfunctionalityasofAugust2019,butdiscussionsareongoingwiththeCommissiontoevaluateifthisdateisprematureandifastandardfirstneedstobedeveloped.PG&EagreeswithSCEandSDG&Ethatthisproposalispremature.TemporalcontrolisnotcurrentlycoveredintheULCRD.ButthismaybeconsideredafterthestandardsareinplaceandafterthecommunicationsystemsareinplaceandcommunicatingwiththeappropriatePG&Egridcontrolsystems.

ProposalA-B#4.ConsensusForSCEcustomersonly,beginning6monthsaftertheapprovaloftheAdviceLetterimplementingthefinaldecisiononWorkingGroupThree,customersapplyingforinterconnectionwithaPCSmustuseaPCSalreadyontheapprovedlist.Interconnectionapplicationformsaretobeupdatedwithnewrequiredfieldsincludingcontrolinformationandlimitedexportsetting.SCEmadethisproposal,andpartiesagreedtoitwiththeunderstandingthatitwouldonlyapplytoSCEcustomers,nottocustomersofotherutilities.ProponentpositionbyCALSSA:

Thisproposalwillallowutilitiestohavethecertifiedcontrolinformationavailableaheadofinterconnectionrequests,whichwillsignificantlyexpeditetheinterconnectionprocess.

EquivalentprocessesfortheimplementationofSmartInvertersthoughtheusageofpre-approvedlists(CEC-Inverterapprovedlist)haveallowedtheutilitiesandDERapplicantstohaveanefficientandcost-effectiveinterconnectionreviewprocess.Underthoseprocesses,theutilitiesincludeintheirinterconnectionportals,thelistofpre-approvedsystemswhichthecustomercanthenselect.Whenapre-approvedcontrolsystemisselected,thenthecertificationreviewaspartoftheapplicationprocessisnotnecessary

Page 140: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

138

resultinganefficientoverallinterconnectionprocess.SCEnotesthattheULPowerControlSystemsCRD(ULCRD)testingprocedureswereapprovedMarch2019andthusbythetimethefinalapprovalforWorkingGroupThreeisissuedwiththe6monthsproposed,controlmanufactureswouldhavehadmorethan12monthstocertifiedtheircontrolssystems.

UtilitypositionbySCE:SCEbelievesthatrequiringcustomertosubmitinterconnectionapplicationswithpre-approvedcontrolsystemswillallowtheutilitiestomaximizetheefficiencyintheinterconnectionportalsintheinterconnectionapplicationprocess.SCEalsounderstandsPCScontrolmanufacturersmayneedtimetocertifiedequipmentandthustheproposalallowsuptosixmonthsafterthefinaldecisiononWorkingGroupThreeforcontrolmanufacturestocompletetesting,certificationandlistingintheutilityorrelevantPCScontrollisting.

Page 141: R1707007 Working Group Three Final Report · Working Group One submitted its final report on March 15, 2018. Working Group Two submitted its final report on October 31, 2018.2 An

139

IssueDWhenshouldtheCommissionconsiderresultsofaninitialreviewordetailedstudytobebinding?UnderwhatcircumstancesshouldtheCommissionallowtheresultstobechanged?PROPOSALTheWorkingGroupdoesnotmakeanyproposalforthisissue.BACKGROUNDCALSSAproposedthisissueforconsiderationknowingthatmultiplecustomershadhadtheexperiencethatautilityhadtoldthemafterinitialreviewthatvoltagerisestudiesindicatedupgradeswerenotrequired,thenafterthecustomersinstalledsystemstheutilitysaidvoltagerisestudiesindicatedupgradeswererequired.Thesamecalculationwasdonetwicewiththesameinputsandproduceddifferentresults,causingcustomerstoincurexpensesthatwerecontrarytotheexpectationstheyhadbeengiven.However,aftertheWorkingGroupbegandiscussingthisissue,CALSSAlearnedthattheutilityinquestionhadfixedtheproblem,harmonizingthecalculationmethodologybetweentwodifferentdepartments.Utilitiesagreethatasageneralprincipletheyshouldnotchangeadeterminationofnomitigationsbeingrequiredunlessnewfactorsareconsideredorthereisamaterialchangetotheapplication.DeterminationscanchangebetweenSupplementalReviewandDetailedStudy,butthatisduetoperformingamoredetailedanalysisusingadditionalinputs.InabsenceofanyevidenceofanongoingproblemCALSSAdoesnotbelievetheCommissionneedstotakeactionatthistime.Thereisnoneedtofixaproblemthatdoesn’texist.CALSSAappreciatesthattheissuewasresolvedbytheutilitywhenitoccurredandregretscausinganunnecessarydiscussiononthetopicintheWorkingGroup.TheWorkingGroupalsodiscussedthesimilarbutdifferentissueofbindingcostestimates.However,thisissuewasconsideredextensivelyinR.11-09-011,withtheresultthattheCommissioncreatedtheCostEnvelopeOptionpilotprogramandtheEnhancedPre-ApplicationReportinD.16-06-052.TheCommissionmayneedtoconsideranotherapproachatsomepoint,butwiththepilotprogramstillunderwaytheWorkingGrouprecommendsnoactionatthistime.