R. Bailey, PS/SPS days, January 2005 Towards the CCC.

16
R. Bailey, PS/SPS days, January 2005 Towards the CCC

Transcript of R. Bailey, PS/SPS days, January 2005 Towards the CCC.

Page 1: R. Bailey, PS/SPS days, January 2005 Towards the CCC.

R. Bailey, PS/SPS days, January

2005

Towards the CCC

Page 2: R. Bailey, PS/SPS days, January 2005 Towards the CCC.

R. Bailey, PS/SPS days, January

2005

Status December 2004

Page 3: R. Bailey, PS/SPS days, January 2005 Towards the CCC.

R. Bailey, PS/SPS days, January

2005

Reminder of what CCC is about

Merging of PS and SL divisions into AB department in 2003 One Operations group Only makes sense in a single control room

DG decided early in 2004 that this will be on the B874 site

Bring together under one roof MCR operations PCR operations TCR operations LHC cryogenic operations

Result; the Cern Control Centre Operational from 2006

Page 4: R. Bailey, PS/SPS days, January 2005 Towards the CCC.

R. Bailey, PS/SPS days, January

2005

Issues addressed over the last year(s)

Requirements and modifications to building 874 Requirements and layout of the CCC Interior design of the CCC Specification and procurement of the consoles Staff needed in the coming years

People involved; R.Bailey, M.Bätz, B.Frammery, D.Manglunki, R.Saban, L.Serio

(CCCWG) M.Delrieux, R.Giachino, S.Knoops, E.Liénard, L.Randot,

L.Stewart (IDOC) M.Clark, D.Hartley, J.Wood (CCD) R.Ballet, A.Bland, P.Charrue, J.J.Cloye, C.Frisk, R.Hopkins

(AB/CO) J.L.Baldy, S.Anghelone, M.Poehler, P.Vachetta (TS/CE) L.Burguete-Oliete, M.Colin, R.Forrest, R.Lauckner ($$)

Page 5: R. Bailey, PS/SPS days, January 2005 Towards the CCC.

R. Bailey, PS/SPS days, January

2005

Modified building 874 - rez

625m2

Page 6: R. Bailey, PS/SPS days, January 2005 Towards the CCC.

R. Bailey, PS/SPS days, January

2005

Modified building 874 - etage

Page 7: R. Bailey, PS/SPS days, January 2005 Towards the CCC.

R. Bailey, PS/SPS days, January

2005

CCC layout issues

Contents 35 control console modules 5 access console modules 4 Mail/etc PC tables 1 social area Storage furniture

Consultants used Several iterations

Criteria applied Links between the facilities Accessibility to different areas Balance between open and closed Density of people Noise levels

Page 8: R. Bailey, PS/SPS days, January 2005 Towards the CCC.

R. Bailey, PS/SPS days, January

2005

CCC layout – final

Laura Stewart AT/ECR

SPS

LHC

PS

TI cryo

Page 9: R. Bailey, PS/SPS days, January 2005 Towards the CCC.

R. Bailey, PS/SPS days, January

2005

CCC interior design issues

Lighting 7x11 direct/indirect (20%-80%) from ceiling provide

background level of 200+ Lux Task lighting at workstation level

Acoustics Ceiling, walls, floor & furniture acoustically treated Acoustic screens behind consoles RT<0.6s

Interior decoration 3 Harmonious colour schemes from CCD 4th chosen by IDOC

Page 10: R. Bailey, PS/SPS days, January 2005 Towards the CCC.

R. Bailey, PS/SPS days, January

2005

CCC interior design - final

Mike Clark CCD

Page 11: R. Bailey, PS/SPS days, January 2005 Towards the CCC.

R. Bailey, PS/SPS days, January

2005

Consoles specification - final

Page 12: R. Bailey, PS/SPS days, January 2005 Towards the CCC.

R. Bailey, PS/SPS days, January

2005

Procurement; 4 firms invited to tender

Page 13: R. Bailey, PS/SPS days, January 2005 Towards the CCC.

R. Bailey, PS/SPS days, January

2005

Dates and schedules

End of SPS run 2004

Building ready end 10/2005

CCC operational 02/2006

2004 20062005

Page 14: R. Bailey, PS/SPS days, January 2005 Towards the CCC.

R. Bailey, PS/SPS days, January

2005

Staff evolution for AB/OP

Page 15: R. Bailey, PS/SPS days, January 2005 Towards the CCC.

R. Bailey, PS/SPS days, January

2005

Outstanding issues

Standard computers for all consoles Different OS 2006 start-up with existing 2004 applications When to converge ?

4 different Access systems SPS & EA as is PS panels emulated LHC new system When to converge ?

Communications in/out/within CCC Fast analog signals in CCC Parking space Office space

Page 16: R. Bailey, PS/SPS days, January 2005 Towards the CCC.

R. Bailey, PS/SPS days, January

2005

The bottom line

Restart all machines from CCC in 2006 PS and SPS off ~ 18 months Remote operation Long checkout periods

In case CCC is late Keep MCR active Access systems ?

2006 is going to be fun!