Quality Juice made from real California fruit X470 Project Management EDP 325936 Summer 2011 Team: L 'Spawns Soif

description

Quality Juice made from real California fruit. Soif. X470 Project Management EDP 325936 Summer 2011 Team: L 'Spawns. Team. Team Name L’SPAWNS Project Manager Karen Stanger Team Members Jing Wang Kendra Polluck Konstantinos Liolios Dino Michael Achury Phi Nguyen Shraddha Singh. - PowerPoint PPT Presentation

Transcript of Quality Juice made from real California fruit

Quality Juice made from real California fruit

X470 Project Management

EDP 325936

Summer 2011

Team: L 'Spawns

Soif

2

Team

Team Name L’SPAWNS

Project Manager Karen Stanger

Team Members • Jing Wang• Kendra Polluck• Konstantinos Liolios Dino• Michael Achury• Phi Nguyen• Shraddha Singh

Mission

To produce a healthy, tasty, friendly, economical, and high quality juice –

Made of real Californian fruits!

Our commitment to the highest standard is the foundation of our business. We stand behind our product. Our mission is to make world a healthier and better place to live.

ValuesL’Spawns as a team, and as individuals, values integrity, honesty, healthiness, and a greener world. These values drive us to achieve our mission

4

Project Mission Statement

By January 1st 2012, L’Spawns will have ready for distribution 10,000 cases of the new Naked product ‘Soif’, a seasonal Juice drink made from 40% California juice – delivered in a trendy re-usable bottle.

Project Charter• Produce a glass bottle from recycled material

that can be reused or traded at vendor locations for immediate discount for Soif flavored juice beverages.

• Create a new economical juice drink made from local california fruit

• Create a catchy and appealing label

5

Stakeholders

• Naked – Sponsor

• Customers

• Manufactures

• Vendors

6

Project Assumptions

• Budget provided by Naked

• Production using existing Naked facilities

• Distribution using existing Naked infrastructure

Project ConstraintsADD

7

Project Scope

In Scope:

• Design and acquire new bottle

• Develop new fruit drink recipe

• Design and produce bottle label

• Produce first batch of 10,000 cases

Out of Scope:

• Distribution

• Manufacturing

• Acquiring capital

8

Risks

Risk Probability

Impact Response

Fruit unavailable

Medium High adjust recipe/flavour of beverage to reflect fruits that are available

Production is delayed

Medium Medium Find alternate production plant, call in experts to fix production machinery

product from small scale production run is not good

Low High adjust recipe/change fruit blend, add new flavor

Juice

9

RisksLabel

This has already been done but it is not in this file….

10

RisksBottle

Needs to be completed

11

Deliverables1) Bottle

2) Juice

3) Label

12

Milestones1) Bottle

Add bottle breakdown

2) Juice

• Vendor contracts signed

• Fruit Delivered

• Small scale production run completed

• Taste test/focus group completed

• Regulatory approval signed

3) Label

Add label breakdown

13

Cost

Add Big Picture Cost

i.e. – estimate cost for the three big deliverables

(and we’ll have a more detailed cost breakdown after the WBS – I think is the best way to do it, but

not sure…)

14

Gantt Chart

I think it would be best to show the bar graphs of maybe the level three activities – because if we show bars for the level two activities – it is just going to be three solid bars going across from start to finish. And if we show level 4+ activities, the chart might start to get too confusing….

What do you think?

And, include milestones?

Also, should we include a bar for ‘project mgmt activities’ – mainly a small bar at the beginning of the timeline for planning and a small bar at the end of the timeline for close out activities…??

15

WBS

Here is the detailed WBS!!

You got this Dino?

16

Time Structure

We need to breakdown timeline and lengths of activities….

Does this need its own slide, or is this information already included in the WBS?

17

Cost Breakdown

Detailed cost breakdown of all WBS activities

Example format….(? I’m just making this up…could be used for time structure as well, or… combine cost and time??)

Activity Time Cost

1.1 Create schedule of seasonal fruit availability

2 days n/a(labor?)

1.2 Focus Groups/taste test

1.2.1 Organize 2 days

1.2.2 Execute 1 day $2000

18

Communication Plan

Who needs to be communicated with?

What to communicate

How to communicate

How often to communicate

Naked Parent Company

Project status Email/meetings Regularly

Customers Information about new product

Marketing/advertisements

regularly

Fruit Vendors Orders Contracts Regularly to check on orders

Manufacturing Dept.

Scheduling requirements

Email/meetings Prior to production date

More?

More?

19

Communication Plan

20

Responsibility Matrix

List WBS items

Assign a code where appropriate:A – approves, S – supports, C – creates, I – informs, R - reviews

PM Sponsor Juice Team

Bottle Team

Label Team

Activity 1

Activity 2

Activity 3

Activity 4

21

Vendor Evaluation Criteria

Don’t know what the best format for this is…what do you think?

This is the content I came up with for Juice:

• Cost – looking for best value• Quantity – need a vendor that produces large

quantities• Location – the closer to production plant the

better• Availability – growers that offer a variety of fruit

throughout the year

22

Monitoring and Control

Don’t know if we need content for this?

Do the example projects have something like this

23

Anything else?

What else are we missing? Anything stand out from the example projects?