Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module...

6
Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation

description

QC at Pol. Hi. Tech Profiles, Paint, Wire, Wire-holder, End-caps, PC boards Sleeves All components pass visual inspection All components within mechanical tolerances No defects in coating Surface resistivity within specs No bad solder connections on PC board Pass leak test (400 V plateau in binary gas Pass 30 day test Tube accepted and sent to US

Transcript of Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module...

Page 1: Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.

Quality Control

QC is taken very seriousQC Document for Tube ProductionQC Document for Module AssemblyQC Document for Installation

Page 2: Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.

Graphite CoatingVisualResistivity (sides, bottom)Detailed records

WiresVisualTest sample of every spoolCapacitanceResistance/Connectivity

TubesLeak testBurn-InPlateauLong term stability(30 days)

WireholderPosition

PC BoardVisualConnectivityCold solder joints

Page 3: Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.

QC at Pol. Hi. TechProfiles, Paint,Wire, Wire-holder,End-caps, PC boardsSleeves

All components pass visual inspectionAll components within mechanical tolerancesNo defects in coatingSurface resistivity within specsNo bad solder connections on PC boardPass leak test (<1 small bubble/min)Pass wire test (weigh wire segment of each spool)Pass wire tension test/capacitance within specsPass electrical conditioning test>400 V plateau in binary gasPass 30 day test

Tube accepted and sent to US

Page 4: Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.

QC at Princeton and Ohio StateTubesRibsPhi - Strips

Inspection of shipping box/transport damageTube resistance and capacitance within specsPass burn-in/conditioning test for 7 daysGood signal shape>300V plateau with ternary gasCounting rate on plateau within expectationsA sample of tubes pass efficiency testPass scan testPhi strips pass conductivity test and visual inspectionModule passes 7 day burn-in test

Module accepted and sent to SLAC

Page 5: Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.

QC at SLACModulesz – StripsElectronicsHV, cables

Inspection of shipping box/transport damageTube resistance and capacitance within specsPass burn-in/conditioning test for nn days

-> Action Item: Define QC procedures at SLAC

Can we create a preliminary list today?

Module installed

Page 6: Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.

Full System Test at SLAC

It would be very valuable to have a complete system up andrunning at SLAC before we install the first modules into BaBar

This should include

Cosmic ray triggerSeveral modules with z- strips(Production) HV system(Production) Front-end electronicsBaBar DAQ

Should we encourage somebody to look into this?