Quinault Indian Nation Long Range Hazard Mitigation and Adaptation Planning.

16
Quinault Indian Nation Long Range Hazard Mitigation and Adaptation Planning

Transcript of Quinault Indian Nation Long Range Hazard Mitigation and Adaptation Planning.

Page 1: Quinault Indian Nation Long Range Hazard Mitigation and Adaptation Planning.

Quinault Indian Nation

Long Range Hazard Mitigation and Adaptation Planning

Page 2: Quinault Indian Nation Long Range Hazard Mitigation and Adaptation Planning.

2

Primary HazardsEarthquakeTsunamiSea Level RiseCoastal ErosionStorm SurgeLandslide

Page 3: Quinault Indian Nation Long Range Hazard Mitigation and Adaptation Planning.

3

Village of Taholah

Page 4: Quinault Indian Nation Long Range Hazard Mitigation and Adaptation Planning.

4

Page 5: Quinault Indian Nation Long Range Hazard Mitigation and Adaptation Planning.

5

Page 6: Quinault Indian Nation Long Range Hazard Mitigation and Adaptation Planning.

6

Page 7: Quinault Indian Nation Long Range Hazard Mitigation and Adaptation Planning.

7

Page 8: Quinault Indian Nation Long Range Hazard Mitigation and Adaptation Planning.

8

Page 9: Quinault Indian Nation Long Range Hazard Mitigation and Adaptation Planning.

9

State Route 109

Vulnerabilities

•Landslide

•Storm Surge

•Tsunami

•Sea Level Rise

•Coastal Erosion

Asset Criticality

•The only improved

access for Taholah

Page 10: Quinault Indian Nation Long Range Hazard Mitigation and Adaptation Planning.

10

Page 11: Quinault Indian Nation Long Range Hazard Mitigation and Adaptation Planning.

11

Page 12: Quinault Indian Nation Long Range Hazard Mitigation and Adaptation Planning.

12

Page 13: Quinault Indian Nation Long Range Hazard Mitigation and Adaptation Planning.

13

Page 14: Quinault Indian Nation Long Range Hazard Mitigation and Adaptation Planning.

14

Short Term Priorities Taholah Master Plan Taholah Sea Wall Relocate children’s &

elders programs- Taholah School- Head Start- Early Head Start- Day Care

SR 109 Vulnerability Assessment and Alternative Alignments Plan

Queets Sewage Treatment Relocation

Long Term Priorities Taholah Relocation

SR 109 Reconstruction

Page 15: Quinault Indian Nation Long Range Hazard Mitigation and Adaptation Planning.

15

FEMA’s Support Pre-Disaster Mitigation and other FEMA Mitigation

grants

- Annual proposals from QIN, including 2014. Restoration of IRR Emergency Roads Fund (25 cfr

170.205…)

- Critical resource withheld from tribes All Hazard Mitigation Plan 5 year Revision

- 2014 – 2015 update

Technical assistance for other large grants (TIGER)

- Annual proposals from QIN, including 2014.

Page 16: Quinault Indian Nation Long Range Hazard Mitigation and Adaptation Planning.

16

Tyson Johnston

Quinault Nation Business Committee (Tribal Council)

[email protected]

Teddy Wallace Hardcastle

Quinault Nation Community Development Department

[email protected]

Garrett Phillips

Quinault Nation Community Development Department

[email protected]

Contact